. , 3906037860 T.S.6.9.1.6 l
PHILADELPHIA ELECTRIC COMPANY l L,lMERICK GENER ATING ST ATION P. O. DOX A S AN ATOG A, PENNSYLV ANI A 19444 l (216) 3271200, EXT. 3000 Oft AH AM M. LEITCH vi.. ........,
October 5, 1990 !
6.......................
50-353 License Nos. NPF-39 NPF-85 j r
, U. S. Nuclear Regulatory Commission '
Document Control Desk Attnt Washington, DC 20555 i
'I
Subject:
Limerick Generating Station Monthly Operating Report For i Units 1 and 2 i
Enclosed are the monthly operating reports for Limerick Units :
1 and 2 for the month of September, 1990 forwarded pursuant to Technical Specification 6.9.1.6.
i t
t 1
Very tr ly urs, I
- +
l KWM/dms {
4 Enclosure i i
cci T. T. Martin, Administrator, Region I, USNRC T. J. Kenny, USNRC Senior Resident Inspector I
l l
9010160108 yovywe !
PDR ADOCK 05000332 .. i R PDC / '
i
/ j
39060378601, l
Dookst No. #60 362 )
Attachment to MontNy .;
Operating Report for l September 1990
[ UMERICK OENERATING STATION - l UNn i J SEPTEMBER 1 THROUGH SEPTEMBER 30,1990 l l l
- - 1. NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES l Limerick Unt 1 began the month of September at a nominal 100% of rated thermal power, l
- On September 7, at approximately 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />, a reactor power decrease was begun. The reactor
- was manually scrammed at 2221 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.450905e-4 months <br />, from approximately 32% power, to the third refueling !
outage Operational Condition (OPCON) 4 was entered on September 8 and 6was entered ,
on SepteW2er 13. ON September 24, OPCON 5* was entered and the first fuel bundle was !
offloaded from the core. Limerick Unit 1 ended the month of September in OPCON 6* with .
, approximately one-quarter of the core off-loaded, in day 23 of a scheduled 75 day refueling outage, j Note: OPCON 5* equates to fuel movement. t Operational events that occurred during the month of September included: -)
- On September 16, D13 Diesel Generator (D/G) was run for its LOCA4.OOP test. As part .i of the LOOP testing, the diesel was started on a bus under voltage signal. It automatloally !
closed onto the bus and loaded, however, a bus voltage of greater than 5.7 kV was noted. !
Following voltage verification, the diesel was secured. The D13 sieguard bus and .
associated loads were declared inoperable. D13 safeguard bus and assochied loads were - _l' declared operable following various testing and receipt of an engineering evaluation on -
September 18. Following 013 D/G voltage regulator troubleshooting , repair of a suspect l rectifier selector switch, and replacement of a shutdown relay, a test run was successfully
- performod on September 19. The LOCA/ LOOP test was next performed, resulting in a bus t, over voltage condition similar to the 9/15 event. The diesel was run several times during ;
the following week for System Engineer and vendor troubleshooting of the voltage regulator, ,
The D13 D/G was run satisfactorNy on September 28. The diesel was then started on - t September 29 for performance of the LOCA-LOOP test. With the #1 rectifer bar* selected, -l a bus over voltage condition occurred and the diesel was shutdown. The diesel was -
restarted using the #2 rectifier bank and the LOCA-LOOP testing was completed i antisfactorly, The D13 D/G was declared operable on September 30. ;
II. CHAT i FNGES TO THE MA!N STEAM SAFETY RELIEF VALVES l
There were no challenges to the Main Steam Safety Relief Valves during the month of September.
l \
l 5 l
1
4
- 1 , is 4
, .33- ,
+
.. , a- i :.
c: 4- .:-
.r,.
, ' t ,
l
@i > ,
t .
_N.' ?4' j ; ;.f.. .
f.
s .
A
- M,, ,
s 3
'l i.
Q ,-'. h a
- $ ;:7 Q s s
O~. .
.i .
- -3 . - .
', b , *
,Ftf') '. i. .
l
.i n
)
t . I.
