Forwards Rev 0 to VEGP Unit 1 Pressure & Temperature Limits Rept
ML20087C298
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/03/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087C301 List:
References
LCV-0474, LCV-474, TAC-M92131, TAC-M92132, NUDOCS 9508090130
Download: ML20087C298 (2)


Text

n m-1 F '

o  : p ' GEygia Pooer Company

% S ^40 invemess Center Parkwa/ .

< 4 - Post othce Box 3295

' Berrrnngham, Aabama 35201 jT prese 205 877 7122

-c.K.McCoy Geornia5' Power Vce Presxiont. Nuclear -
Vogt:0 Protect the southern electrc system August 3, 1995 LCV-0474

. Docket Nos. 50-424 50-425 TAC- M92131 M92132 U. S Nuclear Regulatory Commission ATTM: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT PRESSURE AND TEMPERATURE LIMITS REPORTS By letter dated May 1,1995, (LCV-0603) Georgia Power Company (GPC) proposed to amend the Vogtle Electric Generating Plant (VEGP) Unit I and ' Unit 2 Technical Specifications (TS),

Appendix A to the Operating Licenses NPF-68 and HPF-81. The proposed change would,in part, convert the existing VEGP TS to the improved TS for Westinghouse plants as represented by NUREG-1431. As part of the proposed conversion, VEGP would adopt a Pressure and

. Temperature and Limits Report (PTLR) which would contain the heatup and cooldown limitations and the Cold Overpressure Protection System (COPS) setpoints that are presently specified in existing TS Limiting Conditions for Operation 3/4.4.9.1 and 3/4.4.9.3, respectively.

' In support of the proposed conversion to the improved TS, enclosed are draft PTLRs for VEGP Units 1 and 2.

The methodology to be used for determining the pressure and temperature limits for VEGP is described in WCAP-14040, Revision 1, December 1994, " Methodology Used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves." The associated changes to the TS to incorporate a PTLR are contained in our May 1,1995, submittal (LCV-0603).

Sincerely, C - @f '

C. K. McCoy h

GS0121 \\ \

9508090130 950803 PDR ADOCK 05000424 p PDR

+ ~-

r-- :y ..

-o. ,

.v ,

UcS. Nuclear Regulats9 Commission LCV-0474 Page 2 Enclosures .

'xc: Georuia Power Comoany +

Mr. J. B. Beasley,' Jr.

~

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle ,