Rev 2 Procedure 1040-001-019, Containment Isolation Valves
ML20083A294
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/02/1983
From:
TOLEDO EDISON CO.
To:
Shared Package
ML17150A231 List:
References
1040-001-019, 1040-1-19, IEB-79-01B, IEB-79-1B, NUDOCS 8312200245
Download: ML20083A294 (42)


Text

CALCULATION / PROBLEM COVER SHEET j j Calculation / Problem No: 1040-001-019

Title:

Containment Isolation Valves 2.16 Client: Toledo Edison Company Project: Davis-Besse Unit 1 I & E Bulletin 79-01B Job No. 1040-001-671 Equipment Qualification Design input!

References:

Design Inputs are outlined in the Cover Report. ,

Arsumptions:

Assumptions are outlined in.the Cover Report.

M;thod:

l I Methods are outlined in the Cover Report.

l R: marks:

EDS Nuclear Report No. 02-1040-1076.

l REV. NO. ' APPROVED DATE REVISAON o Oit STQ Q$g S .m9 L o-2-8(

i & -2 a a - M&AJ &n 2 nm na rw -s a%Lsp n%/n ii i

p=:88my;3 ,,,, , ,, , .

o)

\

FrcL Lef: Dtvis-%cn Unit 1 t)

Docket: 50-346 MASTER LIST HARSii ENVIRONMENT Index No: _216M-001_

CONTAINMENT ISOLATION VALVES Rev.: 2 Prepared by:

Checked by:

t

,MM_. / Date: Date: //// b N/M/5 l l 1 l l 1 l l l LOCATION I Worksheet i I Plant I 1 Inside

_I l l_ Inder No. l Rev. IID Number I l Outside i l Primary Primary l l 1 1 Generic Nane l l I l l 216H-009 1 2 lMV0240A I Containment I Containment i REMARKS l 216H-010 1 2 l Valve Motor Operator I i i

_l (MV0240B 1 Valve Motor Operator l Rs. 315 l l 216H-Oli i 2 IMV0624B I I I 216H-012 1 2 I Valve Motor Operator l 1 Rs. 314 l I

lMV1407A 1 Valve Motor Operator l l l 216H-013 l 2 lMV1407B l Rs. 427 I

} 216H-014 l 2 l Valve Motor Operator l Rs. 315 l l I

(MV1411A l Valve Motor Operator l l l 216H-015 l 2 l Rm. 314 I IMVIAliB l Valve Motor Operator 1 Rm. 315 l l l 216H-016 l 2 (MV1567A l I 216H-017 1 2 1 valve Motor Operator 1 l Rs. 314 I l

lMV15670 l Valve Mator Operator l Rm. 315 l l l 216H-018 1 2 lMV20000 l 1

l 216H-019 l 2 t valve Motor Operator l Rm. 314 l 1

lMV20010 i Valve Motor Operator l l i 216H-020 2 l Rm. 303 l 1 (MV20030 I Valve Motor Operator I l l 216H-021 1 2 l Rm. 427 I (MV2012A 1 Valve Motor Operator 1 l l 216H-022 l 2 lMV2012B l Rm. 314 l l 216H-023 1 2 l Valve Motor Operator i Rm. 220 l l l

lMV50700 l Valve Motor Operator l l l 216H-024 l 2 I Rm. 236 l lMV50710 1 valve Motor Operator i l l 216H-025 1 2 IMV50720 I Annulus l i Valve Motor Operator i Annulus l l 216H-026 l 2 (MV50730 l l 1 216H-027 l 2 l Valve Motor Operator I l Annulus l l

lMV50740 i Valve Motor Operator l l l l 216H-028 l 2 IMV50750 Annulus l i Valve Motor Operator l l l 216H-029 -l 2 IMV50760 l Annulus I i Valve Motor Operator I i Annulus i i 216H-030 l 2 IMV50770  !

l I 216H-031 2 i Valve Motor Operator l Annulus I 1

1 (MV50780 ) Valve Motor Operator l l 1 216H-032 l Annulus  !

1 2 lMV50790 l l 216H-033 l 2 l Valve Motor Operator l Annulus l I

IMVMUO2A 1 Valve Motor Operator 1 i 1 l 216H-034 1 2 ISV1542 Annulus l i Solenoid Valve i Rm. 214 l l l 216H-035 l 2 lSV1544 i l

l l 216H-036 l 2 l Solenoid Valve i Rm. 314 I ISV1545 i Solenoid Valve 1 l l 216H-037 1 2 ISV1719A l Rm. 303 I l Solenoid Valve l i l 216H-038 1 2 lSV1719B l Rm. 314 l l Solenoid Valve l Rm. 220 l l l 216H-039 1 2 ISV1773A I l l 216H-039 l 2 I Solenoid Valve 1 i Rm. 236 l ISV1773A l Solenoid Valve i Rm. 220 l l I 1

l i l l Rm. 220 l 1

I l I i l I

ex

[ \

('"\ 'V' PIciliaf: Davis-OGsca Unit 1 Docket: 50-346 MASTER LIST HARSH ENVIRONMENT Index No: _216M-002

_ CONTAINMENT ISOLATION VALVES Rev.: 2 Prepared by:

Checked by: Date: 8 I 6V4. vakf_ Date: U/: fD l l l I l 1 l l l_ LOCATION l Worksheet l l Plant l l Inside i l

l l_ Index No. Outside l I Rev. IID Number l Generic Name l Primary l Primary l 1

1 I l l l

l 216H-040 1 2 lSV2010 I1 Containment l Containment l REMARKS l l 216H-041 1 2 l Solenoid Valve I l ISV20ll i Solenoid Valve l l l I 216H-042 l 2 Rs. 314 l ISV229B l Solenoid valve l l l 216H-043 l 2 l Rm. 314 l ISV232 i Rm. 220 t l 216H-044 l 2 i Solenoid Valve l 1 ISV235A  ! l l 216H-045 4 I Solenoid Valve I Rm. 236 l 1 ISV235B l Solenoid Valve l l I 216H-045 1 2 l Rm. 314 l lSv235B l Solenoid Valve l Rm. 315 I l l l 216H-046 1 2 lSV236 I l

l 216H-047 i Solenoid Valve l Rm. 315 l 1 2 ISV5005 i 1 l

l 216H-048 l 2 i Solenoid valve i tm. 236 l ISV5006 l Solenoid Valve I i l l 216H-049 l 2 lSV5007 ha. 601 l l 216H-050 i Solenoid Valve l Rm. 407 l l l 2 ISV5008 i l l Solenoid Valve Rm. 410 l l l 216H-051 1 2 ISV6831A l l 1 l 216H-052 l 2 1 Solenoid Valve l Rm. 427 l ISV6831B l Solenoid Valve i Rm. 316 I l 1 216H-053 1 2 lSVMUO3 l l l 1

l 216H-054 1 2 l Solenoid Valve l Rm. 208 l ISVMU38 l l

I 216H-054 1 2 l Solenoid Valve l Rm. 208 l l ISVMU38 i Solenoid Valve 1 i 216H-055 1 2 l Rm. 208 l ISVMU66A l Solenoid Valve l l l 216H-056 l Rm. 208 I l 2 ISVMU66B l Solenoid Valve l l

} l 216H-057 l 2 l Rm. 208 l ISVMU66C 1 Solenoid Valve l l l 216H-058 2 l Rs. 208 l l 1 ISVMU66D l Solenoid Valve l l Rm. 208 5

l 216H-059 l 2 IMV06110 l l l l 216H-060 1 2 l Valve Motor Operator I Rm. 208 l IMV0611A l l 216H-061 l Valve Motor Operator l l Rm. 208 l l 2 lMV06030 l l 216H-062 2 l Valve Motor Operator 1 l Rm. 208 l l lMV0603A l l 216H-063 1 2 l Valve Motor Operator l l Rm. 236 l IMVCF02A l Valve Motor Operator l l Rm. 236 l t

l 216H-064 1 2 lMVCF02B I i i Valve Motor Operator l Rm. 217 l l 216H-065 1 2 lMVCF05A Rm. 214 l l t 216H-066 1 2 l Valve Motor Operator l I I IMVCFOSB l Valve Motor Operator l Rm. 217 l I l l 1

' l 2 IBEllA 1 Motor Control Center T' I Rm. 214 l l l

l i 2 IBEllB l I

l l 2 lBEllC l Motor Control Center l l Rm. 209 i See 2.21 1 l l I l Motor Control Center l Rm. 304 l See 2.21 l l l l Rm 304 i See 2.21

.i 1 l I l l

4 O

(s) Davio-B20c@

Ftcilk s.

Dockst: 50-346 Unit 1 U'

MASTER LIST HARSH ENVIRONMENT Index No: 216M-003 Rev.: 2 CONTAINMENT ISOLATION VALVES Prepared by: e. Date: ((

Checked by: M LL-j Date: ///.*//J l l l l l J l LOCATION l l I l l Worksheet l l Plant l l Inside l Outside i 4 l_ Index No. l Rev. IID Number I l Primary l Primary l Generic Name l I I l I 1 Containment I Containment l REMARKS I l l 2 lBFilA I I l

l Motor Control Center l l l l 2 lCDEllB-1 l Disconnect Switch Cabinet l Rm. 427 i See 2.21 l 1 l 2 l l Rs. 304 l See 2.21 l lCDE118-2 i Disconnect Switch Cabinet  !

l 1 2 ICDEllC l Disconnect Switch Cabinet I Rm. 304 l See 2.21 l l l 2 l l Rm. 304 ICDP11A-1 l Disconnect Switch Cabinet l See 2.21 l l 2 l l Rm. 427

, l lCDFilA-2 1 Disconnect Switch Cabinet i See 2.21 l l l 2 lCDYE2 1 i Rm. 427 l See 2.21 l l Disconnect Switch Cabinet l l

i 2 ICDYP2 1 Disconnect Switch Cabinet l Rm. 304 i See 2.21 l t

l l l Rm. 427 i l 2 lEV0240B i Terminal Block Box See 2.21 l t  ! l Rm. 314 1 2 lEV0624B l Terminal Block Box i See 2.21 l 1 1 2 lEV1407B ] I Rm. 427 i l Terminal Block Box See 2.21 l 1 i 2 IEV1411B 1 i Rm. 314 i See 2.21 3

' i Terminal Block Box l 1

l l 2 lEV1544 i Terminal Block Box l Rm. 314 l See 2.21 l l l 2 lEV1545 l l Rm. 303 l Terminal Block Box l See 2.21 l I l Rm. 314 i 2 lEV1567B l Terminal Block Box 1 l See 2.21 I l l 2  ! Rm. 314 lEV1719B l Terminal Block Box l l See 2.21 l l l 2 IEV20000 l l Rm. 236 l Terminal Block Box l See 2.21 l l 2 l l Rm. 303 1

LEV 20010 l Terminal Block Box i See 2.21 l l l Rm. 427 i l 2 lEV20030 l Terminal Block Box l See 2.21 l l l 2 lEV2010 l l Rm 314 l Terminal Block Box i See 2.21 l l i 2 lEV20128 1 l Rm. 314 l See 2.21 l Terminal Block Box l I

1 l 2 lEV5005 i Terminal Block Box l Rm. 236 i See 2.21 1 l l 2 lEV5008 l l Rm. 601 See 2.21 l Terminal Block Box l l l l l 2 lEV50700 l Rm. 427 i See 2.21 1 Terminal Block Box l l

I l 2 lEV50730 l Rm. 500 l See 2.21 l Terminal Block Box i l I

I l 2 lEV50750 i Terminal Block Box Rm. 500 l See 2.21 I l 2 lEV50780 i 1 Rm. 501 See 2.21 1

i Terminal Block Box l 1 l 1 1 2 lEV06030 l Terminal Block Box l Rm. 501 l See 2.21 l 1 l 2 lEV0603A i Terminal Block Box l l Rm. 236 l See 2.21 l l l Rm. 236 l 2 lEV607 l Terminal Block Box 1 i See 2.21 1 l l 2  ! Rm. 314 lEvo6110 i Terminal Block Box I l See 2.21 l l l 2 lEV0611A l I Rm. 208 i See 2.21 I Terminal Block Box I I l I l l l Rm. 208 l See 2.21 l l I l l 4

.i 5

j F cilivg Davis-82Sce Unit 1 Docket: 59-346 MASTER LIST.

