U1R28 OCC Interactive Turnover
ML051920338
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/25/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920338 (35)


Text

Commited toNudcear P/ l*b MV1 Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Sunday, April 25,,2004 Start Time: 1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer / Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors .~

First Une Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Turnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included In Daily Package:

- Site Communication

- Safety Snippet

- Outage Alara Report

- Outage Status Report

- Shutdown Safety Assessment

- Defined Critical Path

- Work Activity Risk Assignment

- Outage Schedule Information in this record was deleted in accordance with Are Freedom of Information Act, tAo 2s Z FDIA/2 1 5 -)1,5-

Radiation Protection Communications EDACS software issue resolved Early on Thursday morning we successfully implemented a software fix to the Electronic Dosimeter Access Control System (EDACS) and re-opened all the EDACS computer terminals for RCA login/logout. The fix put our electronic "dose buffer" back into the system, which had been inadvertently removed by a recent software upgrade. The "dose buffer" performs an automatic check of your remaining allowable annual dose, and if the allowable dose is not more than 100 mrem above your RWP dose limit, the computer system will prevent you from logging into EDACS. Prior to reinstallation of the dose buffer, we were manually checking all RCA login entries at the RP station to verify correct allowable dose. A big thank you goes out to Scott Kohlmann of the IT group for his efforts to help fix the system in a timely manner.

Use of booty bands with protective clothing coveralls An observation by RPTs noted that several personnel are wearing PC (protective clothing) coveralls with the bottom of the coverall legs extending below the shoe covers. This practice creates several potential problems: 1) a tripping hazard due to the coverall leg dragging beneath the shoe; 2) spreading contamination from areas of high contamination to low contamination; 3) causing the PCs to wear out faster than normal. To prevent these potential problems, we expect personnel who are wearing PCs with coverall legs that might drag below the shoe covers (rubber shoes) to use bootybands on the outside of their PCs to hold up their coverall legs.

Thank you in advance for your cooperation.

  • Supervisors and contract liaisons please ensure that this information is communicated to your work groups.

2

Committed to Nuiclcar Exccicnco

  • r1EELLE

_ P~flT 3Ells

  • lIEU Point Beach Nuclear Plant U1R28 Refueling Outage t.;.8.*t5;> >. - Sfe T&'ics;tor week of. tfrli25.Mi -1';:'S5f b S34i Theme for the week This week's theme is Teamwork & Attitude! Good teamwork and attitude will help us complete this outage successfullyl Dali Safety Sni pets Sunday "Sure safety can get old, but so do safe workers' A part of having a good safety attitude Is never letting your guard down. Even when you are just walking around the plant, an Injury is just a door slam away.

Monday "When we're all on the same team problems aren't as big as they seemu Is your job going to be delayed by 30 minutes? Who are you going to call for help? The OCC.

They can help you solve issues.

TuesdAy "Surprises belong at birthday'pdrties not In the shop."

OE17571 Braidwood It was discovered that shop personnel were grinding aluminum stock on the shop bench grinder. Whats wrong with that? Aluminum flakes can adhere to the wheel, causing Itto become unbalanced. Also the flakes thermally expand faster than the rest of the wheel. The Potential result? A wheel fracture and that is a surprise Vou don't needl Wednesdav "Teamwork by all, helps make accident rates fall" Over the last few weeks we have added many new team members to our staff. It is each of our respionsibility's to coach them on the way we do business around here... SAFELYI Nothing can stop the entire organization faster than a serious Injury.

Thursday "No matter what the season, covers are In place for a reason."

Do you know why quartz halogen lights have glass covers? The temperatures reached by the portable halogen floodlights may exceed I OOOF.' OEI 7708 1/6/04 Plant Hatch declared an unusual event as the' result of a small fire. The fire started by hot fragments of glass blown from a halogen lamp. The cover was not in place and the resulting fragments started the fire.

'Friday' "Use your head and stay alert, It keeps you fromt getting hurt" OE17764 Limerick On 2/3104 an electrician received a shock on a GFCI protected line. Why did this happen? The worker failed to ensure GFCI reset properly after testing. Do you check your GFCI prior to use to make sure It Is working right?

Saturday "Safety Is a six letter word but a seven day Job' Remember to not let your guard down as you leave work for the day. Last week there were numerous AR s on Inappropriate driving Inthe parking lot Watch out for your coworker.

I 8

t.T. fM V Ml 2.

3

I 9

Point Beach Nuclear Plant Outage 1R28 Path Picture DAY 21 N A Meets Supporting Operational Excellence Outaae ...

is-Radiation .Performance ....

m .i cumulative . e.o- -rait a

, - .ion 1. lngaun* M t - - ctsd" .

__a__ _

Ell-M- tmit, L IThis indicator measures cumulative dose radiation exposure and* t total number of personnel-contamination events. (PCE's > 5000.

I.Day 21 -April 24 Actual = 2.568 i.- N ....

tiw-&w..i [*W'111 1

Cumulative = 34.402 cpm) during refueling outages. The dose indicator Is measured in Cumulative Forecast = 35.488 Rem and individual PCE events.

Daily dose gbal reforecasted on 4123.

Meets: <=75 Rem ActualCum.

Exceeds: <=71 Rem Dose: 34.402_Rem PCE . #6 On 4122104, an Individual performing support activities (no entry Into a high Meets:.. <=-18: ExcArdl-q <=12. .,Ar-tual PCF's:. 6 contamination area) for eddy current testing was found to have 7,000 ncpm contamination on a shoe.

Stu Thomas I Personnel Contamination Events Cummulative Dose Exposure 20 - 80. I 18 _ R 168 E so ---- Actual 14 -

- Actual 12 -

.Forecast Goal I10 8

6.

' Goal o 40 4 0 20 co 2-o 4.04 ...... ......

0 2 4 6 8 1012141518202224262830323436384042 0 2 4 6 8 1012141618202224262830323436384042

NMCi Coaninuted to Nuclear Excellence .

Outage Status Report Plant: Point Beach Unit I Day: Sunday Today's Date / Time: 4/25104 1600 Outage Duration: Day 22 of Refueling Outage Number U1R28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0 First Aid cases 0 Significant near misses 0 Total for this outage 1 Summary Radiological Dose to date 34.402 Projected to date

  • 35.488 Outage Goal *75 R Difference -1.086 Number of PCEs 6 Summary:
  • Reforecast on 4/23 Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0 Summary:

Plant Status Mode: 0 Hot Standby (Mode 3) El Hot Shutdown (Atode 4) E Cold Shutdown (Mode S) 0 Refueling Shutdown (Mode 6)

RCS: Temperature: 86 Pressure: Vented to Atmosphere RV Level: Refueling Height Time to Boil: 22.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

(

Shutdown Safety Assessment Protected Equlpment:

Major Activities Completed In Last 24 Hours Crltical Path and Near Ciihcal Path Activities (Next 24 Hours)

  • B SIG Sludge Lancing
  • Continue Fuel Motion
  • Commnenced Fuel Motion ,A SIG Sludge Lancing
  • Continue Reactor Vessel Head Inspection Significant Outstanding Issues Date Issue Due Responsibility 4/03/04 Repair Blowdown Tank Leakage 4/30104 Scott Manthei 4/04/04 lP2A Charging Pump Troubleshooting 4130/04 Clay Hill 4/08/04 Incorporate Lessons Learned from I s Reduced Inventory Orange Path 4/26/04 Dave Dyzak 4/22/04 IP-1OB RHR Pump Return to Service Plan 4/26/04 Mike Boeselager 4/25/04 B RCP Motor Oil TBD Jim McGough Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 Heatup >200° 4125/04. 0900 Head Lift 4/09/04 0900 4/21/04 1550 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30104 0100 5

Point Bcach NucIcar Plant PBNP SHUTDOWN SAFETY ASSE,'SSMIENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: April 25, 2004 TIME: 1600'J KEY SAFETY FUNCTIONS:

REACTIVITY: YELLOW CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: YELLOW SFP COOLING: GREEN PROTECTED EOUIPMENT:

COMMENTS:

ItCS Time to Boil is 22.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> SF'P Timelto Boil is 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> (full core off-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as lire prevention contingency PBF-4563 Bdutr.dms: NM10.3 6 Revision 2 1Ot3O02 6 Page S of 9 NP 10.2,1

Defined Critical Path U ID DESCRIPTION OD RD a u SYS ENID I- 25 -2 APR -

I RPIC30 FUEL MOTION AND INSERT 11

  • 1_.
  • 1-1.

_ 92 1 1 I 0-RP.001C

., ,,.,, , I, i2.14;161.2n. 24s 8 .10i12146;1 C..3oFUdLMOTIONANDINSERrSHUFFLE:

A!20,221 0.2,41. n SHUFFLE 0 I

I i

to I

I I

I I

I I

II Run Dstoe . _ Inc. FL- 1 6 DEFINED CRITICAL PATHShEotTi of oPdnmvera Sstmln FL-16' DEFINED CRITCALPATHSE _

after 25APR04 12:00 after 25APR04 12:00 I U1R28 WORKING SCHEDULE I APR 9 I _IR13P DESCRarnoN RD ES EF RISK MF R mi25I MaI 2fi 6 ST: . 5-2.

SLQ A. A i.l I II EMo306911A APR 76 TG-01-VARM 1TG-l-VARM READS. 1 25APR04 I 25APR04 DR-N ML-N 0 ITG -VMREAD! 'HIGH 'PERFORM PRE-CAIw HIGH PERFORM 0900A 12:59 ORT3-N R-N ITG-1 TURE INE GENERATOR CUTPUTVARMETER PRE CAL 2 1 AP0112521 APR 76 B41 NB204 CAUBRATETECH O 28APR04 26APR04 DR-N ML-N 0 AM~ J.URATE TECH SP :C RELAYS 14:59 ORT3-N R-N Q~a~~4C SPECRELAYS _ 13:00r I _ I _ A 4WVA~fG1 .RDS LOAD CENTE 10215121 W

3 O TRIPBS1-2 APR F5243S 1,2 FS2-B1S 1-2 PERFORM 527APR04 28APR04 DR-N ML-N O TRIPB2S-2F2.BS' .2 PERFORM CONI . CKT. AND TRW CONT. CKT. AND TRIP t4:0 09:59 ORT-NNR-N M-4 0 L12ISO2 AP - F52-121 SWITCHING UNE 121 2APR04 27APR04 DRN ML-N O L12ISO2S% CHING LUtE 121 OL TWPBNP YARD" OUTE PBNP YARD _ 0860 . 07.59 ORT3-N R-N M 5 O L121100S2 APS __ F52-121 UINE 121 OUT OF 153, 26APR04 02MAYD4 .DR-N ML-N O LIZIOSUZLP rE121 OUTOF SERVIi E SECOND TIME

___ SERV1CE'SECONd _ 06:00 14:59 ORT3-NR-N I

6 O L121PAINT AS_ F52-121 APS TO PAINT UINE 121 36 26APR04 27APRD4 DRN AML-N III LU21PAINT PS TO PAINT UNE 121 TOWER (PBNP AR

__. _TOWER (PBNP YARD) _ W080v 1S9M ORT3-N R-N 7 0 L121APS F52-121 APS INSTALL UNE 121 147 26APR04 02MAY04 DR-N ML-N 0 LI21APS INSTALL UNE S STIRI5CTRESl 0I.11 A0060AS 7

_V ff~llllf r wuw

_D I O x0 S

xgl4 I

x FN 1X4 STRUCTURES n.rt flO FS3 R VV 0itJLNJ MATERIAL I

_rA 08:00 15.00 I Z 10.59 r.ne diAPR0 08:59 7 D.LY 1 ORT3-N R-N nlS ORT3-N R-N ns _~SIlfffA I

I aI p P040600IX-4 REM )VE SEALING MAT 04006000E-ALI

.OW"VOLTAGE!

atI A ov.,cr tA I F2B

- 4 -1. 8 BUS B I 27APR04A 27APo4

-A4 nRN MLN n _ _.

u 5ZbU F-<> 1-Z I BS2SOSWITCH BUS SECTION 2 01 OUr 'PSNP YARD 06:00 09:59 ORT3-N R-N rTPBNP YAR 10 0 BS2005 APS F52-BS 1-2 BUS SECTION 2 OUT OF 32 27APR04 28APR04 -- DR-N ML-N O BS20CSBUS SECTION 2 t SERVICE 0R 00 13:59 ORT3-N R-N 11 0 BS2 ARREST APS F5248S 1-2 PERFORM TESTING 4 27APR04 27APR04 DR-N ML-N 0 I S2 ARR0TPERFt RM TESTING P524-F524-S 1-2ARESTERS 10.00 13 59 ORT3-N R-N I125 12 1 AP0350 S 7R X-04 PERFORM CABLE 5 27APR04 27APR04 DR-N ML-N 0 APOIDSOAPERFORM

__ DETERM 11:00 15:59 ORT3-N R-N LOW VOLTAGE ST MTON AUXILIARY1 ANsFORMER0305 I 4f,:r59n AP04008M1X-4 DL SEEPAGE (COF TINGENYW1O 7f I -wvowoo ?Q U I1I.`nan a (CONTINGENCYWIO) 11.110 18:59 ORT3-N R-N I __ LOW"VOLTAGEST tANSFORMERo400 1_,

_ _ _ __ __ . _ _ _ . _ . . _ _ , 4 14 1 AP0305025 76 X-04 PERFORM DOBLE TEST 5 27APR04 28APR041 DR-N ML-N I 0 M'OSOO2SPERFO A DOBLE TEST 16:00 11.59 ORT3-NR-N - LOW VOL1 AGE STATION ALM

.. .. _ *L '";: .. I -, - .-  : , -E_. - . . . -. . I JARY,TRANSIORM 3R0305025O 15 [O1 CE0306041 CEI 75 INTAKE CRI I INSPECT CRIB, INSTALL 50 05APR04 j 3aAPR04 1 DR-Y ML-Y I 1ff0 CE0:114I M-SEC ~CMRWAI LIOAMLFWH A BUOYSAND FISH

-_ l10:11A 1B59 - ORT3-Y R-N .

.._11.... _

- U- U- *-_ a

. . .I I .-..  : 1 -, M1 ' .1 . ' I - 1 *N., I l . . ;I , ' .: '

-18I1 CE212642S1 CE4 76 FDO-022A BUILD SCAFFOLDING 1. O9APR04 28ApR04 l DR-Y ML-Y 0 FOR FD-225A 08BOA 1859 ORT3Y R-N c4,BUD42 PPODIN

- PDFDR-225A

-- @n u FWH 1ALC 2505 LOWER 15

  • -l.] 4ss

. l . I

-17A1P l

.I r-.-- I bt l 77 1 (( l1 lblv:g:il. r. - A-A71:_I J( AI'M LI-.- I ADD1U4 L-Y VVYM-211 1 1 1 11 1 xelunil 1{ I . And LIWNMULA I M - VAU PROG -URE HALLS FT1 I 1 Z/RMM91MA I IS:OOA 23:59 IR -Y ML-Y ORT3-Y R-N 1

CEjoJIREINSI ATE - FAC PROG . URBIHALL 8 FIO 1R HD OVERHO I I.

Run Date 25APR04 12:3J1. LT.03 STANDARD PUBUCATION Sheet I of26 OPrfwm stems Inm . FL-03 Execution Publication Set I l

after 25APR04 12:00 I U1R28 WORKING:SCHEDULE l after 25APR04 12.00 U DESCRIPTION IRmI ES hF I__ APR U REsPI wo EF RPS b.",,.10a12.14. 16120,221 60.82.4,6 1 82022 0 i 4. 6. 18.-1Zll16.l 18 CE213699SI CE4 78 CC-0782A BUt SCAFFOLDING 1 5 25APR04 j 28APR04 I DR-Y ML-Y I 1I 3ULP SCAF GFLI SFOR 1CC-762Al FOR 1CC-762A 09.OIOA 11 S9 ORT3-YRN 0040 _- 1P-I' RCPTH - tMALBARRIER C REflJR LNG 19 1_ CE310192SI ICE4t 751 LT-00442 MODIFY EXISTING 8 25APR04 I 25APR04 DR-Y ML- C CI 310190 SI EXISTING S INSFOR LTi4 2

_A _O S DWIG FOR 1 W 23;S9 OR RN

_Y 03101 92 T PRT TRANSMrT:ER 20 1 j 11 E305523SI ICE4 78 CV-001 100 BUILD SCAFFOLDING a 25APR04 28APR04 DR-Y ML-Y _ CI 305523351CLDING Fl CV-110C FOR CV-110C 180 -I 01:59 ORT3-YR-N 03055 23 1-4 VCT C ACID INLET Fl CONTROL I

21 11 CE2139575A CE4 MODIFY EXISTING S __ .... _

76 HX-023A 5 2WAPR04 1 2WAPR04 DR-Y ML- Y CE2139575A IFY EXISTING SW FFOLDING FOR H) 23AfB SCAFFOLDING FOR 07:00, 11:59 ORT3-Y R-N 0213957 L LTURBIEOL COOLER 22 1 CE208957Tl CE4 76 CS-004%6C INSTALL INSULATION 8 25APR04 28APR DR-Y ML-Y 72 CE208957T m J INSULATION OR 1CS-466C FOR 1CS-466C 07:00 14:59 ORT3-Y R-N 0209 IHX-1A iFT-488 HIGH SIC ROOT 23 1 CE207075TR CE4 78 FE-00134 REMOVE INSULATION 8 28APR04 28APR04 DR-Y ML-Y C CE207075TR OEs t INSULATION FOR IFE-134 FOR 1FE-134 07:00 14:59 ORT3-Y R-N 020707 1HX-3AIB NON-REGEN HX O TLET FLOW EL 24 1 CE300B67SI CE4 76 ICP-05.047 BUILD SCAFFOLDING 8 28APR04 26APR04 DR-Y MLtY 117 CE300867SIB SCAFFODING OR ICP SAT FOR ICP 547 _ or:00 14:59 ORT3-Y R-N 0300887 kRY LEVEL CONTR ERS AND SVA 25 1_I CE3096T I CE4 78 MS-00177 INSTALL INSULATION 8 26APR04 28APR04 I DR-Y ML Y 393 CE30 ALL A N NFOT1IN OR MS-1t?

FOR IMS-177 07:00 14:59 ORT3-Y R-N 0309697 Z-54 AE OISTURE SEPARA OR OUTLET 28 1 P1105-TI CE4 77 T-001 NDEJSI - REPLACE 18I 26APR04 I 28APR04 I DR-Y MLY c Ptt0nN~t- REPLACE IN UL.ATION - PZR~SU G;E LINE INSULATION - PZR 07.:00 23:59 ORT3-Y R-N 0303874 I PRESSURIZEF TANK 2T 1 CE212702TR CE4 78 MS-00220 REMOVE INSULATION 5 26APR04 26APR04 DR-Y ML-Y 12 CE212702T RaYE INSULATIO FOR IMS-220 FOR IMS-220 08:00 12:59 ORT3-Y R-N 0212702 H-ASQ 7UAL LINE M ISOLATION 28 1 CE212843S CE4 t 78 P-028B-M REPCE MODIFICATION 4 28APR04 28APR04 DR-Y ML-Y _ CE2128435B CEMODIFICA OF SCAFFOLD FOR IP-na-OF SCAFFOLDING FOR 09:00 1Z59 ORT3-YR-N 0212W STEAM ATORFEED PUM MOTOR 29 1 CE30384TTR CE4 78 MS-000CM REMOVE INSUtATION 8 26APR04 28APR04 DR-Y ML-Y a CE0os REMOVE INS TION FOR MS-e FOR MS-6 13:00 18:59 ORT3-YR-N 0 037Y TURB CYL HTG SUPPLVA Y 30 1 CE20t68S1 CE4 76 CC-007638 BULD SCAFFOLDING 8 28APR04 2tAPR04 DR-Y ML-Y C CE RiBUILDSC OLN FOR ICI 7B.

FOR 1tC-7638 14:00 21:59 ORT3-YR-N M206m ew 1P.1-B RCP CC RE MRN HEADER I 31 1 CE305025SI CE4 76 X-04 BUMID SCAFFOLDING 16 26APR04 27APR04 DR-Y ML-Y C C 30 5 82SBUlDS OLDNGFORX FORX-04 15:00 10.59 ORT3Y R-N 0305025 -LOWVOLTAI 32 1 CE214031Sl CE4 76 CV-00257 BULD SCAFFOLDING 5 28APR04 26APR04 DR-Y ML-Y C CE214031Sl SCAFFOLDINO FO CV-257 FOR CV-257 17:00 21:59 CRT3-Y R-N IT-JVCDT TO T-A-C CVCS HU0214031 33 1 CE216335TI CE4 82 SW00645A INSTALL INSULATION B 26APR04 27APR04 DR-Y ML-Y 274 CE216335lNSTL INSULATION FO tlSI-45A

_ I FOR 1SI-845A 1:.0 01:59 ORT3-V R-N 021335 P-15ASP IMPTORCLOOI 34 1 CE934380SI CE4 76 HS-01R-37 BUILD SCAFFOLDING 8 28APR04 27APR04 DR-Y ML-Y C CE3S13 AFOSC NG F HS-OIR-37A FOR HS-601R-37A 17.0 019 OR3-Y R-N PZR P )RV HEADER SNUI BER9934U80 35 1 CE213464SI CE4 7 CC-00779 BUILD SCAFFOLDING 8 28APR04 27APR04 DR-Y ML-Y C CE213464s1B SC NG F RICC-779 FOR 1Ct-779 18:00 01:59 ORT3-Y R-N 021348 IT-12 CC URGETANK REL 36 (1 CE40020OR I CE4 76 LG-02564 RMOVE SCAFFOLDING 5 28APR04 I 27APR04 DR-Y MLtY 380 CE400290SR SCAFFO FOR 1LG-25 FOR 0LG-2564 23 0a 07:59 ORT3-Y R-N HX-22B MSR EVGAUGE

£ .L 1...J Run Date 25APR04 12:t38l LT-03 STANDARD PUBUCATION . Sheet 2 of 25

-x lFL.03 Execution Pubilcntlon Set

after 25APR04 12:00 j U1R28 WORKING SCHEDULE after 25APR04 12:00 ID E=D DESCRIPFTON RD APR It RESPI WO ES EF RISK

... , , .. I ...MF 9,,, 25 I MonA

.. nA . v Z Tue 77

.STI I II 10, 2*4-, 6.AJ11Z1-4.16.1 .0;,2.4. 6. 8.10112,14,16.1 37 L P1105-SR CE4 77 T-001 NDEAISI -REMOVE SCAFFOLD- PZR SURGE LINE 4 27APR04 00.00 I 27APR04 03:59 DR-Y ML-Y.

