L-MT-03-047, May 2003 Monthly Operating Report for Monticello Nuclear Generating Plant
| ML031700391 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 06/13/2003 |
| From: | Denise Wilson Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-MT-03-047 | |
| Download: ML031700391 (3) | |
Text
Committed to NucarExcetle' Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC L-MT-03-047 June 13, 2003 Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT DOCKET 50-263 LICENSE No. DPR-22 MONTICELLO MONTHLY OPERATING REPORT FOR MAY 2003 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for Monticello Nuclear Generating Plant for the month of May is enclosed.
Please contact John Fields at 763-271-1663 if you require further information.
David L. Wilson Site Vice President Monticello Nuclear Generating Plant Enclosure CC Regional Administrator - III, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Dept. of Commerce 2807 West County Road 75
- Monticello, Minnesota 55362-9637 Telephone: 763-295-5151
- Fax: 763-295-1454
. As
, t'q
Committed to NuclearExce DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-263 Monticello June 3, 2003 J. I. Helland 763-295-1333 OPERATING DATA REPORT REPORTING PERIOD: May 2003
- 1. Design Electrical Rating (MWe-Net)
- 2. Maximum Dependable Capacity (MWe-Net)
- 3. Number of Hours the Reactor Was Critical
- 4. Number of Hours the Generator Was On Line
- 5. Unit Reserve Hours
- 6. Net Electrical Energy (MWHe)
MONTH 600.0 578.1 176.0 136.9 0.0 50,495.6 YEAR TO DATE 600.0 578.1 2,939.7 2,896.3 0.0 1,663,656.5 CUMULATIVE 600.0 578.1 231,781.3 228,315.1 0.0 117,829,199.0
UNIT SHUTDOWNS REPORTING PERIOD:
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE May 2003 50-263 Monticello 06 03 J.. Helland 763-295-1333 1
.1. ____________
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulator Restriction E
Operator Training & Licensing Examination F
Administrative G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
<V No.
Type Method of Cause/Corrective Actions (Year F:Forced Duration Reason Shutting Down to Date S:Scheduled (hours)
(1)
(2)
Comments 1
5/26/03 S
605.1 C
2 Note: Shutdown #1 continued from April report.
S
.4 4
1 4
4
.4 4
1 4
-4 4
4 4
I I
-4 4
1 4
I I
-4 4
I 4
4 I
4 I
4 4
1
-4 4
I 4
4 1
-4 4
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~i4 I
1
SUMMARY
The plant was shutdown for RF021 until May 26. The plant went critical on May 25 and the generator was placed online on May 26. The power was ramped up from 0 to 100% from May 26 to May 29. There was one planned power reduction after this. This was a power reduction to about 90% for 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> on May 29/30 for a rod pattem adjustment.