MONTHYEARML24218A2182024-08-15015 August 2024 Summary of July 16, 2024, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Sequoyah Nuclear Plant LAR Related to Containment Penetrations and Fuel Handling ML24136A2242024-05-15015 May 2024 1B EDG NRC Regulatory Conference Meeting Summary May 2, 2024 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections ML24089A0712024-04-0101 April 2024 3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML24082A2532024-03-26026 March 2024 Summary of March 18, 2024, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Fuel Handling and Fuel Decay Time ML24057A3792024-03-0808 March 2024 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Fuel Handling and Fuel Decay Time ML24065A0262024-03-0101 March 2024 LAR Pre-Application Meeting TS 3.9.8 (Decay Time) and FHA Dose Analysis Meteorological Monitoring and Dispersion Modeling Topics ML24044A0372024-02-15015 February 2024 February 8, 2024, Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Technical Specification Surveillance Requirement 3.1.1.8 ML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML22312A3522022-12-0101 December 2022 Revised - Summary of Regulatory Audit for Alternative Request RV-02 ML22207B8302022-07-28028 July 2022 Summary of July 20, 2022, Observation Public Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request RP-12 to ASME OM Code Testing for the 1B-B Centrifugal Charging Pump at Sequoyah Nuclear Plant, Unit 1 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22048B7852022-03-0202 March 2022 Summary of February 16, 2022, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a Request for an Alternative to Requirements for Addressing Pressure Isolation Valve Leakage ML21313A3482021-11-18018 November 2021 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Seismic and Fire Probabilistic Risk Assessment (PRA) Modifications to 10 CFR 50.69 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21265A5142021-10-12012 October 2021 Summary of September 15, 2021, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Elimination of the High Negative Flux Rate Trip ML21218A1472021-08-11011 August 2021 August 5, 2021 N-769 Relief Pre-Submittal Meeting Summary ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21152A1252021-06-0202 June 2021 Summary of Verbal Authorization of Alternative Request RP-10 for the 1B-B Motor Driven Auxiliary Feedwater Pump ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21112A3262021-04-30030 April 2021 Summary of April 21, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2 ML21067A2132021-03-23023 March 2021 Summary of March 2, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20293A0802020-10-28028 October 2020 Summary of October 13, 2020, Closed Meeting with TVA on Responses to Requests for Additional Information Updated Final Safety Analysis Report Hydrologic Analysis License Amendment Request ML20203M2292020-08-11011 August 2020 July 16, 2020, Summary of Partially Closed Meeting with Tennessee Valley Authority to Discuss Responses to Requests for Additional Information Regarding Updated Final Safety Analysis Report Hydrologic Analysis License Amendment Request ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20108E9092020-06-22022 June 2020 Summary of April 16, 2020, Virtual Meeting with Tennessee Valley Authority to Discuss Submittal of an Exigent License Amendment Request Operate One Cycle with One Control Rod Removed ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20055C2312020-03-0505 March 2020 Summary of February 20, 2020 Pre-submittal Meeting - Operation Without Control Rod H8 and Fuel Transition ML20035C8192020-02-12012 February 2020 Summary of January 27, 2020, Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of Steam Generator Tube Inspection Related License Amendment Request ML19325C7142019-12-0202 December 2019 November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1 ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML19038A4692019-02-28028 February 2019 Summary of January 31, 2019 Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - ML18344A5672019-01-15015 January 2019 November 14, 2018, Summary of Public Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - Sequoyah Nuclear Plant, Units 1 and 2 ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 ML17227A5142017-09-0101 September 2017 Summary of August 1, 2017, Pre-Submittal Public Meeting with TVA Regarding a Class 1E Unbalanced Voltage Relay Licensing Amendment Request for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 ML16117A5512016-05-0202 May 2016 04/01/2016 Sequoyah Nuclear Plant, Units 1 and 2 - Summary Of Public Meeting With TVA Regarding Hydrology-Related Licensing Actions (CAC Nos. ME9238 And ME9239) ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML16029A3512016-02-0505 February 2016 Summary of January 19, 2016, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Technical Specifications for Sequoyah Nuclear Plant, Units 1 and 2 ML15238A3422015-09-22022 September 2015 July 22, 2015 Summary of Telecon Between NRC and TVA, Concerning RAI Set 25 Pertaining to SQN, Units 1 and 2 License Renewal Application ML15233A0352015-09-22022 September 2015 July 20, 2015, Summary of Telephone Conference Call Held Between NRC and TVA Concerning RAI, Set 25 Pertaining to the Sequoyah Units 1 and 2 License Renewal Application (TAC Nos. MF0481 and MF0482) ML15236A0672015-09-0909 September 2015 August 20, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and TVA ML15152A0312015-06-23023 June 2015 Summary of Telephone Conference Call Held on May 13, 2015, Between the U.S. NRC and TVA, Concerning RAI, Set 24 Pertaining to the Sequoyah Nuclear Plant License Renewal Application 2024-08-15
[Table view] |
Text
July 23, 2002 LICENSEE: Tennessee Valley Authority FACILITY: Sequoyah Nuclear Plant, Unit 1
SUBJECT:
SUMMARY
OF JULY 9, 2002, MEETING WITH TVA TO DISCUSS THE SEQUOYAH UNIT 1 STEAM GENERATOR REPLACEMENTS On July 9, 2002, the U.S. Nuclear Regulatory Commission (NRC) staff met with representatives of Tennessee Valley Authority (TVA) and Bechtel at the NRC Headquarters in Rockville, Maryland. TVA requested this meeting to discuss three topical reports and a one-time technical specification (TS) change related to the pending replacement of the steam generators (SGs) for Sequoyah Nuclear Plant (SQN) Unit 1. The meeting was classified as a Category 1 meeting, however, no members of the public were in attendance. Enclosure 1 is a list of attendees and is a copy of TVAs handout distributed during the meeting. The handout includes TVAs agenda for the meeting.