ORT3-Y R-N 318 Pi,'0".RMXEfliS I

  • RE E am 874 SCAFFO - SURGE LNE RIZER TANK 38 1 CE213009SR CE4 82 s5o00830 REMOvE SCAFFOLDING 5 27APR04 27APR04 DR-Y ML-Y 266 FOR 11S-8308 05.-00 10:59 ORT3-Y R-N CE21130095RRE AFFt OFORIs830e T-34B SI PCCUML ULATOR RE EF0213009 39 1 CE-RPI-SR CE4 78 RPI REMOVE SCAFFOLD 5 27APR04 27APR04 DR-Y ML-Y 10t ON RX HEAD FOR RIt COIL ON RX 07:00 11:59 ORT3-Y R-N CE- VP"SRR EMOVE SC FFOLD FOR RPI

_ _ _ _ HEAD_ RPI SVSTB I MULTI ANDIOR NCN-NUMB ERED EQU PMENT0215213 40 1 CE302178TI CE4 82 FD-02518A INSTALL INSULATION 8 27APR04 27APR04 DR-Y ML-Y 172 07.: 14:59' ORT3-Y R-N CE30217Mn NSTALL INSULATO FOR FD-25151 FOR 1FD-2518A lHX-22B MSR SI ELL SIDEELEVEL CCNTROL0302178 41 1 P1138-TI CE4 77 PIPE CH 25 NDEflSI REPLACE INSUL 10 27APR04 27APR04 DR-Y ML-Y 148 P1138-T {NDEJIS; REPLACE IYSUL. REGEN HX ¢ LINE PiP1NC

- REGEN HXCCHG LINE PIPING 07:0 18:59 ORT3-Y R-N cwRGING LINE TO CCLo LEG iAFROM RE, EN HX=303882 P1274 .MNDE/ISI REPLAFE INSUL

  • PIPINO 42 1 P1274-TI CE4 77 PIPING EB- NDEflSI - REPLACE 12 27APR04 27APR04 DR-Y ML-Y 304 INSUL- PIPING NEAR FW-47688 07.00 19.59 ORT3-Y R-N l AFWFF OM CONT ISOLATK liA WAlVIF I *n CW I 1 1

FW-47F8e 43 1 P1248-fT CE4 77 PIPING ES- NDEISI- REPLACE 13 27APR04 27APR04 DR-Y ML-Y t P1246-TI l4DES- REPLACE NSUL. SUPPORTS} ARFW-A7 INSUL. SUPPORTS NEAR 07.0 23:59 RTR3-Y R-N

_____ _FW-476BB FEEDWATEF CONT ISO0VALVEE$TO STEAM GENEF1ATORS 03038761_

44 1 P1329-TI CE4 n7 PIPING H-1 NDEJSl - REPLACE 18 27APR04 27APR04 DR-Y ML-Y 300 P132- NDERSI - REPLA4C INSULATION . P NEAR B-CFC INSULATION - PIPING 07:00r 23:59 ORT3-Y R-N

_ __ _ NEAR B-CFC _ __ _

SE WICE WATER TO E.1 NFFRZSAFB m A.n nw m7 45 1 CEo8TGAT CE4 77 IST-SISI REJNSULATE- FAC 24 27APR04 28APR04 DR-Y ML-Y 357 CEOSTGAT1 lENSULATE- FAC -TURD HASFTEN ARO F I 4i1 CE933444S1 CE4 78 W-001C2-A PROtG-TURBHALL8FT GEN AREA' BUILD SCAFFOLDING 8 07.0 27APR04 10Q59 27APR04 ORT3-Y R-N DR-Y ML-Y 41 SECONDA Il^

r rNSEV CE INSP I CTION020296S-FOR W-1C2-A 09t 18&59 ORT3-VY R-N CE933444S1 BUILD SCAFFOLD! 4 FOR W-1C2-A

  • 4TAINTENTCOOL NG FAN DISCHARG 0DAMPER9933444 47 1 CE212843SR CE4 76 P-028B-M REMOVE SCAFFOLDING 10 27APR04 27APR04 DR-Y ML-Y a FOR 1P-28M 12:00 21:59 ORT3-Y R-N CE212S43SRRE POVE SCAFFOLDII GFOR IFP-2F
  • STEA) IGENERATOR FEEI I PUMP MOTOR021 12843l"lS" 48 1 CE214048T1 CE4 76 HS-C01 INSTALL INSULATION 10 27APR04 27APR04 DR-Y ML-Y t FORHS-CS-01 1200 21:59 ORT3-Y R-N CE214041mnl ISTALL IN5ULATIC NFOR HS-ClS XONENSATE LINE GB-4 SNUBBER 021 4048 49 1 CEMSRTn CE4 7 HX-a22A INSTALL INSULATION 16 27APR04 28APR04 DR-V ML-VY 2t FOR MSR MANWAYS A- 13.00 08:59 ORT3-Y R-N ESRnNSTALLIN MULATION FOR MS RMANWAYS A-C MOISTURE SEPAR PTOR REHEATERO t14083M_

C - nv.,l~~ ,Z £,irr.,, swrC, urnU~.TJ Mi I vcr 8§ ,.I PROG-PAB44FTGEN 17:00 I ORT'YR-N CE44 MATIREIATE - FAC PROG - PAR 14FT GEN AREA

-. AREA .; . - _ _ _- I SECONDARY NSERVCE NSPEC !toNI3II336qm CESISIPREP CE5 IST-SISI I PREP OF SECONDARY 97 05APR04 29APR04 DR-Y ML-Y - 242 E*IPREP PREP PFSECONDARY CC$ONETFOR F4C ' '

51 1 CO S FOR FAC_ 07:00A 21:59j ORT3-Y R-N Eli - I- I .,

i  ; - =

en A ^c. en t --Ar . - n I --A ----

  • Y I .. .- . AV _. __ _ _

I24APR04 5z I

U Ct5 LAU125U 8 26APR04 DR-Y ML-Y W58AIRLEA1C. REPLAP.A.VIE 0 F;W6 ib REPLACEVALVE 18.:OA 1k559 ORT3-NR-N 6

- y- ~-I -

._ _ _ . AAS __ _L .

ISC-Mq PZR LOD SPACE SAMPLE CIV OPE 53 1_ CEC216557 ICE51 75 FD-00282 CI 1FD-282C- REPLACE 121 2APR04 28APR04 DR-Y MtL-V o CEo2ISS71FI 62i2C -REPLACEI ALVE

- MVALVE 07.0 16 59 ORT3YR4 0216557K I -. & 22C MSR LS-25301 r-2515 UPPER I 1 UC u4989 la WV-U12 CV-D REPLACE 12 26APR04 26APR04 I DR-N ML-N, 70 CE0310491 9CV4Dn12.REPLAI EVALVE VALVE 1000 21:59 ORT3-NR-N

- _______ .1.

03049! 1 I

  • I HX-A NON-Rd!GEN HX INLET Run O.to. _2APR24 LT-03 STANDARD PUBiCATiONt Sheet 3 of 26 o Pkvera Systems, In FL-03 Execution Publication Set T

after 25APR04 12:00 I U1R28 WORKING SCHEDULE after 25APR04 12:00 g U D) EQID DESCRIPTiON lRDI Es EF RISK MF APR Sn7 25 M&.no T m77 I ST . _ . .

12.14.18.1 ro z moi2- , p681= 41.

CEi306267 CE5 78* tor01277 A1277 -AIRLEAK 10 26APR04 l 27APR04 I DR-Y ML-Y 0 CE030 1 2 7 7 AIR lLEA: REPLA~E VALVE 6267, REPLACE VALVE 16.00 01:59 ORT3-N R-N - - -^ rr- rs2t 03062671_

5510 56 1 CE0213084 CE5 76 MS-0001OA 1MS40ALEAKBY SEAT 10 26APR04 27APR04 OR-YML-Y 0 CE02130641M -EAK E1YUV S

1900 08:59 ORT3-Y R-N 02130649 __HPTURB STEAI CE0212702 ~AS.220 EXCESSIVElSEAT LEAKAGE 57 1 CE0212702 CE5 76 MS-OC 20 IMS-220 EXCESSIVE 24 27APR04 I3APR04 DR-Y Mt-Y 0 1 SEAT LEAKAGE 02:00 09.59 ORT3-Y R-N HX-IA SG 3LVOWDOWN LINE LNUAL ISOLATION vt&21702in - _

_8 1 CE9929774 CES 77 Z INSTALUMOD 40 27APR04 30APR04 DR-Y ML-Y 29 4INSTALMIhO PLATFORMN 0 CE " 9 77

_ I PLATFORMS 07:00' 16:59 ORT3-Y R-N Z SYSTEl MuLin ANDIOR NCM-NUMBERED ECU ,It.~w~-,,,I 59 1 CE0212542 I CE5 75 FD-00225A FD-225 HARD TO 114 27APR04 I 27APR04 I DR-Y Ml-Y 0 Cl 0 2 1 2 64 2 FD122HA 1WT PEAE OPERATE. REPLACE 0900 22:59 IORT3Y R-N HX-17A U2FWH L.5L

.tA L{YY

.lUO-L IUN. V ZI_

- - . -. .. , .- ;.  ;.. . o~

U ;E0j109g86SECSUPORTMR 9901 E 8 I0 CE0210986 1 CES 77 SEC SEC SUPPOR MR 99-011*B

_ 05APR04 07.00A 07MAY04 14:59 ODR-ML-N ORT3-N R-N 64

-.- . _ & i, _

61" 0 CE0210989 I CE8 76 SEC SEC. INSTALL NEW 80 I 05APR04 07MAY04 I DR-N ML-N 64 4 DE 0989SEC INTALL NEWE EQUIP MR 99-011E _00A 14:59 ORT3-N R-N - i - hE I I I- _

I 4 -4 - i- 4-.-.----- _I . .

4 6211 I 50I I 27APR04 I CE030(103A I CE6 76 102-11TG-0 MR 01-092 (102-11TG01 22APR04 DR-Y ML-Y C CEDI 1O3AMR 01-S2 (102-11;01 RE LACE PROT RELA SP12

_-2-n= 5 ..  ; =

  • . t REPLACE PROT _ 19:00A 18:59 ORT3-NR-N we I - I - I - , E p31l CE030B104A I CEB 76 102.2G0 1MR 01-092(102-2rr- tlI 50s 22APR04 27APR04 I DR-Y ML-Y 0) CEG 6104AM 019S2 (102-2/G01 RiR GEN PROTCiU .PT2-R&R GEN PROT 19S0A 18:59 ORT3-N R-N -'9 m I_______ _______

64 0 CE0210990 CE6 75 SEC SEC REM ABANDONED 80 26APR04 107MAY04 DR-N ML-N 64 CE0210OSE REM ABANDON4 EQUIP MR 11

_ ___ __ EQUIP MR99-011 F 07.0 j 14:59 ORT3-N R-N 021D099 mm _______ u urn_-_

65 1 CE0407589Z CE8 20 T-026 T REMOVE 18 27APR04 28APR04 DR-Y ML-Y I CE0407589, T-026 - REMOVE PCRTION OF TANK WEAR PLATE PORTION OF TANK AND 08:0 01:59 OR3-Y R-N BLOWDO IAN^u4U155_

6 1l CE0407589A CE6 20 T-028 T-026 - REPAIR 40 27APR04 I 29APR04 DR-Y ML-Y 1 CE040759AT - REPAIR PACKAGZPRARA~T PAOKGEPREPARAT1OI 0800 I 0759. CR3-Y R-N 8CLOWDO ryr4 67 -1 CE4600-22 CES 76 R-1 PERFORMUNOERHEAO1III '23APR04I 30APR04 'DR-Y Mt~-V 1-V ,E.4-&o22PER1*TUNDERHEAD INM'7MfON PRX HE~AD-- - . * -

INSPECTION OF RX0 1 22.OA 1-59 I ORT3-Y R-N II I ,,1 ., - . ', - , C,,,

7 68 1 CH0300359 77 CHEM-SAMPL -RCSCCLTSR 3A452 l661 25APR04 01MAY04j-DRNML-N 20 :H0OI59 RCS CLftSR 3A-52

_ _l105:00A 11:59 -1 ORT3-N R4 U - U I- U I-6e9 11 CH0300372 77 CH-EMSAMPLI RCSDO TSR 3.4S 166 _ 25APR04 I 01MAY04 DR-N ML-N .I203 c;m cS D4TSR 3A4.1 77 CHEM-SAMP RCSBORONSR39.1.i1

. _05:00A

_62W04:001 119MAY0I DRM-NN 11:59 ORT3N R-N U -- -

7 CH0300402 20 -Ho0o02 RCS BORON SR 33.1.1 1 05:00A 11:59 ORT3-N R-N lull 4 I I-71 I CH0300428 CH 77 CHEM-SAMPI RCS GROSS ACTIVIY 6 26APR04 I 26APR04 I DR-N ML-N 1 258 CH030042SRCSIGROSS ACTIVITY ' R 3.0416.01 SR 3.04.16.01 600 I 11:59 ORT3-N R-N 0300422M15C CZHEMIS rRYSAMPLING Run Date 25APR04 12-38 LT-03 STANDARD PUBLICATION Sheet 4 of 26 I O Primaver Sems, Inc. FL-03 Executilon Publication Set

after 25APR04 12:00 I U1R28 WORKING SCHEDULE I after 25APRO4 12:00 APR U lul ID RESP WO ECI DESCRIPTION RD ES EF RISK MF quoa25 IkA- ')A Usr l.: - 1 I. -, . :I. - _ -.. 1 M1 12.14.1 I n 11 CH-0300415 ICH- 77 JCHEM-SAMPI RCS FLTSR 34.5.3 8 26APR04 26APR04 DR-N ML-N 258 .CHI10300415RCSFLR35 l 06:00. 13:59 ORT3-N R-N 030041 MISC CH9CI¶STRY SAMPING 73 2 CH0300499 CH 77 CHEM-MM RCS CL TSR 3A.52 60 26APR04 01MAY04 DR-N ML-N 204 CHi)0300499_

06:00, 10 59 ORT3-N R-N 74 2 CH0300512 CH 77 CHEM-SAMP RCS DO TSR 3AS t 60 26APR04 01MAY04 DR-N ML.N 204 CHI 10 51 2 RCS TSRR3A.&I 06:00 10:59 ORT3-N R-N 0300512 1 75 2 CH0300538 CH 77 CHEM-SAMPL RCS FL TSR 34.5.3 8 26APR04 2APR04 DR-N ML-N 138 H0300538RC FLTSRA3.5.3l

_:00 14:59 ORT3-N R-N C10300538 MISC CHM ISTRY SAMPU 76 0 CH030O196 CH 77 BAST BORON TSR 40 26APR04 30APR04 DR-N ML-N 104 1H0300191 BORON TSR 3..2 3512 7:00 14:59 ORT3-N R-N 030019 77 1 CH030038B CH 77 CHEM-SAMPL SGBDFO GAMMA SCAN 40 28APR04 30APR04 DR-N ML-N 104 :H0336Sb 07:00 14:59 ORT3-N R-N H0300386~ AM SCAJ c I _F CI 78 1I CH0300441 CH 77 CHEM-SAMPL RE-229 ISOTOPIC 40 26APR04 30APR04 DR-N ML-N 104 HO RE229 ISOTOPIC I 07.0 14:59 ORT3-N R-N C10300341 79 2 CH0300525 CH 77 CHEM-SAMI SG8DFO GAMMA SCAN 40 26APR04 30APR04 DR-N ML-N 104 H0 3 00 525SG 03AMMA Sc4 07:00* 14:59 ORT3-N R-N 0300525 80 2 CH0300551 CH 77 CHEM-SAMPL RE-229 ISOTOpiC 40 26APR04 30APR04 DR-N ML-N 104 H0300551 REV9 ISOTOPIC 07.W 14:59 ORT3-N R-N 0300551 fft - i- -Iq dm 81 1 CHK300353 CH 77 CHEM-SAMPt RCS H-3 TSR 3.4.1.1 1 27APR04 27APR04 DR-N ML-1N 251 CI1030035RC 1H-3 TSR 3.4.1.1

_ 07.: 07:59 ORT3-N R-N SC CHEMISTRY SA AjpUNG0300393f 82 1 CH0300452 CH 77 ClEM-SW RCS DOSE ECURVALENT 6 27APR04 27APR04 DR-N ML-N 248 CH03 304 5 2 RCS DOSE E IUIVALENTI.131 1-131 07, ,W12:59 ORT3-N RN SCC1CEMTRYSA APLUNG03M04MM No 83 O EE0407387 EEP 76 W-BM W-3V-M OBTAIN VIB 1 25APR04 25APR4 3 OBTWNVIED AND URRENT DATA AND CURRENT DATA 12:00 12:59 IF 23-29PA EXSTFLTER AN MOTOR 048 84 1 EM-BMFP-11 EM 78 P-028B-M P28B PREP WOR FOR 4 25APR04 25APR04 DR-Y ML-Y c -EM0 wj-1 P2881 REP WORK FOR N )TOR COVER REM NAL MOTOR COVER M000A 15:59 ORTS-N R-M ~STEAM 3ENERATOR FEED MP MOTOR0312 335 85 0 EM0305116A EM 78 D721207 IWMP037-06 REPI. I 10 25APR04 25APR04 I DR-N ML-N 0 EMITO'0611SA1 WP.O 7.0 REPL 1MOB 003 IMOB-O0 --083 0600A 22:59 ORT3-N R-N -_ II^__

- yPWR71)

I _

1W3:

4^ _ ^^P__{ §^"^tW "X tA ^_*F mAFEGUAKLAU BUS IIIlu-.1la eSLI 1 EM-BMFP-01 EM 76 r P-2B-M P28B REMOVE OL LNES 2 AND MOTOR COVERS 25APR04 0800A 25APR04 13 59 DR-Y ML-Y ORT3-N R-M i2 -

A~qp.oj P28B3) EMOVE OIL UNES LND MOTOR COVE IS NSTEAMGE 4ERATOR FEED PU 4P MOTOR 031203!

76 P.0018B-M P-1B PERFORM OL 161 25APR04 2BAPR04.1 DR-N ML-N 0 P-is )ERFORM ORl FLUSH 87IIIEM01*4077I Ell FLUSH _ 09OA 04:59 ORT3-N R-N.

- I - IRFAr-T __.

'OR COOLANT PUIVP MOTOR 88 OI EM0407387E IEM1 781 W-0308M W40BM PERFORM PM 1 25APR04 25APR04 I DR-N ML-N IO0 ORT3-N R-N _0. D.7387EW-30 M PERFORM PMTI UN OF MOTOR

__ RUN OF MOTOR I 12:00 12:59 IF--231F-29 PA vEXHIAUST FILTER 'AN MOTORo40738 I 89 1 X04-015 EM X04 INSTALL FAST BUS - 2 25APR04 25APR04 DR-N MA.N 17 KC i4z ISINSTALI.FJ ST BUS TRANSFEI TEMP MOD TRANSFER TEMP MOD 12:00* 13:59 ORT3-N R-N E Run Date 25APR04 12338 LT-03 STANDARD PUBLICATION Sheet 5 of 26 C Prmavera Sysems, Inc FL-03 ExecutIon Publication Set i

after 25APR04 12:00 after 25APRO4 12:00 I U1R28 WORKING SCHEDULE I IP EQID DESCRPTION RD ES RIK A2RPER STUI .jR j . Es.n ~/ 7 rMl n qSn 25s Mon 2bA 6AD TOP qAD 77A _i_... ___._

  • fl R I - i  ;

rS~nntljl mm k *,

h112Q --

0 21.1,1 021 . . og #OI 1,&

1 tM F

r~tMjtmiLYw to U EMO 01 .C I CGEANALYZE MO1I UKR (1B2-414M/1Bw III MOTOR tI14.1V 17:59 ORT3-N R-N M852414Mt1B-411 M AC7 JRNING GEAR LUS OIL PUMP MOTOF 0301995 91 1 EM-BMFP-R7 EM 76 P-028-M P288 REMOVE COND. 2 25APR 26APR04 DR-Y M.L-Y 0 RETURN LINE SPOOL. 16:00 08:59 ORT3-NR-N W1FP4R7P 2 eB I EMOVE COND. RE URN UN SPOOL I qECE.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _PIECE._

nt7fn12" _ _ STEAM GENERATC R FEED PUMP MOT

_ _ _ EA 92 1 EM0309006A EM 76 MS-0023t IMS-231, 5 25APR04 25APR04 DR-N MPN 0 1 RE-TERMINATE HEAT 18900 22:59 ORT3-N R-N Ely I09006A M 13,RE-TERMIINAT 9HEATTRACE

_________TRACE _ _

0309006 HX-1A SG HEAC ER ST-2029 INLET 93 1 EM0216164Z EM 76 ISOL PHASE REMOVE BUS UNKS 8 25APR04 26APR04 DR-N ML-N 0

'ALL BUT 1PER PHASE' 18:0w 01:59 ORT3-N R-N 12161 4zREM BUS UNKSAJ LBUT I PER PHAS E (RE5TART}

(RESTART) ___ I___ _ __ _

0216164 ISL PHAS DUCT 94 0 EM9808988 EM 76 17-L-08 17-L-08 MOD CKT PER 4 25APR04 25APR04 DR-N ML-N 302 RERS 95-0077 #1 19.00u 2Z59 ORT3-NR-N -M9808988i 7 MOD CKT PER RERS 95-0 or11 9808988 PWRTOEL6EI NIT 1 CONTAREA IIGHTING 95 1 EM0215243A EM 78 52dBYB BYPASS BKR TESTING 2 25APR04 25APR04 DR-N ML-N 119 PER IRMP 9026-1 STEP 20uO 21:59 ORT3-N R-N -M0215243AB S BKRTESTI? G PER 1RMP 902t' STEP 5:16 5.18 _ .

0215243 REACTOR TRIPB (PASS BREAKER 96 1 EM0215215 EM 7^ RG-01 CLEAN AND INSP OF 5 25APR04 26APR04 DR-Y ML-Y 1 NEUTRAL GROUNDING 20:0 00.59 ORT3-N R-N EM0215215C AND INSP OF NEUTRAL GROUNI ING TRANS CUBE

_ ________ TRANS CUBE 0215215 GENERATO GROUNDING RESI ;TORWIXG-01 97 1 EM0203 130 EM 76 W-01D2M 1W-1 02-M CLEAN 16 25APRO4 26APR04 DR-N ML-N 0 1 CONNECTIONS 2000u 12:59 ORT3-N R-N EM0203130 1025 ClEAN CcNNECTIONS 02

_- ---- 0313nil . _

MNTAINMAI I tl-n-6^ln^_rts

_ _ . .. .. _ IT COOtlNG FAN M nTOR 98 0 EM03061 16B EM 76 D72-21-07 IWP-037-06 EM PMT OF 2 26APR04 26APR04 DR-N ML-N (0 I MOB-80 .083 00-00 01:59 ORT3-N R-N EM0306 i1 sBIMP43706 EN PMT OF tM09-80 -083 030 1161UPWRTO IC -03 SAFEGUARDS I lUS B 9 1 EM0305165 EM 76 D-205 UNIT 1 MONTHLY NON-SAFETY 125V DC 4 26APR04 00-26APR04 03:59 DR-N ML-N ORT3-N R-M 5

EMO30 516 5 U1T I MONTH LY NON-sAFElY 12 5V DC STATION

_ ________ _STATION __. _.

030 S165l125V D( STATION BATTER7 I1 1 EM0305168 EM 78 D-20 UNIT I QUARTERLY 4 26APR04 26APR04 DR-N ML-N 522 NON-SAFETY 125V DC 00-00 03.59 ORT3-N R-M EM030 S1 6 8 UNrT1 QUART MRLY NON-SAFETY 125V DC STATION STATION 030 S168E125VD( : STATION BATTER' 101 0 EM0305175 EM 77 35-E MONTHLY FUNCTIONAL 6 26APR04 26APR04 DR-N ML-N 520 CHECKIINSPECTION 00_.00* 05.59 ' ORT3-N R-N EM030 517 5NMNTHLY FUI ICTIONAL CHECK? ISPECTION 030 S175NOF TH SERVICE BLDG -EMERGENCY UGK NG PANEL 102 1 EM0216164B EM 76 ISO PHASE INSTALL GNDS & 2 26APR04 26APR04 OR-N ML-N REMOVE REMANING 03:00 04:59 ORT3-N R-N EM )21616481NSTA.LI -NDS & REMOVE R MANG BUS NLD

. ______ ^

AA_._ .. _ __. A,, .BUS UNKS A.A . _ _A____. 02116164E1SOLI 7HASE DUCT EM0UJ6111B LM j 4uArKu9 I UR-N ML-N IW UI (ti IT-PWRTOAIR SYSTEMS 2bAPtICLM U EM 3306111BIWP0374 5 SUPPLYT-PWRT 3AIR SYSTEMS At I PANEL 01:00 05:59 ORT3-N R-N ANN PANEL 030611IPW1 TO C-01 U1UU2 SAF EGUARDS CTL BO R (IMOS130

- I .+ 4-

.<#1A - 4 ___-

uMKt' -M<1

_ ClJ

_- sa

-_ -- _ - _ - 4- . -- --- 4_ I _ _ ..

