ML020880228
| ML020880228 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 03/13/2002 |
| From: | Forbes J Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML020880228 (4) | |
Text
NMC Committed to Nuclear Excelle[ce Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC March 13, 2002 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operatinq Report for February 2002 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the month of February is provided.
leasartmann at (763) 271-5172 if you require further information.
Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant c:
Regional Administrator - Ill, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Dept. of Commerce K\\Th
C\\Documents and Settings~hrtpO4\\Desktop\\Monthly Operating Report.doc 2807 West County Road 75 a Monticello, Minnesota 55362-9637 Telephone: 763-295-5151
- Fax: 763-295-1454
OPERATING DATA REPORT DOCKET NO.
50-263 DATE 3-1-2 COMPLETED BY E.
H.
Limbeck TELEPHONE 763/295-1006 OPERATING STATUS
]Notes Unit Name:
Monticello]
Reporting period:
February
]
Licensed Thermal Power (MWt) :
1775
]
Nameplate Rating (Gross MWe):
613
]
]
Design Electrical Rating (Net MWe) :
600
]
]
Maximum Dependable Capacity (Gross MWe-T:605.1
]
Maximum Dependable Capacity (Net MWe):
578.1
]
]
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any: _N/A N/A THIS MONTH YR.-TO-DATE CUMULATIVE Hours In Reporting Period Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next 12 Months
_Not Reported 672 672.0 0.0 672.0 0.0 1187314 410030 396128 100.0%
100.0%
102.0%
98.2%
0.0%
(Type, Date, 1416 268825 1328.0 221497.6 0.0 940.7 1276.1 218074.8 0.0 0.0 2237057 344359409 772766 116839250 745185 111895170 90.1%
81.1%
90.1%
81.1%
91.0%
76.9%
87.7%
75.4%
9.9%
4.7%
and Duration of Each)
- 25.
If Shut Down At End Of Report Period, Estimated Date Of Startup:
- 26. Units In Test Status(Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
8.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
24.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DATE 3-1-2 TELEPHONE 763/295-1006 FEB 02-01-02 Power operation.
to 02-09-02 02-09-02 to 02-10-02 Power reduction to 75% to perform MSIV quarterly testing, a control rod pattern adjustment and to precondition fuel.
02-10-02 Power operation.
to 02-28-02 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
MONTH
UNIT SHUTDOWNS REPORT MONTH DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE February 50-263 Monticello 03-01-02 E. H. Limbeck 763-295-1006 3
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulator Restriction E
Operator Training & Licensing Examination F
Administrative G
Operational Error (Explain)
H Other (Explain) 4 Method:
1 Manual 2
Other (Explain) 5 Draft IEEE Standard 805-1984 (P805-D5)
IEEE Standard 803A-1983 Method of Cause & Corrective Type Duration Reason Shutdown Action to No.
Date (1)
(hours)
(2) 3 Prevent Recurrence None 1
4-4
+
J
.1.
A L
.1.
- 4.
- 1.
J 4
- 4.
- 4.
- 4.
J 4
- 4.
4
- 4.
- 4.
1 4
- 4.
4 4
4
- 4.
4 4-4 4
4 4
4
+
4 4-4 4
4
.4.
4
- 4.
4 4
+
4
- 4.
4 4
4
+
4
- 4.
4 4
4
+
4
+
1 4
4 1
F S
2 Forced Scheduled