1 r 5
,j F
t , I t V
-l-
, -; l .\ <
C. i
,. 't id ; it m ,
75 ;
i
't
,6 A
- i: .f 1
-.\p
, if ,
L
.? . t ' .s
\1 f
r ?
i r
- .J - <
W' i i e>6 o'i
- i l' E4 N >' 8 1 e4- gMOi W i . e) < e H
e E
- g.
'f t-U l' 3 ..; ' k
) > me '
Ui e en g
>= >-'
OMC. I i i
- i i n' O WI W D O O O' G' D 'O 'O ;Q ' O O O i e g' 2 ei >3 .g -
k- U O *== K .J t - t
== Wi M N W og W '.
et R t
.' i i 2 i .J ** e i r
31 !
Wi > g O' .c 5, 1
6
- e. gtW- D: . '
8 et W ** 2 N W -
i e og . & I og e- . d .y'~
i e i . 33c e e ti g.
i ea &i gM Mg M -g r N i .J . i U N' W
@ U' R I 48 I W W ed U M' > >
J- Mi >= W O 6 5
- is a as 1 et
@'u ea i
2m
.W,!
7 W
> .$ ,' W E
5 Di e 'i e-i
.J. 6a 33 e .J a i
-a ut *m > .
i m'O O 'i me - U 4 1 -l e W D we N >. .b e S' O e, .- M g @ @ b' ED ,
@l .J Qe&3 W g e .J w l e- ea . e e N t , . . tgN N .: N. N Ns N- N N M ,
'l O + t n
- >= W > W < :{
O ** e r s 3- w gt et 5 o <
6 k W W U
w en : U .J .J -
g
'2 W W s D -
> -3 W g
>: eJ \
- (
i
- .J 5 1
?. t b
i fa o
' 5; .W. o. n r. . e. e . n, ' .s o a : o- oo,a. o;o -
o-e c:- >3 N
- N.N N e 4.
g
% $8
. We C C O . O :' O
.* * - C e .i W' st e.A eg e- * .e '
e
=>-
, e 4 ;
i - 48 4 -Q.-a :r
.a.
- y. g n
_ B. d 5 a .-
W: a
- P W ,'g a > t.
lh Wi et et t
' y!
I N M m @
e > e N M 4 e-@. b' e'm.O-e e
4 e e i 2 e e- e* .: e
'g O
'j v
y i '
' 0
+
1
- g e g, _ - - .' , ',
te '
i f
g
- . p' ,
r- .
O E==" "5 "'" "'" "'
39060U860 DOCCET NO. 50 - 352 ..- -....
DATE OCTOBER 1.1990 - - -
COwPLETED Bv PHILADELPHIA ELECTRIC COwcANv kARL wECM REPORTS SUPERVISOR BUSINESS UNIT LIwERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3370 ---
OPERATING STATUS __
l NOTES: NO LO40 REDUCTIONS GREATER l 1 UNIT NAME: LIwERICM UNIT T l
_ _ ... - ----- ____......_. l i THAN 20% CRIOR TO WANUA., t
- 2. REPORTING PERIOD: SEPTEwSER. 1990 g 3293 i SCRAw TO START 3RD REFUEL l
- 3. LICENSED THERwAL POWER (wwT): -- __ . g ;
1130 OUTAGE. l 4 NAMEPLATE RATING (GROSS wwE): _... ___._.. _.
1 g
g 1055 I.
1
- 5. DESIGN ELECTRICAL RATING (NET wwE): ..._ .._. ; g i i
- 6. wax!wUw DEPENDABLE CADACITY (GROSS wwE): 1092 g l
1055 i I 7 max!wUw DEPENDABLE CADACITY (NET wwE):
- 8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUwSER 3 THOOUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. DOWER LEVEL TO wHICH RESTRICTED. Is Aw fNET wwEl.