LPtJ 4 I =>zSDrD CS tJM 7iI -n ON THE STAND P-001O-M fP1BD/W &ES15TANGE R-N Si EZMRCP-EI P.1B I JN & RESISTANCE 3N THE STAND 05:00 I 26APRI4 2 1 2BAPR04 07:59 I ORT3-N DR-N ML-N 021S2055 F SACTOR COOLANT PUMP MOTOR 105 1 EM0216164C EM 76 ISOL PHASE PRE-MAINTENANCE 3 26APR04 26APRO4 DR-N ML-N (

MEGGEROFISOPHASE . .08:00 10-59 ORT3-N R-N EM021164CF RE4LAINTENANCE AEGGER OF ISOPM kSE BUS

_ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ ~~ . BU S_ _ _ _ _ _ _ _ _ _ _ _ _ _

0216184 KISOL PHASE DU 106 U EM0305184 EM 7W 0D6006- MONTHLY DIESEL FIRE 4 26APR04 26APR04 DR-N ML-N 515 ;E PUMP BATER)

PUMP BATTERY 08. 11:59 ORT3-NR-N EM03051840 0305184 4NTEILY DIESEL TIRE PUMP BATTEF WYTACK CONTR 107 O EM0305336 EM 76 D-600 ARTERLY DIESEL FIRE PUMP BATTERY 4 26APR04 08:0A 26APRO4 11:59 DR-N ML-N ORT3-N R-N 515 EM0305335C FP-35B DiESQz FIRE PUMP BATTE 03053361 P,-35B DIESEL -RE PUMP BATTEI YWRACK CONTRt I M II bl KP hM 15 F'-U0113 INS' P-1 MOTIUR N I I 8U00A'KU 17A:59 I UK-N ML-N Ui 1 EZMRCP-2B I ISP P.1B O. MOTOR OlITHE STAND 1

THE STAND 08:.00 17:59 IORT3-N R-N _

02152051RE/CTOR COOLANT PLIMP MOTOR L_ _ I Run Date 25APR04 12:38l LT.03 STANDARD PUBUCATION Sheet 6 of 26 I @'Prnsvers vselncs Im FL-03 Executlon Publication Set

after25APR04.12:00 U1R28 WORKING SCHEDULE after 25APR04 12:00

.28.ORI,- 1 . .C;DU.E.

F u ID RESM WO EQrO DESCRIPTIN RD ES EF RISK IMP I ^ nes 11(1 ST AlV-:'__".L'I-*

- -+/- 8101 12,14.16.la20221 Oi'2 f4 i6 8.10112;14#16.1920,221 0 i2 c4 i6, 8 , 1 IZ124t16,1 109o0 EM0306111A EM 76 D72-16-11 IWP-037-05 REPI. MOBS is I 26APR04 27APR04 I DR-N ML-N 0 EM0306iIIAP !P-37-05 REPI.MC035 IMOB-1lO. 141 IMOB-130. 145 O8:00 00.59 CRT3-N R-N 03O8hl11 _PWRTPWRTOC- C UI/U2 SAFEGU t10 1 EM0400344 EM 76 P-02BAM IP-25A-M PUMP END 10 26APR04 27APR04 DR-Y ML.Y 0 09_00 09:59 ORT3-YR-N EM0400344 IP-28A4M PUMP EN3 MOTOR BEARINC LEAKING MOTOR BEARING 0400344II -I IEWAU cnmF 111 0 EM0305203 EM 75 125V STATION TECH SPEC 3 26APR04 26APR04 DR-N ML-N 512 BATTERIES WEEKLY 12:00 14:59 ORT3-N R-N EMO3I SMSTATION TECI I SPEC BATTERIE NEEKLY 03( 5203WI2VSYZETEM MUTI ANDVI NON-NUMBERE 112 1 EM-BMFP-02 EM 75 P-028B-M P288 INSTALL MOTOR 4 26APR04 26APR04 DR-Y ML-Y 0 13.00 16:59 ORT3-N R-M EM-BI IFP-02iP288 INSTAL MOTOR RIGGI EQUIPMENT RIGGING ECUIPMENT 0: 120355MTEAJ 4GENERATOR FEE PPUMP MOTOR 113 1 EM0203013A EM 78 W-001D2-M IW-102-M PERFORM I 26APRo4 26APR04 DR-N ML-N 114 BUMP FOR ROTATION 14 00 14:59 ORT3-N R-N EMO !03130AlW-1D2-M MERPORM BUMP Fi R ROTATION

,2031301CONTAIN VENT COOLNG FA I MOTOR 114 1 EM0218165D EM 77 HX-001A REMOVE POWER 10 26APR04 27APR04 DR-Y ML-Y 489 Sl.PPLE FROM I MDGETRAILEP EM02i6i6t DREMOVE POWEA SUPPUES FROM 15:00 01-59 ORT3-N R-N STEAM GE IERATOR 0216165!1" 115 1 EM0216838 EM 40 P-001B-M PERFORM REPAIRS FOR 140 26APRo4 03MAY04 DR-N ML-N 0 EM02 60PERFORM RE 'AIRS FOR P-IB Hl H BREAKAWAN P-1B HIGH BREAKAWAY 19:00 02:59 ORT3-N R-M REACTICR COOL.ANT PUMP IOTOR0216638- I - _- _

116 1 EM021521 8 EM 75 W001A1-M W-1AI-M INSPECT 1 26APR04 26APR04 DR-Y ML-Y 0 EMO21 5218 WV-AJM INSPECT EOUA4IATION VALVE

_ EQUALIZATION VALVE 20.W 20.59 ORT3-N R-N 021521 8[CONTAINMENT ACPIDENT RECIRCI 117 1 EM-84B0I EM 78 RPI AT HEAD RPI COL 10 28APR04 27APR04 DR-N ML-N 0 M48480IAT H-EAD FI COIL RESISTANW~INDUCTANCE A _ESISTANCEJINDUCTANt 20.0 05:59 ORT3-N R-M 8215721 2i Rpl k'RTIUM0 IJTI I 118 1 EM-8480J EM 75 R-1 AT HEAD CRDM COIL 10 26APR04 27APR04 DR-N ML-N 0 S48& AT HEAD CR!

ESISTANCElNDUCTAN M COL RESISTAN EfINDUCTANCE 20 00' 05:59 ORT3-N R-M REAC7 OR VESSEL AND A MSEMBLY0215214g 119 1 EM0218167 EM 75 E-01 INSPECT AND MAINTAIN 10 26APR04 27APR04 DR-N ML-N 0 EM02161671 ISPECT AND MAIM AIN EXCITER FUSE SPER MWP 104 EXCITER FUSES PER 20.00 20.59 ORT3-N R-M TGW1' TUF1tNE GENERATO R lEX C2CTER02l61676 GI I [-

120 1 EM0304544 EM 75 POS-00488 POS-466 INSTALLWEEP 4 26APR04 27APR04 DR-N ML-N 0 'ALL WEEPHI-tOLEn I FLEX CONwun EM0: 0 45 4 4 P0SAIN8INS' HOLE IN FLEX CONDUIT 23.0 02:59 ORT3-N R-N 0304 W4MW1HX-1AS 3 FW REGULATC 121 0 EM0306 11C EM 78 D72-16-11 IWP-037-05 PERFORM 1 27APR04 27APRD4 DR-N ML-N 0 osjj1CIWP.037-M 'ERFORM PMT FOI LIMOB- 130^ 14 PMTFORlMOB-130- _ 0200 02:59 ORT3-N R-N I3061111PWRTO -01 UI/U2SAFE 122 0 EM03061 11D EM 75 D72-16-11 IWP-037-05 RESTORE 3 27APR04 27APR04 DR-N ML-N 39 EM0300111DtNP307-0 RESTOF EPWRTOAIR SYS ANN PNI. & PU PWRTO AIR SYS ANN 04:00 07-59 ORT3-N R-N Ioaoei111F WR TO C-01 UI1 123(1I EM-BMFP-03 EM 75 P-0288-M4 P289 REMOVE MOTOR 4 7APR04 27APR1 4 I DR-V ML-V 0 E-wBMFP4m P288 REMOVE MO rOR TOP COVER TOP COVER 08.00 115 CRT3-N R-M STEAM GENE RATOR FEED PUMI I MOTOR 03120351 I 4--4 _ . .... .. .....

l .

1241 1 EM0215225 EM 75 W4004A-M PERFORM MCE 4 27APR04 I 27APR04 I DR-N ML-N 0 El !2I522SPERFORN MCEW.-04A- (1B52317MIIB-31J W-004AM OtOG' 12:59 ORT3-N R-M CONTI INMENT REACTOR :AVIY COOUNG FRMN MOTOR02152Sr 125 1 EM0215248 EM 78 621A01 CALAND TEST 821A01 8 27APR04 27APR04 DR-N ML-N 0 EMO !15246CALANOTE 5`621A01 RELAYP -:R IRMP 9302-1.

RELAYPERIRMP 12:00 17:59 ORT3-N R-N 1A-01 BUS TIM1 DELAY RELAY021 5248 125 1 EM0215225 EM 78 W-004B-M PERFORM MCE 4 27APR04 27APR04 DR-N ML-N 20 O 2 21 P!RFOR MCPAW-0049-M (1 52-3i18MMEW31)

W-004B-M 13-00 18:59 ORT3-N R-M WTAINMENT RE/ CTOR CAVITY COO ING FAN MOTOR 0 t15226

- - - -- - -- -_A -... - .- . . ...

1Z7 1 EM0215Z29 EM 76 W4004A -W-04A-INSPECTAND 1227APR041 13 AR 4 DR-N ML-N 0 EM0215 12 9 W.004A^INSPEl TAND MAINTAIN FAN AND MOTOR MAINTAIN FAN AND . I3.W 01:59 ORT3-N R-N CONTAINM -]'TREACTOR CAM rYCOOUNG FAN0: !15= ,-

_ _ . I

  • I r - IT I IV Run Date 25APR 1231 LT-03 STANDARD PUBLICATION Shet 7 of 26 0 Pdrnavera SystemsInc. l FL-03 Execution Publication Set

after 25APR0412:00 U1R28 WORKING SCHEDULE affer25APR0412:00 ARD f lu 10 RESP wo EQID DESCRIPTION RD ES EF RISK MF~

ST , ". 2, 11 . - _-, I ,; .1- h.1012,14,161920.2210. 2,'4-.6, 80007,14,16.18,20,2210. 2'. 4,.6, 8.10112J4,16.1 128 I EM0212678 E-02 IE02 MOUNonNG BLOC 2 7APR04 27APR04 EM l 78 CRACKED 17:0oo 19:59 DR-N ML-N ORT3-NR-N 0_

I EM0167N~

TO-Cl TG VOL~tGE R1EqMff rJCrrA7bN EQUIPI ENTO21267"*

OCK'CRACKEE

.. _. .,. I - .I . , .. 7 - - "' .I . , .  ! ....

129 1 EM021513A TEMV CC-0754A- CC-754A-O MOV TROUBLESHOOTER 5 25APR04 08.,A 25APR04 17:59 I DR-Y ML-Y ORT3-N R-N EM0 15163ACC 7 5 A- MOVTROUBL SHOOTER (FAIRM PMT) 1P-1 p RCP CC INLET M( VOPERATOR 0215 63 130 1 EM04071 158 EMV 76 FP-03705 FP-3705 REMOVE PIPE 3 25APR04 25APR04 DR-Y ML-Y V 071158FP-37I sREMOVE PIPE FC I MOV OPERATOR REMOVAL FOR MOV OPERATOR 11DOA 14:59 ORT3-N R-N EMI !WLUBE OIL RESERVOIR DELUt E0407115 131 1 EM0215168B EMV 78 CS-02189-O CS-2189- oREINSTALL 15 25APR04 26APR04 DR-N ML-N V -Mc4 j!!jS CS-211 9-0 REINSTALL A )TEST MOV ACTU TOR 8

AND TEST MOV 15:00 07:59 ORT3-N R-N fU21515H

. . J .

SrFPMDIcH IJRGE MMV OPERAI -R ll .

^_.^

I F 1-211

  • r
  • 132 1 EM0215192 EMV 76 SW-02907-0 SW-2907 MOV 30 25APR04 27APR04 DR-N ML-N V EM0215192 SW.2907 MOV AC4A;O REBULD (S AP)-

_ ACTUATOR REBUILD 21:0r 04:59 ORT3-N R-N ~ 9 U IHX-151 _L 02151t9 1 I i-D CONT RECIF i

133 1 EM0215194 EMV 76 Sw-o2so8-O SW-290s STEM 4 25APR04 26APR04 DR-Y ML-Y V EM021511 4 SW-2906 STEM Ct EANING AND LUBE CLEANING AND LUBE 22:00 01:59 ORT3-N R-N 021511 4lHX-154-D C INT RECIRC HX El iERGENCY FCV OP :RATOR 134 1 EM0403298 EMV 76 SW-0M908-O SW-2908-0 PERFORM 10 25APR04 28APR04 DR-Y ML-Y V PERLi PRhSTEM LUBE AJI tD FBJ INSPECTiOP EM040329 SM20-STEM LUBE AND FBJ 22:00 08:59 ORT3-N R-N U,IYs~X- . I W e i - e-.-szv e.- '.-tc-A 040329 LA,ru, A e ew-.-w .. _ . __ .

wi -~i- 4 rJVMmf¶mi NF Q

135 1 EM0407115C EMV 76 FP-03705 FP-3705 REINSTALL PIPE 4 28APR04 2sAPR04 DR-Y ML-Y C E-M04071ISCIP 3705 REINSTALL P RE FOR MOY OPER kTOR REMOVAL FOR MOVOPERATOR 08:00 11:59 ORT3-N R-N 047115! _LUBE OIL RES ERVOIR DELUGE 036 1 EMC215193 EMV 76 SW-02907-O SW-2907 STEM 4 27APR04 27APR04 .DR-N ML-N V EM0215193S ONG AND LUBE CLEANING AND LUBE o01:00 04:59 ORT-NR-N 0:'15193MHX-15 S-DCONT RECtF I O 137 1 NG26Tfc2EV EPI 77' ISTmS1SI ENG3EVAL FOR FAC 526AR04 26AROC4*lD- bYl NagTFC2VF!NY~-FOR FAC P tOG *TURD HAILL2 I FT GEN AREA PROG-TURBHALL26 0700 12:59 ORT-VRN 0301897~1111ECONDAR) INSERVICE INSPEt TION 138 1 EP030190s EPI 77 U1.CONTAIN visuAL INSPECTIONOF 60 26WPR04 05MAY04 lDR-Y ML-Y so5 6mg 1909V1SUAL. NSPECTION OF CT ITLUNER PIA7I 30

_ ___CTMTULNER PLATE 18- 01:59 lORT3-YR-Nl .... _. AA._...L.___..____ .^40 !__ _ ._ a

@IvIt e onmrslurn FI 139 1 N GU4CFC1EV EPI 77 IST-SISt ENG EVAL FOR FAC I 27APR04 27APRI04 DR-Y ML-Y 2t FAC PROG - CTMT 4FT GEN AREJ P.lROG -CTMT 44FT GEN 0 7:0 0 7.59., . ORT3;Y R-Nl SIECO Y ISEJMVCEINSP -CTION10301871 LU :;flJ~:je, j= I ~ X a;1:1! 3 m 140 1 EP0301958 EPT 7TS HX-W1A EDDY CURRENTTEST 38 17APR04 28APR04 DR-NMLY MI- EP 4,i1 6EDDY CRNTM TEST c TE4MrGEN A-I SHIFTI.

STEAM GEN A-1 SHIFT 07:00A . 16:59' ORT3-N R-N' El~~mI --

I-~ i 141 1 EP0301957 EPT 76 HX-OOIB EDDYCURRENTTEST 38 17APR04 2WAPR04 DR-N ML-Y V _ EDDYC.4RRENT TEST GEN D

  • 15HIFIT STEAM GEN B-I SHIFT 0700A 16:59l ORT3-N R-N I urn.

- . i _

11421 I EP0301962A IK.P 76 HX-020A HX-020A - EDDY 141 23APR04I 27APR04 I DR-Y ML-Y 6 EP41962AHX0O2~A 'EDDYCURR ~REEW.EUN CURRENT - 080uA 1_0:59 _,ORT3-Y R-N - a - a a . _.

PFEEDWA 1431 1 _ l l . l l _ _

._ r EPM31966 IEPT . I 76 HX-024 HX-024 - EDDY 10 24APR04 I 28APR04 I DR-Y ML-Y a E4u i¶OHX-024 .EDDYCURE 04 CO4E COOLE CURRENT INSPECT I 00 O 16:59 ORT3-Y R-N -S - I mA I FQAT= prre' Co,nbn4 a&

- I - I . ..

-M__

uFlon

  • c wvvvcn v v @1C C 144 1 EP0301972A I EPT 78 HX4)SM HX-0561 - EDDY 8 .EDDYCU CURRENT 24APR04 0800A 28APR04 14:59 DR-Y ML-Y ORT3-Y R-N 0 z"ImmmAX-oSt 8 J _ __ _ _ __ _ _ _ _ LI L . .JI -

. 1I I

- W. 2E113 SG -P OL CoL0d I i Run Date 25APR04 12:381 LT-03 STANDARD PUBUCATION Sheet 8 of 26 0 Prlmavera Systems, Inc. FL-03 Execution Publication Set __

after 25APR04 12:00 U1R28 WORKING SCHEDULE after 25APR04 12:00 ID RESP WO EQID DESCRIPTION RD ES EF RISK MF IIIU I Sun 75r1 _I MMn 26 Tue 27 ST 'v ,¢  ;,, I.. tt 4S B s ; . 9. . I 2149 16.1 v. 9.,4.R8. 8E012.146S.1 1,10112i14,1

'451 1 l NG-SGB-CSL I EPT 76 HX-001 a - S/G B - REM S/L EQUIP j 2 25APR04 25APR04 j. OR-Y ML-Y NG4 Wg~stS/O B1 REM S/L EQUIP At D CLOSEOUT INSP AND CLOSEOUT 0800A 13:59 ORT3XY R-N ESTEAM GE IERATOR0301939 INSPECTION I 146 1 NG-SGA-ZSL EPT 76 HX-001A SiG A- FOREIGN I 25APR04 25APR04 DR-N ML-N 3 3AZSLSIG A FOREIGN MATERI LINVESTIGATION MATERIAL I .WGA 12:59 ORT3-Y R-N INVESTIGATION ISTEAM GENI RATOR0301938 "CTION 147 1 NG-SGA-ASL EPT 76 HX-001A SIG A - SETUP FOR 4 25APR04 25APR04 DR-N ML-N 0 TUBESHEETCLEANING 12:00 15:59 ORT3-Y R-N NG4. 3A.ASLSfG A SETUP FOR TUBE 01EET CLEANING WSTEAM 3ENERATOR03019 IS 148 1 NG-SGB-ESL EPT 76 HX401 B SG B - SETUP AND 15 25APR04 26APR04 DR.Y ML-Y 0 I

89EqLtoa SETUP AND PERW IRM FOSAR INSPEI PERFORM FOSAR 14:00 04:59 ORT3-Y R-N

__ ___j__ __ INSPECTION -

I'l STEM 4 GENERATOR0301 139 1q 4 1 I tr I Iu;L to rtXA-I TUBESH-rtKUEAM la U -e-IGnA PERFORM TUBES IEET CLEANING TUBESHEET CLEANING 16:00 0959 ORT3-Y R-N {li- libCbL- _.._a-_--_--_--= I 0 11938 STEAM GENERA DR 150 1 NG-SGA-FSL EPT 76 HX-W01A SIG A - PERFORM 1I 26APR04 26APR04 DR-Y ML-Y 2 I- PERFORM UPPE SUPPORTPLATE INSPECTION PPER SUPPORT PLATE 06:00 16 59 OCR-Y R-N NGm.SlAFLl ,

AA ^

INSPECTION 030t93qi _ SJTEAT GENERATOR 151 I NG-SGA-DSL EPT 76 HX-001A SJGA-ANNULUS 5 26APR04 26APRU4 DR-Y ML-Y 0 FLUSHING AND EQUIP 1000 14:59 ORT3-Y R-N NG-SGA43SI SIG A - ANNULUSF LUSHING AND EOL IPBREAKDOWV 03019: BSSTEAM G iNERATOR BREAKDOWN I1 T NG-SGA-YSL 76 HX-001A SGA-REMOVE HOSE I 26APR04 26APR04 DR.Y ML.Y 70i THRU HATCH 15:00 15:59 ORT3-Y R-N NG SGA.YSLSIG A - RI MOVE HOSE THRI HATCH l03019381STEAM 3ENERATOR 153 1 NG-SGB-DSL EPT 76 HX-001B REMOVE AND LOAD 5 26APR04 26APR04 DR-Y ML-Y 0 SLUDGE LANCING 15:00 19 59 ORT3-Y R-N NG-SGB- ,SLREMOVE AND LI )AD SLUDGE LANW ING EQUIPMEN1 II _ __ EQUIPMENT _ 10301939ME MEAM GENERATOF 154 1 NG-SGA-ESL EPT 76 HX-001A S/G A- SETUP AND 15 26APR04 27APR04 DR-Y ML-Y 0 PERFORM FOSAR 15:00 07:59 COR3-Y R-N NG-SGA EsLSIG A - SETUP WD PERFORM FO! AR INSPECTIOh INSPECTION __ _ rTEAMGENERAT 0301938 155 1 EP0301964 EPT 76 HX-023A HX-023A - EDDY 6 26APR04 26APR04 DR-Y ML-Y 0 CURRENT INSPECT 17:00 22:59 ORT3-Y R-N EP0301964 X M E23AEDDY CU tRENT INSPECT Li BE OIL COOLEF LUBE OL COOLER _ 1 0301964-~ETURBINE LUBE BL COOLER 156 1 EP0301966A EPT 76 HX-024 HX-024.EDDY 12 26APR04 27APR04 R-Y ML-Y 20 CURRENT 17:00 08:59 ORT3-Y R-N EPO301966AHX5 I- EDDY CURRENT REVIEW/RERUh

________ R E-EVIEW/RERUN _

CONDENSATECO(LER03019661 157 1 EP030 1965 EPT 76 HX-023B HX-023B - EDDY 6 26APR04 27APR04 DR-Y ML-Y 0 CURRENT INSPECT 23:00 08:59 ORT3-Y R-N EP0301965 -A3B. EDY CU hRENT INSPECT LI BE OIL COOLEt LUBE OL COOLER TURBINE LUB OIL COOLER 0301 E6 CU 158 1 EP0301964A EPT 76 HX-023A HX-0Z3A- EDDY 12 26APR04 27APR04 DR-Y ML-Y 0 CURRENT 23:00 14:59 ORT3-Y R-N P03019SAHX-02J L- EDDY CURRENT LRE1WIREUN Tl IRfhFa I*UDW: IRI h!mew - -neWL-0AVA.J .

