R tN Committed to Nuclear Excesse Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC April 14, 2003 L-MT-03-027 Technical Specification 6.7.A.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT DOCKET 50-263 LICENSE No. DPR-22 MONTICELLO MONTHLY OPERATING REPORT FOR MARCH 2003 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for Monticello Nuclear Generating Plant for the month of March is enclosed.
Please contact John Fields at 763-295-1663 if you require further information.
David L. Wilson Site Vice President Monticello Nuclear Generating Plant CC Regional Administrator, USNRC, Region IlIl Project Manager, USNRC, NRR NRC Resident Inspector Minnesota Dept. of Commerce Attachments:
Operating Data Report Unit Shutdowns
" q C/
2807 West County Road 75
- Monticello, Minnesota 55362-9637 Telephone. 763-295-5151
- Fax: 763-295-1454
Committed to Nuclear Excellnc DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-263 Monticello April 1, 2003 J. I. Helland 763-295-1333 OPERATING DATA REPORT REPORTING PERIOD: March 2003
- 1. Design Electrical Rating (MWe-Net)
- 2. Maximum Dependable Capacity (MWe-Net)
- 3. Number of Hours the Reactor Was Critical
- 4. Number of Hours the Generator Was On Line
- 5. Unit Reserve Hours
- 6. Net Electrical Energy (MWHe)
MONTH 600.0 578.1 744.0 744.0 0.0 437,856.0 YEAR TO DATE 600.0 578.1 2,160.0 2,160.0 0.0 1,267,562.2 CUMULATIVE 600.0 578.1 231,001.6 227,578.8 0.0 117,433,104.7
UNIT SHUTDOWNS REPORTING PERIOD March 2003 DOCKET NO.
50-263 UNIT NAME Monticello DATE 04 03 COMPLETED BY J. I. Helland TELEPHONE 763-295-1333 Type Method of Cause/Corrective Actions F:Forced Duration Reason Shutting Down No.
Date S.Scheduled (hours)
(1)
(2)
Com nents None 1
2 Reason:
Method:
A Equipment Failure (Explain) 1 Manual B
Maintenance or Test 2
Refueling 3
Automatic Trip/Scram D
Regulator Restriction 4
Continuation E
Operator Training & Licensing Examination 5
Other (Explain)
F Administrative G
Operational Error (Explain)
H Other (Explain)
SUMMARY
The plant operated at essentially 100% power the entire month, except for the following four power reductions: A power reduction to 93% for about 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> on March 8 for a rod pattern adjustment. A power reduction to about 90% for about 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> on March 18 for an Amertap and a rod pattern adjustment.
A power reduction to 98% for about 40 minutes on March 28/29 for a rod pattern adjustment and a power reduction to about 92% for about 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 30 minutes on March 30 for a rod pattern adjustment.