ML023600325

From kanterella
Revision as of 14:43, 24 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Monticello Nuclear Generating Plant
ML023600325
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/13/2002
From: Forbes J
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML023600325 (3)


Text

Monticello Nuclear Generating Plant Committed to Nuclear Exce~llence Operated by Nuclear Management Company, LLC December 13, 2002 Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for November 2002 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the month of November is en*losed.

Plse contact Paul Hartmannat (763) 271-5172 if you require further information.

Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant Enc.

C: Regional Administrator - Ill, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Dept. of Commerce J \LICENSE\NRC Misc Correspondence\Monthly Operating ReportWMonthly Operating Report Nov 2002 doc 2807 West County Road 75

  • Monticello, Minnesota 55362-9637 Telephone 763-295-5151
  • Fax 763-295-1454

Committed to NuclearExcellence DOCKET NO. 50-263 UNIT NAME Monti6ello DATE December 2, 2002 COMPLETED BY H. H. Paustian TELEPHONE 763-295-1317 OPERATING DATA REPORT REPORTING PERIOD: November 2002 MONTH YEAR TO DATE CUMULATIVE

1. Design Electrical Rating (Mwe-Net) 600 0 600.0 600.0
2. Maximum Dependable Capacity (Mwe-Net) 578.1 578.1 578.1
3. Number of Hours the Reactor Was Critical 720.0 7,928 0 228,097.6
4. Number of Hours the Generator Was On Line 720.0 7,876.1 224,674.8
5. Unit Reserve Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 424,937.3 4,577,393.3 115,727,378.3

UNIT SHUTDOWNS DOCKET NO. 50-263 UNIT NAME Monticello DATE .12-02-02 COMPLETED BY H. H. Paustian REPORTING PERIOD: November 2002 TELEPHONE 763-295-1317 Type Method of Cause/Corrective Actions F:Forced Duration Reason Shutting Down No. Date S:Scheduled (hours) (1) (2) Comments None 2

Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Scram C Refueling 3 Automatic Trip/Scram D Regulator Restriction 4 Continuation E Operator Training & Licensing Examination - 5 Other (Explain)

F Administrative G Operational Error (Explain)

H Other (Explain)

SUMMARY

The plant operated at essentially 100% power the entire month, except for a small reduction to 98% for about 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on November 9 for a control rod pattern adlustment.