-JI tU B _~

REIEW/RERUN _ . -.- ll8 159 1 EP0301965A EPT 76 HX-023 HX-0238 - EDDY 12 27APR04 27APR04 DR-Y MLY 4 PO3iSA5AHX-0231 .- EDDY CURRENI CURRENT 09:00 20:59 ORT3-YR-N  : - ,., .' ,,

REVtEWIRERUN - _; .4 "TURBINE LUBEO t-VV rFnliAK4 160 1 FG0212814P FG1 76 PIPEAC01 PIPEACO152N-04 45 21APR04 27APR04 DR-YML-Y 198 STRIPIREPAINT (pan 2) 20N00A 12:59 ORT3-YR-N fljtMAjPIPEAj:0132N404 STRIPIIIEPAINT~pwt2) . I - I

_ _ - . I - I - `

161i I I IFWUZ1Z617 FuG 7b r-wilU IP-1tF IliPANI OIL COULECTION TANK ID Z5Ri-(U4 I Z7RJU4 07:.A 23:59 oUK-T ML-T ORT3-Y R-N Z41 FG0; ip-tS R7AINT OL1. COLL .N =TAN.

t1-tT1i -.- --- _ _ _ _ _ _ _ _ _ . . .. _

16bz 1 1rUv9Z1ZtPa '1-U 75 I M-i-Um1i PANINTVALVE 1MS-1-17 4 25APR04 I 25APRD4 DR-Y ML-Y U Fa pPAMNT> ~Ai1MS117 l 12:00 15:59 ORT3-Y R-N 1 5

_HX-21AP 5F SA SHELL IDE P12325 ROOT! 9272S1

-I Run Date 25APR04 12:38 LT-03 STANDARD PUBLICATION Sheet 9 of 26 C Primavea Sytems, Inc. 1 _ FL-03 Executlon Publication Set I

after 25APR04 12:00 U1R28 WORKING SCHEDULE after 25APR04 12:00 lRESP DSR28OW DESCRIPTION

.KINR

-I RD I ES EF RISK SCHESULEF MF AOO ejIU ID hESP WO 5T I .: . . I- I . -- . I , - l! 3.1 Di 25 4Un MOn 12.14. 1I8,201221 0,2. 4,6.8-1D1214,16,1 4 12,2a21T0 2.-41 6.8,1Ot12 14, 161 T8 163 I FG0J212788 I FG 77Ut-CONTAIN CONT 48 FT PIPE 28 '25APR04 I

28APR04 DR-Y ML-Y. I 126 FGO maCONT SUP

+

SUPPORT NEEDS PAINT I-I 13:00 I

07:59 4-DRYM-

. ORT3-Y R-N 1277TL 11u4 1 FG9927250P I al 78 MS-00116 PAINT`VALVE IMS-116 1 4 1 25APR04 I 25APR04 DR-Y ML-Y 0 P 27250PPA*VALVE tMS-116l 18:00 21:59 ORT3-Y R-N 9927250 HX-2OAULPFWH4SHELL4SIDE P1 7ROOT

+ 4 + 4----

1651 1I FG9927254P I FG1 76 MS-00115 PAINT VALE IMAS-115 14 25APR04 1 I 215APR4 DR-V ML-Y 0 F 2754pP VALVElMS-115 18:00r 21:59 ORT3-Y R-N 9927254 HX-20B LP FWH 4 SHELL SIDE P-6 ROOT 166 1 FG216557P FG1 76 FD 0022C PAINT 1FD-282C 8 26APRO4 I27APR04 D-MLYl 1 FG216557P NT IFD-282C 0216557 HX-22C SR LS-2530=4 T1FGP40 l0400313 E3 Nl BLDG EMERG CY GHTING IN

_EMERGENC' c04 p5LT-W3t5 9 LEVEL DEVIAT1 DEVATION Oa..00 M 059; ORT3-Y R-M. T-34B IACCUMULATOR TRANSM R0407898 169 1 1F0 4701 I3 76 ICP-FG2047 SECONDARY LEVEL. 86 196APR04 0AYF04 DR-Y ML-Y 0 . SECND Cs VLEVEL COfR SADST CONTROLLERS AND 0600 11:59 ORT3-Y R-N 1 IC0302098 IC 76 LC-02514 1C-2514 REFURBISH 88 19APR04 1.:0CA 04MAY04

.1:59 DR-Y ML-Y ORT3-YR-N 27 ~ gL-514 IH 11 -I-171 11 IC0305085 IC1 76 LS-02376 ILS-2376SMALLSTEAM 881 19APR04 1 04MAY04 DR-YML-Y 27 C03 5tBSIS-37SMALL STEAM~ ~~

LEAKONLVLSW 1100A 11:59 ORT3-YR-N

_ _ l 172 1 ICLS3579 I10 76 LS-03579 DISASSEMBLE. CLEAN 1 88 19APR04 I04MAY04 I DR-Y ML-Y 27 j;1;7IASS4BLBCLEANAN J EVE INS rRU AND INSPECT LEVEL I 11:OOA 11:59 ORT3-Y R-N 173 1 ICLS3580 I11 76 LS-03580 DISASSEMBLE. CLEAN 88 19APR04 104MAY04 DR-Y ML-Y 27 "5,0Ds LB. CLEAN ANDSPECT LEVEtINS=R ANDINSPECTLEVEL I 100A 11:59 ORT3-YRN R 174 1 ICLS3581 I11 76 LS-03581 DISASSEMBLE. CLEAN 88 19APR04 04MAY04 . DR-Y ML-Y I27 CU LBECLEAN AND SPCTLEVEL AND INSPECT LEVEL 11.00A 11:59 ORT3-Y R-N IS19APR04 I04MAY04 I L_

1751 1 1CLS3582 l10 716 LS-03582 DISASSEMBLE. CLEAN 88 AND INSPECT LEVEL I 11DOOA 11:59 DR-Y ML-Y ORT3-Y R-N 27 Z%~2DIASSE LB-.CLEAN AND SPECT LEVELI 176 1 IC0213740 ICI 76 FIT-00458 FIT-458 DRY BA BUILDUP 5 23APR04 25APR04 DR-Y ML-Y 110 C02 RY BA BUILDUP 01 IXMfl¶ERl ON XMITTER 1 t00A 16:59 ORT3-Y R-N _RC LC OP A RTD MANIFOl DFLOW INDICATOF TRANsmrmTO2I3 '40 177 1_ K:5.60

___ _ IC1 76 1ICP-05.06 _. RTD MANIFOLD _i__

5 23APR04 25APR04 _DR-Y MLY 62 C5.E )RTD MANIFO .D FLOWICO

_FLOW/CO _ 1OA 16:59 ORT3-Y R-N U RRTD ANIFOLD FLOWICC NTSPRAY HOR FLI W XMTRS OUTAII3 '0981 178 1 IC4121443 IC1 76 ICP-04.026 ICP 4.26 NIS PR 5 I 24APRo4 25APR04 I DR-N ML-Y 0 SN43ICP 4261 IIS PR CALI3RATIC N CALIBRATION 14DO1A 16:59 ORT3-N R-N :AR INSTRUMENTA ION SYSTEM POW :R RANGE0300839 t1 4- -t+ I I 179 1 IC0407900 I10 87 1IICP-4.00 FT-465 RECALIBRATE I I25APR04 25APR04I DR-Y ML-Y 92: RECALIBRA rE STEAM FLOW X lTRER STEAM FLOW XMTR O9 00A 12 59 ORT3-N R-N ;H-X-IA SG SI EAM FLOWTRANSI TItTER

_ _J _ _ _ _ _ _ _ .l l l Run Date C Primavera Sstems, Inc 25APR04 12:38 LT-03 STANDARD PUBLICATION FL-03 Execution Publication Set T Sheet 10 of 26

after 25APR04 12:00 U1R28 WORKING SCHEDULE after 25APR04 12:00 Ul2.WOKN SCEUL t IRESP [wo EQID DESCRWPMON RDI ES RISK I M}

SIM 725 Mn 26 r

Tue 27

,ST 19.1 12714.IA.l , 2i4 i R., A 1.9.4-. R6 IC4.14 IC1 78 ICP-04.014 ICP 4.14 BA CONTROL 15 1 25APR04 I 26APR04 DR-N ML-N 4 ICP 414 BA CONTRFX INSTRUMEHHTk. _

INSTRUMEIN1T CAL 0900A 15:59 ORT3-N R-N 1801I _BORIC 43CD CONTROL SY't rMU 181 1 ICS65A IC1 78 1ICP-05.06 ICP-05.065 LETOOWN PRESS PT-135 3 25APR04 1200 25APRD4 14:59 DR-Y ML-Y ORT3-Y R-N 46 C1E hICP-O&065 ETMOWN PRESS F r-135 4LETDO IAND RCP SEAL 0 ITRANSMrrrER 01 TAGE CAIJ 0300981 182 1 IC0310564 ICI 78 MS0235 iMS-2035 LIMIr SWirCH 12 26APR04 27APR04 DR-Y ML-V 0 IC0310564IN -20MS LIMIT SWITC kPROBLEM PROBLEM 07:00* 07:59 ORT-Y R-N 03105641 m -IU PTURBINELOV 163 1 IC0400553B IC1 76 SERVICE SERVICE MAINT 20 26APR04 28APR04 DR-Y ML-Y 12 IC0140553 BaS VAC 4 SUPTEO MAINTT

_UPPORT-EOVERIFYIN 07:00 10 59 ORT3-YTR-N 0400553pi5i-E _

184 1 IC0306uu2 ICl 76 S-06050A 1S-65CA IOPS CH-1 24 26APR04 29APRD4 DR-Y ML-Y 0 IC:030600250A lOPS Ml PEED LIGT OVERSPEED LIGHT 07:00' 08:59 ORT3-Y R-N 0306002E - T I 151 1 IC426N44 C10 76 ICP-04.026 ICP 426 NISPR 115I 27APR04 I 28APR04 I DR-N ML-Y I 0 IC4. IN44CP426 ISF RCALIBRATION CALIBRATION 08:0u 09:59 . ORT3-N R-N

  • .. . _ . -
  • ISTM 18611 IC0302376 1C2 '76 ' S-02134 TS-2134 RELOCATE l 20 14APR04 l 28APR04-1 DR-N ML-Y 94 C03 2376TS2134 OELOCATE SWITCI SWIrCH I I 22OOA 02:59 ORT3-Y RN I- ---- ._ i I 1871 1 IC5.52-1 IC2 j 76 ICP-05.052 ICP5S.2SECONDARY 120 14APR04 27APR04 DR-Y ML-Y 13 CIL CP 5.52 SECONDARYVTEMPE ATURE INST TEMPERATURE INST I 23:00A l0259 l ORT3Y R-N . _+ _NECONtRY PI-ANTTEMI 3881 1 IC5.22 IC2 1 76 ICP-05.022 FEEDWATER CONTROL 120 19APRO4 I 27APRI4 I DR-N ML-Y 24 Cs4FEEDWATE;OMRM 0SYSTE! CAL SYSTEM

.M CAL I 2300A 0259 CZ5 ORT3-N R-N I -90FEFEEDWARECONTROL IC5.9 102 76 ICP-05.009 MISC TURBINE 23 1 21APR04 27APR04 I DR-Y ML-Y 0 C&MCT INSTRUMENTATION 21:00A 18:59 ORT3-YRN -I *w [1 1891 1

4. _

19011 IC5.16RK IC2 76 1ICP-05.01 ICP-05.016 CVCS 6 1 24APR04 I 25APR04 I DR-N ML-N 67 CS1 iRK1CP751 4CVC5: NORMALCI ARGING NORMAL CHARGING I 9.tCQA 23:59 ORT3-N R-N _I RCS AND CVC INSTRUMENTS0 TAGE CALIBRATIO 40300978 IC0306469 76 LT-00428 1LT-428 BA BUILDUP ON 120 24APR04 28APR04 1. DR-Y ML-Y 0 C031 64691LT.428 I ABUILDUP ON W aFOLD 19111I MANIFOLD _ t 9 00A 02:59 ORT3-Y R-N _ __ - I I

o I

19121 1 I0030847 12 76 LT-00427 tLT427 BA BUQDUP ON 20 24APR04 28APR04 1DR-Y ML-Y I C036 4 ONTlIFOLD MANIIFOLD t90WA 02:59 ORT3-YRN I I __ _ _ __ _ __ -

I 193j1 Ir,4ZtFZR I IC2 768 1ICP-04.00 .4.

ICP-04.003-1 PZR LEVEL 120 XMTRCAL 4-I 24APR04 1tgWA 4

28APR04 02:59 .

.4.

DR-Y ML-Y ORT3-Y R-N 4-2 4 1P P

ZRC IP2R.X4R 3b CAL I -

D-x 194 I IC4.7-1 IC2 76 1ICP-04.00 ICP 4.7-1 FEED FLOW 4 25APRo4 25APR04 DR-i ML-Y 90 C4.7 1ICP4.7-. FLOW XMTR CA & BACK FlUL XMTR CAL & BACK FILL 00-00A . 21:59 ORT3-Y R-N FEEDWATER FLC VTRANSMIlTERS {XJTAGE CAL 03009 *1 195 1 IC0212657 IC2 76 PIPING NB- PIPING NB-01 DAMAGE 10 25APR04 26AR4 DR-Y ML-Y 13 Mi2657t G NE14t DAMAGE k-1279 IAw1279 1800 03:59 ORT3-Y R-N 0212657 INSTRL AENT AIR DOWNST SEAM OF DRYER 196 1 IC5.56RK IC2 76 .... ..... ... ..

1ICP-05.05 ICP-05.056 RCS RACK 10 25APR04 26APR04 DR-N ML-Y 78 lC556RICI~ 1 ILSO~i RCS RACK CALS (LTOP) 18:00 03:59 ORT3-N R-N 0300980 RC I TRUMENTS OUTAC ECALIBRATION 1971 1 IC4.3-1PRT IC2 76 1IICP-04.00 ICP-04.003-1 PRT LEVEL I8 26APRO4 27APR4 1 DR-i ML-Y 0 103 P T .03 P IrTLEVEL XMTR CAL XMTR CAL 000D0 18:59 ORT3-Y R-N qi I-

  • A. 1L L J _ . ,

Run Date 25APR04 12:383 LT-03 -STANDARD PUBLICATION Sheet 11 of 26 O Primavera Systems; Inc. I FL-03 Execution Publication Set l

after 25APR04 12:00 UR W SCHEDULE after25APR0412:00

, .I I

  1. ID RESP ROI RISK APR U WO EOID DESCRIPTION ES EF I UF Sun25 1 Mi 2R Tiu 27 ST.I., 4.1h19.1A.14. ).A . Ft. 1L10112,14,16,18,20 1 221 0-j 2. 46 L6.

8,lO(12S14,16,1 1981 1 IC0310192 IC2 7B ' LT-00442 1LT-442 REPLACE POWER SUPPLY 36 26AWR04I 30APR04 00.00 QtS29 I DR-Y ML-Y ORT3-Y R-N 0 IC031 192ILT-442 REPLJ4CE POWER SUPPR ia03i I - _

I_ _w . . S.

4

.,_ I . , 4-J-L. __ J. _ r 199 1 IC10.32 IC2 76 ICP-10.032 tCP 10.32 CONT H2 RTD'S & PRESS SW 201 27APR04 28APRo4 DR-Y ML-Y 0 7ICIC10: CONTH a

_. 0800' I .14:59

  • ORT3-Y R-N tS-^rrslmuto

.- -l -IAII-t rI uvrtott n I UmfJIcn M ztlTnte M . .

^nn"s

.IUNUUO I

20011 IC554-% . I 78 ICP-05.04 ICP 5.54 SECONDARY 132 19APR04 2BAPR04 DR-Y ML-Y 0 I

LOW RANGE PRESSURE 11 0uA 1059 ORT3-Y R-N a&ICr5- 54 SEPONDARY LOW Pt2E_PRESSURE "START __

,AAA . ..A. X ._ ] __

AA zul ^I .I IC9944161 IC5 1 76 DPS-05933

= _

IDPS-5933 INSTALL 132 19APR04 26APR04 OR.Y ML-Y 0 aPS4 [MALL S SNUBBERS I I 60A 10.59 ORT3-Y R-N s mm s- _s I l - U- , _ . .

.__ l __ .

AA s .1 l. .__ __

.A 202l IC5.20 IC5 I 78 ICP-05.020 PZR PRESS CONTROL I 11 24APR04 27APR04 I DR-N MAL-Y _

0 PZR PRESSONTROL SYSs (OCP-5O 024)

SYSTtM CALS II8OA 11:59 ORT3-N R-N - . m _ rn m_

l>

_ _r 203 1 IC0310061 IC5 76 LC-00471B- 1LC-471B-YA REPLACE 5 25APR04 25APR04 DR-Y ML-Y 0 C03 3061 ILC-4711 VYA REPLACE TES *RELAY TEST RELAY 12:00' 16:59 ORT3-Y R-N 1IHX-1 I SG TRAIN ALOW 0W LEVEL TRIP M, TRCITEST031006' 204 1 IC0406155 ICS 71 PC-00431A- 1PC-431A-YA TEST 5 25APR04 25APR04 DR-Y MLtY 0 C04 ,,1551PC-431i -YA TEST RELAY

___TRAM APZR HIGH PRES IRE TRIP MATRKC EST RELAY040615 RELAY 12 00 18:59 ORT3-Y R-N 205 1 IC021 3084 ICS 76 LT-00433 LT-433 REPLACE 10 I 25APR04 I 26APR04 DR-N ML-N 0 C02 3 04LT-433 F ePLACE MANIFOU MANIFOLD 120u 10tu59 ORT3-Y R-N ,OU _m a jr-1 PZR COLD C ALlBRATION LEVEL TRANSMITTER

aOB I IC5.61 ICS 76 11CP-05.06
  • ICP-05.061 10 25APR04 26APR04 DR-N ML-N C C5. .P P4ESSURIER LEVE COLD CAL 05,61

. PRESSURIZER LEVEL 12:00' 10:59 ORT3-Y R-N _ _ m u P URtirnm & OLD LEVELTRANS MITTER OUTAGI 207 2 IC0304490 ICS 78 AF FT-4036/FT-4037 LOOP I 26APR04 26APR04 DR-Y ML-Y 52C IC0304490FT40 B6FT-4037 LOOP at ECK CHECK 05:00@ 05:59 ORT3-Y R-N 0304490DAF ! (STEM MULTI AND )R NON-NUMBERE ) EQUIPMENT 208 1 IC0304504 IC5 76 AF FT-4036/FT4037 LOOP 1 28APR04 26APR04 DR-Y ML-Y 520 61FT-4037 LOOP Cl ECK CHECK IC03045W4FT-r4 05:00- 05:59 ORT3-Y R-N 0304504MAF.' YSTEM MULTI AND DRNON-NUMBERE 3 EQUIPMENT 209 1 IC10.40A IC5 78 ICP-10.040 ICP 1o.40 HC STATION I20I 26APR04 28APR04 I DR-N ML-N IC10.40A CP 10.40 HC STAT )N (HC-142,133,957 ,104 & 105)

(HC-142133.957,104 & 09:00' 08:59 ORT3-N R-N 0300893

_ _ _ __ I I _ _ _ .. _. 13 --__.- -. -

210 1 IC10.40B IC5 78 ICP-10.040 ICP 10.40 SECONDARY 120 2BAPR04 I 28APR04 DR-Y ML-Y 87 IC10.40B 10.40SECOND YHC STATION CkS.

HC STATION CALS 09:00 0:59 ORT3-Y R-N 0300893 'U!

211 _1 CI300795 IC5 76 I&C MISC VISUAL INSPECTION OF 12 26APR04 27APR04 DR-Y ML-Y 39 RELAY RACKS _ 10.00 10:59 ORT3-YR-N

._hW I_ _

5sViSUALINSPECT N OF RELAY -,!_L

- - . - WORK A5IC , - I ACTIVMIESS300709151


------- I 212 0 ICSECCOMP1 ICS 77 SEC-COMP 0 SEC COMPUTER 1 1 27APR04 27APR04 DR-Y ML-Y 498 FANIFILTER CHECK 05:00' ICSE :COMpI SEC COM UTER I FANFILTEI tCHECK (12WK 05:59 ORT3-Y R-N CA. SECURITY COMPI TER0300706f1 213 1 IC2.16SUP IC5 76 ICP40Z016 ICPZi6 2 27APR04 27APR04 DR-N MLtY 0 OVERPRESSURE 05:00' 07:59 ORT3-N R-M ICZ16SU lOP '.18OVERPRI SSURE MITIGATOIO1BlSTASLE CHK C 'ERPRESSURIZATI PN MmGATING SYc TEM0300809154 214 1 ICCX-PORV ICS 76 CX PORV OPERABILITY 2 27APR04 27APR04 DR-N ML-Y 158 CX4qMRVPORVO -RABInflYTES1 TEST 05:00 07:59 ORT3-N R-N N TEMP OVE RPRESSURE PROT :CTION (RO430) RI LAY0300T724

. .... . I 2151 1 ICAX-PORV I ICS 76 AX PORV OPERABILTY 3 27APR04 27APR04 I DR-N ML-Y - 20 1CAX-PORV OP-B3IMTEST TEST 05:00 08:59 ORT3-N R-N 30o0762 LOWTEMP OVE

_ _ . .L...._._ .L . I Run Date 25APR04 12:381 LT-03 STANDARD PUBIJCATION l Sheet 12 of 26

_ Prlmavem Svstems, Inm I FL-03 Execution Pubflcation Set ___

after 25APR04 12:00 U1R28 WORKING SCHEDULE after 25APR04 12:00

  1. .I U ID RESPI WO I EaD DESCRIPTION RD ES EF RISK MF I Ma 2R Tue 97 I ST 4 O. 2, A. A.R8i.1alZ.l 2161 0 KC0213808 IC5 77 Z-107H EXPLOSIVE DETICTOR 1 I 27APR04 I 27APR04 DR-Y ML-Y 252 1EXPLOSIVE DETE ,TOR CLEANINM CLEANING 06:00 06:59 ORT3-Y R-N IC0213E01 PORTABLE EXPLOSIVES DETE CTOR02136081 217 0 ICSECCOMP2 IC5 77 SEC-COMP 0 SEC COMPUTER 2 1 27APR04 27APR04 DR-Y ML-Y 497 ICSE COMP2 SEC COM UTER 2 FANIFIITE CHECK (IZWK FAWFLTER CHECK 07:00' 07.59 ORT3-Y R-N  ;AS SECURIIY COI PUTER03007071 218 1 IC.21 IC5 76 ICP-05.021 PZR LEVEL CONTROL 15 27APR04 28APR04 DR-N ML-Y 0 IC5.211FI ER LEVEL CONTRC SYSTEM CAU SYSTEM CALS 12Z00 16:59 ORT3-N R-N .PRESSURIZER L ,VEL CONTROL03C Ot59g _-l 219 1 ICS.49DAY1 ICV 76 ICP-05.049 IP 5.49 SEC CONTROL 60 21APR04 30APR04 I DR-Y ML-Y 7 CS hAYI ICP 5.44 SEC CONTROL V4VES .--

_ _ VALVES 14 00A 165B9 ORT3-Y R-N 2201 1C5.49NGTI lCV 78 ICP-05.049 I ICP 5.49 SEC CONTROL 60 I 21APR04 I 30APR04 I DRY ML-Y 0 * ~

m -I .,

VALVES 19.O0A 22:59 ORT3-Y R-N IC5 SECCONTOL 4VES ~{r 221 1 IC9950096 ICV 76 CV-00313A, CV-313A-S REPLACE 5 25APR04 25APR04 DR-N ML-Y 0 oogCV-313A. 3 REPLACE SOLED DID VALVE SOLENOID VALVE 10:00A 16:59 ORT3-N R-N c 3 RCP #1SEAL WA 'ER RETURN ISOLA flON SOL 9950096 m 1 IC4.14A ICV 76 ICP-04.014 CV-110ABAFLOW 2 25APR04 25APR04 DR-N ML-N 0 IC&14ACV 110A BA FLOW CO(TROLVALVE CONTROLVALVE 19W00 20 59 ORT3-N RN 0300834A BORIC ACD CONTI tOL SYSTEM 223 1 IC4.148 ICV 76 ICP-04.014 -V111RMUW DILUTION 2 25APR04 25APR04 DR-N ML-N 41 IC4.14BC!j III RMUW DMtLI )NFLOW CONTROL VALVE FLOW CONTROL VALVE 19W00 20.59 ORT3-N R-N 0300834" BORIC ACID CONTI tOL SYSTEM 4 1 ICS.16-135 ICV 76 1CP-05.01 CV.135 LETDOWN UNE 4 25APR04 26APR04 DR-N ML-N 152 1C5.16-1 3 5 CV4135 LETDOV tNUNE

