December 2001 Monthly Operating Report for Monticello
ML020350518
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/14/2002
From: Forbes J
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML020350518 (4)


Text

Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC NuMC Committed to Nuclear Excellenc January 14, 2002 M2002004 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for December 2001 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the month of December is provided.

Please contact Douglas A. Neve, Project Manager - Licensing (Interim), at (763) 295-1353 if you require further information.

Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant c:

Regional Administrator-Ill, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Dept. of Commerce J:\\LICENSE\\NRC Misc Correspondence\\Monthly Operating Report.doc 2807 West County Road 75

  • Monticello, Minnesota 55362-9637 Telephone: 763.295.5151
  • Fax: 763.295.1454

, ý/ It

OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-263 1

2 E.

H.

Limbeck 763/295-1006 OPERATING STATUS

]Notes

1. Unit Name

__Monticello I

]

2. Reporting period:

December 1

3. Licensed Thermal Power (MWt) :

1775 1

]

4. Nameplate Rating (Gross MWe) :

613

]

]

5. Design Electrical Rating (Net MWe) :

600

]

]

6. Maximum Dependable Capacity (Gross MW7eT:605.1

]

]

7. Maximum Dependable Capacity (Net MWe) :

578.1

]

1

8. If Changes Occur in Capacity Ratings (It-ems Number 3 Through 7)

Since Last

Report, Give Reasons: __N/A
9.

Power Level To Which Restricted, If Any (Net MWe):

10. Reasons For Restrictions, If Any: _N/A

_N/A THIS MONTH YR.-TO-DATE CUMULATIVE Hours In Reporting Period Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next 12 Months Not Reported 744 447.0 0.0 397.8 0.0 645221 222200 212639 53.5%

53.5%

49.4%

47.6%

0.0%

(Type, 8760 267409 6873.6 220169.6 0.0 940.7 6776.6 216798.7 0.0 0.0 11809337 342122352 4040848 116066484 3876323 111149985 77.4%

81.1%

77.4%

81.1%

76.5%

76.8%

73.8%

75.3%

12.5%

4.6%

Date, and Duration of Each)

25.

If Shut Down At End Of Report Period, Estimated Date Of Startup:

26. Units In Test Status(Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

22

23.

24.

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DATE 1

2 COMPLETED BY E.

H.

Limbeck TELEPHONE 763/295-1006 MONTH DEC 12-01-01 Shutdown for the 2001 refueling outage.

to 12-13-01 12-13-01 to 12-18-01 Plant startup following the refueling outage.

12-18-01 Power operation.

to 12-21-01 12-21-01 to 12-22-01 12-22-01 to 12-31-01 Power reduction to 75% to perform a control rod pattern adjustment and to precondition fuel.

Power operation.

Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

UNIT SHUTDOWNS REPORT MONTH December DOCKET NO.

50-263 UNIT NAME Monticello DATE 01-03-02 COMPLETED BY E. H. Limb TELEPHONE 763-295-1 3

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulator Restriction E

Operator Training & Licensing Examination F

Administrative G

Operational Error (Explain)

H Other (Explain) 4 Method:

1 Manual 2

Manual Scram 3

Automatic Scram 4

Other (Explain) 5 Draft IEEE Standard 805-1984 (P805-D5)

IEEE Standard 803A-1 983 eck 006 Method of Cause & Corrective Type Duration Reason Shutdown Action to No.

Date (1)

(hours)

(2)

(3)

Prevent Recurrence 10 11/03/01 S

346.3 C

1 Note: Shutdown #10 continued from November report.

__ r

[1.

1 1

1 F

S 2

Forced Scheduled