HARSN ENVIRONMENT Index No: _216M-004 CONTAINMENT ISOLATION VALVES Re v. : 2  !

Prepared byi Date
// b Checked by: Wr44j Date ///J/// ,

v ,

I I I

I l I l l 'l l_ thCATION I I Worksheet l l Plant l l Inside l Outside I

l_ Index No. I Rev, IID Number l l Primary 1

(

l 1 Generic 1.ame l Primary l i l l l 3 I I 2 1

l Containment l Containment i REMARKS 1 lEVMUO3 I i

{ l l 2 lEVMU38 l Terminal Block Box l

. I I

1 i l' 1 Terminal Block Box l Rm. 208 i See 2.21 I

~2 IEVMU66 l Ra. 208 l l 2 i Terminal Block Box l i See 2.21 l lMV01060 l Valve Motor Operator l l Rm. 208 l 2 i See 2.21 1 INV0106A l Valve Motor Operator l I Rm. 500 1

[ l 2 IMV01070 l l See 2.8 l l i Valve Motor Operator I Rs. 501 i See 2.8 l 2 lMV0107A l Valve Motor Operator l l l l 2 l Rs. 501 l See 2.8 lMV05990 i Valve Motor Operutor l i l l l 2 Rs. 500 l See 2.8 l lMV06010 i Valve Motor Operator i I Rs. 314 I l 2 lMV06060 l l See 2.4 l I I 2 i Valve Motor Operator l Rs. 314 l See 2.4 IMV06120 l Valve Motor Operator l l Rs. 303 I

l l 2 lMV13660 l i See 2.4 l i l 2 1 Valve Motor Operator i Rs. 303 l See 2.4 l lMV13670 l l l l 2 i Valve Motor Operator l Rs. 314 l See 2.17 lMV13680 i Valve Motor Operator l l Ra. 314 l

j l l 2 lMV15170 l i See 2.17 l j i i Valve Motor Operator l Rs. 314 l See 2.17 1 2 IMV15180 1 Valve Motor Operator I l j l l 2 I Rs. 236 i See 2.10 l (MV15300 i Valve Motor Operator i i Re. 236

l i 2 l i See 2.10 t

! (MV15310 i Valve Motor Operator I Ra. 303 l l 2 lMV5010A l l See 2.14 l l l 2 l Valve Motor Operator 1 Rs. 314 i See 2.14 lMV50108 l Rm. 316 l j l i Valve Motor Operator l l See 2.23 1 2 iMV5010C l Valve Motor Operator i 1 l l 2 l Rs. 314 i See 2.23 '

1 IMV5010D l Valve Motor Operator I Rs. 407 l 1

j l l See 2.23 l 2 lMV5010E I Valve Motor Operator l l

! l l 2 l Re. 314 i See 2.23 l lMV5011A I Valve Motor Operator l I

{ l Rs. 314 i See 2.23 1 2 lMV50llB l Valve Motor Operator l l Rm". 303 i 1

See 2.23 l l 2 i IMV50llD 1 Valve Motor Operator 1 Rm. 410 l I i 2 IMV5011E l Rm. 315 I See 2.23 l I

I l 2 I Valve Motor Operator l l See 2.23 i lMV50370 l Valve Motor Operator l l Rm. 314 I l l 2 lMV50380  !

l See 2.23 l j l i Valve Motor Operator l Rm. 236 I See 2.15 i 2 lMV50650 l l i l 1 valve Motor Operator 1 Rm. 236 i See 2.15 l i 2 IMV50900 i i i I 2 l Valve Motor Operator I .Rm. 208 l See 2.15 l lMVDH01A 1 Valve Motor Operator l l Rs. 314  ;

l l l l l See 2.15 l 1 l Rm. 238 i See 2.10 i l I i

l '

l

e-~x Iq f [

%]

Fccilh.f:) Davis-Bassa Unit 1 MASTER LIST N

Docket: 50-346 Ind2x No: 216M-005 HARSH ENVIRONMENT Rev.: 2 CONTAINMENT ISOLATION VALVES Prepared by:

checked by:

Date: l( f!M jfyff,& Q Date: N?/23 I l l l l

l LOCATION I l l l l i Worksheet l Inside 1 Outside I l l Plant l l l Primary 1 Primary l l Index No. l Rev. IID Number l Generic Name l l l l l l Containment l Containment l REMARKS I l l l l l 2 lMVDH01B l Valve Motor Operator l Rm. 208 l

l l 2 lMVDH110 l Valve Motor Operator 1 l See 2.10 l l Rm. 220 l l See 2.10 l l l 2 lMVDH120 l Valve Motor Operator l Rm. 220 l l 2 l See 2.10 1 lMVHP02A l Valve Motor Operator l Rm. 236 1

l l 2 lMVHP02B l Valve Motor Operator l l See 2.11 l I i Rm. 236 l See 2.11

I l 2 lMVHP02C l Valve Motor Operator l Rm. 208 l

l l 2 lMVHP02D l Valve Motor Operator l l See 2.11 l I 2 l l Rm. 208 ] See 2.11 l l lMVMU59A l Valve Motor Operator Rm. 214 l l 2 lMVMU59B l Valve Motor Operator l l l See 2.13 l l Rm. 214 l l See 2.13 I I l 2 lMVMU59C l Valve Motor Operator l Rm. 214 l l 2 lMVMU59D l Valve Motor Operator l l See 2.13 l l Rm. 214 l l See 2.13 1 1 2 lNV0624B i Push Button Switch 1 l

l l Rm. 427 i See 2.21 1 l 2 INV1542 i Push Button Switch l I Rm. 314 l See 2.21 I l 2 lNV1544 l Push Button Switch 1 l l Rm. 303 1 See 2.21 l l 2 lNV1545 l Push Button Switch 1 l 2 l l Rm. 314 1 See 2.21 1 l lNV1719B l Push Button Switch l l Rm. 236 l See 2.21 l l 2 lNV20000 l Push Button Switch l l 2 l l Rm. 303 i See 2.21 1 l lNV20010 l Push Button Switch l I Rm. 427 l See 2.21 l 2 I 1

l INV20030 l Push Button Switch l I Rm. 314 i See 2.21 l l 2 INV2010 l Push Button Switch 1 l l Rm. 314 l See 2.21 l l i 2 lNV20ll l Push Button Switch I

l I Rm. 314 i See 2.21 l l 2 lNV232 i Push Button Switch l l Rm. 236 l See 2.21 l

! l 2 lNV235A l Push Button Switch l 1 Rm. 314 l See 2.21 l 1 l 2 lNV236 l Push Button Switch l t Rm. 236 i See 2.21 2 l l l lNV5008 l Push Button Switch l l Rm. 427 i See 2.21 l l I 2 lNV598 l Push Button Switch l Rm. 314

} 1 l See 2.21 l l l 2 lNV06030 l Push Button Switch l l Rm. 236 1 See 2.21 I l [ 2 INV0603A l Push Button Switch l I Rm. 236 l See 2.21 l l 2 lNV607 l Push Button Switch l l l Rm. 314 l See 2.21 l l l 2 INV06110 i Push Button Switch l I Rm. 208 i See 2.21 l l l 2 lNV0611A l Push Button Switch l l Rm. 208 l See 2.21 l l 2 lNV68318 i Push Button Switch l l l l l l Rm. 208 l See 2.21 l l l l l 1

(

\

F2cilkwyf Davis-3asse Unit 1 Q L) g Docket: 50-346 MASTER LIST HARSH ENVIRONMENT Index Nc: _216M-006 Rev.: 2 CONTAINMENT ISOLATION VALVES Prepared by:

  • Date: O Checked by: )6dE 2%

j Date: //////J l l l l l l l l LOCATION l l l Worksheet l l Plant l l Inside l Outside l l

l__ Index No. I Rev. LID Number i l Primary l Primary l

Generic Name l l 1 l 2 lNVMUO3 l Push Button Switch l Containment l Containment l REMARKS l 2 i l l lNVMU38 l Push Button Switch I Rm. 208 l See 2.21 l l 2 l 1 INVMU66A I Push Button Switch l Rs. 208 i See 2.21 l l 1 2 INVMU66B l I Rs. 208 i Push Button Switch i See 2.21 l l I 1 2 lNVMU66C I Push Button Switch l Rs. 208 l See 2.21 l l l 2 l lNVMU66D l Push Button Switch l Rm. 208 l See 2.21 l t 1 2 lSV1001 l i Solenoid Valve l Rm. 208 l See 2.21 l 1 l 2 lSV100A l Solenoid Valve l l Rm. 602 l See 2.8 l 2 l l 1 lSV100B l Solenoid Valve l Rm. 602 l See 2.8 1 l 1 2 ISV100C l Solenoid Valve 1 l Rm. 602 i See 2.8 l l l 2 ISV100D 1 Rm. 602 l

l Solenoid Valve l I l See 2.8 l l 2 ISV100E l Rm. 602 l

l Solenoid Valve l l See 2.8 l l 2 ISV10ll l Solenoid Valve l Rs. 602 i See 2.8 l I i l 2 ISV101A l Solenoid Valve 1 Rm. 601 i See 2.8 l 1 l 2 ISV101B l Rm. 601 i

l Solenoid Valve l l See 2.8 l l 2 ISV101C l Solenoid Valve 1 l Rm. 601 l See 2.8 l I l 2 ISV10)D l l Rm. 601 l

l Solenoid Valve 1 See 2.8 l 2 ISV101E 1 l Rm. 601 l

1 l Solenoid Valve l l See 2.8 l 1 2 ISV1356A l Solenoid Valve l Rm. 601 l See 2.8 i l 1 2 lSV1356B i Solenoid Valve 1 i Rm. 314 i See 2.17 l l 2 l i ISV1357A l Solenoid Valve l Rm. 314 l See 2.17 l l 1 2 lSV1357B l Solenoid Valve l l Rm. 314 l See 2.17 t l i 2 ISV1358A l Solenoid Valve 1 l Rs. 314 l See 2.17

l l l l 2 ISV1358B Rm. 314 i Solenoid Valve l l See 2.17 l 1 l 2 ISV375 i Solenoid Valve 1 l Rm. 314 l See 2.17 l l l 2 ISV394 i I Rm. 602 l 2 l Solenoid Valve l i See 2.8 l l lSV598 i Solenoid Valve l Rm. 601 i See 2.8 l l i

l 2 ISV607 i Solenoid Valve l l Rm. 314 l See 2.8 1

, 1 I 2 ISVICS11A1 i Solenoid Valve 1

l Rm. 314 i See 2.8

] l I 2 l Rm. 602 l

ISVICS11A2 l Solenoid Valve l l i See 2.8 l I 2 ISVICS1181 l Solenoid Valve l Rm. 602 l See 2.9 l 1 l 2 1 Rm. 601 I

ISVICSilB2 l Solenoid Valve l l l See 2.3 l I 2 lSVMU33 Rm. 601 l Solenoid Valve l l See 2.3 I 1 l 1 l 1 1 Rm. 236 l See 2.25 l I l I l

o

\.

