ML20198C224

From kanterella
Jump to navigation Jump to search
Responds to 980701 Request for Approval of Route for Transporting Sf from Univ of Missouri Research Reactor to Savannah River Site,Aiken,Sc.Route Which Meets Regulatory Requirements of 10CFR73.37 & Approval Through Dec 2000 Encl
ML20198C224
Person / Time
Site: University of Missouri-Columbia
Issue date: 12/15/1998
From: Shankman S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Kutikkad D
MISSOURI, UNIV. OF, COLUMBIA, MO
References
182-SFPO:GMB, NUDOCS 9812220006
Download: ML20198C224 (5)


Text

_ _ _ _ _ _ . . _ . _ . _ __. _ _ _ ____ ___ . _ _ _____. _ .

OA 27 JA 3 TO ( "

q ) (fy fi- n On 1/1 U0 1 ,1 2 t trM~

182 SFPO:GMB Mr. Das Kutikkad Reactor Physicist iT THIS DOCUMENT !$;

$s*eaNha UPON* REMOVAL OF ATTAC Columbia, MO 65211

/}LCVoAYr o CL

Dear Mr. Kutikkad:

/ $nc/' / 2S 40C /c S Pr F/.tob This is in regard to your July 1,1998, request for an approval of a route for transporting spent fuel from the University of Missouri Research Reactor to the Savannah River Site, Aiken, South Carolina.

The route in Enclosure 1 meets the regulatory requirements of 10 CFR 73.37. - Enclosure 2 constitutes approval for this route through December 31, 2000. Note that transportation of licensed radioective material must be conducted in compliance with applicable U. S. Department of Transportation regulations.

NRC staff have completed the arrangements with local law enforcement agencies required by 10 CFR 73.37(b)(6). Note that armed escorts are required for the following urbanized areas: St.

Louis, Missouri; Nashville and Chattanooga, Tennessee; Atlanta and Augusta, Georgia.

Information on these arrangements is provided in Enclosure 2, and is to be incorporated into your shipment plans and provided to your carrier along with instructions regarding its use. If your carrier deviates from the approved route, please provide details of the deviation to the contact listed below as soon as possible.

The notification requirements of 10 CFR 73.37(f) and 73.72 apply for each shipment. When making notification to this office under 10 CFR 73.72, please confirm that armed escort will be provided as required, and that the appropriate govemors or designees will or have been r.otified.  ;

Should you require additional information or have questions conceming this matter, please contact Gloria Bennington of my staff at (301) 415-8524.

Sincerely, e "'isan F. Shankman, Deputy Director

' 9812220006 981215 rectorate of Licensing and Inspection PDR P

ADOCK 0 g6 ent Fuel Project Office Nuclear Material Safety and Safeguards Docket No. 50-186 tated

((?] { M W ,

OFC SFPO 5 SFPO C- SFPO JSFRQ.>(7/

NAME C GMBennington RCook MMaston n DATE 12////96 12////98 12 OFFICIAL RECORD COPY C = COVER E = COVER & ENCLOSURE N = NO COPY t

Dccument Transmitted Herewilli Contams Safeguads information If - {} 2] h

. . .._ _ _ . . _ . . . _ . . . . . . . .~. _ _ . . _ ._ _ . _ . _ ._

s-

  1. 182 (UMO/SRS)

DISTRIRUTION: 05000186D60R-w/ enclosures: w/o enclosures:

. Docket File 50-186. NMSS/SFPO R/F CJPaperiello Case File 50-186 Njensen, OGC MRodgers Regions ill & ll Mmessier, OCFO (TAC-L22663)

PUBLIC -

i

)

1 l

1 l

l -

l l

l I

I' i

l I,

e i

k g>RR4ep4

,e o

~

b SPENT FUEL PROJECT OFFICE OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS DECEMBER 1998 IRRADIATED REACTOR FUEL ROUTE

SUMMARY

UNIVERSITY OF MISSOURI, COLUMBIA, MO TO DOE SAVANNAH RIVER SITE, SC (182)

$ m,

) + - .

i y.

l } j.

y a- t i  !

g llf Enclosure 1 Page 1 of 3

.c k

IRRADIATED REACTOR FUEL ROUTE

SUMMARY

UNIVERSITY OF MISSOURl, COLUMBIA, MO TO DOE SAVANNAH RIVER SITE, SC SC CONTINUE ON l-20 1-20 NE AIKEN 18 851.5 SC TURN ON SC-19 towards SC-19 S NEWELLENTON 14 000.5 US-1 SC CONTINUE ON SC 19 SC-19 S FACILITY 8 883.5

+ . -

.}:.

W %-w A W; Di;h.

.shl4 8 /;i,,4

sC.j"iT STATE MILEAGEC..l ~ . d SUBTOTAL e ~$$l~?; -t M,'.?

~ ' ~~

pc.$,;$?; ,;3".a"'# Mbte G M*rr.38l %

' -~t-

- o . = w e .c , 4,. + . . . . _ . + , . , .-

e ,--

+ ROUTETOTAL imprw? o".

F. - _ . . . 4-- 9, we etv_i*-W.- #, ,3.

rd. e49s4W

,-g 1 4 89.5 ~ C O, 4

1 l

i I

I Enclosure 1 Page 3 of 3 4