_ _ _ 23:00 02:59 ORT3-Y R-N 0300178RCS AND CVCS INSTRUMEN S OUTAGE CALnBR NTION 225 1 IC0300940 ICV 76 RH-C0625-O RH-625 DIAGNOSTIC 4 26APR04 26APR04 DR-N ML-N 0 1IC0300940RH 425 DIAGNOSTIC C-ECK CHECK 07:00 10.59 ORT3-N R-N 030094OW *HX-11BRHRHX DounTEr CONTROL OPERATOR 226 1 IC5.69-625 ICV 76 IICP-05.06 ICP-05.069B TRAIN B 10 28APR04 26APR04 DR-N ML-N 0 ICS.69-6251CF .050699 TRAIN a 07:00 16:59 ORT3-N R-N 03O090MI IM E W .T.AM B RHR HEAT EXCH ANGER VALVE A 227 1 1C0207879 ICV 76 CV-00112A 1CV-112A SEATING 4 28APR04 26APRO4 DR-Y ML-Y 69 1C02078791CV-1 I A SEATING PROS, EM DIAGNOSTIC PROBLEM DIAGNOSTIC . 185: 21:59 ORT3-Y R-N lT-4VCT -EVEL CONTROL D VERT02078T9M r 228 1 IC9950097 ICV 76 CV-0371A- CV-371A-S REPLACE 5 26APR04 26APR04 DR-N ML-Y 0 1C995009TCV-3 t1A-S REPLACE SC LENOID VALVE SOLENOIDVALVE 18:00' 22 59 ORT3-N R-N 9950097= *LETDOWN UNE CONTAINMENT I

_ .1 I . ..I 229 1 IC0407614A I ICV 78 MS-02057 I IMS-2057 DID NOT 4 27APR04 27APR04 DR-Y ML-Y I l l IC04 NOT MODULATE FRE DIAGNOSTIC MODULATE PREI ... _ ,

090.0 12:59 W~4 ORT3-Y@S R-N I L I" MAI STEAM  ;*,.,.DUMP TO 7S14AIMS-2057DIC MONDENsER DUMP CONTROL0407Bt4 m I 2301 1 l MM0304672 IMM1 7B HS-601R-73 I 1HS-601R-73 CHANGE I 10 I 24APR04 I 2BAPR04 , DR-Y ML-Y MMoj~67IH&WS-6073 CHANGE SNU 3BERSTROKE1 S WAP I SNUBBER STROKE& I I 10o00A 1059 ORT3-Y R-N

=

LINE SNUBBER (F )RMER HS-17)

SRVRL NPR 23111 1 MM-4800 _ MMI1 76 1 R-1 ICLEAN REACTOR HEADI 401 24APR04 27APR04 DR-Y ML-Y 190 4 4 8 QCLEAN EACTOR HEAD S 1 J ,____ STUDS l11.00A 07:59 1ORT3-YR-H U~~~ . }V_RREAcroR l VZ I- --

z VFRSF w

2321 1 l MM0305396 IMMI 76 W-00161 N-181 REPLACE SPRING 33I 24APR04 I 26APRO4 DR-N ML-N mMC ,i 23396W-1B PACS4~

ISOLATORS 13.00A 11:59 ORT3-N R-N -__ u ina. inain. __

=

2331 1 l MM0214167 MMI 76 W-00IAI W-1A1, INSPECT AND 1 35 1 25APR04 28APR04 I DR-N ML-N 0 MW 7141871IAILWPECTNii . FAN BEAR16 -

LUBRICATE FAN W00A 19-59 ORT3-N R-N _ _

I Run Date 25APR04 12:38l LT 03 STANDARD PUBLICATION Sheet 13 of 26 we PDA 0% ~n J L II

  • 1*~i Ie Ita cF S -A

.ena FaLCt-flJ

- tet  ! LA M S1t.QL SU9I JU L I

after 25APR04 12:00 1 U1R28 WORKING SCHEDULE I after 25APR04 12:00 I U ID RESF wo. EQtD DESCRIPTION RD ES EF I RISK MF Rm 2S APR Man 2ff IT . TUe 27.

ST 01.2; 4 6'. IlA01214.1 in. 2I.4.6,8.tAM1214,16.J 2341 1 MM0407699 MM1 71 P-002A

  • P-002A. REPLACE 4 j25APRD4 I 25APR04 I DR-N ML-N OMc 07 m9P-0 A. REPLACE DISCHA IGE OIL PRESSURI !GAUGE DISCHARGE OL 13.0 .16:59 ORT3-N R-N 6

_CHAR, ;ING PUMP040759!

PPI:CMI WI r.ALGE0 235 1 MM0214055 MM1 76 HX-015A HX-15A, MOTOR 12 25APR04 26APR04 DR-N ML-N 0 COOLING COL 20-00 20:59 MM0214055H C-IS, MOTOR CO KUNG COIL INTERN %L1NSPECTION ORT3-N R-N I I# A4 tI

_ .___INTERNAL

____ INSPECTION 02140551 *_ *1 .d 4

. Aflr-EnFrI=.- _ . . . ECIRC FAN MOT 236 1 MM0301141 MMI 76 HX-01SAS HX-015A5.CFCCOIL 12 25APR04 26APR04 DR-N ML-N 0 INTERNAL 21t00 21:59 ORT3-NR-N MM0301141 4X-015A5. CFC CO INTERNAL INS AN1NG 0301141 I __COTYAI -------

AMNFT A CIDENTRECIR

_ _____ _ _ _ INSPICLEANING _ _.

237 1 MM0301142 MMI 76 HX-415A6 HX-015A6, CFCCOIL 12 25APR04 26APR04 DRNML-N 0 238 1 MM0301144 MM1 76 HX-015AB INTERNAL INSP/LEANING HX-015A8, CFCCOIL 12 25APR04 23:00 23:59 26APR04 ORT3-N R-N DR-NML-N 0 MM0301 42H"X015",. CFCFOLINTERNALINQPE_

0301 U NTAINMEANCCO NG 1ACCIDENT RE(

INTERNAL 23:00 23:59 ORT3-N R-N MN10301 144 HX-15A CFC ILINTERNAL A INSP/CLEANING 0301 CONTAINM ACCIDENTREC 239 1 MM0301143 MM1 76 HX-015A7 HX-015A7. CFC COIL 24 26APR04 28APR04 DR-N ML-N 2 INTERNAL 01:00 02:59 ORT3-N R-N MM1Cr 0 11 43 X-0I5AT7. C COILINTER 4NPXE~ANG I a INSP/CLEANING 0:01143- 1 240 1 MM0305857 MM1 76 P-0 10B 1P-1 OB REPLACE 30 26APR04 27APR04 DR-N ML-N 0 1 ROTATING ELEMENT 08.o 15:59 ORT3-N R-N MM0305857 03055571 IE IR ES

. u Lo4.

241 1 MM9924975A MMI 76 S-1 HS-.1, REBUILD A TEST 40 26APR04 30APR04 DR-N ML-N 0 SNUBBER (SHOP) 11:00 06:59 ORT3-N R-N MM99249 5AHS-1. REBUILD TEST SNUBBER (lOP)

  • ? i- _7Vl _ .

242 1 MM9934380B MM1 76 HS-601R-37 HS-601R-37A. 3 27APR04 27APR04 DR-Y ML-Y 0 REINSTALL SNUBBER 02:00 04:59 ORT3-Y R-N MM993438U 3HS-60IR-37A RE NSTALL SNUBBER AFTER TESTING

___ AFTER TESTING PZR PORV -EADER SNUBBER 19343801 r243 *1 MM0214168 MM1 76 W-001A1 W-1A1, INSPECT & LUBE 3 27APR04 27APR04 DR-N ML-N 20 MM 2 1416 oW-1A1. INSI ECT & LUBE BACH DRAFT DAMPER BACKDRAFT DAMPER 06:01? 05:59 ORT3-N R-N CO 4TAINMENT ACCIDI NT RfCIRCU1AT1O 4FAN 0214168[U 4" I MJ~st M ID rl-u I U r-1uo, rwrYAtu'M b IIINAINUw4 zitV'1 Iu JI-N ML-N v1 DM0305857 -10, PERFORM FT4ALALIGNMEM ALIGNMENT' 16:00 22:59 'ORT3-N R-N -RESIDUALI

- -. ,: . . -i . . , . j . U;: :  :,,.......... . 1EAT REMOVAL PUAP0301SS7W 2451 1 MM0306054 MM2 76 P-028A P402_A-CONTINUE 16 1 ' R04 I 26APR04 . DR-Y ML-Y - 0 .JM4854:02A CONTINUE OVI AUL MAIN PEED Pl MP I 1VERHAULMAINFEED I PUMP I ' 11.0A l 16:59 l ORT3-N R-N -mE . FAW GFNFRATOR FFE 8 PUMP0306054 246 1 MM0311887A MM2 76 HX-21B IHX-21B CLOSE HX 4 25APR5APR04 DR-N ML-N 12 B CLOSE HXAFT] R ECT AFTER ECT 06DOA 15:59

  • ORT3-N R-N U ihHP Mc0 537PIAHX-2 FEE PWATER HEATER S30311887 247 1 MM0214090X MM2 76 HX-024 OPEN olhe end l 2 25APR04 25APR04 DR-N ML-N 13 other end of CONDI TNSATE COOLER H C-24 Mc 114090XOPEN CONDENSATE COOLER 13:00 14:59 ORT3-N R-N HX-24. ICONDEN1 LATE COOLER0214 190 248 t MM0304206 MM2 76 FD-00249A FD-00249A-INLET 6 25APR04 25APR04 DR-N ML-N 129 1249A - INLET PLUC GED PLUGGED 18:0W- 23:59 ORT3-N R-N :M 03042051 _HX.19ALP FW I 3A LG-2538 LOWE RISOLATION 249 1 MM0214128 MM2 76 P4029-T P-29-T, INSPECT lB & OB 20 25APR04 27APR04 DR-N ML-N 0 BEARING OIL COOLERS l18:W 02:59 ORT3-N R-N M q0214i128'-29 r, INSPECT IS & Ot l BEARING OIL COO LRS.

021412S_- I ~ II lP~~ Al - FEEDWATER T

,,, . -ov . .

1 1 MM0214048 MM21 76 HS-CS-01 HSCS1, -5 26APR04 26APR04 DR-N MIL-N 0 lMM02140481. RET4OVEJ1 IEPUCE SNUBBEi WIREBUILT REMOVE/REPLACE 08:001 12:59' ORT3-N R-N

________ ___ _ SNUBBERWIREBUILT _ _ _ _ 0214048CONDENSA1 ELINE GB-4 SNUBI ER

'21;i I IkEfln2E4 fl MnviA nA r I n rAN ISIk Air, 1 n ot l . - I r-.

L MWW IVI I INS EC 10 R I VIEI ASnERI08 015 4 1 1 - R T-NM RN

.v. I VJ~

INSPECT LO RESERVOIR l 08 -W 00.e59 lORT3 N R-N 1 MM0306061-----

qP~tLAND I I SPECT LO RESERi OIR 030w e6llP~__ _ _ _ _ 8A SGFP LUBE C Run Date 25APR04 12:381 LT.03 STANDARD-PUBLICATION Sheet 14 of 26 CPrimavea Systems, In I FL-03 Execution Publication Set l

after 25APR04 12:00 U1R28 WORKING SCHEDULE I after25APRO412:00 I I,

  1. lu ID RESF WO EQED DESCRIPTION RD ES EF RISK MF APR

_u .2_.5 Tue 27 ST - --

?I Q. 2i 4 . 6i 8:521614.1 s R.1 1.1012.14.1 2521 1 l MM03057 MM2 76 HX-021A IHX-21A PLUG TUBES.

CONTINGENCY WO 5 1 26APR04 10:00 2BAPR04 14:59 0 MM030571 2 1Ht21A PLUG n BES ^ CONTINGEN :YWO wimi 0305s1 2 1HPFEED VATER HEATER 5A 253 1 MM0306045 MM2 76 CS-02291 INSPECT & MAINTAIN 3 28APRo4 26APR04 DR-N ML-N 2 MMc 30045 NSPECT & 1 AINTAIN IP-28A SIEAL WATER PC%

IP-28A SEALWATER 14:00 1t8:59 ORT3-N R-N 130604sf IP-28 SGFP SEAL WATE I INTMD LEAKO 254 1 MM0306^u51 MM2 76 CS-02292 INSPECTI MAINTAIN 3 28APR04 2APR04 DR-N ML-N 2 16:59 ORT3-N R-N MMo 30 60 51 INSPECT A LAINTAIN IP-28A Sl:AL WATER PCI IP-28A SEALWATER 14:00- 1306051MlP-28 ,SGFP SEAL WATE I1INTMD LEAKO 255 1 MM0214101A MM2 76 HX40568 HX-0568 - CLOSE SGFP 2 26APR04 26APR04 DR-Y ML-Y 0 Mh 3214101AOX-0561- CLOSE SGFP OIL OOLER OLCOOLER 15:00 1kS59 ORT3-YR-N 0214101fP-288 MGFP OL COOLER 256 1 MM0305771 MM2 76 HX-020A IHX-20A PWG TUBES - 10 28APR04 27APR04 0 M 305771 IHX-20A LUG TUBES - CON IINGENCYWO CONTINGENCYWO 15 00 00.59 0305771f LP FEEDWA 'ER HEATER 4A 257 1 MM0214082A MM2 76 HX-021A HX-21A. CLOSE HP 8 26APR04 27APRo4 DR-Y ML-Y 0 LOSE HP FEEAINA TER HEATER 50 MN 0214082AHX21AI

_EEDWATER HEATER SP 1800' 01:59 ORT3-N R-N kTER HEAT 2R 5A0214082U HPIFEEDWi 258 1 MM0207075 MM2 78 FE-00134 IFE-134REPLFLANGE 8 26APR04 27APR04 DR-N ML-N *2 MM0207075t E-134 REPL FLANC ;E GASKETS GASKETS 20 00- 03:59 ORT3-N R-N 02070751 HHX-3A B NON-REGENI 259 1 MM0305777 MM2 78 HX-048 1HX-48 PLUG TUBES- 10 27APR04 27APR04 7 MMo3057MHX4 l PLUG TUBES - CCNTINGENCYWC CONTINGENCYWO 01:00' 10:59 C;LAND STI AM cNDFnppaiwq77 I_

260 1 MM0214129 MM2 76 P-029-T EMERGENCY GOV INSPECTION P-29-T 6 27APR04 03:00 27APR04 21:59 OR-N ML-N ORT3-N R-N 0 MM0214129 El ERGENCY GOV INIkPECTON P-29-1 02141291§ I 261 1 MM0214099A MM2 78 HX-0S6A HX-058A - CLOSE SGFP 2 27APR04 27APR04 DR-Y ML-Y 0 MM0214099AI KX-056A - CLOSE SCFP OIL COOLEF OLCOOLER 06:00 07:59 ORT3-YR-N P-28A SGFP OL CC OLER0214099E MM0304995 76 2521 1 I OSMAY04 . Mmo30495P 289 - OVERHAUL i AIN FEED PUMI MM2 P-028B P-028B - OVERHAUL MAIN FEED PUMP 99I 27APR04 06:00 16:59 I ORT3-N DR-Y ML-Y R-N 0 l STEAM ,FNFRATOR FED Pt iupnvn 263 I MMB485 IMM3 78 P-401B P-1B. INSPECT I MAINTAIN SEAL RMP 44 I 1I100A 24APR04 29APR04 11:59 N-R-DR-N3 ML-N ORT MM-sasP-iB. INSECT/ MAINTAtN SlRM. D00Z-5.S

- 0 264 1 MM0303383 I MMV 7B SC00966B I SC-9668- VALVE 1 13 1 09APR04 27APR0 I4 DR-Y ML-YV 0 4M0g03383SC46 -VALVE LEAXiNGlBYy. REPAIR LEAKNG BY, REPAIR _ 1100 I I I 10:59 ORT3-N R-N

-I_ -- RMPZRuIUID MM0406916 I MMV 76 MS-2016 tMS-201B VALVE LEAKSI 9 20APR34 27APR041 DR-Y ML-Y 0 wM01069161MS-20 6 VALVE LEAKS Er 265j 1 BY 22.SA 03:59 ORT3-N R-N t - HX-tA ElG HDR ATMOSI s _ ..

26 .

8 MM0214113A lMMV 76 MS-02719 MS-2719 - RE-INSTALL 22 21APR04 I 28APR04 I DR-N MI-N 4 0 M0111113'AM37 1 9 - REi4NSTALL VALVE AFTERmTESTIN VALVE AFTER TESTING 09 00A 10:59 ORT3-N R-N -I l _ .

1. _ -

267 1 MM0214025 IMMV 76 CS-00022A ICS-22A-INSPIMAINTAIN 9 21APR04 1 26APR04 DR-Y ML-Y 4 0 WMM 1402CS-C2A[ INSP IMAINTAJN NHECKVALVE PER RMP9158 CHECKVALVEPER I 21.00A, 15:59 ORT3-N R-N

- S*- u I._

i - .4 .. p-21Ar 'OND PUMP DISCH kRGE CHECK 268 1 MM0301046 MW j l 75 LG-02561 ILG-2581 LEVELGAUGE STUCK 3 21APR04 22.00A 25APR04 20:59 DR-N ML-N ORT3-N R-N 78

%iim lMOI 010461LG-2 1 LEVEL GAUGE S UCK HX-22C MSR LEVE GAUGE030I140 269 I MM030996 MMV 78 LG-02697 ILG-2697 FLUSH LEVEL 6 21APR04 25APR04 DR-N MI-N 129 UM°] 0969MILG-20 7 FLUSH LEVEL IN lICATOR INDICATOR 22.10A 23:59 ORT3-N R-N lliT ')CAO I L-T 1jf lAAR tSrMr %I I mi nrAitn-mngla Run Date 25APR04 12:38 l LT-03 STANDARD PUBUCATION Sheet 15 of 26 ePrfmnwaoe fv.tmi. Ir-m m0 F~warlitofnn PliruinAnt

. - I

after25APR04 12:00 UlR28 :WORKING SCHEDULE after25APR04 7-2:00

  1. IU m9

?DlRS ImEp wo ECHO DESCRIPTIN RD ES RISK ,J I P

Apg3 Sun 25 *Von26  : - Tue 27 ST . .. , -1. 1- ..-- . A1A.16C1 I 2i4, 6,A R. RA1A12.147.R.1 01a12,14,16,8C20,2210.PAKI 4.6 27011 MMO302915 I MMV 76 LEAKI SC-966C I 1SC-9%6C-PACKING 6 21APRO4 230MA I 27APRO4 00:59 DR-N ML-N ORT3-N R-N 0 AM016o21151"es6C

- I- I -

  • PACMNG LEA _RC HOT LECI SAMPLE 271 11 MMO407719 MMV 76 MS-02746 IMS-2746 REFURBISH 129 24APR04 29APR04 7 4MAM07719 IMS-27 4 REFURBISH VAI VALVE J11DOA 08 59

-- i

+ _

2721 1 MM0407697 MMV 76 WG-01788-01 IWG.1788&OAIR LEAK. 8 24APR4 I 27APR04 MY aDR-Y M40M6971WC-1 #O AIR UEAK RE;LACE DLAPHRAGM' REPLACE DIAPHRAGM 2DOA0 ORTg N R-N _MrTM-16 L

RCDn i _ .

2731 1 MM0407698 MWV 78 WG-01789-0 lWG-18R-OPAIR LEAK 5 I 24APR04 I 27APRD4 I DR-V ML-V C MM407931WGd 19O AIR LEAK1R14LACE DlIt REPLACE DIAPHRAGM I20:OOAI 02-59 ORT3-N R-N I I T-10 RCC -SAMPLETO Z-274 1 MM02141t3A MMV 76 RC-00434 RC-434 - LISA CHECKS 3 25APR04 25APR04 DR-N ML-N 0 Mm t;413TARC- 34- LISA CHECKS 18:00 20:59 ORT3-N R-N 0214137 T-1 PZR SAFETYT iT-2 PRT 275 1 MM0407621 MMV 76 CV-0096 1CV-296, BODY TO 20 25APR04 27APR04 DR-Y ML-Y 38 M ~040762ICV- 26. BODY TO BOi 4ET LEAK BONNETLEAK 18:00 0t59 ORT3-N R-N 07T621i 1HX-2 RE 'EN HX TO AUX 278 1 MM0214034 MMV 75 CV-00370 CV-370 - INSPI MAINTAtN 40 25APR04 29APR04 OR-Y ML-Y 0 M I0214034E O- INSF IMAtNTAt. CHECK VALVE-I MP9003-8 CHECK VALVE. 18:00 00.59 ORT3-N R-N 0214034O - _ _

277 1 MM0214139 MMV 75 RC-00435-L RC-435 - USA CHECKS 3 25APR04 25APR04 DR-N ML-N 115 MM021413e. C43S - LISA CHE( KS 21:00 23:59 ORT3-N R-N 0214131 URC-435 PZR S FETY UFT IND SW rCH ASSEMBLY 278 1 MM0216627 MMV 76 CV-01296 CV-1296 - INSTALL NEW 40 26APR04 29APR04 DR-N ML-N 16 MM0216V27-1 96 -INSTALL NEW TRIM PER MOD 02- m27 I TRIM PER MOD 02-027 06:00 12 59 ORT3-N R-M 0216O27" I $ I-279 1 MM0216196 MMV 76 CV-00275 ICV-275 PACKING LEAK 6 26APR04 26APR04 DR-N ML-N 0 MM02161960 P.275 PACKING LL 613PM REPACKA 6DPM. REPACK 07:00- 12:59 ORT3-N R-N 02161960 N IF-9A3/B RC SEAL WATER INJ ON FLTER B 280 1 MM0407623 MMV 76 CS-004608A 1ICS460EA REPACK 8 28APR04 26APR04 21 -4808A REPACK 07:t0 12t59 O407623M IHX-IA SG; 1 7-460B WIDE RAN LOWER ROO1 281 1 MM0206768 MMV 76 CC-00t763B 1CC-7638 SWAP VALVE 6 27APR04 27APR04 DR-N ML-N 0 MM020676E IIC-7638 SWAP.V WITH SPARE WITH SPARE 07.0 12:59 ORT3-N R-N IP-IB RCP C RETURN HEADE DilREUEF0206768 282 1 MM0213699 MMV 76 CC-t0762A ICC-762A SWAP WITH 6 27APR04 27APR04 DR-N ML-N 0 MM021 I69 ICC-762A SYVAP WITH SPARISED FOR TES11NG SPAREISEND FOR 07:00' 12.59 ORT3-N R-N IP-IA RCP THERMAL BARRIEF COOUNG RETUFIN RELIEF0213E99 283 1 MM0214031 MMV 76 CV-00257 CV-257. SWAP WITH 8 27APR04 27APR04 DR-N ML-N 0 Ml RM414031 CV-257. 91i W1TH SPARE SPARE 07:00- 14:59 ORT3-N R-N IT-4 VCTR UJEFTOT-8A-C CVt HUT0214031 254 1 MM0207072 MMW 75 tV00277 ICV-277 REPLACE BIl 12 27APR04 28APR04 DR-N ML-N 0 MM02 0 21CV-277 BIB GASKE GASKET 07.00 09.59 ORT3-N R-N IT-4 VCT INU.I Tu nLnIntodfl7 285 1 MM0213464 MW 76 CC-00779 ICC-79 SURGE REUEF 8 27APR04 28APR04 DR-Y ML-Y 0 MM0; 4641cC- Su VALVE 0tl0 07:59 ORT3-Y R-N 1T-12 CC SURGE TANK REUEFTO 21ASTE HUT0213464 286 1 Pt201NDE NOE 77 PIPING EB- HX-0E1:EXAMINEFW 4 25APR04 2WAPR04 DR-Y ML-Y .. 39 t42AmiEHX-(1B. EXAMINE FW NOZ LE WELDS i