() v Pacilkyt) Davis-BessaUnit1  %

Docket: 50-346 MASTER LIST NON-HARSH ENVIRONMENT Index No: 216M-007 Rev.: 2 CONTAINMENT ISOLATION VALVES Prepared by:

  • Date: /[

Checked by: Jxsi!V C f Date: // /d // 3 l l l l l l l l 1 LOCATION I l l l Worksheet l l Plant l l Inside i Outside l l i l Index No. I Rev. IID Number l l Primary l Primary l Generic Name l l l l l I Containment l Containment l REMARKS [

I l l 0 l belle I Motor Control Center l 1 1 1 l 1 lBE12E l Rm. 402 l Motor Control Center 1 l i l l 0 l l Rm. 100 IBF11B l Motor Control Center l l l l 1 l Rm. 405 lC5721 l Control Room Panel 1 l l l l 0 l CDP 11B l l Rm. 505 l Disconnect Switch Cabinet l Rm. 405 l l l l 0 LEV 0645B l Terminal Block Box l l l 1 l 0 LEV 1773B l Terminal Block Box l 1 Rm. 402 l l

} l l 0 lEV20020 l l Rm. 225 I l Terminal Block Box I l l 0 lEV229A l l Rm. 402 l l Terminal Block Box l l

l l 0 IMV0645B l Valve Motor Operator l Rm. 225 I I l 0 l l Rm. 402 l lMV20020 l Valve Motor Operator l l l l l 0 lMV5011C l Valve Motor Operator l Rm. 402 l l l 1 0 l l Rm. 402 lMVDH9A l Valve Motor Operator l l l 1 l 0 lMVDH9B l Valve Motor Operator l Rm. 225 l l j l l 0 lNV1773B l l Rm. 225 l

' l Push Button Switch l l Rm. 225 l

1 l 0 lNV229A I Push Button Switch l l l l 0 INV5005 i Push Button Switch l I Rm. 225 l l l 0 l l Rm. 600 l lNV1541 l Push Button Switch l l l l l Rm. 221 1 0 ISV1541 l Solenoid Valve l l

\ l 0 lSV1773B l i Rm. 221 i Solenoid Valve l l 1 1 0 ISV229A l Solenoid Valve l l Rm. 225 l l l l 0 l l Rm. 225

' lSV5005 i Solenoid valve l l I I l l l l Rm. 600 l I l l 1 l l l 1 l l 1 l l l l l 1 I 1 I I i i l i i I I I I I I l l 1 l i l i i I I I I 1 I I I I I l l l I I l I I I l l i I I I l I I l l l I I l l 1 l l l I I l I

I I l

ia -

o Facilt4f: Davis-B2cas Unit 1 Docket: 50-346 0s' MASTER LIST Index No: _216N-008 CONTAINMENT ISOLATION VALVES Rev.: 2 Prepared by:

Date: [/ /

Checked by: M/A-d Date: //,/d//)

I  ! l l l 1 l l l_ LOCATION I Worksheet i I Plant l l Inside  ! Outside I

i

} l__ Index No. 1 Rev. LID Number i l Primary l I

, I I Generic Name i Primary l I I l i i i l I Containment l Containment i REMARSS I I I l I I I i I i i I 1

1 1 l l 1 1 I I

I 1 I I I 1 I

i i i i l I I

i I I i l i i I I

I I

l I I I I I i I I I I I I i I I i I I l l I l i l I I I l I I I I I I I l i l i I

' 1 I I 1 I I I I I i I I l I 1 4

I I I i I i i I I

I I I I I I I j I I i l i I I 1

l I l i I I I I I I i l i i l i

l i I I 1 I I l i I I I

, I I l l I I I I I I I I

I I I I i I I I I I I I l i l I I I I I t I I l l l i i I i l l I I i i I 4 I I I I I I i l i i l i I i l 1 I I I i

I I I

! I l i I I I I I I I

! i i l I I

i I l I l i 1 I l i l I I I I i l

I l l I I

. I I l

~~

r^T f F&cility:(Lovis-BrasDUnit1 ) (/ p Dochst: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Prgpared by: _ _ _ d Index No.: _216H-009 Ch3cksd by: Date: _II i 3 Rev.: 2

~

M'? #

Date: g/6 l

ll lEQUIPMENT DESCRIPTION ll l l_ ENVIRONMENT ll Paramete: ! Specification l I i l I DOCUMENTATION REF. ~l lSystSm: Containment ll l l Qualification lSpecificationlQualificationil Qualification l Outstanding l l ilOperating l 1 Year i 1

l Method I Items l Isolation llTime 1 1.1 Years i F l

l 1

l i M-26 l Simultepeous l l l l_ _ l l None l Plant ID No. MV0240A l IV-24E, V-24G I Test l l i ll l 1 1 Note 1 i IComp2nent: Valve Motor llTemperaturel 283.0 1

I I 1

1 l

11 (*F) l 1 300.0 I H, X I I

1 Operator I Note 2 l M-26 1 I l l_ 1 l

I IV-24E, V-24G li Simultaneous Test i None l ll 1 l t i IManufacturer: Limitorque llPressure l l 1 1

i 1 52.0 84.7 I

I I ll(PSIA) l 1

l G, X l M-26 I I

IModel Number: SMB-000-2 l lO/N: 375060D 11_ i l l

IV-24E, V-24G ll Eimultaneous Test l None  !

IFunction: Operates PRZRllllRelative l l l i l l l l l

l i 100.0 l l Sample Isola- IIHumidity i 1 100.0 l A l

l 1

tion valve 1 M-26 l ll__ (41 I l l Simultaneous I  :* ...

t 1 1 IV-24E, V-24G I Test l

il i l i i 1 Accuracy: Spec: N/A I l l l

Demon: N/A Il i Boric Acid i Boric Acid I

I I

l l

'l llChemical i 1800 ppm l l M-26 I i llSpray l 1800 ppm i A l l I pH 5.0 l ISarvice: Reactor Coolant ll l pH 5.0 l lV-24E, V-24G l Simultaneous l l CAL-40 None 1

Pressurizer ll l l l 1

l Test, I

]

1 Sample Valve l l Note 2 l Analysis I il I t l Location: Containment l

l l

  • I i l

I llRadiation 11.7 x 107 RADS 12.0 x 108 l l l

l l l. l RADS I CAL-44 l M-26 l 1 IFlood Level Elev: 572'-2*ll l 1

ISequential Testl None 9Above Flood Level: Yes llAging I

i IV-24E, V-24G l  !

l i I l 40 Years t 40 Years l _I 11 l 1 I l i Nsidad for: ___ l l_ l l

CAL-93 l Sequential Testl. None I

Hot Shutdown 1 l 1 I i X l ll 1 l Analysis l l 1 1 l -

I llSubmergencel 572' l l l l Cold Shutdown l_x_l Il

-2" l 566' l l l B i l l M-10 l N/A l

I l_ l I l I None l l l I l l I l

l l

i k s Facility: Devis-Besce Unit 1 Dockst: 50-346 SYSTIM COMPONENT EVALUATION WORKSHEET

! Index No.: 216H-009A '

NOTES Rev.: 2 Prepared by: M Date ll I Checked byQg g gG,., rg, _, Date et/ 2./ 83 .

l

, 1.

j %e 120*F test fn subjected 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. the valve motor operator to a transient of 300*F and 84.7 psia for 32 minutes, followed by a wn cooldo to i We valve snotor operator was then subjected to a second transient of maintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200*F and 24.7 psia, which was maintained for 24 days.300*F an$ 44.7and Se toeperature psia, which w pressure 214.7'r and inside 32.2contaitunent psia peak at 283*F and 52.0 psia in 17 and 50 seconds, respectively.

At I hour the conditions are psias and at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the at 3 hours theare conditions conditions are18.03 143*F and 204*Fpsia.

and 29.46 psia at 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 'the conditions are 193.2*F and 27.08 i

' Se conditions return to ambient in 7 days.

, Based on this information, it can be concluded that the laboratory test subjected the valve moto roperator to an overall more severe environment than that which would result from a postulated IDCA. i operable throughout the test and functional af ter the test, Since the valve motor operator remained j

4 f unctional during and af ter esposure to the accident environment which would result ef romA.the(Reference H, and X) . postulatG,d 14 C 2.

1 CAL-40 qualifles components tested in a high pH boric acid spray to a pH value of 5.

J I ,

.i j

i i i 1

)

1 i

i i

a i

i i

s .

i

m

[N i

(3, (

V.

)

FIcility: 'Lavis-Beczo Unit 1 Dockst: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: 216H-010 PrGpared by: Rev.: 2 Date: [!M2 Chscksd by: A p G __ 4 Date: g /3 I

il lEQUIPMENT DESCRIPTION ll l

ENVIRONMENT l t l I I ll Parameter l DOCUMENTATION RsP.

1 ll l Specification 1 Qualification ISpecificationlOualificationil Qualification Method l lOutstanding l ISystem: Containment lloperating l l l l Items l

'l Isolation 1 Year l 1.1 Years l F I I I llTime l l l M-28 i Simultaneous l None l l l V-24G l ll l l Test l lPltnt ID.No. MV0240B ll l 1 l l Note 1 l l

I 1 1 l llTemperaturel l l 221.0 l 250.0 l lCosponent: Valve Motor (*F) i C-314 l M-28 1 I l Operator il i I l l Simultaneous ! None l ll l l V-24G l Test l l l l l Il l l 1 l l 4

IManufacturer: Limitorque ll Pressure l l l l

l 19.76 1 39.7 i C-314 1

1 I

' ll(PSIA) 1 l l M-28 l Simultaneous l None l Modal Number: SMS-000 l l V-24G l ll l l l Test l lO/N: 375060D l l ll l l l l IS/N: 190252 llRelative l l l l

l 100.0 l 100.0 l l IFunction: Pressurizer llNumidity l l l A l M-28 l Simultaneous i None l

l Sample Outlet l l ll (4) l l l V-24G l Test I l 1

Isolation Valve ll l 1 I l l l Accuracy: Spec: N/A ll l l l l l

l l l l

Demon: N/A l l l ll Chemical i N/A l l l l lISpray l N/A l N/A l N/A l

i l N/A l None lSarvice: Pressurizer ll l l l l l l

,i Sample Outlet l l 1 l ll 1 l l l 1 l l

Isolation Valve ll l l l l l l Location: Auxiliary Bldg.llRadiation 11.0 x 106 1 l l l l

I Rm. 314 RADS l2.0 x 107 RADS 1 T l M-28 l l ll 1 l l Sequential Testl None IFlood Level Elev: N/A ll l 1 i V-24G l l l

l lAbove Flood Level: N/A llAging 40 Years l l l l

l 1  ! 40 Years l I CAL-93 l l il l I ISequential Test l None lNredad for: ll I l l l 1 Analysis I

l l l

l.

Hot Shutdown l X l ll l l l l l l l l I llSubmergencel N/A l l l 2

l Cold Shutdown i X l l N/A l N/A I N/A l

l ll l l l N/A l None l ll l l l 1 l l I I l I I l

\

Facility: Leis-Becco Unit 1 O

SYSTEM COMPONENT EVALUATION WORKSHEET

~.)

