(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Letter
MONTHYEARML24025A9362024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0055 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000263/20230042024-01-31031 January 2024 Integrated Inspection Report 05000263/2023004 ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20244012024-01-22022 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2024401 L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota IR 05000263/20234022023-12-13013 December 2023 Security Baseline Inspection Report 05000263/2023402 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20230032023-11-13013 November 2023 Integrated Inspection Report 05000263/2023003 and 07200058/2023001 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 ML23291A1102023-10-23023 October 2023 Environmental Audit Summary and RCIs and RAIs ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23248A2092023-09-18018 September 2023 Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection IR 05000263/20230102023-09-0707 September 2023 Commercial Grade Dedication Inspection Report 05000263/2023010 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 ML23214A2412023-08-31031 August 2023 Letter: Aging Management Audit - Monticello Unit 1 - Subsequent License Renewal Application IR 05000263/20230052023-08-30030 August 2023 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2023005) L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 ML23241A9732023-08-21021 August 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1, Subsequent License Renewal Application (Docket No. 50-263) L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence ML23215A1312023-08-0909 August 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application IR 05000263/20230022023-08-0707 August 2023 Plantintegrated Inspection Report 05000263/2023002 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 ML23198A0412023-07-28028 July 2023 LRA Availability Letter ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23201A0352023-07-24024 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan IR 05000263/20235012023-07-13013 July 2023 Emergency Preparedness Inspection Report 05000263/2023501 2024-01-31
[Table view] Category:License-Monthly Operating Report
MONTHYEARL-MT-05-033, March 2005 Monthly Operating Report for Monticello Nuclear Generating Plant2005-04-0808 April 2005 March 2005 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-05-024, February 2005 Monthly Operating Report for Monticello Nuclear Generating Plant2005-03-0404 March 2005 February 2005 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-05-016, January 2005 Monthly Operating Report for Monticello Nuclear Generating Plant2005-02-15015 February 2005 January 2005 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-05-006, December 2004 Monthly Operating Report for Monticello Nuclear Generating Plant2005-01-11011 January 2005 December 2004 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-04-076, November 2004 Monthly Operating Report for Monticello Nuclear Generating Plant2004-12-0707 December 2004 November 2004 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-04-073, October 2004 Monthly Operating Report for Monticello Nuclear Generating Plant2004-11-0909 November 2004 October 2004 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-04-057, August 2004 Monthly Operating Report for Monticello2004-09-0909 September 2004 August 2004 Monthly Operating Report for Monticello L-MT-04-052, July 2004 Monthly Operating Report for Monticello2004-08-10010 August 2004 July 2004 Monthly Operating Report for Monticello L-MT-04-044, June 2004 Monthly Operating Report for Monticello2004-07-12012 July 2004 June 2004 Monthly Operating Report for Monticello L-MT-04-039, May 2004 Monthly Operating Report for Monticello2004-06-11011 June 2004 May 2004 Monthly Operating Report for Monticello L-MT-04-033, April 2004 Monthly Operating Report for Monticello Nuclear Generating Plant2004-05-10010 May 2004 April 2004 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-04-026, March 2004 Monthly Operating Report for Monticello2004-04-0707 April 2004 March 2004 Monthly Operating Report for Monticello L-MT-04-020, February 2004 Monthly Operating Report for Monticello Nuclear Generating Plant2004-03-0808 March 2004 February 2004 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-04-009, January 2004 Monthly Operating Report for Monticello2004-02-0606 February 2004 January 2004 Monthly Operating Report for Monticello L-MT-04-001, December 2003 Monthly Operating Report for Monticello Nuclear Generating Plant2004-01-15015 January 2004 December 2003 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-03-087, October 2003 Monthly Operating Report for Monticello Nuclear Generating Plant2003-11-11011 November 2003 October 2003 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-03-076, September 