L-MT-03-003, December 2002 Monthly Operating Report for Monticello Nuclear Generating Plant

From kanterella
Jump to navigation Jump to search
December 2002 Monthly Operating Report for Monticello Nuclear Generating Plant
ML030230161
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/14/2003
From: Forbes J
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-03-003
Download: ML030230161 (3)


Text

Monticello Nuclear Generating Plant Committed to NuclearExcellence Operated by Nuclear Management Company, LLC L-MT-03-003 January 14, 2003 Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for December 2002 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the month of December is enclosed.

PILEke contact Paul Hartmann at 763-271-5172 if you require further information.

Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant Enc.

c: Regional Administrator- III, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Dept. of Commerce 2807 West County Road 75

  • Monticello, Minnesota 55362-9637 Telephone: 763-295-5151 ° Fax: 763-295-1454

S \ lNiiC Committed to Nuclear Excellence DOCKET NO. 50-263 UNIT NAME Monticello DATE January 2, 2003 COMPLETED BY H. H. Paustian TELEPHONE 763-295-1317 OPERATING DATA REPORT REPORTING PERIOD: December 2002 MONTH YEAR TO DATE CUMULATIVE

1. Design Electrical Rating (Mwe-Net) 600 0 600.0 600.0
2. Maximum Dependable Capacity (Mwe-Net) 578.1 578.1 578.1
3. Number of Hours the Reactor Was Critical 744.0 8,672.0 228,841.6
4. Number of Hours the Generator Was On Line 744.0 8,620.1 225,418.8
5. Unit Reserve Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 438,164.3 5,015,557.6 116,165,542.6

UNIT SHUTDOWNS DOCKET NO. 50-263 UNIT NAME Monticello DATE 01-02-03 COMPLETED BY H. H. Paustian REPORTING PERIOD: December 2002 TELEPHONE 763-295-1317 Type Method of Cause/Corrective Actions F:Forced Duration Reason Shutting Down No. Date S:Scheduled (hours) (1) (2) Comments None 1,

.1 ________ .L ____________ 1 1 .1._________________ L 1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Scram C Refueling 3 Automatic Trip/Scram D Regulator Restriction 4 Continuation E Operator Training & Licensing Examination 5 Other (Explain)

F Administrative G Operational Error (Explain)

H Other (Explain)

SUMMARY

The plant operated at essentially 100% power the entire month, except for small reductions to 98% for about 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on December 7 and on December 28 for control rod oattem adiustments.