- 10. REASONS FOR RESTRICTIONS. IF ANv:
THIS woNTH VR-TO-DATE CUsutATIVE 11 HO'JRS IN REPORTING PERIOD 720 6.551 40.871
- 12. NUABER Or HOURS REACTOR WAS CRITICAL 166.3. 5.510.2 32.639.0
- 13. REACTOR RESEpvE SHUTDOWN HOURS 0.0 0.0 0.0 14 '40URS GENERATOR 04-LINE 166.3 5.373.6 32.045.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0. 0 - 0.0
- 16. GROSS THERMAL ENERGv GENERATED (www) 540.343 77.270.679 95.134.113
- 17. GDOSS ELECTRICAL ENERGY GENERATED (www) 173.910 5.555.990 30.742.560
- 18. NET ELECTRICAL ENERGv GENERATED (www) 164.701 5.339.695 2?.396.091 DAGE 1~O*-2 ac , , , . . . , - . , - - - ,,, , . . . . .
-g i
. DOCKET N0.7 . , 50 - 354 b ~ ; . . . . . ,,,
OPER3 TING DATA REPORT (CONTINUE 3) 3906037860}
~
- 7 r r, _;
.L.L DATE OCTOBER 1.1990 -
_~
..=--
THIS MONTM VR-TO-DATE CUWULATIVE 23.1- 87.0 - 78.4
- 19. UMIT SERV!CE FACTOR' . .-- ---- --
23.* 82.0 78.4
- 20. UNIT AVAILASILITY FACTOR __
21.7. 77.3 ^ 68.2 21 UNIT' CAPACITY F ACT OR (USING MDC NET) ....._....-- _. -
-_= -
21.7 77.3 68.2-
- 22. UNIT CAPACITY FACTOR (USING DER NET) - .._.
O.0 3.6 3.0 .
- 23. UNIT FORCED OUTAGE RATE . . . . . . . _ . -_.- -. ...____ ....
2A. SHUTDOwwS' SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH)-
REFUELING OUTAGE: SEPTEmeEn 07.1990: 75 Days _
- 25. IF SHUTD0mN AT END OF REPORT PERIOD. ESTIMATED DATE 08 STARTUP:
FORECAST ACHIEVED.
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITV 12/19/8A 12/22/8A INITIAL ELECTRICITY WID APRIL 95 4/13/95 COMMERCIAL OPERATrow 1ST OTR 96 2'01/90'
- PAGE'2.0F'.2- -
s=
u T g,.
me
'g e " "
a e .,
m w- ve , gyw ,-- ...ww gy "ew w--,
p= 'e w w .q. '-e- ' owisa w - -w_'<T -e*44* - - W W M v w-'sep69+'PW-' tee'-
Wf**e'tr'ePtM*'aae***- -WrTV5'-'
W WW **49T-1A NNF'w' W'5Ti SM-WV W W ' tw Fwhm ie t' v + 1 it avw-***'ha-d'-'* Tem . i mm-en r,w-m
UNIT SHUTDOWN 3 TND POWE!? REDUCTIONS DOCMET NO. 50 - 352 __
UNIT NAME LINERIC UNIT.I DATE OCTOBE2 1.1990 REPORT MONTH SEPTEMBER. 1990 COMPLETED SW PHILADELPHIA ELECTRIC CO ANY MARL MECR REPORTS SUPERVISO4
.USINESS .I1 LINERICM GENERATING STATION 3906037860 TELEPHONE (215)-327-1200 EXTENSION 3320 I ! l l l NETHOD OF l LICENSEE lSYSTEwlCOmpONENTI CAUSE AND CORRECTIVE lTYPElDURATIONIREASONISHUTTING DOWNl EVENT l CODE l CODE l ACTION TO I
NO.I DATE 1 (1)! (HOURS)l -(2) i REACTOR (3) l REPORT a I (4) I (5) ! PREVENT RECURRENCE
. _- =_.--------------------------
35 l 900907 i S l 553.7 I C l 2 ) N/A 1 ZZ l ZZZZZZ l LOAD WAS REDUCED 68% FOLLOwED BY A l l I I l l l l WANUAL SCRAW TO BEGIN THE THIRD l
I l i l 1 l 8 REFUELING OUTAGE.
f l 1 I i - --- l l l l l l 1 1 1 553.7 I I i l I l L (2) (3) (4)
(1)
= - FORCED R E A SOe. wETWD EXHIBIT G- INSTRUCTIONS A - EOUIPMENT FAILURE tEkPLAIN)
-' WANUAL . FO# PREPARATION 08 DATA S- SCHEDULED ENTRY SHEETS FOR LICENSEE e - MAINTENANCE OR TEST 2 - WANUAL SCRAM.