Dockst: 50-346 Index No.: 216H-010A Rev.: 2 f NOTES Prepared by: ,N _ Date N ,f.l Checksd by: (a f, b _ , // Date ifIL/81 1.

We test in subjected 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. the valve motor operator to a transient of 250*F and 39.7 psia for 30 minutes, followed by a cooldown to 120*F

'Ihe valve motor operator was then exposed to a second transient of 250*F and 33.7 psia for 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />, ther. a cooldown to 200*F and 24.7 paia which was maintained for 15 days. The temperature in Room 314 peaks at 221*F in 1.55 esconds. %e pressure in Ibom 314 peaks at 19.76 psia in .086 seconds. %e temperature and pressure in Room 314 retusT to ambient conditions af ter 8 minutes.

Based on this information, it c&n be concluded that the laboratory test subjected the valve motor operator to an overall more severe environment than that which would result f rom the postulated HEIA. Since the valve motor operator remained operable throughout the test, it can be concluded hat the valve motor operator will remain functional during and af ter sxposure to the accident environment which would reault f rom the postulated H IA. (Reference C-314) i I

1

)

i i

t 1

i l

i l

l

?h i

)

\ /

Facility: Lwife-Becca Unit 1 Docket: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: 216H-Oll Prepared by: N Date: / /P3 Rev.: 2 Ch2cked by: M;sM.-.8 Date: ///)/M i

il IEQUIPMENT DESCRIPTION ll l

( ENVIRONMENT I I

I I l ll Parameter i Specification l DOCUMENTATION REF.

ll l Qualification lSpecificationlQualification)l Qualification Method l Outstanding I lSystam: Containment lloperating l I l l Items l l Isolation 1 Year i 40 Years 1

I I llTime l l P l M-28 I l

11 l l l l V-24G l Simultaneous l None l lPltnt ID No. l l Test l MV06248 ll I I l 1 l l I IITemperaturel N/A l l l 1

l l Component: Valve Motor l N/A l Note 1 l l l Operator ll ('F) l l l N/A I N/A ll l l l None l 1

l 1 1 ll l l l l l 1 l Manufacturer: Limitorque llPressure 1 l l l l l l N/A l N/A 1 l

ll(PSIA) l I Note 1 l N/A l l

lModel Number: SMB-030 l l N/A l None l ll l l l IO/N: 381748A i I l j ll l I I lS/N: 214576 ll Relative l l l l IFunction: Operates Con- ll Humidity l N/A l N/A 4 l l I

l Note 1 l N/A l

! I N/A l None 1 tainment Isolation Valvell (t) I l l l l

l for Penetration 72 ll l l 1 l l l Accuracy: Spec: N/A  !!

1 l l l 1

l l 1

l l l l Demon: N/A ilchemical l N/A l l l l

l l N/A 1 ll Spray l l N/A I N/A l l

I N/A l lSarvice: Penetration 72 ll 1

l l l l l None l Containment l l l ll l l l l l l Isolation Valvell l l 1

l l l

l l Loc & tion: Auxiliary Sldg.llRadiation 13.12 x 105 l l l

)

l Rm. 427 RAE312.0 x 107 RADS l T l _l l! I I M-28 l Sequential Testl l Flood Level Elev: N/A ll l 1

l l V-24G None l l

lAbova Flood Level: N/A ll Aging i 40 Years l l l l l l l l 40 Years l I l f I l 11 1 CAL-93 l Sequential Testi IN2sded for: ll I I l None l 1

l Hot Shutdown IX l ll l l l l Analysis i I l l l 1 l l llSubmergencel N/A l l l

l Cold shutdown l_X l ll l l N/A l N/A l N/A l l l I N/A l_

ll l l l l None j 1 l l l 1 l l

l l

< s j

Facility: Davis-Besse Unit 1 SYSTEM COMPONENT EVALUATION WORKSHEET Index No. : 216H-011A Dcchet: 50-1E Rev.: sZ Prepared by: N Date $! (

l Checks;d tys'j w y. yf ,( m g Date p / 2./ P1 i-

1. The only harsh envirorsment seen is increased radiation due to recirculated fluids.

t j

4 i

l i

i t

I ,

l t

i l

l 1

i i

a l -

I I

}

l i

i i

n g-Fccility:\p)

'bsvis-Se22e Unit 1 V (")

Dockst: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Prepared by: _ Index No..: _216H-012 Date: ] M2 Rev.: 2 Chicked by:

}ddiCh b &/ Date: J//J///

I il l EQUIPMENT DESCRIPTION ll I l_ ENVIRONMENT l ll_ Parameter l I l I DOCUMENTATION REF. I ISystsm: Containment ll l Specification li Qualifidation lSpecificationlQualificati oni 1 Qualification l Outstanding l llOperating 1 Method i Items l Isolation l

25 Seconds 1 30 Days i M-26 l  !

1 ll Time 1 i K 1 V-24C l l l l Simultaneous i l Plant ID No. ll_ l l l V-24E None l MV1407A ll l l l Test l i l l 1 Note 1 l l l Component: Valve Motor llTemperaturet 283.0 1 i M-26 l l

ll (*F) l 1 300.0 l H, X I

l i Operator i l V-24C i 2 I f l_ l 1

I I V-24E I Simultaneous l I

None l ll l Test I I i i l Manufacturer: Limitorque llPressure I l

l i l 1 52.0 1 84.7 l M-26 I 1 ll(PSIA) l l

l G, X l V-24C I

l i IModal Number: SMB-00-10 ll l l l I Simultaneous l None

' 10/N: 370756A l V-24E l Test l ll l l l IFunction: Operates CCW l t l l 1

llRelative i 100.0 l l M-26 l

l Outlet Containment llHumidity 1 100.0 l A I

l l l l V-24C l l Accuracy:Isolation Valve ll_ (t) l l 1 Simultaneous l None Spec: N/A ll l

l l l V-24E i Test l 1

l l l l Demon: N/A l l l l

ll l Boric Acid l Boric Acid l l M-26 l l

l ISarvice: Component 1l Chemical i 1800 ppm l V-24C 1

l ilspray i 1800 ppm i A l

l l l pH 5.0 I V-24E l Cooling water Outlett! l pH 5.0 l i Simultaneous l None l I CAL-40  !

'I 1

Isolation valve ll l l l 1 Note 2 l Test, I l l l Analysis 11 l l l l l l Location: Containment ilRadiation l1.7 x I?7 RADS 12.0 x 108 l l l 1

I l M-26 l 1 il I RADS l CAL-44 i V-24C l l l Flood Level Elev
572'-2"ll l l l Sequential Testl 1 I V-24E None I IAbova Flood Level Yes ll Aging l l I

I ll 11 i 40 Years l 40 Years  ! I l

l l

__I

lNesdtd for: l 1 CAL-93 l l l ISequential Testl None
l Hot Shutdown ll l l 1

lX l l l l Analysiu 15 l l l l

( l l l llSubmergencel 572'-2" l l l

l Cold Shutdown I l ll l 593'-0* I B l l l

'l_ l l M-9 l N/A l

_l l- I l l l None l l l I

l l l I

___ l l i

O F2c111ty: L O-Bessa Unit'1 O

SYSTEM COMPONENT EVALdlON WORKSHEET )

Index No.hw6H-012A Dockst 50-346 . Rev.: 2 Prepared by: NM oate iI/t /F3 Oncksd by: A34 .Date gg [ t /pJ I ,

i i 1. W3 test subjected the valve motor operator to a transient of 300*F and 84.7 psia for 32 minutes, followed by a cooldown to 120*F in 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The valve motor operator was then subjected to a second transient of 300*F and 44.7 psia, which was

! maintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200*F and 24.7 psia, which was maintained for 24 days. We tesperature and l pressure inside containment peak at 283*F and 52.0 psia in 17 and 50 seconds, respectively. At I hour the conditions are j 214.7'F and 32.2 psia s at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the conditions are 204*F and 29.46 pela s at 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the conditions are 193.2*F and 27.08 paia and at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the conditions are 143*F and 18.03 psia. The conditions return to ambient in 7 days.

. Based on this information, it can be concluded that the laboratory test subjected the va.1ve motor operator to an overall l

more severe environment than that which would result f rom a postulated IDCA. Since the valm motor operator remained opsrable throughout the test and f unctional af ter the test, it can be concluded that the valve motor operator will remain f unctional during and af ter exposure to the accident environment which would result f rom the postulated LOCA. (Reference G, H, and X). .

f 2. CAL-40 qualifles components tested in a high pH boric acid spray to a pu value of 5.

i i

i i

1 I

1 1

i i

1

O N

Fccility:

Dockst:

n'Lovis-Bac22 Unit 1 J 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: 216H-013 Rev.: 2 Prepared by: Date: I 2 Chrcksd by: MS Date: gJ//f I ~~~

ll l EQUIPMENT DESCRIPTION l l ll ENVIRONMENT l l l l_ DOCUMENTATION REF.

l ll ParameterI i Specification l Qualification l Specification lQualificationil Qualification Method i lOutstanding l ll '

Items l l System: Containment lloperating i I I l 25 seconds 1 30 Days l  !

l Isolation l P l M-26 ll Time l l l l Simultaneous l None l l

ll l l V-24E l Test l l l l l Plant ID No. MV1407B ll l 1 Note 1 l l l l l l llTemperaturel l l 221.0 295.0 C-314 l l lCcmp:nent: Valve Motor ll (*F) l 1 1 l M-26 l Simultaneous l None l l l l Operator ll l l V-24E l Test l l 1 l 1 l l Il I l l l l Manufacturer: Limitorque ll Pressure l 19.76 l 1 1 I I l 84.7 l C-314 l ll(PSIA) l l M-26 l Simultaneous i None l l l IMod31 Number: SMB-00-10 l V-24E IO/N: 370756A ll_ l l l l I Test I I ll l l l l lS/N: 191383 ll Relative i 100.0 1 l l l l l 100.0 4 A M-26 l l Function: Operates Compo-llHumidity l l l

l Simultaneous l None l l nsnt Cooling Outlet Iso-ll (t) l l l l V-24E l Test l l l

1 lation Valve from Ctmt. ll l l l l 1 l l Accuracy: Spec: N/A ll l 1 l l l l ll Demon: N/A llChemical l N/A l l

N/A l l l 1 l I llSpray l N/A l N/A l N/A l l l None l

iSarvice
Component ll l l 1 l l l 1 l l Cooling Outlet l l il I i l l l

l Isolation Valve ll l 1 l l l l Location: Auxiliary Bldg.llRadiation 11.0 x 106 RADSl 12.0 x 108 1 I l l l l Rm. 314 RADS l T l M-26 l Sequential Testl ll 1 1 I None l l Flood Level Elev: N/A ll l l l V-24E l l l IAbova Flood Level: N/A ilAging l 40 Years 1 40 Years 1 l l I l 1

ll l l I l CAL-93 ISequential Testl None l lMrcdsd for: ll l I l l Analysis l l l

l Hot Shutdown l__ X l ll l 1 l l I l l 1 l l lSubme rgence l l l N/A l N/A N/A l 1 l Cold Shutdown l l ll l l l l N/A l N/A l None l l l l 11 l l l l l l l l l 1

O O C

Fccility: Davis-Besse Uhit 1 SYSTEM CDNPONENT EVALUATION WORKSHEET Index No.: 216H-013A Docksts 50-346 Rev.: . 2 Prtp3rsd by: Date NI Chscksd ny f r; g Q ] Date y l 2,}g3 i

l

1. h test subjected the valve motor operator to a transient of 300*F and 84.7 psia for 32 minutes, followed by a cooldown to  !