TVA submitted three topical reports to provide the technical justification for:
C The proposed use of an alternative methodology for concrete reinforcement rod (rebar) splicing, Topical Report Number (No.) 24370-TR-C-001
[ADAMS Accession No. ML020780612],
C The details regarding rigging and heavy load handling, Topical Report No. 24370-TR-C-002 [ADAMS Accession No. ML021060581], and C The proposed use of through-bolted splice-plate connections for reconstruction of the SG compartment roofs, Topical Report No. 24370-TR-C-003
[ADAMS Accession No. ML020910792].
The licensee discussed their responses to questions proposed by the staff in public meetings on August 9, and October 10, 2001. The technical staff proposed additional questions during the July 9 meeting concerning the type of leak-rate testing to be performed after restoring the containment structure, shear stress and yield analyses for those bolts used in the rebar splicing, the clarification of the licensees program for the review of the vendors quality assurance program, and the use of certain industry standards. Questions were proposed regarding clarification of how the licensee intends to meet various requirements in Section 5.1 of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Also, a clarification regarding the specified time frame for the proposed TS change was discussed. The technical staff indicated their intention to address their questions in future correspondence. In conclusion, the licensees representatives stated that the meeting was beneficial in their understanding of the technical staffs questions and concerns regarding the three topical reports.
2 The staff noted that the above meeting was beneficial in gaining an understanding of TVAs plans and activities regarding the pending SG replacement for Sequoyah Unit 1.
/RA/
Ronald W. Hernan, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-327
Enclosures:
As stated cc w/encls: See next page
2 The staff noted that the above meeting was beneficial in gaining an understanding of TVAs plans and activities regarding the pending SG replacement for Sequoyah Unit 1.
/RA/
Ronald W. Hernan, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-327
Enclosures:
As stated cc w/encls: See next page Distribution: See next page MEETING
SUMMARY
- ML022050041 PACKAGE: ML022050048 ENCLOSURE 2: ML022060552 OFFICE PDII-2\PM PDII-2\PM PDII-2\LA PDII-2/SC NAME EBrown RHernan BClayton KJabbour (A)
DATE 07/22/02 07/22/02 07/22/02 07/22/02 OFFICIAL RECORD COPY
Distribution:
PUBLIC PDII-2 R/F JZwolinski HBerkow RHernan (hard copy)
EBrown BClayton (hard copy)
OGC ACRS MKotzalas (e-mail)
JMa GHarrity SRosenberg(e-mail)
PFredrickson, RII
ATTENDANCE LIST NUCLEAR REGULATORY COMMISSION STAFF MEETING WITH TENNESSEE VALLEY AUTHORITY AT NRC HEADQUARTERS JULY 9, 2002 NRC TVA Ronald Hernan Pedro Salas Eva Brown Paul Trudel Greg Hatchett Ed Craig John Ma David Ryder Bechtel Cal Reid Joseph Cowhill Myron Anderson George Thomas ENCLOSURE 1
Tennessee Valley Authority SEQUOYAH NUCLEAR PLANT cc:
Mr. J. A. Scalice Mr. Mark J. Burzynski, Manager Chief Nuclear Officer and Nuclear Licensing Executive Vice President Tennessee Valley Authority Tennessee Valley Authority 4X Blue Ridge 6A Lookout Place 1101 Market Street 1101 Market Street Chattanooga, TN 37402-2801 Chattanooga, Tennessee 37402-2801 Mr. Pedro Salas, Manager Mr. Karl W. Singer, Senior Vice President Licensing and Industry Affairs Nuclear Operations Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Soddy Daisy, TN 37379 Chattanooga, TN 37402-2801 Mr. D. L. Koehl, Plant Manager Mr. Jack A. Bailey, Vice President Sequoyah Nuclear Plant Engineering & Technical Services Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 6A Lookout Place Soddy Daisy, TN 37379 1101 Market Street Chattanooga, TN 37402-2801 Mr. Russell A. Gibbs Senior Resident Inspector Mr. Richard T. Purcell Sequoyah Nuclear Plant Site Vice President U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Tennessee Valley Authority Soddy Daisy, TN 37379 P.O. Box 2000 Soddy Daisy, TN 37379 Mr. Lawrence E. Nanney, Director Division of Radiological Health General Counsel Dept. of Environment & Conservation Tennessee Valley Authority Third Floor, L and C Annex ET 11A 401 Church Street 400 West Summit Hill Drive Nashville, TN 37243-1532 Knoxville, TN 37902 County Executive Mr. Robert J. Adney, General Manager Hamilton County Courthouse Nuclear Assurance Chattanooga, TN 37402-2801 Tennessee Valley Authority 6A Lookout Place Ms. Ann P. Harris 1101 Market Street 341 Swing Loop Road Chattanooga, TN 37402-2801 Rockwood, Tennessee 37854