Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC Committed to Nuclea Excellence June 10, 2002 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for May 2002 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the month of May is provided.
Please contact Paul Hartmann at (763) 271-5172 if you require further information.
Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant c:
Regional Administrator - Ill, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Dept. of Commerce J\\LICENSE\\NRC Misc Correspondence\\Monthly Operating Report.doc 2807 West County Road 75
- Monticello, Minnesota 55362-9637 Telephone: 763-295-5151 e Fax: 763-295-1454
<V
OPERATING DATA REPORT DOCKET NO.
50-263 DATE 6-3-
2 COMPLETED BY H.
H. Paustian TELEPHONE 763/295-1317 OPERATING STATUS INotes Unit Name
__Monticello
]
]
Reporting period:
May
]
]
Licensed Thermal Power (MWt) :
1775 1
Nameplate Rating (Gross MWe) :
613 Design Electrical Rating (Net MWe):
600 Maximum Dependable Capacity (Gross MWe-T:605.1
]
Maximum Dependable Capacity (Net MWe) :
578.1
]
]
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9.
Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any: _N/A
_N/A THIS MONTH YR.-TO-DATE CUMULATIVE Hours In Reporting Period Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next 12 Months Not Reported 744 744.0 0.0 744.0 0.0 1318167 453613 438208 100.00%
100.0%
101.9%
98.2%
0.0%
(Type, Date, 3623 271032 3535.0 223704.6 0.0 940.7 3483.1 220281.8 0.0 0.0 6148830 348271182 2118882 118185366 2045743 113195728 96.1%
81.3%
96.1%
81.3%
97.7%
77.1%
94.1%
75.6%
3.9%
4.6%
and Duration of Each)
- 25.
If Shut Down At End Of Report Period, Estimated Date Of Startup:
- 26. Units In Test Status(Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
8.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
24.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263 DATE 6-3-
2 COMPLETED BY H.
H. Paustian TELEPHONE 763/295-1317 MONTH MAY 05-01-02 to 05-31-02 Power operation.
Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
UNIT SHUTDOWNS REPORT MONTH May DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-263 Monticello 06-03-02 H. H. Paustian 763-295-1317 3
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulator Restriction E
Operator Training & Licensing Examination F
Administrative G
Operational Error (Explain)
H Other (Explain) 4 Method:
1 Manual 2
Other (Explain) 5 Method of System Comp Cause & Corrective Type Duration Reason Shutdown Code Code Action to No.
Date (1)
(hours)
(2)
(3)
LER No.
(4)
(5)
Prevent Recurrence None Draft IEEE Standard 805-1984 (P805-D5)
IEEE Standard 803A-1983 1
F S
2 Forced Scheduled