ML022900017
| ML022900017 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 10/08/2002 |
| From: | Forbes J Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML022900017 (3) | |
Text
Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC Committed to Nuclear xcelen October 8, 2002 Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for September 2002 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the month of September is enclosed.
Pse contact Paul Hartmann at (763) 271-5172 if you require further information.
Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant Enc.
c:
Regional Administrator-Ill, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Dept. of Commerce J \\.ICENSEXNRC Misc Correspondence\\Monthly Operating Report Sept 2002 doc 2807 West County Road 75
- Monticello, Minnesota 55362-9637 Telephone 763-295-5151 e Fax: 763-295-1454
,D
NMC Committed to Nuclear Excellence>
DOCKET NO.
50-263 UNIT NAME Monticello DATE October 1, 2002 COMPLETED BY H. H. Paustian TELEPHONE 763-295-1317 OPERATING DATA REPORT REPORTING PERIOD: September 2002
- 1. Design Electrical Rating (Mwe-Net)
- 2. Maximum Dependable Capacity (Mwe-Net)
- 3. Number of Hours the Reactor Was Cntical
- 4. Number of Hours the Generator Was On Line
- 5. Unit Reserve Hours
- 6. Net Electncal Energy (MWH)
MONTH 600.0 578.1 720.0 720.0 0.0 416,914.5 YEAR TO DATE 600.0 578.1 6,463.0 6,411.1 0.0 3,718,072.4 CUMULATIVE 600.0 578.1 226,632.6 223,209.8 0.0 114,868,057.4
UNIT SHUTDOWNS REPORTING PERIOD:
September 2002 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulator Restriction E
Operator Training & Licensing Examination F
Administrative G
Operational Error (Explain)
H Other (Explain)
DOCKET NO.
50-263 UNIT NAME Monticello DATE 10-02-02 COMPLETED BY H. H. Paustian TELEPHONE 763-295-1317 Method:
1 Manual 2
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
SUMMARY
The plant operated at essentially 100% power the entire month, except for a short drop to approximately 95% power on September 14 for a minor control rod pattern adjustment.
Type Method of Cause/Corrective Actions F.Forced Duration Reason-Shutting Down No.
Date S:Scheduled (hours)
(1)
(2)
Comments None 1