NOZZLE WELDS 1000A 15:59 ORT3-Y R-N FEEDM kTER CONT ISOL V JVESTO STEAM GIpNERATORS03033r 6 2871 I ING44CFC1ND NOE 77 IST-SISI NOE FOR FAC PROG- 10 26APR04 26APR04 I DR-Y ML-Y 01 NG44CFCI ND NC FOR FAC PROG :ONTAINMENT 44 1T GEN AREA CONTAINMENTU FT 07:00 16:59 ORT3-Y R-N 0u315u S _ E btfA IDARY INSERVICE {NSPECTION Run Date 25APR04 12:38 LT-03 STANDARD PUBLICATION Sheet 16 of 26 Prmavera ISemsInc. FL-03 Execution Publication Set I

after 25APRO4 12:00 l U1R28 WORKING SCHEDULE I after25APR0412.00 U too RESPJ WO ST.

l EQID

-6.*

~~~~~ ~

I

~

DESCRIPTION

.. ~

RD

~ .. ~ ~

ES

~l T~

EF

...~

RISK

~ ;.-. ~ ~~

MF 2012.14,16.111o22 22 4681141 APR 4

2. 4,6 8 .10Z14,16,11120,221 0 .2 *4 *6.*8801141§ 2.1w 6A 288 1 ND030461'2B NDE 78 HS-601R -73 HS-801R -73, PERFORM 1 28AR04 26APRD4 DR-Y ML-Y 317 ND030W 2OHS4M-CO73, PEORM AS LEFT VT 30ON SNUBBER ASLEFTV`T-3ON 11-00 11:59: ORT3-V R-N 00 PRRRL N NBE RE~-7 SNUBBER ___ _ 0 -:

289 1 ND9934380B NDE 76 HS-O61R-37 HS-601R-37A PERFORM I 27APR04 27APR04 DR-Y ML-Y 217 ND99343 BHS-M1R-7A PE IFORM AS-LEFT -3 ON SNUBBER AS-LEFT V0-3 ON 0500 05.59 ORT3-Y R-N PZR P M HEADER SNW BE99343801

_________ SNUBBER_ _ _ _

290 1 TG0302107 NDE 76 EH PT EH FITTINGS 10 27APR04 27APR04 DRY ML 40 TG0302107PT N FITTINGS

_ 0700' 18:59 ORT3-Y R-N HSYSTE IMULTI ADIR EHMIl ANDIOR NC N-uMBERED E. PMENT01207 BRDEUPET302107 291 1 NMO407660 NMS 77 FE-02804A 1FE-2804A CHECK COUPUNG ADHEASVE 8 26APR04 09.00' 26APR04 18 59 DR-Y ML-Y .

ORT3-Y R-N NM0407660 0407560 104A CHECK OUPUNG AD lYE W.1A CONT RECIRC F MOTOR CLR IN

- --- - 2 - _- - MOTOu 292 0 OP0215279 OPO 77 O4C068 BIWEEKLY 1 27APR04 27APR04 DR-N ML-N 10 2 B YOPERATIONIC CIOF BARON I OPERATIONICHECK OF 08:00' 08:59 ORT3N R-N CK O BARON IIHIGH PR BREATHING Al SYSTEM 021 5279 BARON fl I ___

293 lP0215265 O OPO 77 O-PC-021A4 WEEKLY 5 27APR04 27APR04 DR-N ML-N 156 P 52WEl MISCELLAEOUS IATA READING MISCELLANEOUS DATA 08: 00'12:59 ORT3-N R-N 'WEEKLY MISC EOUS DATA i ADNG0215265 X -~9[)"w 294 0 OP0215355

_u - ---

OPI 77 O-PC-MIDS READINGS OPERATiONS MID SHIFT 35 WEEKLY ROUTINE 23APR04 00-00A 30APRO4.

06:59 DR-Y ML-Y ORT3-N R-N 133 _ 5 3 5 5OPERA NS MID SNIFF Y ROUTINE 2 lOP0216077 OPI 77 TS-CONTO00 CONT ISOL VALVE AND 2 26APR04 26APR04 DR-N ML-N 166 _ CONT ISOLV YE AND FLANGE HECKS FLANGE CHECKS 00-00' 01:59 ORT3-N R-N .. OT tSO. .LV AND FLANGE VEFATIN TIDE(

296 OP0215433 OP2 77 0-PCDAYS OPERATIONS DAY SHIFT 16 19APR04 27APRo4 DR-Y ML-Y 155 p 54o33 0PERA ONSDAYSIFT EEKLY ROUTINE WEEKLY ROUTINE 08_.0A 1359 ORT3-N R-N NOPERAl 297 0 OP0215508 OP2 77 O-TS-083 TS-83. G-03 I 25APR04 25APR04 DR-N ML-N 170 G 03EERt ENCYDIESEL EMERGENCY DIESEL 09.00A 12:59 ORT3-N R-M G-03 EMER -NCY DIESELGEM TOR MONTHLY 298 0 OP0215513 OP2 77 PT-FP-002 DIESEL ENGINE-DRIVEN I 26APR04 26APR04 DR-N ML-N 167 OP0215513 DEL ENGINE-OR EN FIRE PUMP FIRE PUMP 08:00' W9 ORT3-N R-N 0215513 DIESEL ENGINE-DI IVEN FIRE PUMP FtNCTIONALTESI 299 1 OP021538 OP2 77 O-TS-032 TS-32. MISCELLANEOUS 3 26APR04 26APR04 DR-N ML N 165 OP02158385 MISCELLANE US EQUIPMENT EQUIPMENT 08:00' 10-59 ORT3-N R-N 0215838 MISCELLANEOL S EQUIPMENT (MONTHLY) 300 2 OP0218117 OP2 77 O-TS-432 -32 MISCELLANEOUS 3 26APRO4 26APR04 DR-N ML-N 185 O 0 1 117 M L ESEUMENT K(

EIPET08:00' 10-59 ORT3-N R- 0117 MCEAN SEUIPMENT CH (MONTHLY) 301 0 OP0215434 OP2 77 O-PC-DAYS OPERATIONS DAY SHIFT 42 WEEKLY ROUTINE 27APR04 08:00' 02MAY04 14:59 DR-N ML-N ORT3-N R-N 119 .5-40PERA OPERATIONS AY SHFT LY ToNS DAY SHiF-02154 ROUTINE

.OPERiA i1 l SHIFTW_*_EEKL _OUIN_2 302 O OP0215549 OP3 77 O-PC-SWMNG OPS SWiNG SHIFT 21 21APR04 27APR04 DR-Y ML-Y 153 j 5 5 4 9 OPS !NG SHIFTWEEKLROUTINE WEEKLYROUTINE 15:O0A 22:59 ORT3-N R-N - w .

303 0P0215848 O OP3 77 TS-CCW-001 CC SYSTEM VALVE I 25APR04 25APRo4 DR-N ML-N 173 i 5 8.sCCSYS VALVE NCHECKS POSmON CHECKS 18:00' 1B:59 ORT3-N R-N 015848 CCW OW PATHVALVE ONVERJFICAtON Run Date 6 Prlmavera Systems, Inc 25APR04 12:38 LT-03 STANDARD PUBLICATION FL-03 Execution Pubilcation Set 7 Sheet 17 of 26

after 25APR04 12:00 U1R28 WORKING SCHEDULE after 25APR04 12:00

_ U ID lRESP WOl EQID DESCRIPTION RD ES EF RISK _ u APR

_D _ S . _. .. ,. .: -. : _.,aZ14.I6,ia20,2210i2.4i.6.8.1912,14i16,18,20,2210.2Z14.66. 8t10014,16,1 304 0 OP0215638 OP3 77 O-IT-014. rr114. FOTRANSFER 3 25APR04 25APR04 DR-N ML-N 171 p 1 S 33 Srr-14,F TRANSFER SYSIMPUMPSI SYSTEM PUMPS/ 16 00 18 59 ORT3-N R.M a 15638 3 EDG FUEL OL TFANSFER SYSTEM PUMPSWALVES 305 0 OP0215640 OP3 n7 O-IT-0100. rrI1o0 SEAT LKG TEST 3 25APR04 25APR04 DR-N ML-N 171 no 1 5 6 4 0 rT.1, EAT LKG TEST OF )A-352 AND

. OF DA-352 AND 16 00 1859 ORT3N R-M O5540 G EDG SEAT LKG T -ST OF DA COMP DSCH CHK VLVS 306 0 OP0215624 OP3 77 O-PC-043.3 CLEAN SERVICE WATER 32 25APR04 29APR04 DR-N ML-N 142 npV 15 2 4 CLEAN CE WATER S RAIERS

. STRAINERS 1600 19.59 CRT3-N R-N _ - 1O 307 2 OP02161 38 OP3 77 O-PC-001.3 TBZ MONTHLY 32 25APR04 29APR04 DR-N ML-N 142rp0 16138 2MO4 HEATNGM i NTtLATION I

_HEATINGVENTLATION 16:00, 1t59 ORT3-N R- N . 138 U 308 2 U2GNDR007 OP3 O-PC-021.3 DRAIN U2 MAIN 1 26APR04 26APR04 DR-Y ML-Y 0 U2GNDR007 )RAIN U2 MAIN ELECTRICAL GENERA OR PER PC 21 ELECTRICAL 19.00 1959 ORT3-Y R-N 1 309 0 OP0215582 OP3 77 O-PC-078.4 NSB FIRE PROTECTION I 27APR04 27APR04 DR-N ML-N 159 OP0215582NS]31 RE PROTECTION ONTROLVALVE CONTROLVALVE 16:00 16:59 ORT3-N R-N NS8 FIRE PR 3TIEC7ON CTL VAL tE POS VERIFICAn N 021S5821 310 0. I0P0308218 OP3 77 O-PC-045.11 SLOW DOWN 1 27APR04 I27APR041 OR-N ML-N 158 0P03o821 9BowDOWN INTIINT AIR SSE INSTRUMENT AIR 17:001 17:5 ORT3-N R-N PERIODCE -OWDOWN OF AIR ECEIVERS AND PI1 NG0308218Ei 1 A;?_A I E_ * - -

311 1 1RP1C-030 OMS O-RPW00C FUEL MOTION AND 92 25APR04 29APR04 OR-N Mt-N 0 1 MOUEL HAND INSERTJHUFFLE-N INSERT SHUFFLE 08:OOA 07.59 ORT3-N R-M 12 1 EP0403494A OPS. 76 PT-RCS-1 OPERATING SUPPORT 4 25APR04 25APR04 DR-Y ML-Y 266 4A T MNB SUPPORT OF ITIAL RCSWALK OWN OF INITIAL RCS 1200' 15:59 ORT3-N R-N REACT R COOLANT SYST 'M (RCS) PRESSUR TTEST - IN/040349 313 1 O-RT-046A OPS 77 O-RT-046 PRE LLRT FOR AUX 4 25APR04 25APR04 DR-N ML-N 0 PR FOR AUX CHAR ING CHARGING 12.00 15:59 ORT3-N R-N AUXLU RY CHARGING UNE (P-32O215981 314 1 SOP-CV-010 OPS T-04 ISOLATE& B . 25APR04 25APR04 DR-N ML-N 0 sOP -V LA &DEPRESSU - THE VCT PER SOI -CV-002 DEPRESSURZE THE 12z00 20.59 ORT3-N R-M 315 0 O 49B OPS 76 W-030A RESTORE PAB 2 25APR04 25APR04 386 I9B PAB VENLATIO A

VENTILATION 16:00 17:59 a *1 . 29 pAs EXAU FILTER FAN 316 1 OP0215163 OPS 82 CC-00754A- CC-74A-OMOVPMT I 25APR04 25APR04 DR-Y ML-Y 236 1 51 63 CCi MOV PMT si ROKE PER IT-250 STROKE PER IT-250 18:00 18:59 ORT3-N RN 0215131P IA RCP CC INLET OV OPERATOR 317 1 SOP-BS-07A OPS P4010B TRANSFER B HUTTO RWST-TARGET21%

B 25APR04 21:00 26APR04 04:59 DR-N ML-N ORT3-N R-N 39 SOPS-07A RANSFER HUT RWST-TARGET 1%LEVEL 318 1 SOP-CV-015 OPS T-004 DRAIN LETDOWN PER 8 25APR04 26APR04 DR-N ML-N 0 SOP-CV-015 N LETDOWN SOP-CV-02 SE CT 52 SOP-CV-002 SECT 5.2 21:00 04:59 ORT3-N R-M 319 1 01-164-B OPS T-008C PREPARE C HUT FOR 10 25APR04 26APR04 DR-N ML-N 0 01154" AR! C HUT P R 1CV-257 REPLA EMENT ICV-257 REPLACEMENT 21:00 07:59 ORT3-N R-M 320 1 oP9950096 OPS 76 CV-00313A- CV-313A-S PMT STROKE 1 26APR04 26APR04 DR-N ML-Y 14 oprs CV-13A-s P STROKE PER IT2 PER IT250 0000o 0a59 ORT3-N R-N 995 0951P-I1NR #1SEAL WATER TURN ISOLATION OL 321 1 OP0306894 OPS 82 AF- -M, IAF-4000-M PMT 2 26APR04 26APR04 DR-Y ML-V 111 . I _AF.4000-M STROKE PER IT4 A STROKE PER ITs-A 00w00 01:59 ORT3-N R-N 030 s4E1P-29AFPP ISCHARGE 1FK-IBSO INLET ISOLATI N MO Run Date 25APR04 12:38 LT.03 STANDARD PUBLICATION Sheet 18 of 26 o Prlnavera Systems, Inc. FL-03 Execution Publcatlon Set

after 25APR04 12:00 U1R28 WORKING SCHEDULE after 25APR04 12:00

  1. U to RESP WO EOID DESCRIPTION RD ES EF RiSK MF Mon Tun 27 02 ]to,14,16lw8o.2210, 2i4i26.813 0l 322 0 OPS-037-06

___ST_..:*r;_

7 D72-21-07 IWP-037-08 OPS PMT &

u!-d[,

I 26APRo4 26APR04 DR-N ML-N

_1-t 0

46 5 jjjj 14i16,19-2022 op :.n3 7ToWP-037-06 PS PMT &ALIGN IENT POST MOD 22 l

6E o~~~~

8 jj OZ14.16*

ALIGNMENT POST MOD 02.00 02:59 , ORT3-N R-N _30611I6PWRTO C-03 SAFEGUARD BUS B 323 1 1IT-700 OPS 77 0-T-0700 REACTOR COOLANT 4 28APR04 26APR04 DR-N ML-N 143 IT.700 R TOR COOLANT VASNT VALVES GAS VENT VALVES 07:00- 10:59 . ORT3-N R-N 0215924 UNIT 1 REACTC t COOLANT GASVI NT VALVES (CS 324 1 X04-005 OPS X-04 IPTE BRIEF TO 1 26APR04 26APR04 DR-N ML-N 0 X04005 BRIEF TO D&M ERGIE IX-04

-DE-NERGIZE IX-04 08:00 08-59 'ORT3-N R-N HIGH VOLTAGE ST lION AUXILIARY SFORMER 325 1 OP0403298 OPS 75 SW-02908-O SW-2908-0 PMT I 26APR04 26APR04 DR-Y MLY 0 OP0403298 SW-2908-0 PMT SOKE STROKE _ 0090 09.59 ORT3-N R-N 0403298 HX.15A-D CONT ECIRC HX EMERGE NCY FCV OPM 328 1 X04-010 OPS X404 CROSSTIE IA-03 & IA-04 1 28APR04 26APR04 DR-N ML-N 0 X4010 CROSSTIE IA-03 & A-C4TOUNIT2 TO UNIT2 09:00 09:59 ORT3-N R-N 327 1 X04-020 OPS X-04 DE-ENERGE X-04 2 26APR04 26APR04 DR-N ML-N 0 X0J-0 ODE-ENERGIZE X

.10:00 11:59 ORT3-N R-N 328 1 OP0300940 OPS 75 RH -0 RH-625 PMT STROKE I 26APR04 26APR04 DR-N ML-N 5 0P00 40RH-625 PMT STOCKE PER IT 390 PERIT39 P _ 11:00 11:59 ORT3-N R-N _ 0300 W0EHX.11B RHR COUTLE TCONTR LOPERATOR 329 1 IT-320A OPS 77 04T-0320A CV-294 UFT TEST (SEAL 4 26APR04 28APRo4 DR-N ML-N o 1T320ACV-294 FT TEST (SEAL R N)

RETURN) 16:00r 20:59 ORT3-NR-N 021590R RCP SEAL RET PIP PENETR THER 330 1 O-RT-32B OPS 77 O-RT-032 POST LLRT OF N2 TO SI 4 26APR04 26APRo4 DR-N ML-N 245 PRT.O32B FDST OF N2 TO Si AC CONTINGENCV ACC CONTINGENCY 17:00 21:59 ORT3-N R-N 0215970 lNITROGEN TO E SlACCUMULA 331 1 IT-270 OPS 77 04T-0270 IN SERVCE TEST OF 2 26APR04 26APR04 DR-N MI-N 9 . r.2 70OIN SERVICE STOFSW-2880, SIUPPLYTO TO SW-2880, SW SUPPLY 20.00c 21:59 ORT3N R-N 0215898 1SW-2880 SERVI EWATER SUPP 332 1 O-RT-027 OPS 77 O-RT-027 RT SEAL RTRNIEXCES 4 26APR04 27APR04 DR-N ML-N 90 RTRNIE XCES

_ I 21:00 0o:59 ORT3-N R-N R CTOR PUMP SEAL RE URN (P.11)0211966 333 1 oP9950097 OPS 75 CV-00371A- CV-371A-S PMT STROKE I 27APR04 27APR04 DR-N ML-Y s 0P9 97 '1As PMT STI PER 12 2 PER IT 320 o 00_00 0059 ORT3-N R-N 99 7ELETDOWN S CONTAIN 334 0 OPS-037-05 OPS 78 D72-15-11 IWP-o37os oPS PMT I 27APR04 27APR04 DR-N ML-N 0 o~s o -asM'P 5 OF PMTAND AU0GN0 POST MOD ANDALIGNMENT POST 03:00 03:59 ORT3-N R-N l I03O6IIPWRT 1 UUU2 SAF 335 1 T-TU-O81M OPS EHI REVISE JET CL = 2 27APRO4 27APRO4 495 T-TU-061 REVISE JET CLEARANCE FOR EHC OL FLUSH FOR EHC AFTER OL 08:00 0w59 336 1 CL1oCO1o 0OPS CL-tOc TURBINE HALL SW a 27APR04 27APR04 DR-N ML-N 315 CuICioo BINEHALLSW VAVE VALVE UNEUPS 08:00 13 59 ORT3-N R-N TURBINE SERVICE WATEfVALVE UNEUPS 337 1 O-RT-0688 OPS 77 O-RT-068 POST LLRT ON P-tA 4 27APR04 27APR04 DR-N M-N 174 P-1A CCW LINES CONINGEN 8 POST LLRTO CCW UNES , 14:00 17:59 ORT3-N R-N C TO AND FRO P.i1A (P-15/PI17) 216001 338 1 RHX99A PPt MILESTONE I 125V IWVP 00-037 A/B 0 28APR04 26APR04 DR-N ML-N 0 RHFM99A1 125V IW P 00-037 AIB TRAIN INTERFERANCE Pt NT TRAIN INTERFERANCE 03:00 02:59 ORT3-N R-N IMOs MO IFCATION 00037 p SEUENCiNG 339 1 480VBOIZ -04 BPPG END 480V BUS B04 0 28APR04 26APR04 DR-N ML-N 89 480V 101ZEND 480V BUS B04 RELATED ENE RGIZED WORK RELATED ENERGIZED 12:00 11:59 ORT3-N R-N lEND OF B04 B IS WORK WINDOIA Run Date 25APRU412:31l LT-03 STANDARD PUBLICATION Sheet 19 of 26 0 Prmavera Systems, Inc. FL-03 Execution Publication Set.

after 25APR04 12:00 after 25APR04 12:00 U1R28 WORKING SCHEDULE I APR t0 RESPI WO I EGID DESCRIPTION I RD ES EF RSK MF SIm 9. I Man 26 TUe 27

.1ST 4 Q.2.4.6. 11.1012.14.1 Q. 2. 4..6 .10112.14.16.1 SWT01Z MILESTONE CLOSE TURBINE . 0

.PPG I 27APR04 27APR04 DR-N ML-N L 0 3401 1 j_ SW1 D1ZCLOSE TURBIN SERncEWATER1WORKWINWY SERVICE WATER WORK 08:00 - OT:59 - ORT3-N R-N . URBINE BULDIN SERVICE WATERl .

. WINDOW ... _ . . . . - ... .

I-P7 4I II RPSH078-l RPI PACIAGE 7B7I INSTALL SHIELDING ON I1 1 25APR04 l 25APR04 I DR-Y ML-Y REGEN FOR CV-296

_:'I- 1___

_-'1 I_

. 10 0A .

-' 1-: '

12:59 . I ORT3-Y RN I____'"I - -1 I' *

.55)IPo7NSTM 1 ' -: _-

itELNG ONRE I .

ONl ENFOR CV-290 1 .- _. _ _.-

l 342 SD.GSI-191 SDS CONT ENGINEERING 24 08APR04 I 28APR04 I DR-Y ML-Y. 64 ,D-SI.191ENGIN1ERING WA.DA -SUMPINTRUSIOt ISSUES WALKDOWN-SUMP 0800A I 14:59. 1.ORT3-YR-N INTRUSION ISSUES'. I , - :1 343 1 TGSUPPORT TGG TG-01-T PROVIDE CRANE. 167 [13APR04 0AY0 T DR- ML-Y O 174 rG PPORTPROVE CRANE, E ARIGGATOOLROOM UPPORT(PT)

RIGGER AND rrr nmn.

I 0900A I 13:59

  • I ORT1YR-N I II m - _

~~~~-

- - - - 1~ I 1 - I 1- I IMS-2028 REINSTALL LHI 5 1 19APR04 1 26APR04 I I , . A . __A . , AA . _A . , __ ...........

DRY ML-Y 1 I

=

TG0302t33d ITGGl fu M-02025 l C rGo},2I33BMS-246; REINSTALL FANO PILOT STOPANDPILOTVALVE 1 I 0900A I11:59 ORT3-YR-N

, I Ton 1 7R I PIIG IR IIG2 0P0 ISNE 9P0 RVM-l nr lu.JlUri'l Lr~ lUJ numuru U..IJ.

'P..-

I s I TrnnnorAn I UWUC14U I i%,% to P;PING CRO ICROSSUNDER PIPING 127 120APR034 I29APRD0. DR-Y ML-Y r24CROSS NDERPIPINI2 INSPECTION / 11W00A 09 59 ORT3-Y R-N _~t~ CR';_ ,- _

7^.I I RENPAIRSECT1N I I mu - i ___ u- L-urn g_

4 1W -. 4 .. I-os°1MAf; I TRU 7R MS-202k7 - REINSTAUL RII UI Z1APRU4 A7',

I 1 I TRU1v17t WAR MS-2U27 27APR04 I DR-Y ML-Y

&wouc l.a II rGOw71 34BMS-207 REINSTALL!RH OP VALVE STOP VALVE 0800A 08&59 ORT3-Y R-N -_ H P TURBINE R 1- M-l1-t4ALI0N

.+,-4' 11 I .. . II (AI'XU4 - I4 UK-T.. ML-T I 3.7 1 1 TG9il19338 TGG 76 PIP;NG Et- MS-27j51- REAL1GN I11 21APR0. 27APR04 IDR-Y MLIT 77 rG91338MS1275* REAIJGN PIPIIG6 REAM OF ALVE4n PIPING DOWNSTREAM 15 00A 09-59' ORT3-Y R-N 4 I MAIN STEAM OF VALVC-PT2

] .o^n .n .^ A ^ A V s V 4X EAO1 .

