Letter Sequence Other |
|---|
|
|
MONTHYEARML20087C2981995-08-0303 August 1995 Forwards Rev 0 to VEGP Unit 1 Pressure & Temperature Limits Rept Project stage: Other ML20087F3281995-08-0909 August 1995 Responds to RAI Re Proposed Conversion of Units 1 & 2 TS Based on NUREG-1431 Project stage: Other ML20098A4801995-09-22022 September 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing VEGP TS Requirements to Format & Content of NUREG-1431 Project stage: Request ML20094N3821995-11-20020 November 1995 Rev to 950501 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Convert Existing TS to Format & Content of NUREG-1431,Westinghouse Improved STS Project stage: Request ML20097A3091996-01-30030 January 1996 Forwards Listed Changes to 950501 Proposed Conversion to Improved Ts,Based on NUREG-1431,in Response to NRC Comments Project stage: Other ML20100G0331996-02-19019 February 1996 Forwards marked-up TS Pages W/Comments Reflecting Results of Util Review of NRC Draft Safety Evaluation of Gpc Proposed Conversion of TS as Provided to Gpc by NRC 960117 & 0201 Ltrs Project stage: Draft Other ML20100M7231996-02-29029 February 1996 Requests That Listed SR Not Be Required Immediately Upon Implementation of Improved TS Project stage: Other ML20101D4081996-03-0505 March 1996 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing TS to Improve for Westinghouse Plants as Represented by NUREG-1431 Project stage: Request ML20101D3161996-03-12012 March 1996 Informs That Changes to TS Would Convert Existing VEGP TS to Improved TS for Westinghouse Plants as Represented by NUREG-1431 Project stage: Other ML20111A5271996-05-0606 May 1996 Forwards marked-up Ts,Revising Proposed Extended DG AOT to 14 Days from Discovery of Failure to Meet Lco,Provided Standby Auxiliary Transformer Available,In Response to NRC RAI Project stage: Response to RAI ML20113A0221996-06-17017 June 1996 Forwards Proposed TS & Bases Reflecting Listed Submittals & Administrative Changes Based on NUREG-1431 Re Conversion of Existing TS to Improved TS Project stage: Other ML20117C3571996-08-23023 August 1996 Provides Statement of Conditions & Response to 960725 Telcon W/Sa Varga Re Request for Extended AOT for EDGs Project stage: Request ML20117N5811996-09-13013 September 1996 Requests to Pursue Proposed Extended DG AOT Apart from Conversion to Improved TS & Bases Project stage: Other ML20128H5621996-09-25025 September 1996 Safety Evaluation Supporting Amends 96 & 74 to Licenses NPF-68 & NPF-81,respectively Project stage: Request ML20133L3041997-01-10010 January 1997 Forwards Clean Typed Version of Affected Page from Table 3.3.1-1 as Stated in Amends 96 & 74 Project stage: Other ML20149M7131997-01-20020 January 1997 Requests That NRC Review Encl Comments Re Safety Evaluation Rept in Support of Amendments That Issued Improved TSs Project stage: Other 1996-03-12
[Table View] |
Text
n m-1 p ' GEygia Pooer Company F
^40 invemess Center Parkwa/.
o S
- Post othce Box 3295 4
' Berrrnngham, Aabama 35201 jT prese 205 877 7122
-c.K.McCoy Geornia Power 5'
Vce Presxiont. Nuclear -
- Vogt:0 Protect the southern electrc system August 3, 1995 LCV-0474
. Docket Nos. 50-424 50-425 TAC-M92131 M92132 U. S Nuclear Regulatory Commission ATTM: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT PRESSURE AND TEMPERATURE LIMITS REPORTS By letter dated May 1,1995, (LCV-0603) Georgia Power Company (GPC) proposed to amend the Vogtle Electric Generating Plant (VEGP) Unit I and ' Unit 2 Technical Specifications (TS),
Appendix A to the Operating Licenses NPF-68 and HPF-81. The proposed change would,in part, convert the existing VEGP TS to the improved TS for Westinghouse plants as represented by NUREG-1431. As part of the proposed conversion, VEGP would adopt a Pressure and
. Temperature and Limits Report (PTLR) which would contain the heatup and cooldown limitations and the Cold Overpressure Protection System (COPS) setpoints that are presently specified in existing TS Limiting Conditions for Operation 3/4.4.9.1 and 3/4.4.9.3, respectively.
' In support of the proposed conversion to the improved TS, enclosed are draft PTLRs for VEGP Units 1 and 2.
The methodology to be used for determining the pressure and temperature limits for VEGP is described in WCAP-14040, Revision 1, December 1994, " Methodology Used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves." The associated changes to the TS to incorporate a PTLR are contained in our May 1,1995, submittal (LCV-0603).
Sincerely, C - @f '
C. K. McCoy GS0121 h \\\\
\\
9508090130 950803 PDR ADOCK 05000424 p
PDR
+ ~-
r--
- y
-o.
.v
- UcS. Nuclear Regulats9 Commission LCV-0474 Page 2 Enclosures.
'xc:
Georuia Power Comoany
+
Mr. J. B. Beasley,' Jr.
Mr. M. Sheibani
~
NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle t-s t
\\
[
i B
a d'
%s-p g
,- - r
~..
.