120*F in 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. h valve motor operator was then subjected to a second transient of 300*F and 44.7 psia, which was maintained for 9;t hours, then a cooldown to 200*F and 24.7 psia, which was maintained for 24 days. h temperature in Room 314 peaks at 221*F in 1.55 seconds. h pressure in Room 314 peaks at 19.76 psia in .086 seconds. h conditione in Roost

) 314 return to ambient after 8 minutes. ,

i Baced on this information, it can be concluded that the laboratory test subjected the valve motor operator to an overall more severe envirorument than that which would result from a postulated HEIA. Since the valve motor operator remained j

l operable throughout the test and functional af ter the test, it can be concluded that the valve motor operator will remain functional during and af ter exposure to the accident environment which would result f rom the postulated HEIA. (Reference C-314) i i

l i

l 5

1 l

i a

I

Facility: 'Lu/is-Scsso Unit 1 Duckst: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: 216H-014 Rev.: 2 PrepEred by: 'N ,Date: / D Chick 2d by: 3453f h ( M Date: ///,7//:P l 11 1

l lEQUIPMENT DESCRIPTION ll ENVIRONMENT I I l I DOCUMENTATION REF.

l 1 l1. Parameter l Specification I Qualification ISpecificationlQualification)1 Qualification i Outstanding l l ll l Method i Items l l l lSystsm: Containment lloperating I l l i 25 Seconds l 30 Days l K l M-26 l

i Simultaneous l 4

l Isolation llTime l l l None 1 l l V-24C, E l Test l ll l l l l Plant ID No. MV1411A 1 i Note 1 l l ll l l l l l 1 l llTemperaturel 283.0 l l ICorponent: Valve Motor l 300.0 l H, X M-26 ll ("F) l i I 1

l Simultaneous l None l l Operator ll I V-24C, E I Test l l l l l l l l l l ll l I l Manufacturer: Limitorque llPressure .

I i l l 1 52.0 l 84.7 G, X l I ll(PSIA) l l M-26 l Simultaneous l None l l l i lModel Number: SMB-00-10 ll l l l V-24C, E .I Test l l l

IO/N: 370756A ll l l l 1 1 I l Function: Operates CCW l l l llRelative i 100.0 l 100.0 l j l A M-26

l Inlet ContainmentilHumidity l l l l

l Simultaneous l None 1 l V-24C, E l l Isolation Valve ll (t) l l l l l Test l l

I ll 1 I l 1 1 I l l l l Accuracy
Spec: N/A l ll l Boric Acid l Boric Acid l l M-26 1

1 Demon: N/A ll Chemical l 1800 ppm l 1800 ppm i A 1 I l l l ll Spray I V-24C, E l Simultaneous l None i pH 5.0 l pH 5.0 l l

lSarvice: Component 1 CAL-40 1 Test, I l ll l l l l Cooling Isolation ll l Note 2 l Analysis l l l l 1 I l i l Valve to Containment ll l l l l l l

l Location: Containment llRadiation 7 l1.7 x 10 RADS l2.0 x 108 l l l I RADS l CAL-44 M-26 ISequential Testl ll l l None i l i V-24C, E

' IFlood Level Elev: 572'-2"ll l l l l l l l lAbove Flood Level: Yes llAging l 40 Years l 40 Years  !

l l l I ll I l CAL-93 l Sequential Test l None l l l l lNDedad for: ll l l l l Analysis l l l

l Not Shutdown l X i ll l l l l l l l l 1 l llSubmergencel 572'-2" l 597'-0" l B l l

! I Cold Shutdown I i 1. M-9 i N/A l None ll l l l

I l -l l ll l l [

l l 1 I i I

I L v F:cility: havic-Dease Unit 1 Dockst 50-346 SYSTDI COMPONENT EVALUATION WORKSHEET Index No.: 216H-014 A Prepared by: N Date l hv. : 2 i

diacksd by: * @gg,,j Date ,

jf / 2 /fJ

/

l.

%a 120*F test in subjected 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. the valve motor operator to a transient of 300*F and 84 7 psia f .

snaintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200*F and 24.7 psia, which waspsia, . maintained which was f%e va l prassure inside containment peak at 283*F and 52.0 psia in 17 and 50 seconds or 24 days.' The temperature and 2L4 7"F and 32.2 psia s at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the conditions are 204*F and 29.46 psias , respectively.

at 5 h At I hour the conditions are psias and at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the conditions are 143*F and 18 03 pala. ours the conditions are 193.2'F and 27.08 We conditions return to ambient in 7 days.

Based on this information, core severe environment than that which would result from a postulated IDCA.it can beoverall or to an concluded tha operable throughout the test and functional af ter the test, Since the valve anotor operator remained functional H, and X). during and af ter exposure to the accident environment which wouldit can be concluded that the valve motor operator will result from the postulated KOCA. (Ref erence G, j 2.

CAL-40 qualifies components tested in a high pH boric acid spray to a pH vl a ue of 5.

i

.I l

1 i

i i

O (m\ (O)

Facility: DSvis-Bessa Unit 1 V' m)

Dockzt: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: _2'16H-015 Prcpared by: 4.As 4 Rev.: 2 Date: NI .$

Check 1d by: , M b f M [ Date: ///J//*J l

11 l EQUIPMENT DESCRIPTION ll 1 l_ ENVIRONMENT 1 1

l ll_ Parameter l Specification l 1 DOCUMENTATION REF. l l l System: Containment ll 1 l

Oualification ispecificationtoualification) Qualification _

Method l Outstanding l ilOperating i I I l Items l l Isolation llTime 25 Seconds l 30 Days l P l l l l l M-26 l ll l l l l V-24C i Simultaneous l None 1 IPlant ID No. MV1411B l l l Test i l l

ll l l

l Note 1 l llTemperaturel 221.0 1

l 1 l

lCorponent: Valve Motor ll ('F) 1 295.0 i C-314 t i I l l l M-26 Operator (( l l l 1 V-24C l Simultaneous l None l l l I Test i 11 l i I 1 I

lMrnufacturer: Limitorque llPressure l 19.76 1

1 I

I l l 1 84.7 I ll(PSIA) l 1 C-314 l M-26 l l l Modal Number: SMB-00-10 l l_ l l .

l I V-24C l Simultaneous I None I lO/N: 370756A ll l i I 1 Test l l t l I IFunction: Operates Compo-llHumidity llRelative l 100.0 1

l l I

l 1 100.0 l A 1

l l l l I M-26 nent Cooling Inletti (%) 1 l l l V-24C i Simultaneous l None i 1 l l Test Isolation Valve ll l l l I (

IAccuracy: Spec: N/A ll l l l 1

l l l l l l

  • Demon: N/A llChemical l l l l l l N/A l N/A l llSpray l l N/A I N/A l l lSarvice: Component ll l l l N/A l None l l l l t l Cooling Inlet ll 1 l 1 l l 1 1

Isolation Valve ll l I

I I l l l Location: Auxiliary Bldg.llRadiation 11.0 l x 106 RADS 12.0 x 108 l l I  !

l l Rm. 314 l ll l RADS i T I M-26 l l IFlood Level Elev: N/A ll 1 l ISequential Testl None l 1

l 1 V-24C 1Above Flood Level: N/A llAging l 40 Years l l 1

l 1

1 I l 40 Years l l I l DNacd d for:

ll l l

l CAL-93 ISequential Teatl

____ ll 1 l l None l 3 Hot Shutdown l l Analysis l_ X l ll 1 l I I l l

) l  ! I ll Submergence! N/A l l I

} Cold Shutdown l I ll l 1 N/A i N/A l N/A l l L l l N/A ll 1 I

I None l l l l l t l I l l 1

il y Dev -Besse Uhit 1 SYSTDI CONPONENT EVALUATION WORKSHEET i Prepared by __ f'i Index No.: 216H-015A Chscked by: S,43,%(f_

Date II!8f23 Dete -

g( / gf g 7_

3 1.

i 'Ihe 120*Ftest in subjected 3 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. the velve motor operator to a transi f

maintained 314 peaks at 221*F forin 192 hours, then a cooldown to 200*F and 24 7 p iThe, followed 55 seconds. .

valvebymotor operator a cooldown to w 1 s a, which was maintained for 24 days.ransient of 300*F and 44 7 a

314 return to ambient af ter 8 minutes.'the pressure in Room 314 peaks at 19.76 psia in .086 seconds. 'the tesperature in Room Based on this information, The conditions in Room

smore severe environment than that w-hich would result fross ait can postulated HELB.

be concluded that the laboratory tes e valve motor operator to an overall

op3rable throughout the test and functional af ter the test Since the valve anotor operator remained f unctional during and af ter exposure to the accident envi , it can be concluded that the valve motor o 4

C-314) ronment which would result fross the postulated HEIA.

(Reference W

i k

I i

I I

l i

l i

~

o u>

(O) g e

/%

Frcility: b vis-Braze Uni't 1 Dockst: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: 216H-016 Ptspared by: Date: k l Rev.: _

2 Checktd by: ;4t//w I M Date: /////W l

ll l EQUIPMENT DESCRIPTION ll l l_ ENVIRONMENT I

l 1 1

ll Parameter i Specification l DOCUMENTATION REP. l lSyntam: Containment Il i I Qualification ISpecificationjoualificationil QJalification Method l Outstanding l llOperating i 35 Seconds l l l l Items l l Isolation llTime 30 Days l K l

l l l l M-26 IV-24C, V-24E ll Simultaneous l l l l None ll 1 l Plant ID No, MV1567A l l l Test l l ll l I Note 1 1 l l l llTemperaturel 283.0 1

l l l

IComponent: Valve Motor (*F) l 300.0 l H, X l _l ll l l M-26 IV-24C, V-24E Il Simultaneoas l 1 Operator l l None ll l i l l l Test l 11 l 1 l l l l Manufacturer: Limitorque llPressure i l l l l 52.0 1 84.7 1 l I

ll(PSIA) l l G, X l M-26 l lV-24C, V-24E ll Simultaneous l l l Mod 21 Number: SMB-00-10 ll l l None l l

' IO/N: 366321L l Test l ll l 1 l 1 I IFunction: Operates CCW llRelative l 100.0 l l l l l l l 100.0 l Inlet CRD ll Humidity i l A I M-26 l _l l

Isolation Valve ll __ (t) l l l lV-24C, V-24E l l Simultaneous l None l l l l Test l 11 l l l l Accuracy: Spec: N/A l l l l l

Demon: N/A 11 .

l Boric Acid l Boric Acid l l l l l

i l

ll Chemical i 1800 ppm l M-26 l 1

ll Spray l 1800 ppm l A l l lSarvice: Component Cool- ll l pH 5.0 l pH 5.0 l IV-24C, V-24E I Simultaneous i None l l CAL-40 l l

ling Inlet Isolation valvell I l l l Note 2 1 Test, Analysis l l lto Control Rod Drive ll l I I I I l l

!l Location: Containment 1 l l

1 ll Radiation l1.7 x 108 RADS 12.0 x 108 l l l

l RADS I CAL-44 l M-26 l ll 1 I l Sequential Testl None IFlood Level Elev: 572'-2"ll l I IV-24c, V-24E l 1 ilAbove Flood Level: Yes llAging l 40 Years 1

l l 1 1

l 40 Years

l l  ! I l l Il l l CAL-93 ISequential Test l ilNasdad for
ll l l l None l
l Hot Shutdown l_X l ll 1

l l l l Analysis l l

1 l 1 l l llSubmergencel l [ l 572' -2" l t 1 Cold Shutdown l l ll l 580' l B l H-9 l l l_ l l

l N/A l None l l

ll l l l l 1

l l l l

l l I

d s

' \

F:cility: Mvin-Besse Unit 1 Docksts 50-346 SYSTEM COMPONENT EVAINATION WORKSNEET Index No.: 216H-016A i Pr2 pared by _b Date lk I h3 nev.: 2 Osscked byrg/gM Date __ [l / t / gj 1

9 1.

We 120*F test in subjected 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. the valve motor operator to a transient of 300*F and 84 7 4

i maintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200*F and 24 7 psia, which n was

. mai psia, t iHe which was valve m pressure inside containment peak at 283*F and 52.0 paia in 17 and 50 seconds n a ned for 24 days. .He temperature and respectively. At I hour the conditions are pnias and at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the conditions are 143*F ands 18.03 .

psia.214.7'? and 32.2 pala s at 3 at 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the conditions are 193.2*F and 27.08

%e conditions return to ambient in 7 days.

Based on this information, it can be concluded that the laboratory t

, core severe environment than that which would result from a postulated IDCA.est subjected the valve motor operator to an overall operable throughout the test and functional af ter the test, Since the valve motor operator remained f unctional H, and X). during and af ter exposure to the accident envirorument which wouldit can be concluded that the valve motor operator result from the postulated IDCA. (neference G,

2 CAL-40 qualifles components tested in a high pH boric acid spray to a pH vl a ue of 5.

1 i

4 I

i f

i l

l b

l 1

n O i Ftcility:(hsvis-BasseUnit1 Dockst: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: 2_16H-017 Prtpared by: - Rev.: 2

.Checksd by: Date:

946k W : 6 / ~ Date: //XJ/#"a I

il j l EQUIPMENT DESCRIPTION 1 d

ll l ENVIRONMENT l l ll 1 DOCUMENTATION REF. I i l _ Parameter i Specification I Dualification ISpecifica*iontgualificationil Qualification i Outstanding i il

! l System: Containment 1 1 Method i Items l l Ope rating I 1 I I i l Isolation llTime 35 Seconds l 30 Days i F I I I i l M-26 l

11 i l i V-24C l Simultaneous l None I I

(Plant ID No. 1 I l Test l MV1567B ll l l l Note 1 l l 1

{ llTemperaturel 1

1 I I I l component: Valve Motor 221.0 l 295.'O l l ll (*F) l C-314 l M-26 l 1 Operator ll

{

l l I i V-24C i Simultaneous l None l I l l Test l 11 l 1 l l I ,

, (Manufacturer: Limitorque llPressure l 19.76 l l l l I

l

] l ll(PSIA) l 84.7 i C-314 l t i l M-26 1 IModel Nun.ber: I l_ l i l i V-24C i Simultaneous 1 None l l Test IO/N: 366321L ll l 1 1 l l l l l l l ll Relative l l l i 100.0 l- 100.0 l l IFunction: Operates Compo-llHumidity l A I M-26 l i 4i nent Cooling Inletil_ (t) l l l l l Simultaneous ! None l [

11 i I V-24C l Test Valve to CRD I l l ll l I I 4

l Accuracy: Spec: N/A ll l l l I i l l l l l Demon: N/A flChemical l N/A l 1 I l

l l N/A l N/A l l liSpray I l N/A ISarvice: Component l .I I I N/A l None I

.I Cooling Inlet ll l 1 l

i l il i l l ,

i,i I l Valve to CRD ll l I I I 1 I

'l Location: Auxiliary Bldg.llRadiation 11.0 x 106 RADSl l2.0 x-108 l l l I I 7l Rm. 314 ll. RADS l T l M-26 l l 1 IFlood Level Elev: N/A ll I i l ISequential Testi None

, I I l V-24C I 1

jlAbova Flood Level: F/A ll Aging ( 40 Years I l l l l ji 1 40 Years l I l _l '

11 I I CAL-93 ISequential Testl

lNasdad for
ll l i I None I 1 I Analysis

'l Hot Shutdown l l lX l ll l l l l l

l l l IISubmergencel N/A l 1 l l l
l Cold Shutdown l l ll l N/A l N/A l N/A l 1 l

!! ll l l l N/A l None l I I l

I l l I I 1

I I I

i

/~%

4 fx FCcility: Davis-Besse Unit 1 Dockat: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: _216H-017A '

Przp3 red by: _N Rev.: 2 Date _I Dizcked by-g ;j^fg g A Q *Dste  : __ jf l ~2. / 2 2 i 1.

1he test 120*P in subjected 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. tho valve motor operator to a transient of 300*F maintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, The valve motor operator was then subjected to a second transientand 84 7 pela for 32 minutes, followed by a

) 314 peaks at 221*F in 1.55 seconds.then a cooldown to 200'F and 24 7 psia, which was maintained for 24 dof 300*F and 44.7 paia '

ays.

314 return to ambient after 8 minutes.The pressure in Room 314 peaks at 19 76 psia in .086 seconds. The tosperature in Room i

l The conditions in Room Based on this inforlaation, it can be concluded that the laborato more severe environment than that which would ' result from a postulated HEIAry test subjected the valve motor cperator to an overall operable throughout the test and functional af ter the test, .

Since the valve motor operator remained functional during and af ter exposure to the accident environment which wit can be concluded that the valve motor operator C-314) will re ould result f roen the postulated HEIA. (Referencen i

a 1

J F&cility: -L w is-Desse Unit 1 Docket: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: 216H-018 '

Rev.: 2 Prepared by:

Chickad by: >497 h & #_

Date: II(!82 Date: //XA/12

, I ll l EQUIPMENT DESCRIPTION l ll ENVIRONMENT l 1 l I l '

l DOCUMENTATION REF.

ll Parameter l Specification i Qualification lSpecificationloualification!1 Qualification l Outstanding l

] l Method l System: Containment ll l l I l Items i s j lloperating l I l 1 Year l 1.1 fears i F l l 4

l Isolation llTime l l M-28 l Simultaneous l None l l 1 l ll l l V-24C l Test l l Plant ID No. 1 I l l MV20000 ll I I Note 1 l l I I i l llTemperature! l l 218.0 250.0 C-303 l l j IComptnent: Valve Motor ll ('F) l 1 l l M-28 i Simultaneous l Note '

l l l 'l i Operator l l' i l V-24C l Test i t

i i i I I i 11 l I l i l l Manufacturer: Limitorque llPressure 17.16 I l l l l

l l 39.7 l C-303 M-28 1

ll(PSIA) l l l l

l Simultaneous l None i IModel Number: SMB-000 ll l l V-24C I Test l l l I lO/N: 381749A ll l 1 l l l l IS/N: 214611 l l l 11 Relative l 100.0 l 100.0 l l 1

l Function
Operates Con- llHumidity l l A I M-28 i Simultaneous l None  !

l l l tainment Isolation Valvell (t) l l V-24C l Test 'l l l

) I for Penetration 71A ll l l 1 l l l l IAccuracy: Spec: N/A ll l l l l l l t

} l Demon: N/A ll Chemical 1 l l l l N/A l N/A l ,

}I llSpray l N/A 1 N/A l N/A I l l None l 1

lSarvice: Penetration 71A ll l l l l l 1 l i Containment 1 l ll l l l l l

l Isolation Valve ll l l l 1 I I i 1

ILocation: Auxiliary Bldg.llRadiation l1.16 x 106 RADSl2.0 x 107 l l l l t l Rm. 303 RADS I T I M-28 l Sequential Testl ll l l None l IFlood Level Elev: N/A ll l l l 1 V-24C l l l i lAbova Flood Level: N/A ll Aging 1 l i 40 Years l l l 40 Years l CAL-93 l

I II I l I I ISequential Testl None l

' lNaedad for: ll l 1 l l l Analysis l l l Hot Shutdown l_ X l ll l l l l l l l l l llSubmergencel l l N/A l N/A l N/A l l jl Cold shutdown iX l ll l l N/A- I N/A l None l l l l

!I il i 1 l I I l

! I I I i y4 y , . + - - - - , - --

_ . - - __ - . _ . . - - - _ _ _ _ _ = _ _ . _ . _ _ . _

\ '

\ )

, F;cility: 'Lu o-Besso Unit 1 SYSTkN COMPONENT EVLtON WORKSHEET Index No.b ICH-Oln '

Docksts- 50-346 Rev.: 2 NOTES Prep 3 red by: N Date ll lJl b

. . Checksd by th g g ,p[, Date ll / 2. / j 3

1. We test subject'ed the valve motor operator to a transient of 250*F and 39.7 psia for 30 minutes, followed by a cooldown to j 120*F in 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. We valve motor operator was then exposed to a second transient of 250*F and 39.7 psia for 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />, j then a cooldown to 200*F and 24.7 psia which was maintained for 15 days. Se temperature in Room 303 peaks at 218'r in 1.5
seconds. We pressure in Room 303 peaks at 17.16 psia in .038 seconds. Se temperature and pressure in Room 303 return to I ambient conditions af ter 19 minutes.

j Based on this information, it can be concluded that the laboratory test subjected the valve motor operator to an overall l more severe environment than that which would result f rom the postulated HEIA. Since the valve motor operator remained f operable throughout the test, it can be concluded that the valve motor operator will remain f unctional during and af ter i exposure to the accident environment which would result f rom the postulated HEIB. (Reference C-303) i 1

I i

i

.1 l

5 I

l

^

N FEcility: h #is-Braic Unit 1 Dockat: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: 216H-019 PrGpared by: Rev.: 2 Chscksd by: Date: ]l I M&</1 # ' Date: f//a ' '

/#1 8

1 ll l EQUIPMENT DESCRIPTION ll l

1. ENVIRONMENT l l I

l ll Parameter l Specification l DOCUMENTATION REF. l 11 I Qualification lSpecificationlQualificationil Qualification Method 4 Outstanding l ISystsm: Containment floperating i I I i Items l l 1 Year l 40 Years I l l

' Isolation llTime l P l M-28 l I

il l l l 1 V-24C i Simultaneous i None l I l lPIEnt ID No. MV20010 ll l l l Test l l l 1 l 1 l I llTemperaturel N/A l 1 l

lCo7ponent: Valve Motor ll (*F) l N/A l Note 1 l N/A 1

l l l N/A 1 Operator ll 1 l I None l' t i 1 l I I l l ll I I I l Manufacturer: Limitorque llPressure I i I I i N/A l 1 l 1 N/A l ll(PSIA) l I Note 1 l N/A 1 lModel Number: l l I N/A I None l ll l l l I IO/N: 381749A ll l I I I l l lS/N: 214612 1

l l ll Relative i N/A l l l l

IFunction: Operates Con- llHumidity J N/A l Note 1 l N/A l l l l l N/A l None

, I1for tainment Isolation 72A valvell (t) 1 l l l

Penetration ll l l l l l l l t IAccuracy: Spec: N/A ll l l l 1

1 l l l  ! I Demon: N/A I(Chemical l N/A l l l I

'l l N/A l l lispray l N/A l N/A l l

l N/A l None ISarvice: Penetration 72A ll l l 1 l t l l I

Containment l l_ l l l l l

I I l Isolation Valve ll l 1 i l l I l

+l l Location: Auxiliary Bldg.flRadiation 13.12 x 105 RADSl2.0 x 107 I l l I

Rm. 427 RADS l T l l

lFlood Level Elev
N/A ll l l_ l I l M-28 l Sequential Testl l None  !