Al'E^

.0-256 CANNOT ADJUSI 1 U I 22APRK4

^

I Lo306sow IIGG l7 L0256O-U 1 ^eO _^ Of E^

26bARKU4 I UR-Y ML-Y 4 J451 1U rw J 6 5 90 1-256 ANNOTADUST SiiiS PRESS IEG VLV MR SIDE SO PRESS REC 16 00A 16:59 ORT3-Y R-N _ -llD ci I)E SEALOIL PRES URE REGULATC

-. I 1 VL-V _ _wu 7R I §7.....-f--+-t .. I -- ..

'UCtl 1 I T{.n71A117 Tr^n MSR UUO-GHI INSPIEC t AND MAINTAIN I 1 I 23APRU4 I26APR04 UR-Y ML-Y I

_CK VAI VES t0 RS 3UL I" I II "'3 0iQ rGO14117INSPEC NCH F MSR DUO-CHECK _ 08:00A 14:59 ORT3-Y R-N d t-t~ - ,y -~n CHECKS

  • ' 1 I VALVES I II _ _

ru-: nr- VI- - I C 3501' TG0302149 TGG 76 TG-01 MECHANICAL 7 23APR04 26APR04 I DR-Y ML-Y 17 rGTo k MEcH4ACAL OVERSPEvpEVIC~EINWECTIC I OVERSPEED DECE I 09:00A 13:59 ORT3-Y R-N 49

-l_

IRRIMP -NFRATOR ftGNPI S ]C. EE CfIMPI INSPECTION _

_ 7=

351111T 77 T- I 4 J23APR04 26APR04 DR-Y ML-Y n, I 1LO-254 -

ITLi _

ID LW-UZ4 Irw3067741LO-254 LOWER COCKE

.REPACKIG REPACKIGLAND - 1300A 10t59 ORT3-Y R-N - . - *ENEN EAL OL PUMP DIS :HARGE HEADE FOLLOWER COCKED 7e7 I, I I t^-GU3UZ1J39 n


T--- I r __

P-129D IP-1290. REPLACE #6 20 23APR04 2BAPR04 DR-Y ML-Y _ _

1r ITUr lb 0 1=139P-1290 IREPLACE 36 BEA] c P-59A AIR SIDE JulI BEARING UFT PUMP I 19:00A 17:59 ORT3-Y R-N - a- a- a- _

- -i O

GA§ 3531 1 TG-30550-T T-^

-AC-Q TGG IP ___ I 7B I TG-01-T

__ - In INSTALL HP LOWER

. .An

.- 7 rn nnrnn 10

.- nI 24APR04 I 26APR04 I DR-Y ML-Y 1 I V _.

6r 5591NSTAL LOWER HALF BACE INGS HALF BLADE RINGS _ 01:00A 16:59 ORT3-Y R-N - A I WI(4 IRESSURETTURBIN-0302153

--7 3541 I 1 I -- 7A


7 TG-3020 Tt TGG I 761 Tts ^ T_

TG-01-T IA *-

MEASURE e nc STEAM GAND CASINGS HP INNER e Is __ I 12 24APRO4 -------

01OOA I

26APR04 I DR-Y ML-Y.

D 18:59 a An ORT3-Y R-N V I 0.

I. m.

2"SOMEASUR4 HP INNER STEAMZ n I CSGS R P~RESURE -whINF0302153 nrnc--c -v 355111 TGO302141 I TGG 1 76 1 RO-02711 RO-2711 - INTERSTAGEC7 26APR04 26APR04 . DR-Y ML-Y I 0 TG0302141 ORIFICE INSPECT ON ORIICE INSPECTON 07:00 13:59 ORT3-Y R-N 0302141 TG-01 HP1 IRBINE INTRASTAM E DRAIN ORIFIC 356 1 3561 TrvI I bM04 j7 -IITG TGG IX-022

. HX-= REINSTALL ICA MSR I - I 26APRD4 I.... 26APR04 II DR-YV ... MI-YV n 0 TGHX22MS2REJNSTAU. MSR SHEI LSIDE MANWAYS SH-ELLSIDE MANWAYS 07:00 22:59 ORT3-Y R-N MOISTURE SEP RATOR REHEJ

31. JLJ & 1& J.S .L1* I -L Run Date 25APR04 12:38 LT.03 STANDARD PUBLICATION Sheet 20 of 26

' Primavera Systems, Inc. FL-03 Execution Pubilication Set

after 25APR04 12:00 U1R28- WORKING SCHEDULE I after 25APR04 12:00 to RESPI Wo I EQID DESCRIPTION RD ES EF RISK Sun 25 Man z  ; Tito 27 STI >.1.

0; 2. A. R; 8.112114.1 10, 2, A.R.8Amm'12.14.16H1 I I 27APR04 I 3I 358 1 TG0216537 TGO215000 TOG TOG 76 76 P-059A TG-01-T1 1P-59A REPLACE AIR 120 1 26APR04 SIDE SEAL OIL PUMP P1 - EROSION SHIELDS 40 07:00 28APR04 2BAPR04 S

02:59 DR-Y ML-Y ORT3-Y R-N DR-Y ML-Y 128 0

0216537 TGO215000 I-159A REPLM

_A AE AkIRE ;IDAL IR EROS1ON sHILS OVER BRO SLD

  • LP OL PUIMP SIDE EAL OL PUMP DRAIN LN OVER BRG SLOPED T07:0 02:59 ORT3-Y R-N 021 S000= I _U 359 1 TG0214999 TGG 76 TG-01-T2 LP2 - EROSION SHIELDS 30 26APR04 29APR04 DR-Y ML-Y 0 TGO214999MLP - EROSION SHIL4S OVER BRO SLPCDRAIN N-PT2 OVER BRG SLPD DRAIN 07D00 12:59 ORT3-Y R-N 0214999 , . _. =s-380 1 TGHX22AASY TGG 76 HX-22A MSRATUBESIDE 7 26APR04 26APR04 DR-Y ML-Y 122 TGHX2AASYh SR A TUBESIDE RESSSEMBLY REASSEMBLY 0080' 14:59 ORT3Y R-N 0214083w MOISTUJ ESEPARATOR RE) EATER 381 1 TG0302142 TGG 78 RO-02712 RO-2712 -INTERSTAGE 7 26APR04 27APR04 DR-Y ML-Y 0 TG 13021942RC-271%2 . ITERSTAGE ORIFK E INSPECTION ORIFICE INSPECTION 14:00 1259 ORT3-Y R-N 302142- TG-01 HP 382 1 TG0302262 TOG 76 HG-00055 1HG-O REPLACE 20 28APR04 28APR04 DR-Y ML-Y 120 rG03022621oHm I4EPLAC EHYDROGI ENREGULATOR HYDROGEN 1700 0259 ORT3-Y R-N 0302262_

l mm - om i

363 1 TG9818789 TOO 76 TG-01-T ITG-01-T REPLACE 5 26APR04 26APR04 DR-Y ML-Y 123 TG98S 1T AT REPLACE STEM I CHEST FITTNCG STEAM CHEST FITTING 18:00' 22:59 ORT3-Y R-N 981S7S9HIGH PRESSUF ETURBINE 364 1 TG0213959A TOG 76 HX-027 HX-27. CLOSE 10 28APR04 27APR04 DR-Y ML-Y 119 'GOU.3959AH , RBUS COONG 2

GENERATOR BUS 18:00' 17:59 ORT3-Y R-N TO-' 1TG BUS COOUN( I UNI 02139591_t~~

365 1 TG-30530 TOG 76 TG-01-T INSTALL HP L/H INNER 4 28APR04 26APR04 DR-Y ML-Y 0 TG.s053OINSTAUI N STSEA 4GOLD CASINGS STEAM GLD CASINGS 19:00 22.59 ORT3-Y R-N 0302153 HIGH PRESSUF ETURBINE 366 1 TG-30625 TOG 76 TG-01-T OBTAIN TIGHT-WIRE 20 26APR04 27APR04 DR-Y ML-Y 0 TG30625c BTAIN RHEASUREMENTS IIT IF HP CYLINDER MEASUREMENTS OF HP 2300 2259 ORT3-Y R-N HIGH PRE& URETURBINE03 2 53 __

367 1 TG-30690 TOG 76 TG-01-T HAND CLEAN HP CYL 30 28APR04 28APR04 DR-Y ML-Y 0 TG0590HANID HP CYL HO NTAL JOIN HORIZONTAL JOINT 23:00 1259 ORT3-Y R-N HIGH PRESS URE TURBINE3O2 53 368 1 TG0302132 TOG 76 LO-00291 L0-291 - OVERHAUL 24 27APR04 29APR04 DR-Y ML-Y 0 TG03 132LO-291 -OVER AULPESSRE UCING VALVE PRESSURE REDUCING 07:00 14:59 ORT3-Y R-N TURBINE OIL PRESSURE RE UCNG0302132 369 1 TGHX2BASY TOG 76 HX-022B MSR B TUBESIDE 7 27APR04 27APR04 DR-Y ML-Y 112 TO MSR BTUB EREASSEMBLY

_ REASSEMBLY 08:00' 14:59 ORT3-Y R-N MOIST IRE SEPARATOR 024 021EATERO 370 1 TG0403278 TGG 10 Z-W8 GAS LEAK DOWN 20 27APR04 29APR04 DR-Y ML-Y 0 TGW32. GAS LEAK STREAM OF SOLENOI STREAM OF TEST 08:00' 11:59 ORT3-Y R-N TG- metumc n_-CIt=&r,% -fD PM^UI~ ,%KlrrnDnAn,7,.a 371 1 TG0214007 TGG 77 W-045A W-045A - GREASE FAN 1 27APR04 27APR04 DR-Y ML-Y I TG021400 PW-045A.. GREASFAN BEARINGS BEARINGS 09:00' 09:59 ORT3-Y R-N TG-01 TO BUS CO XJNG FAN 02140071 372 1 TGO214008 TOG 77 W-045B W-045B - GREASE FAN I 27APR04 27APR04 DR-Y ML-Y 0 TG02140C lW-045B - GREASE FAN BEARINGS BEARINGS 09:00 09.59 ORT3-Y R-N TGW TG BUS CD XING FAN 0214008 f 373 1 TG0303847 TOG 75 MS-00008 MS.6 - VALVE LEAKING 16 27APR04 28APR04 DR-Y ML-Y 0 G0303947MS G.Y LVE LEAKING BY. VEPLACE VALVE BY, REPLACE VALVE 09.00 00.59 ORT3-Y R-N HP TUF B CYL HTG STEAM SUPPLY YS-2744 BlIrAmNrarwmni3A- ---

374 1 TG0213973 TOG 76 W-045B W-0458 - CHECK FAN 4 27APR04 27APR04 DR-Y ML-Y 0 TOO !13973WI0458 - CHECK FAN BELTS BELTS 1:00W 13:59 ORT3-Y R-N TG-01 TO BUS Cl )OUNG FAN 02139, 3-3751 1 TG0302143 TOG 76 RO.02720 RO-2720 - INTERSYAGE 7 27APR04 28APR04 I DR-Y ML-Y 0 30 3021U RO-220 INTERSTAGE ORIF CE INSPECTION ORIFICE INSPECTION 13.00 11:59 ORT3-Y R-N TG-01 HPT JRBINE INTRASTAG EDRAIN ORIFICEO0 O2143g Run Date 25APR04 a-' -

LT.03 STANDARD PUBLICATION I

I 4 Sheet 21 of 26

.5. 4 Run Date .25APRO4 1238 LT-03 STANDARD PUBLICATION Sheet 21of 26 C Plmavea Systems, Inc. I FL-03 Execution Publication Set l

after 25APR04 12:00 U1R28 WORKIG SCHEDULE after 25APR04 12:00

_ ID MP WO EQID DESCRIPT1ON RD ES EF RISK MF M A26 R 37 1 TG0213972 TGG 76

_BELTS W-45A W-045A - CHECK FAN 4 27APR04 14:00' 27APR04 17.59 ORT3-Y DR-Y ML-Y R-N .1 TG401TG TGO USCOOLUNGFAN)21397200 13 9 7 2W-045A . C) ECK FAN BEL 377 1 TG-8376B TGG 76 HX.3A HX-023 . CLOSE 10 27APR04 28APR04 DR-Y ML-Y 0 .S376BHX423A LOSE TURBINE U BE OL C TURBINE LUBEOL 1500 00-59 ORT3-Y R-N TURBI LUBE OLCOOLE 10213957 378

. {*,1{.E z 1 CL-2B WCC CL 2B MODE 6TO MODE 5 273 25APR04 CHECKLIST 06MAY04 DR-N ML-N 0 2 MODE a TO FODE 5 CHECKLIST a-00A 20-59 CR13N R-N 379 1 T-8620-R WCC 5-YR I CW 5-YR DIER CE 1 25APR04 25APR04 DR-N ML-N 213 r86 R1 CW 5-S DPVER CE REV2-1 REV2-1 12.00 12 59 ORT3-N R-N ICW 5-YRD ERCEREV2-100 620 380 1 T-8640-H WCC DPS-593313 1 OS DPS-5933/34 IC 1 25APR04 25APR04 70 1 03 DPS- 3334 IC REVO-1 REVO-1 1Z00 1259 1 OSDPS-59 MM4ICREVO- 1001 640 381 1 T-1715-R WCC RC-00434 I RC RC-434 MMV 2 25APR04 25APR04 261 r17 RC RC-41 MMV REWV-I I^1 REV-1 _ 12:00 13:59 1RC RC-4 MMv REVO-1 001 15 3821 11 T-591"- WCC CHARGING II CV CHARGING INSIDE 4 25APR04 25APR04 2 T.5 ICcVc~ GINO INSIDE CON AINMENT MMV I-1.

CONTAINVMENTMMV _ 1Z00 15:59 1 CV a IRGING INSIDE ONTAINMENT MMV EVO-10015919 383 1 T-6398-H WCC LT-0C427 1 RP LT-427 IC REV0-1 4 25APR04 25APR04 54 r U 1 RP LT-4 IC REVO-1 1200 15:59 1 RPL 27ICREVO-1001 1 VNCC HHXISA

_ 198 I1 T-1830-H WCC HX-15A I VNCC HX-15A MM 5 25APR04 25APRO4 DR-Y ML-Y 0 r1 SA MM REVO-1 REV0-1 12:00 16:59 ORT3-Y R-N . MM REVI 10011 830 385 1 WP2004-014 WCC P-10B TRANSFER Di WATER 8 25APR04 25APRO4 DR-N ML-N 0 04-014 DIWATERTO RSTAND ALLOW O WARM TO RWST AND ALLOW 1Z00 20.59 ORT3-N R-N 388 0 T-836D-R WCC W-0308 o VNPAB W-30B-M EM 3 25APR04 25APR04 0 r8 "0 VNPAB -3094M EM REV3.1 I OiN200W01)

REV3.1-1 ON 2004.001) 13:00 15:59 R 01t6 387 1 T-8023-R WCC W-021A I 4soV1WP 01-12E8E-FN I 25APR04 25APR04 DR-N ML-N 0 T B R I 480V r P 01-128SE-FN (0S ) EM REVO-1 (01-39) EM REVO-1 15:00 15:59 ORT3-N R-N 001 023M1 480V VP 01-128tE-FN (C 39) EM REVO-I 388 1 T-7458-H WCC CV-=098 1 Cv CV-296 MW 3 25APR04 25APR04 0 T.T7SI CV CV- .9 MMV REVI-1 REVI-1 15:00 17:5 o 456_1 001 CV-29s MMV REV1 1 389 1 T-2765-H WCC CV-01296 1 Cv CV-1 296 MMV 2 25APR04 25APR04 I T. 755 1 CV GI 1290 MMV REVO-1 REVO1 _ 16:00 17:59 0 12765I1 CV-1296 MMV 1 390 1 T-1305-R WCC CV-0313A- 1 CV CV-313A-S IC I 25APR04 25APR04 5 1305-R1 CV t V-313A-S IC REVO-REVD-1 17:00 17:59 01130511 CV-33A-St ICRE 1 391 1 T-8437-R WCC LC-471B-YA I RPLC471B-YA IC 1 25APR04 25APR04 118 37.RI RP 1 -47IB-YAIC REVC 2 REVO-2 17.00 17:59 0184371 R1 LC-471B-YA IC RE D2 392 1 T-1831-H WCC HX-15A 1VNCC HX-15AMM 2 25APR04 25APR04 DR-Y ML-Y 0 j131411 VNC HXItSA MM REVI I REV1-1 17:00 1s59 ORT3-Y R-N o1131H1 tNCC HX-1sA MM EVI-1 393 1 T-8378-R WCC P-2A 1CV P-2A MM REVO-1 2 25APR04 25APRO4 DR-N ML-N 195 CV r ZA MM REVO-1 I75R1 17:00 19 59 ORT3-N R-N 013711 n P-2A MM REV0-RunDate 25APR04 12:38 LT-03 STANDARD. PUBLICATION Sheet 22 of 26 Primavera Sstems Incm FL-03 Execution Publication Set

after 25APR04 12:00 U1R28 WORKING SCHEDULE after 25A PR4 12:00 IUl ID lSPQ WO I E0D E DESCRJIDON RD ES EF RISK MVFS1 IIun2 APR 2 18. ue2 ST . . .- - : .I ..  ! ' .I -. I. . 131011214.1&1&20.221 0 2f4. 6 *8 1012M.1618l211221 0--2.4,6. 8 11012.14,16,1

~~'liiWuqItelga -_*_1 3941 1 T-1679-R 1 WC P-037C 1 LO P-37C EM REVO-1 I 25APR04 I 25APR04 19W00 19.

104 T71679-R 00116791 1

L P-37C EM REVO-1

.0 P-37C EM REVO o1 395 1 T-2615-H WCC SW-2907 1 SW SW-2907 EM 2 25APR04 25APR04 DR-N ML-N 0 T-26151 I WSW.2907 EM RE% 0-1 REV0-1 19-00W 20:59. ORT3-N R-N 0012615W I SW SW-2907 EM lEV0.1 396 1 T-2616-H WCC SW-2908 I SW SW-2908 EM 3 25APR04 25APR04 DR-Y ML-Y 0 1 T.2616-H 2 WSW.2908 EM RE% 0-1 REVO.1 lgr.0O 21:59 ORT3-Y R-N 0012616f9 1SW SW-29Q8 Eh REVG-1 397 1 T-1830-R WCC HX-15A 1VNCC HX-1SA MM 2 25APR04 25APR04 DR-Y ML-Y 122 T.1830-1RI INCC HX.1 SA MMI EVm.i REVOQ1 20a00 21:59 ORT3-YR-N 00118301 1VNCCHX-15AN V REV0-1 398 1 T-841 t-H WCC 01-164 1 CV 01-164 OPS REV0-1 5 25APR04 26APR04 34 T-641141 I CV 01-1U4 OPS RI VO-i

_ _ _ 21:00 01:59 0016411 _1 CV0O1-6 OPS REVO-1 399 1 T-6938-R WCC D72-21-Q7 1 125V IWP O-037-06 EM 1 25APR04 25APR04 0 1 T-693 R 125V IWP 000 17-06 EM REVO-1 REVO-1 23:00 23:59 0016 3811 125VIWPOO 037-08 EM REVO-1 400 1 T-752t-R WCC MS-00231 I MS MS-231 EM REVD-1 1 25APR04 25APR04 348 .R 1 MS MS-231Ea REVO-1 23:00 23:59 0017 2111 MS MS-231E MREVO-1 401 0 T-6419-H WCC A4-01277 OIALA-I127MMREVO-1 2 26APR04 26APR04 13 T-6 9-H0OIAtA.1277MI REVO-1

_ 00:00 01:59 001 419fl0 IA IA-1271 MM REVO-1 402 1 T-2704-H WCC CC-762A I CC CC-762A MMV 3 26APR04 26APR04 25 T-2Z WH I CC CC-762A WMV REVO-1 REVW-1 Qk0WC 02:59 001 r.041W CC CC- '62A MMV REVD-1 403 1 T-2683-H WCC CC-7638 1 CC CC-7B38 MMV 4 26APR04 26APR04 24 T-21 1I CC CC-7638 HMV REVO-1 REVO-1 00.00 03:59 001 683_1 CCCC .763B MMV REVO-1 404 1 T-6123-H WCC CV-00275 1CV CV-275 MMV 4 26APR04 28APR04 2 T-61 MMl1 CVCV-275 M HV REVO-1 REVO-1 0W000 03:59 001 1231_ CVCM *275 MMV REVO-1 405 1 7T-1780-Q WCC HX-15A I VNCC HX-15AMMV 5 26APR04 28APR04 DR-Y ML-Y 90 T.1l 01 VNCC HX.1& MMV REV0-1 REVO-1 00.0 04:59 ORT3-Y R-N 001 17809 1 VNC HX-ISA MMV REV )-1 406 1 T-9790-R WCC TG-01-G I TUTG-01-G EM REVO-1 1 26APR04 28APR04 0 1

  • 9790R TU TG-01 OEM REVO-1 0Z00 02:59 00979031 TU TG- 1-G EM REV-1 407 1 T-1271-H WCC P-025A I CS P-25A OL MM 2 28APR04 26APR04 145 .12714-I CS P-25A DL MM REVO-1 REV0-1 0Z00- 03:59 011271E1 CSP- SA OIL MM REVO-1 408 1 T-7106-H WCC TG-01-G 1 TU TG-01-G EM REVI-1 2 26APR04 26APR04 0 .7106UH1 TUT.-01 OEM REVji1 02:00 03:59 017106E1 TUTG 01-G EM REVI-1 409 1 T-8295-H WCC SGBD I MS SGBD MMV REVD-1 2 26APR04 26APR04 156 .829541 MS SGBC MMV REVO41 020W 03:59 01B295f1 MSSC D MMV REVO-1 410 1 T-06-H WCC ICP-5.69B 1 RH ICP-5.69B IC 2 26APR04 28APR04 0 T7-68-H1 RH ICI -5.69B IC REVO-1 REVO-1 0400 05:59 W1068E1 R- ICP-5.69B IC REVO 411 1 T-5819-H WCC P-010B 1 RH P-10B MM REVO-1 3 26APR04 28APR04 1 T-5619 I RH P.1 0OMM REVO-1

_ I I 04:W 06:59 00158191 F 4 P-1B MM REVO-412 I T-7106-R WCC IITUTG-01-GEMREVI-11 I 2BAPR04 28APR04 I T.7106 .R TUT 3-01-G EM REVI-1 TG-01-G 05:00 05:59 0017106E1 nT TG-01-G EM REVI-

_________ L .4 L .4. L 4. 4 Run Date 25APR04 12:38 LT-03 STANDARD PUBLICATION Sheet 23 of 26 O Prnmavem Systems, Inc. I FL-03 Execution Publication Set

after 25APR04 12:00 U1R28 WORKING SCHEDULE ] after 25APR04 12:00

  1. U I D IRESPI WO I EQI DESCRPTN RD_ F EF RISK: MFI APR 6 sr _l . .. . . .. ,  : _ .s ... ,, : .; .'... _ i701.14.16.lF,2n.a21n.2;i4 .6 ,-8 .1011214,16;1,8,20,2210o.2,4 i6. 8 .10OZ14,16.1 V

hlifsE = _-K.!e 4131 1 T-71W-H wcc TO-1-Go j1TUTG-01-G EMREV2-1j I 26APR04 26APR04 0 T-7107-HI 'ri ;-01-G EM REV2.