2003 Monthly Operating Report for Monticello2003-10-0707 October 2003 September 2003 Monthly Operating Report for Monticello L-MT-03-088, August 2003 Monthly Operating Report for Monticello Nuclear Generating Plant2003-09-0909 September 2003 August 2003 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-03-060, July 2003 Monthly Operating Report for Monticello Nuclear Generating Plant2003-08-12012 August 2003 July 2003 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-03-051, June 2003 Monthly Operating Report for Monticello2003-07-11011 July 2003 June 2003 Monthly Operating Report for Monticello L-MT-03-047, May 2003 Monthly Operating Report for Monticello Nuclear Generating Plant2003-06-13013 June 2003 May 2003 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-03-038, April 2003 Monthly Operating Report for Monticello Nuclear Generating Plant2003-05-0808 May 2003 April 2003 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-03-027, March 2003 Monthly Operating Report for Monticello Nuclear Generating Plant2003-04-14014 April 2003 March 2003 Monthly Operating Report for Monticello Nuclear Generating Plant L-MT-03-020, February 2003 Monthly Operating Report for Monticello2003-03-14014 March 2003 February 2003 Monthly Operating Report for Monticello L-MT-03-009, January 2003 Monthly Operating Report for Monticello2003-02-11011 February 2003 January 2003 Monthly Operating Report for Monticello L-MT-03-003, December 2002 Monthly Operating Report for Monticello Nuclear Generating Plant2003-01-14014 January 2003 December 2002 Monthly Operating Report for Monticello Nuclear Generating Plant ML0236003252002-12-13013 December 2002 November 2002 Monthly Operating Report for Monticello Nuclear Generating Plant ML0233101852002-11-15015 November 2002 October 2002 Monthly Operating Report for Monticello Nuclear Generating Plant ML0229000172002-10-0808 October 2002 September 2002 Monthly Operating Report for Monticello ML0223305032002-08-0808 August 2002 July 2002 Monthly Operating Report for Monticello Nuclear Generating Plant ML0219804842002-07-11011 July 2002 June 2002 Monthly Operating Report for Monticello ML0217104352002-06-10010 June 2002 May 2002 Monthly Operating Report for Monticello Nuclear Generating Plant ML0214404802002-05-0606 May 2002 April 2002 Monthly Operating Report for Monticello Nuclear Generating Plant ML0210904342002-04-10010 April 2002 March 2002 Monthly Operating Report for Monticello Nuclear Generating Plant ML0208802282002-03-13013 March 2002 February 2002 Monthly Operating Report for Monticello ML0205903602002-02-13013 February 2002 January 2002 Monthly Operating Report for Monticello Nuclear Generating Plant ML0203505182002-01-14014 January 2002 December 2001 Monthly Operating Report for Monticello 2005-04-08
[Table view] |
Text
Monticello Nuclear Generating Plant Committed to Nuclear Exce~llence Operated by Nuclear Management Company, LLC December 13, 2002 Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for November 2002 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the month of November is en*losed.
Plse contact Paul Hartmannat (763) 271-5172 if you require further information.
Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant Enc.
C: Regional Administrator - Ill, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Dept. of Commerce J \LICENSE\NRC Misc Correspondence\Monthly Operating ReportWMonthly Operating Report Nov 2002 doc 2807 West County Road 75
- Monticello, Minnesota 55362-9637 Telephone 763-295-5151
Committed to NuclearExcellence DOCKET NO. 50-263 UNIT NAME Monti6ello DATE December 2, 2002 COMPLETED BY H. H. Paustian TELEPHONE 763-295-1317 OPERATING DATA REPORT REPORTING PERIOD: November 2002 MONTH YEAR TO DATE CUMULATIVE
- 1. Design Electrical Rating (Mwe-Net) 600 0 600.0 600.0
- 2. Maximum Dependable Capacity (Mwe-Net) 578.1 578.1 578.1
- 3. Number of Hours the Reactor Was Critical 720.0 7,928 0 228,097.6
- 4. Number of Hours the Generator Was On Line 720.0 7,876.1 224,674.8
- 5. Unit Reserve Hours 0.0 0.0 0.0
- 6. Net Electrical Energy (MWH) 424,937.3 4,577,393.3 115,727,378.3
UNIT SHUTDOWNS DOCKET NO. 50-263 UNIT NAME Monticello DATE .12-02-02 COMPLETED BY H. H. Paustian REPORTING PERIOD: November 2002 TELEPHONE 763-295-1317 Type Method of Cause/Corrective Actions F:Forced Duration Reason Shutting Down No. Date S:Scheduled (hours) (1) (2) Comments None 2
Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Scram C Refueling 3 Automatic Trip/Scram D Regulator Restriction 4 Continuation E Operator Training & Licensing Examination - 5 Other (Explain)
F Administrative G Operational Error (Explain)
H Other (Explain)
SUMMARY
- The plant operated at essentially 100% power the entire month, except for a small reduction to 98% for about 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on November 9 for a control rod pattern adlustment.