July 23, 2002 LICENSEE:
Tennessee Valley Authority FACILITY:
Sequoyah Nuclear Plant, Unit 1
SUBJECT:
SUMMARY
OF JULY 9, 2002, MEETING WITH TVA TO DISCUSS THE SEQUOYAH UNIT 1 STEAM GENERATOR REPLACEMENTS On July 9, 2002, the U.S. Nuclear Regulatory Commission (NRC) staff met with representatives of Tennessee Valley Authority (TVA) and Bechtel at the NRC Headquarters in Rockville, Maryland. TVA requested this meeting to discuss three topical reports and a one-time technical specification (TS) change related to the pending replacement of the steam generators (SGs) for Sequoyah Nuclear Plant (SQN) Unit 1. The meeting was classified as a Category 1 meeting, however, no members of the public were in attendance. Enclosure 1 is a list of attendees and is a copy of TVAs handout distributed during the meeting. The handout includes TVAs agenda for the meeting.
TVA submitted three topical reports to provide the technical justification for:
The proposed use of an alternative methodology for concrete reinforcement rod (rebar) splicing, Topical Report Number (No.) 24370-TR-C-001
[ADAMS Accession No. ML020780612],
The details regarding rigging and heavy load handling, Topical Report No. 24370-TR-C-002 [ADAMS Accession No. ML021060581], and
The proposed use of through-bolted splice-plate connections for reconstruction of the SG compartment roofs, Topical Report No. 24370-TR-C-003
[ADAMS Accession No. ML020910792].
The licensee discussed their responses to questions proposed by the staff in public meetings on August 9, and October 10, 2001. The technical staff proposed additional questions during the July 9 meeting concerning the type of leak-rate testing to be performed after restoring the containment structure, shear stress and yield analyses for those bolts used in the rebar splicing, the clarification of the licensees program for the review of the vendors quality assurance program, and the use of certain industry standards. Questions were proposed regarding clarification of how the licensee intends to meet various requirements in Section 5.1 of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Also, a clarification regarding the specified time frame for the proposed TS change was discussed. The technical staff indicated their intention to address their questions in future correspondence. In conclusion, the licensees representatives stated that the meeting was beneficial in their understanding of the technical staffs questions and concerns regarding the three topical reports.
2 The staff noted that the above meeting was beneficial in gaining an understanding of TVAs plans and activities regarding the pending SG replacement for Sequoyah Unit 1.
/RA/
Ronald W. Hernan, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-327
Enclosures:
As stated cc w/encls: See next page
2 The staff noted that the above meeting was beneficial in gaining an understanding of TVAs plans and activities regarding the pending SG replacement for Sequoyah Unit 1.
/RA/
Ronald W. Hernan, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-327
Enclosures:
As stated cc w/encls: See next page Distribution: See next page MEETING
SUMMARY
- ML022050041 PACKAGE: ML022050048 ENCLOSURE 2: ML022060552 OFFICE PDII-2\\PM PDII-2\\PM PDII-2\\LA PDII-2/SC NAME EBrown RHernan BClayton KJabbour (A)
DATE 07/22/02 07/22/02 07/22/02 07/22/02 OFFICIAL RECORD COPY
Distribution:
PUBLIC PDII-2 R/F JZwolinski HBerkow RHernan (hard copy)
EBrown BClayton (hard copy)
JMa GHarrity SRosenberg(e-mail)
PFredrickson, RII
ATTENDANCE LIST NUCLEAR REGULATORY COMMISSION STAFF MEETING WITH TENNESSEE VALLEY AUTHORITY AT NRC HEADQUARTERS JULY 9, 2002 NRC TVA Ronald Hernan Pedro Salas Eva Brown Paul Trudel Greg Hatchett Ed Craig John Ma David Ryder Bechtel Cal Reid Joseph Cowhill Myron Anderson George Thomas ENCLOSURE 1
Tennessee Valley Authority SEQUOYAH NUCLEAR PLANT cc:
Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. Karl W. Singer, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Jack A. Bailey, Vice President Engineering & Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Richard T. Purcell Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37379 General Counsel Tennessee Valley Authority ET 11A 400 West Summit Hill Drive Knoxville, TN 37902 Mr. Robert J. Adney, General Manager Nuclear Assurance Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Mark J. Burzynski, Manager Nuclear Licensing Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. Pedro Salas, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37379 Mr. D. L. Koehl, Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37379 Mr. Russell A. Gibbs Senior Resident Inspector Sequoyah Nuclear Plant U.S. Nuclear Regulatory Commission 2600 Igou Ferry Road Soddy Daisy, TN 37379 Mr. Lawrence E. Nanney, Director Division of Radiological Health Dept. of Environment & Conservation Third Floor, L and C Annex 401 Church Street Nashville, TN 37243-1532 County Executive Hamilton County Courthouse Chattanooga, TN 37402-2801 Ms. Ann P. Harris 341 Swing Loop Road Rockwood, Tennessee 37854