! 1 l

l V-24C i lAbove Flood Level: N/A ll Aging 40 Years l l I (

!l l l 40 Years l I l CAL-93 l l l (INsedad for:

Il i l l Sequential Testl None l l. I l l

'l Hot Shutdown iX l ll 1

I l l 1 Analysis l l l 1

}l llSubmergencel l l l 1

_I N/A l

l Cold Shutdown 111 ll l I N/A l N/A l N/A l N/A l 1 l l l l None l ll l l l l l l 1 l I l l

l '

i Facility: Davis-Besse Unit 1 SYSTEM COMPONENT EVAUJATION WOIUCSHEET Index No. : 216H-019A

  • i Dcekst: 50-346 Rev.: 2 l

Prepared by:

h Checksd tyr g nffsh d _ g ,Date Date Il /!f2 11 / 2. / B3 *

1. The only harsh envirorunent seen is increased radiation due to recirculated fluids. .

i a

4 i  !

r e

.i i

i l

i t

1 1

i

. v E

i i ,

I

(

l i

i l

l i

I I

ym ~

\ t \

k' / \ / .

Freility: L-<fs-Brasa Unit 1 SYSTEM COMPONuuc' EVALUATION WORKSHEET Index L ,41 216H-020 Dockst: 50-346 Rev.: 2 ,

PrGpared by: h _ Date: (!N Chicksd by: MMfd Date: //////3 l 11 l l l l l EQUIPMENT DESCRIPTION ll ENVIRONMENT l DOCUMENTATION REF. l Qualification l Outstanding l l ll Parameter I Specification l Qualification lSpecificationlQualification! Method l Items l l ll 1 l l l l l l ISystem: Containment llOperating l 1 Year' l 1.1 Years l F l M-26 l Simultaneous l None l l Isolation llTime l l l l V-24G l Test l l l ll l l l 1 Note 1 l l l l Plant ID No. MV20030 ll l l l l l l l l llTemperaturel 221.0 l 250.0 l C-314 l M-28 l Simultaneous l None l lCcmpanent: Valve Motor ll ('F) l l l l V-24G l Test l l l Operator ll l l l l l l l l l 11 l l l l l 1 l l Manufacturer: Limito:que llPressure l 19.76 l 39.7 l C-314 l M-28 l Simultaneous l None l l ll(PSIA) l l l l V-24G l Test i l l Modal Number: SMB-000 ll l l l l l l l lO/N: 392414B ll l l l l l l l lS/N: 230158 ll Relative i 100.0 l 100.0 l A l M-28 l Simultaneous l None l l Function: Operates Con- ll Humidity I l l l V-24G l Test l l l tainment Isolation Valvell (t) l l l l l l l l for Penetration 74A ll l l l l l l l l Accuracy: Spec: N/A ll l l l l l l l l Demon: N/A ll Chemical I N/A l N/A l N/A l N/A l N/A l None l l ll Spray l l l l l l l lSarvice: Penetration 74A ll l l l l l l l l Containment ll l l l l l l l t

l Isolation Valve ll l l l l l l l l Location: Auxiliary Bldg.llRadiation l1.0 x 10 6RADS 12.0 x 10 7RADS l T l M-28 (Sequential Testl None l l Rm. 314 ll l l l l V-24G l l l

l Flood Level Elev
N/A ll l l l l l l l lAbova Flood Level: N/A llAging l 40 Years l 40 Years  ! I l CAL-93 l Sequential Testl None l l ll l l l l l Analysis l l lNeedsd for: ll l l l l l l l l Hot Shutdown l X l ll l l l l l l l l l lSubme rgence l N/A l N/A l N/A l N/A l N/A l None l l Cold Shutdown i X l ll l l l l l l l l ll l l l l l l l

ps /

F;;cility:

c

\

)

/

kr.is-Bewa Unit 1 SYSTDI COMPONENT EV ON WORKSHEET

( ]/

\

s Index No.'h R"-020A Dockst 50-346 Rev.: 2 NOTES Prepa red by : N Date lI!( !. b Qvack1d bys pyyugf) / Date U l L/ bl

1. We test subjected the valve motor operator to a transient of 250*F and 39.7 paia for 30 minutes, followed by a cooldown to 120*F in 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. ne valve motor operator was then exposed to a second transient of 250*F and 39.7 psia for 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />, then a cooldown to 200*P and 24.7 psia which was maintained for 15 days. %e temperature in Room 314 peaks at 221*F in 1.55 esconds. %e pressure in Room 314 peaks at 19.76 psia in .006 seconds. %e temperature and pressure in Rocu 314 return to rnbient conditions af ter 8 minutes.

Based on this information, it can be concluded that the laboratory test subjected the valve motor operator to an overall more severe environment than that which would result f rom the postulated HEIB. Since the valve motor operator remained operable throughout the test, it can be concluded that the valve motor operator will remain functional during and af ter sxposure to the accident environstant which would result f rom the postulated Hela. (Reference C-314)

f% )

Fccility: -_ c-BeI20 Unit 1 SYSTEs COMPONh / VALUATION WORKSHEET Index i.'s 216H-021 Dockst: 50-346 Rev.: 2 Prepared by: _ Date: , k Check:d by: ACk# h i f Date: ///J//3 r r l ll l l l l l EQUIPMENT DESCRIPTION ll ENVIRONMENT l DOCUMENTATION REF. l Qualification l Outstanding I l ll Parameter l Specification l Qualification lSpecificationlQualificationl Method l Items l l ll l I I l l I l lSyctsm: Containment ilDperating i 25 Seconds 1 30 Days l F l M-26 l Simultaneous l None l l Isolation 1l Time l l l l V-24E l Test l l l ll l l l l Note 1 I l 1 l Plant ID No. MV2012A ll l l l l l l l l ll Temperature l 283.0 l 300.0 l H, X l M-26 l Simultaneous l None l lComptnent: Valve Motor ll (*F) l l Note 2 l l V-24E l Test l l l Operator ll l l l l 1 I I l ll l l l l 1 l l l Manufacturer: Limitorque llPressure l 52.0 l 84.7 l G, X l M-26 i Simultaneous l None I j

l ll(PSIA) l l l l V-24E l Test l l l Modal Number: SMB-00-10 ll l l l l l l l lO/N: 372235A ll l l 1 l l 1 l l llRelative l 100.0 l 100.0 l A l M-26 i Simultaneous ! None l l Function: Operates ll Humidity l l l l V-24E l Test i I l Containment Normal ll (1) l l l l l l l l Sump Isolation Valvell l l l l l l l l Accuracy: Spec: N/A ll l Boric Acid l Boric Acid l I M-26 l l l l Demon: N/A ll Chemical i 1800 ppm l 1800 ppm l A l V-24E l Simultaneous l None i l llSpray I pH 5.0 l pH 5.0 l l CAL-40 l Test, I l l lSarvice: Containment ll l l l l Note 2 l Analysis l l l l Normal Sump Iso-ll l ,

I l l l l l l lation Line Valvell l l l l l l l l l Location : Containment 6 ilRadiation l1.7 x 10 RADS l2.0 x 108 RADS l CAL-44 l M-26 l Sequential Testl None l l l ll l l l l V-24E l l l l lFlord Level Elev: 562'-2"ll l l l l l l l lAbove Flood Level: Yes ll Aging l 40 Years  ! 40 Years l I l CAL-93 l Sequential Testl None l l ll l l l l l Analysis l l lNacdsd for: ll l l l l l l l l Hot Shutdown l xl ll l l l l l l l l llSubmergencel 572'-2" l 578'-6" l B l M-7 l N/A l None l l Cold Shutdown l l ll l l l l l l l l ll l l l l l l l

A n'%./

Fscility: Davia-Bec30 Unit 1 U

Dockst: 50-146 SYSTI58 COMPONENT EVAIAJATION WORKSHEET Indes No.: 216H-021A .

ma y. : 2 Prspared by: _h Date k! I b Checksd bys ',mjyof Le y / 2.lgy k 1.

1 We 120*F test in subjected 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. the valve motor operator to a transient of 300*F and 84.7 psia for 32 minutes, followed by a cooldown to t

ccaintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200*F and 24.7 psia, which was,maintained which was Se temperature and for

{ pressure inside containment peak at 283*F and 52.0 psia in 17 and 50 seconds, respectively. At I hour the conditions are l 214.7'F and 32.2 psia s at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> the conditions are 204*F and 29.46 psia; at 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> the conditions. are and palas and at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the conditions are 143*F and 18.03 psis.

19327.08 2*F

%e conditions return to ambient in 7 days.

bsed on this information,

.aore severe environment than that which would result from a postulated IOCA.it can be concluded that the lab

Since the valve motor operator remaimd l operable throughout the test and functional af ter the test, it can be concluded that the valve motor operator will remain i fH,unctional and X). during and af ter exposure to the accident environment which would result f rom the postulated IACA . (Reference G,
2. .

CAL-40 qualifies components tested in a high pH boric acid spray- to a pH value of 5.

1 I

}

4 5

s i

l i

1 1

1

I

f") Unit 1

(

Facility: 'Lsis-Men v) j t

Dockst: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: 216H-022 R 2 Prcpared by: _ Date: II(

Chicksd by: 2 M h 1 2 _ g Date: ///q/r>

l ll lEQUIPMENT DESCRIPTION l II l l l ENVIRONMENT I DOCUMENTATION REP.

l I ll Parameterl i Specification l Qualification ISpecificationlQualification)l Qualification Method l iOutstanding l ll l Items  !

ISyctsm: Containment lIOperating i I I l l 25 Secolds l 30 Days l K I M-26 l l Isolation llTime  ! I l Simultaneous l None l l l l V-24G l l ll I l Test i I l lPIEnt ID No. MV2012B l! l l l Note 1 I I l l l l l

llTemperaturel 198.0 295.0 l l l l Component: Valve Motor ll (*F) 1 l C-236 l M-26 l Operator l l 1 l Simultaneoua l None l ll l l V-24G I Test i l l 1 I ll 1 I I I I I l Manufacturer: Limitorque llPressure i 15.51 I I I I l 1 84.7 i C-236 i M-26 i ll(PSIA) l l l l Simultaneous i None l lModel Number: SMB-00-10 ll l l V-24G l Test l l l lO/N: 372235A ll l 1 l l l l lS/N: 180781 l l l l

flRelative l 100.0 l l l Function: Operates l 100.0 l A l M-26 l llHumidity l I I l Simultaneous i Fone l l

Containment Notmal ll (1) I V-24G I Test l l l l j i Sump Isolation Valvell l l l l l l I l Accuracy: Spec: N/A ll l l l l l l l l l Demon: N/A ll Chemical l l l N/A ( N/A l l I lispray l N/A 1 N/A l N/A i I l l None l ISarvice: containment il l I l l l l l I

-Normal Sump ll l I I I I l

l Isolation Valve ll l 1 -

1 1 1 1 l

1 l ILocation: Auxiliary Bldg.ll Radiation 11.97 x 10 RADS 6 l2.0 x 108 RADS l T l l l l Rm. 236 ll l I M-26 ISequential Testl None l

t l l Flood Level Elev: N/A ll l l 1 i V-24G l l l l

lAbova Flood Level: N/A ilAging i 40 Years 1 40 Years l l l l l CAL-93 I

il i I I l ISequential Testl None I INerdsd for: ll l l I I l Analysis l I l Hot Shutdown IX l ll l l l I l l I l l l lisubmergencel N/A l N/A l l l  !