05:00 05:59 001710711 TU TG-01-G EM REV2-414 1 T-7147-H WCC 1F52-122 1345KV1F52-122APS 1 26APR04 12APR04 0 REVI-1 05:00 05:59 T-71474 1I 345F V 1F52.122 APS RE /1-1 001714711 34X KV lF52-122 APS F EV1-1 415 1 T1 308-H WCC CV-00371A- 1CV CV-371A-S IC 2 26APR04 28APR04 10 1 REVO-1 05:00 07:59 T.13OM6H CVCV437tA-S IC REVU-'

0011306"1 CV CV-371A-S IC R 416 1 T-2650-R WCC 1F52-122 1345KV 1F52-122 APS 2 26APR04 26APR04 0 3 451 V 1F52-122 APS RE REVO-I 05:00 07:59 T.2650-Rl 0012650M1 345KV 1F52-122 AF REV0-1 417 1 T-6596-R WCC HX-1B 1 MS HX-1B MT EPT 4 26APR04 28APR04 64 T4596- 1 MS - X-1S MT EPT REVO 1 REVO-1 05:00 09:59 00165961 E1MS HX-1B MTE REVO-1 418 1 T-7969-H WCC CV LID I CV CV LAD SYSIVCT 4 26APR04 26APR04 0 VLID SYStVCT MM REVO.11

_ MMVREVO.1-1 05:00 09:59 T-7969-4 1 CVC II CV CV LIDSYS/ MW REVO.1-1 0017983 419 1 T-7458-H WCC CV LUD I CVCVULD SYSCT 6 26APR04 28APRo4 0 VLID SYSVCT OP!

OPS REVO-1 05:00 11:59 001745840 S/CT OPS REVD-1 1 CVCVULDS 420 1 T-7465-H WCC CV L/D 1 CV CV LID SYSNCT 6 26APR04 2APR04 0 OPS REVI-1 05:00 11:59 T.7465.1I C V VL/O SYSIVCT OP! REVI.1 00174653w _1CVCVLIDS OPS REV1-1 421 1 T-6935-H WCC D72-16-1 1 1 125V IWP 00-037-05 EM I 26APR04 26APR04 0 T-6935-H I I 5V IWP 00-037-051 M REVO-1 4 REVO-1 07:00 07:59 001693531 125V IWP 00-037-0. EM REVO-1 422 1 T-7970-H WCC CV-257 I CV CV-257 MM 4 26APR04 28APR04 17 REVO.1.1 08:00 11:59 T-7970-1 CV CV-257 MM RE% 0.1-1 00179701 M1 CVCV-257 & MREVO.t1-423 1 T-2616-R WCC SW-2908 I SW SW-2908 EM I 26APR04 26APR04 DR-Y ML-Y 118 REV0-1 10 00 10.59 ORT3-Y R-N T-261S. I1 SWSW-2908EI REVW-I 0012U1 Bs1 SWSW-29081 M REVO-1 424 1 T-7108-H WCC TG-01-G 1TU TGO-1-G EM REV3-1 I 28APR04 28APR04 0 11:00 11:59 UJ I TU TG01-0 El REV3-1 T-710i 0831 TUTG-01-G ;M REV341 0017, 425 1 T-7150-H WCC 1F52-122 1345KV 1F52-122APS 1 26APR04 26APR04 0 REV2-1 11:00 IHI 345KV 1F52.1 2 APS REV2-1 11:59 T-715 5031 345KV 1F52S 22 APS REV2-1 428 1 T-1714-R WCC LT-433 1RC LT-433 ICREV0-1 2 26APR04 28APR04 38 0011' Eft1 I T.1711 Al RC LT-433 IC I 11:00 1Z:59 14f1 RCLT-433 C REVO-1 001f 427 1 T-7107-R WCC T-01-G 1TUTG-01-G EMREV2-1 1 28APR04 26APR04 138 MREV2-1 1Z-00 1259 T-71 07-RtTU Tr0141 110711 TU TG-- EM REV2-1 001t 428 1 T-7147-R WCC 1F52-122 1345KV1F52-122APS T 28APR04 26APR04 138 g74R1 345KV F52- 22 APS REV1-1 REVI-1 12:00 12:59 T-71 t14711 345KV IFS -122 APS REV1-1 429 1 T-745-R. WCC CV LD 1 CV CV LID SYSIVCT 1 26APR04 28APR04 61 001~

58-RI CV CV LID 3 'StVCT OPS REVO-1 OPS REVO-1 _ 1Z00 12:59 T-74 r45811 CVCV LID )YSNCT OPS REVO I 430 1 T.7465-R WCC CV UD 1CV CV UD SYSNCT 1 26APRo4 26APR04 101 001 OPSREVI1- 12:00 GSRI CV CVLIDS 'SNCT OPS REV1-1 12:59 T74 r46851 CVCVLID YSNCT OPS REVI 1 - I 1 001 43111 T-8017-R WCC FP-0370S I FP FP75 MM REV0-21 I 26APR4I 26APR04 88 M REVO-2 1ZOO 159 TU 17-RI FP FP-37051

.3LL______ ______.1 ....... ...

101731 FP FP-370t MM REVO-2 I1 I Run Date 25APRO4 12:38l LT-03 STANDARD PUBUCATION I Sheet 24 of 26 CPrimavera Sytems.,Inc. I FL-03 Execution Publication Set I

after 25APR04 12:00 U1R28 WORKING SCHEDULE after 25APR04 12:00

  1. Ul T-0924-H wCc STTh.

IRE5P WO IF.=

A52-38 DESCRIITION 1 4.16KV A52-36 EM RD 2

ES 28APR04 2BAPR04 RISK

~t.

IF I 0

APRR M 20 _

6S8 _

4321 t TO9i 24411 4.16KVA52-Z 6 EM REV1-I REV0-1 12.00 13:59 001 3924K 1 4.16KVSW 2.36 EM REVO-1 433 1 T-2ZS2-H WCC X-44 14.t6KVX-4APSREVO-1 3 26APR04 28APR04 0 T-2f 52441 4.I1KVX-4A mS REV6-1 12:00 14:59 001 2652[j1 4.1tKV C- APS REVO-1 434 1 T-9895-R WCC W-001D1 tVNCCW-IDIIID2EM 1 26APR04 28APR04 0 1 895-R VNCCW-1t 111D2 EM REVO-1 REV0-1 13:00 13:59 040939551 VNCCW- 11/102 EM REVO-'

435 1 T-6123-R WCC CV-00275 1 CVCV-275MMV 3 26APR04 28APR04 112 1 T-4 123-R CVCV-275 lMV REVO-1 REV0-1 13:00 15:59 18123: 1 cvCm-275 MMV REVO-1 435 1 T-2746-R WCC P-025A 1 CS P-25A MM REV0-1 1 26APR04 28APR04 137 T7-480 1

CS pWI SA MM REV0LI 16:00 16559 001274681 CS- -25A MM REV0-1 437 0 T-6418-R WCC IA-1258 OIAUlr1258MMREV0-1 I 2BAPR04 28APR04 179 T-6418&RO IA UA- 58 MM REVO-1 16:00 16:59 001648160 IA [A1259 MM REVO01 438 1 T-0924-R WCC A52-36 1 4.16KVA52-38 EM 1 26APR04 28APR04 70 T-0924-R1 4.161 YA52-36 EM REW REVO-1 17:00 17:59 001092451 4.1 SKV A52436 EM RE\ -L1 439 1 T-6557-R WCC HX-24 1 CS HX-24 EPT REVD-1 I 26APRQ4 26APR04 DR-Y ML-Y 450 T-0557.RI CSI X-24EPT REVO.1 17:00 17:59 ORT3-Y R-N 001655751 CS HX-24 EPT REVO-1 440 1 T-0686-R WCC ICP-5.698 1 RH ICP-5.69B IC

  • 2 26APR04 28APR04 75 TM-86R I RH Ii p.5 .691 IC REVO-1 3 REVO-1 17:00 19.59 00106866"1 RH ICP-5.69B IC RE VD1 441 1 T-9892-R WCC W-OOIAI I VNCC W-tAIIIA2 EM I 26APR04 2WAPR04 DR.Y ML-Y 108 T-992-R IVNCC W.IAIIIA2 EM REVO-1 I I REVD-_ 2t:00 21:59 ORT3-Y R-N 0009892 II VNCCW-1A1I1A 2 EM REVO-1 442 1 T-13Q6rR WCC CV-00371A- 1 CV CV-371A-S IC 1 26APR04 26APRQ4 0 1 CV CV-371A-S IC REW-I T-130 REVO-1 23:00 23:59 0011; 0651 CV CV-371A- SIC REVO-1 443 1 T-6935-R WCC D72-16-11 1 125V IWP 00-037-05 EM 1 27APRo4 27APR04 0 T-693! 1 125VIWP 00-0 P-05 EM REVO-1 REVO-1 01:00 01:59 1 125V IWP 00 '37-05 EM REVQ-1 169355 444 0 T-6419-R WCC LA1277 OIAIA-1277MMREV0.1 2 27APR04 27APR04 275 0

.6419- IA WI12T 'MM REVO-1 02:00 0359 1016419E0 IA WI 277 MM REVO-I 445 1 T-1273-R WCC HX-21A I CS HX-21A MM REV0-t 3 27APR04 27APR04 235 .1273-RI CS HX-21 PMM REVO-1 0Z:00 04:59 1CS HX-21A MM REV0-I 1011273^

448 1 T-3784-R WCC POSr466 I CS POSr4EE EM 1 27APR04 27APR04 24 TJ7-4T4Rl CS POE .468 EM REVO-1 REVW-1 03:00 03:59 1C POS-468 EM REV0- 100137843 447 1 T-8598-R WCC WG-1788-0 I WG W-1788O MM I I I 27APR04 I 27APR04 I DR-Y ML-Y 183 T. 1598 RI WGWG-1 88- MM REVO-1 REVO-1 03:00 03:59 ORT3-N R-N IWGW -1788-0 MM REVO- 10018595

44) 1 T-8599-R WCC WG.1789-0 1WG WG-178 MM I 1 1 27APR04 I 27APRO4 I DR-Y ML-Y 192 Ljq "WGWG.17 39-0 MM REV0-1 REV0-1 03:00 03:59 ORT3-N R-N 1 WGW .1789-O MM REV0D 001 s859 449 1 T-7047-H I WCCI 1 P-02sAM 1 CS P-28A-M EM REVI-11 1 27APR04 27APR04 DR-Y ML-Y 1 5 T.7047-H 1

CS P-2 "M EM REVI.1

_ - _ _ _04:00 04:59 ORT3Y R-R S P-28ArM EM REV -100170471 4501 1 T-7992-R MS.2016 I MS MS-201S MMV 121 27APR04 I 27APR04 2S3 WCC r.7992.R 1 M MS-2 316 MMV REVO-1 REVC-1 04:00 05:59 1ME MS-2016 MW REV 10017992=

_ _ __ . _ _ _ _ _

  • 1. 1 IRun Date 25APR04 12:381 LT.03 STANDARD PUBLICATION l Sheet 25 of 26 O Pima Svstems, Inc. FL-03 Executlon Publication Set I

-.- ..-- -.. - .- ------ - -- -- -... - .- -- I - -

after 25APR04 12:00 WORKING SCHEDULE .

J

_rU1R2 ar 25APR04 12:00 4 U ID lRE5P WO EOID DESCRInNON RD t ES EF RISK MF S _n_25_'_APR______

11 ST , .. A.12Z14,1&1a2Q,2210Oj21.4.I6. 8,11Z14.161&2(12210.l2.4, 6.8.l1ml2.l4,16,1 451

R;tlE _

1 T-2615-R WCC SW-2907 I SW SW-2907 EM 2 27APR04 27APR04 DR-N ML-N 99 41 i@ 1 ji T.261 EM REV0.

REVO-1 05:00 07.59 ORT3-N RT 1 SW-2907 EM RE $1 C0.2615 2W 27 452 1 T-6595-R WCC HX-lA 1 MS HX-1A MT EPT 1 27APR04 27APR04 41 .6595.R I MS HX1 MT EPT REVO-1 RE'V0-1 08 00 0a59 1 MS HX-1A MT EF r REV0-1 0016595 453 1 T-6915-R WCC MS-02035 1 MS MS-2035 IC REVO-1 2 27APR04 27APR04 0 T 6915R1 MS REVO-1 I2035IC 0800 09-59 1 MS MS-2035 REVO-1 0016915 454 1 T.1301.R WCC P-028A I CS P-28A MM REVO-1 4 27APR04 27APR04 283 T-1301-R 1 CS 28A MM REVO-1 08:00 11:59 1 CS P-28A M REV0 -10011301 455 1 T-7043-R WCC P-02SAM 1 CS P-2SA-M EM REV0- 1 27APR04 27APR04 DR-Y ML-Y 0 T.7043-R CS AEM REV0.

I 10 00 10 59 ORT3-Y R-N I CS P-28A- I EM REVO-10017 3 458 1 T-8034"H WCC TG-01-T 11TU TG-01-T 3 27APR04 27APR04 0 T.034-H1 TU TG01-T REV7-1 RESTORE EH TO S MOKE VALVES REV7-l1(RESTORE EH T 10:00 12:59 1 Tu T 1-T REV7-1 001 W4 457 1 T-064-H WCC 62/AD1 I MRR 62/A01 RMP 1 27APR04, 27APR04 0 T.0964-H 1 URR 621A01 RMP 9 02-1 EM REVO-1 9302-1 EM REVO-1 1100 11 59 1 M R 62VA01 RMP 930 -1 EM REV0-10010 3 458 1 T-24071-H WCC RMP 1 4.16KV RMP 9364-1 1 27APR04 27APR04 41 T-2 4) j;4.16KV RMP 364-1 UMBIUCALC ORD EM REVO-1 UMBIUCAL CORD EM 11:00 t 1:59 14.16KV RMP 9 s4-1 UMBILICAL CO D EM REV0-1 0012 073 459 1 T-2434-R WCC CC-754A I CC CC-754A EM 2 27APR04 27APRo4 DR-Y ML-Y 0 T-2434-R I CC CC r54A EM REVO-1 4 REVO-1 12_00 13:59 ORT3-Y R-N I CC CC- 54A EM REV0- 001 434f 480 1 T-2683-R WCC CC-7e38 1CC CC-7'38 MMV 1 27APR04 27APR04 178 ra263Rlt CC CC-7 B MMV REVO-1 REVO-1 13:00 13:59 1 CCcC- ,638 MMV REVO-10 126831 461 1 T-2704-R WCC CC-762A 1 CC CC-762A MMV 1 27APR04 27APR04 0 r.274R1 CC CC-7 zA MMV REVO-1 REVO-1 13:00 13:59 1 CC CC- 82A MMV REV0-10 127041 462 1 T-8034-R WCC TG-01-T 1 TU TO-01-T REV7-1 1 27APR04 27APR04 491 T-8034-RI TG-l01-TREV7-1 13:00 13:59 1 TTG-01-TREV7-10 180341v 463 1 T-7047-R WCC P-028a-M 1 CS P28.AM EM REVI-1 I 27APR04 27APR04 DR-Y ML-Y 20 T7047-R I CS P.i6M EM REVI-1 15:00 15:59 ORT3-Y R-N 1 C' P-28AM EM REVI1 0017047 464 1 T-f411-R WCC 01-164 1 CVO1-64OPSREVO-1 3 27APR04 27APR04 116 T8411R1 CVa 164 OPS REVO-1 1:0 17:59 1 O0I-1640PS 1001o6411,I 1

465 1 T-i970-R WCC CV-257 1 CV CV-2s7 MM 3 27APR04 27APR04 133 T-7970R CV CV- W MM REV0I-1 REVO.1-1 15X00 17:59 I CV CV-257 MM REV0.1. I001770 un Date 25APR04 12:38 LT-03 STANDARD PUBUCATION Sheet 26 of 26 o Primavema stems, Inc. FL-03 Executiort Publicatlon Set

Sheet I 012 RunDate Run Date 25APR04 12:59I Sbeet of 2 Work Activity Risk Assignment I

,U l ACT 10 WOl GRP I @TJ D-HPE RT3N0 EQUIPMENT Activity Description S .:.RISKT Cal DUR START

,ID -21 FINISH Mo . ue27

  • ed28
  • T 2 rl 30

.6 2 I Sun

.. l21F1096n21a18 MD I EM-BMFP-01 76 EM DR-Y ML-Y P-028B-M P28B REMOVE OIL LINES 8 2 25APR04 25APR04 STEAM GENERATOR FEED PUMP MOTOR ORT3-N R-M AND MOTOR COVERS ,08:WOA 13:59 0 12035 - 128EM 1 EM0305165 76 EM DR-N ML-N D.205 UNIT I MONTHLY U 4 26APR04 26APR04 0125V DC STATION BATTERY ORT3-N R-M NON-SAFETY 125V DC _ 00:00' 03:59 0305165 - 80681 1 EM0305168 76 EM DR-N ML-N D-205 UNIT 1 QUARTERLY U 4 26APR04 26APR04 0125V DC STATION BATTERY ORT3-N R-M NON-SAFETY 125V DC I 00:00' 03:59 0305168 - 80681 1 EM-BMFP-02 76 EM DR-Y ML-Y P-028B-M P28B INSTALL MOTOR 8 4 26APR04 26APR04 OSTEAM GENERATOR FEED PUMP MOTOR I ORT3-N R-M RIGGING EQUIPMENT 13:00 16:59 0312035 - 128EM I EM0216638 40 EM DR-N ML-N P-00Ot-M PERFORM REPAIRS FOR U 140 26APR04 03MAY04 I A ORT3-N R-M P-IB HIGH BREAKAWAY 19:00 02:59 0216638 - 128EM 1 EM-84801 76 EM DR-N ML-N RPI AT HEAD RPI COIL U 10 26APR04 27APR04 mRPI SYSTEM MULTI ANDIOR NON-NUMBERED EQUIPMENT ORT3-N R-M RESISTANCEtlNDUCTANCE 20:00 05:59 0215213 - 128EM t EM-8480J 76 EM DR-N ML-N R-1 AT HEAD CRDM COIL U 10 26APR04 27APR04 =REACTOR VESSEL AND ASSEMBLY ORT3-N R-M RESISTANCE/INDUCTANCE 20:00 05:59 0215214 - 128EM 1 EM0216187 76 EM DR-N ML-N E-01 INSPECT AND MAINTAIN 9 10 28APR04 27APR04 ED=#TG-0I TURBINE GENERATOR EXCITER ORT3-N R-M EXCITER FUSES PER MWP 20:00 20:59 0216167 - 128EM I EM-BMFP-03 76 EM DR-Y ML-Y P-028B-M P28B REMOVE MOTOR TOP 8 4 27APR04 27APR04 OSTEAM GENERATOR FEED PUMP MOTOR ORT3-N R-M COVER 08:00 11:59 0312035 - 128EM EM0215225 76 EM DR-N ML-N W-004A-M PERFORM MCE W-004A-M U 4 27APR04 27APR04 [OCONTAINMENT REACTOR CAVITY COOUNG FAN MOTOI ORT3-N R-M (tB52-317Mt18-31) 09:00 12:59 0215225 - 128EM I EM0215226 76 EM DR-N ML-N W-004B-M PERFORM MCE W-004B-M U 4 27APR04 27APR04 OCONTAINMENT REACTOR CAVlY COOUNG FAN MOTOI ORT3-NRM (1B52-318M1B-31). _ 13:00 16:59 0215228 - 128EM

- EuI - - _ - - -

2 IC0407898 76 IC DR-Y ML-Y LT.00935 LT-9341935 LEVEL 1 5 25APR04 25APR04 -348 SI ACCUMULATOR LEVEL TRANSMITTER ORT3-Y R-M DEVIATION .08:WA. 16:59 0 07898- 1281C El-1 IC2.16SUP EE 76 IC5 DR-N ML-Y ICP-02016 ICP 2.16 OVERPRESSURE illS U

_E __

2 27APR04 27APR04 IWOVERPRESSURIZAnON MmGATING SYSTEM ORT-3 N R-M MmGATION BISTABLE CHK 05:00 07:59 0300809 - 1281C ORT3-Y R-H STUDS 11:WCA 07:59 -214134 128MM 1 M"85 76 MM3 I

DR-N ML-N

-a -

P-001B P-1, INSPECT/ MAINTAIN 5-44 24APR04 29APR04 REACTOR COOLANT PUMP ORT3-N R-M SEAL RMP.900Z-5. .11:oA 11:59 .214119 128MM I MM0216627 76 MMV DR-N ML-N CV-01296 CV.1296-INSTALL NEW 5 40 28APR04 29APR04 . [2-LRuXLIARY CHARGING LINE ISOLATI ORT3-N R-M TRIM PER MODO0600 0215827 - 128MM 01 0P0215508 77 OP2 DR-N ML-N O -TS-083 .TS-83.07-03 EMERGENCY 2 1 25APR04 25APR04 1 m.03 EMERGENCY DIESEL GENERATOR MONTHLY

- ORT3-NR-M DIESEL 09:WOA 12:59 C1!15508 - B06B1

_NMCWE l LT-81 HUMAN ERROR RISK BARCHART FL-S1 HUMAN ERROR POTENTIAL C Primavera Systems, Inc.

A PBNP U1 Refueling 28 Outage I

Sheet2of2 Date Run Date Run 25APR04 12:59I Work Activity Risk Assignment I . .

Sheet1.2 of 2 1-ACT WO GRP ST Inrpin l l HPE RIK MS EQUIPMENT ID 1 AMtlyjty Cal CAI uRt SART START FIIS FI21H093rI2 21ST 21E 0 APR 2RI I MAY 147,6rI2 810.6[E 21I .

o OP0215638 77 OP3 DR-N ML-N 04T-0014.3 IT-14, FOTRANSFER 3 3 25APR04 25APR04 0G-03 EDO FUEL OIL TRANSFER SYSTEM PUMPSIVALVES ORT3-N R-M SYSTEM PUMPSI 16:00' 18:59 0215638- .306B1 0 OP0215640 77 OP3 DR-N ML-N O-IT-0100.3 IT-100, SEAT LKG TEST OF 3 3 25APR04 25APR04 0G.3 EDG SEAT LKG ESTI OF DACOMP DISCH CHKVLVS ORT3-N R-M DA-52 AND .16:00' 18:59 0215640 - B06B1 gMIE.. _ -. _ __ _ _ _

1 RPIC-030 OPS DR-N ML-N O-RP-001C FUEL MOTION AND INSERT 1 92 25APR04 29APR04 REFUENG ORT3-N R-M SHUFFLE 08:DOA 07:59 1 80P 1 SOP-CV-010 OPS DR-N ML-N T-04 ISOLATE &DEPRESSURIZE U 8 25APR04 25APR04 ORT3-N R-M THE VCT PER SOP-CV-002 12:00 20:59 280P 1 01-164-B OPS DR-N ML-N T-008C PREPARE C HUT FOR U 10 25APR04 26APR04 ORT3-N R.M ICV-257 REPLACEMENT 21:00 07:59 12BOP 1 SOP-CV-015 OPS DR-N ML-N T-004 DRAIN LETDOWN PER T 8 25APR04 26APR04 O ORT3-N R-M SOP-CV-002 SECT 5.2 21:00 04:59 1280P NMC IWE LT81 HUMAN ERROR RISK BARCHART R _ PBNP U1 Rfuieling 28 Outage FL-ai HUMAN ERROR POTENTIAL 0 Primavera Systems, Inc.