l Cold Shutdown l l N/A l N/A l N/A l ll l l l None l

1. l l l Il I l l l I I I l I l

. _ _ - _ - _ - _ -_ -- = _ _ _ --

F;cility: Davio-Becae Unit 1 SYSTBt COMPONENT EVALUATION WORKSHEET Inden No. : 21FM 422A Dockot 50-346 nov.: 2 frvpared by: _k Date ll ( N Checksd by: % & n w / / t Date // / 2./#I f

4 i

1. The test subjected the valve motor operator to a transient of 300*F and 84.7 psia for 32 sainutes, followed by a cooldown to 120'F in 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The valve smotor operator was then subjected to a second transient of 300*F and 44 7 psia, which was snaintained for 92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br />, then a cooldown to 200'F and 24.7 psia, which was maintained for 24 days. The teaperature in Room 236 peaks at 198'F in 19 secoeds. The pressure in Room 236 peake at 15.51 psia in 1.6 seconds. The conditions in Room 236 return to ambient af ter 6 7 minutes.

i Based on this information, it can be concluded that the laboratort test subjected the valve motor operator to an overall '

more severe environment than that which would result from a postulated HEIa. Since the valve motor operator remained  !

operable throughout the test and functional af ter the test, it can be concluded that the valve motor operator will remain i functional during and af ter exposure tr. ;he accident environnant which would result f rom the postulated NEIA. (Reference '

C-236) l l

l

{

i e

5 \

i 4

4

(

3 I

l j i l

Frcility: 'L.,v,li c-B ac2@

o C) v/

i Unit 1 Dockst: 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Inder No.: 216N-023 Prepared by: Rev.: 2 lI (

_ Date:

Chick;d by: , h .g;c,f M _ Date: //////3 1

11 l EQUIPMENT DESCRIPTION ll I

ENVIRONMENT l l 1 l DOCUMENTATION REF. 1 I

ll Parameter l Specification l Qualification lSpecificationlQualificationil Qualification l Outstanding i ll l Method Items lSyctea: Containment lloperating l l l l 1

l 1 Isolation 30 Seconds i 16 Days l K 1

i f llTime I l l M-28 l Simultaneous l None l l l

' 11 l l Note 1 I Test l l Plant ID No. MV50700 ll 1 I I I I l

1 l l I I llTemperaturel 109.0 l 250.0 l l l IComponent: Valve Motor (*F) l C-Annulus l M-28 l l Operator ll il l l l l V-24C l Simultaneous l None i I I l Test l 1 I I l ll 1 I

l l IMsnufacturer: Limitorque llPressure i 15.32 I I I l

l ll(PSIA) 1 39.7 i C-Annulus l M-28 I I

' l Modal Number: SMB-000-5 l l l l V-24C i Simultaneous l None l ll l l I Test l IO/N: 370756E l 1 l

11 1 1 lS/N: 188841 llRelative l l l I I i 100.0 100.0 1 l

l Function: Operates Con- IIHumidity 1 l A i M-28 l

I l l i Simultaneous l None I tainmcat Vacuum Reliefil (1) l I 1 l V-24C l Test l l I Valve Penetration ll l I I I I lAccuracy
Spec: N/A ll l 1 l l l I

ii l l l ~~l Demon: N/A ll Chemical I N/A l 1 l I l N/A I l ilSpray i N/A l N/A I I N/A l None l ISarvice: Containment 11 1 I I I I i I i I Vacuum Relief ll l l i l  ! l I l Valve Penetration il l l I l

,l Location: Annulus llRadiation l l 1

l l l1.7 x 106 RADS 12.0 x 107 RADS l CAL-44 l l l ll l l M-28 ISequential Testl

lPlood Level Elev
N/A ll l l 1 V-24C I None l l I

{lAbovaFloodLevel: N/A flAging l l 1 i

l 40 Years l l tl 1 40 Years i 1 CAL-93 l

ll l l 1 l Sequential Testl None

!!NPcdsd for: ll l l l l Analysis 1 (

il Hot Shutdown l l l l l_X l ll l l l l

l l 1 l l llSubmergencel N/A l l

! Cold Shutdown l l N/A l N/A l l l ll l l N/A l N/A l None

,1 l 1 lI I i l l 1 1 1 I i 1 J

O Ficility J in-Decco Ursit 1 Docketa 50-346 SYSTEM COMPONENT EVALUATION WORKSHEET Index No.: 216N-023A Prapared bya Rev.3 Oneckzd bysq9,7;",j .n f 'Date __ f(l t 131 uste lf (!M3 -4 1.

N testinsubjected 120*F 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.the valve motor operator to a transient of 250*F and 39 7 then a cooldown to 200*F and .24 7 psia which wasays.

at 109'F in 22 seconds.

maintained for 15 dh andvalve motor 39 7 psia for 22operator hours, was then l

prsssure in the contairusent anreulus return to ambient conditions .

in 6.7 n 5 seconds. TheminutesThe temperatura andpressure in th i

i Dased on the above, that which would result from the postulated HEIB.it is felt that the test subjected the valve motor operator to an ov which would result from the postulated Hela.can be concluded that the valve motor est, operator it would re (Reference C-Annulus) r ng and after exposure to the harsh environment i

l

% l ~s O \

\

Fccility: L sic-322ce Unit i Dockst: 50-346 SYSTi;M COMPONENT EVALUATION WORKSHEET Index No.: 216H-024 Prep 2 red by: _. Rev.: 2 Checksd by: _ Date: lIl

_ h / h / Date: qA//3 1

11 IEQUIPMENT DESCRIPTION Il I i ENVIRONMENT I

i i ll Parameter i Specification l DOCUMENTATION REF. l I

ISysta=: Containment il I i Qualification l Specification l Qualification)! Qualification Method l Outstanding l i ilOperating 1 i l l Items l 1 Isolation llTime 30 Seconds l 16 Days l K i i i l l M-28 I

1l l l l l V-24C l Simultaneous l None i IPlcnt ID No. MV50710 i l i l Test i l t

ll l l Note 1 1 llTemperaturel 109.0 l l l 1

l l Component: Valve Motor 250.0 l i Operator ll (*F) l 1 1

l C-innulus l M-28 l Simultaneous i None

_l ll l l l V-24C l l l l Test i Il l l l I

lMEnufacturer: Limitorque llPressure .I I I 1

I l l i 15.32 1 39.7 I ll(PSIA) {

l l C-Annulus ! M-28 i Simultaneous l I I lModel Number: SMB-000-5 ll 1 l I V-24C None l lO/N: 370756E I l Test l ll l l l IS/N: 188842 ll Relative 1

l l 1

l IFunction: Operates Con- IIHumidity i 100.0 1 100.0 l l 1

l l A l M-28 l l i

tainment Vacuum Relieffl (t) l l l l V-24C l Simultaneous l None l 1 l 1 Test i Valve Penetration 'll l l l i l Accuracy: Spec: N/A ll l -

l l l I l l l l 1 Demon: N/A llChemical l l l l l I N/A l N/A l l

llSPray l I N/A I N/A l lSarvics: Containment ll l l l i N/A l None 1 i l l 1 Vacuum Relief ll l l I l l l l Valve Penetrationli 1 l l i l l

ILocation: Annulus llRadiation 11.7 x 106 l l l 1

I l I RADS 12.0 x 107 RADS l l l l l. l CAL-44 l M-28 l IF.lood Level Elev/: N/A ll I l ISequential Testi None l l 1 V-24C l lAbova Flood Level: N/A lIAging l 40 Years 1

l l l l l l l 40 Years l l ll l I I CAL-93 l lNesd:d for: l l ISequential Testl None i ll 1 l D Hot Shutdown I, X_I ll I i l 1 Analysis l l l 1 l I

_ llSubmergencel N/A l l l I

Cold Shutdown l__l 1l l N/A l N/A l l l l l N/A l N/A

_I ( l l l l None l l l l I I I I

l

_I

N i Facility v eio-Besso Unit 1 ,

SYSTIM COMPONENT EVi- TION WORKSHEET Dockst 50-346 Index hue 216H-024A Asv. 2 Prepared by: g gl [g NOTES

! Onucked by //pg Q j , gg, j

! 1.

The 120*F test subjected in 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. the valve motor operator to a transient of 250*F and 39.7 psia for 30 minutes, followed by a cooldown to l %e valve motor operator was then exposed to a second transient of 250*F and 39 7 psia for 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />, at 109'F in 22 seconds. and 24.7 psia which was maintained for 15 days. Se temperature in the containment annulus peaks then a cooldown to 200*P He pressure in the containment annulus peaks at 15.32 psia in 5 seconds. he temperature and pressure in the containment annulus return to ambient conditions in 6.7 minutes.  ;

Based that whichon the above, would resultit from is feltthe that the test subjected postulated HEIA. Sincethe valve motor operator to an overall more severe environment than the valve motor operator remained functional during the teste it can be concluded that the valve motor which would result from the postulated HEIB. operator would remain functional during and af ter exposure to the harsh environment (Reference C-Annulus) -

i I

l, i

b I

I  !

4 i

a l 1 l l

j

n p

(

~

/ 1 i l Frcility- 0-B;=a Unit 1 SYSTEM COMPON EVALUATION WORKSHEET Ind;x N5^. 216H-025 Dockst: 50-346 Rev.: 2 Prep red by:

Ch;ck d by: _a4 9/ / d /_

Date: l[/!((

Date: f/,/g/d7 l ll l l l l lEQUIPMENT DESCRIPTION ll ENVIRONMENT l DOCUMENTATION REF. l Qualification i Outstanding i l ll Parameter l Specification i Qualification lSpecificationlQualificationi Method Items l l l ll l l l l 1 l 1 lSy;tcm: Containment llOperating 30 Seconds l l 16 Days l K I M-28 l Simultaneous l None l l Isolation llTime l l l l V-24C l Test l l l ll_ . . I l l l Note 1 l l l

'Irnt ID No. MV50720 ll l l l l l l l t ilTemperaturel 109.0 l 250.0 l C-Annulus l M-28 l Simultaneous l None l lC mp:nent: Valve Motor ll (*F) l 1 l l V-24C l Test l l l Operator ll l l l l l l __l l ll l l l l l l l lMinufacturer: Limitorque llPressure l 15.32 l 39.7 l C-Annulus l M-28 l Simultaneous l None l l ll(PSIA) l l l l V-24C l Test l l l Modal Number: SMB-000-5 ll l l l l I I l lO/N: 370756E ll l l l l l l l lS/N: 188843 IIRelative i 100.0 l 100.0 l A l M-28 l Simultaneous l None l l Function: Operates Con- ll Humidity l l l l V-24C l Test l l l tofnment Vacuum Relief ll (%) l l l l l l l l Valve Penetration ll l l l l l l l l Accuracy: Spec: N/A ll l 1 l l l l l l Demon: N/A ll Chemical l N/A l N/A l N/A l N/A l N/A l None i 1 llSPray l l l l l l l lSarvice: Containment ll l l l l l l l l Vacuum Relief ll l l l l I l l l Valve ll l l l l l l l l Location: Annulus ll Radiation l1.7 x 106 RADS 12.0 x 107 RADS l CAL-44 l M-28 l Sequential Testi None l l ll l l l l V-24C l l l lPlood Level Elev: N/A ll l l l l l l l lAbova Flood Level: N/A ll Aging i 40 Years 1 40 Years l I l CAL-93 ISequential Test l None l 1 ll l 1 l Analysis l l l l lN:ed:d for: ll l C l l l l l l Hot Shutdown l X l ll l l l l l l l l ll Submergence l N/A l N/A l N/A I N/A l N/A l None l l Cold Shutdown l l ll l l l l l l l 1 ll l l 1 l l l l

._ _ _ _____ _ . _ ___________