C - REFUELING 3 - AUTOMATIC SCRAW. EVENT REPORT-(LER)
D - REGULATORV RESTRICTION 4 - OTHER (EMPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING
- LICENSE ENAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EMPLAIN) EXHIBIT I - SA*E SOURCE 4
- e 4
A 9 e pe y- .g- .g.9%.p i.7--- .-p e =a # ,..ger g-a-s-wwi-. gay r-%- .ge9 $ym,w.e mir-=w y --p* es w%g.4-m, g y9 9 u.r .v g _, , , j
3906037860 1; r
- t
' Dookst No. #50 353 [
Attachment to Monthly i Operating Report for . l September 1990 l
r UMERICK GENERATING STATION UNIT 2 i SEPTEMBER 1 THROUGH SEPTEMBER 30,1990 j J.,
i
- 1. NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES Limerick Unit 2 began the month of September at a nominal 98% of rated thermal power. On j September 1, reactor power was reduced to 00% to repair an Electrohydraulic Control (EHC) system i leak on #4 Main Turbine Control Valve. Retum to power was begun on September 2 and reactor -
power achieved 100% on Septomber 5 following completion of LPRM onlibrations. On ember '
8, reactor power was briefly reduced to 90% to perform Main Turbine Control Valve test . On September 10, at 0911 hours0.0105 days <br />0.253 hours <br />0.00151 weeks <br />3.466355e-4 months <br />, the reactor automatically scrammed due to a Nuolear Steam upply Shutoff System (NSSSS) Group l isolation signal created during survet:ance testing. . On September 13, at 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br />, the reactor achieved criticailty, and the main turbine generator was synchronized .- j to the grid at 2112 hours0.0244 days <br />0.587 hours <br />0.00349 weeks <br />8.03616e-4 months <br /> on September 14. Power ascension was continued and the reactor ;
reached 100% power on September 16. On September 17, reactor power was briefly reduced to !
90% to perform a Control Rod Pattom adjustment. On September 20, reactor power was briefly !
reduced to 95% to perform a Control Rod Pattom adjustment. Umerick Unit 2 ended the month of September at a nominal 100% of rated thermal power, ,
Operational events that occurred during the month of September included: '
i On September 10, a full NSSSS Group 1 MSIV isolation occurred due to an instrument !
failure. This occurred when a plant operator was reading the Turbine Enclosure Steam !
Tunnel Temperature D!V 4 switches in the Auxiliary Equipment Room, concurrent with l&C ?
testing of the NSSSS Main Steam line DIV 1 temperature instrumentation. Following the ;
MSIV isolation, the reactor scrammed with the reactor vessel leve' 'xreasing to 48' and . !
pressure rising to 1112 psig. HPCI and RCIC both started, but due to the short duration of I the initiation signal, only RCIC injected to the reactor vessel. HPCI was run in the full flow .
test mode. The 'N' SRV opened initially on the pressure spike and the K, M, H, S and E SRV's were cycled to contral reactor pressure. The plant entered OPCON 4 at 2209 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.405245e-4 months <br />.
On September 11, l&C replaced the faulty temperature switch (TTS-025-216D) and satisfactorily performed a cal / functional test.
1
-1 i
- 11. CHAli FNGES TO MAIN S1EAM SAFETY RELIEF VALVES l
There was one challenge to the Main Steam Safety Relief valves during the month of September, i The 'N' SRV opened when reactor pressure rose to 1112 psig following a scram due to an inadvertent NSSSS Group 1 MSIV isolation. This pressure is within the allowable setpoint range per I Technical Specifications. See Operational Events section above for details.
)
a l
l
. 1
.m .
' p; q 3g p[n 9 .I,( N M i.
y; * ' 4 f .; .
2
% w- .;A;f: ' .K ' a . ,
^,- '
--n' ' '
i)
' +>. ,
-;; ,f},'l&m'l _ 4
, O iv +
,. s
- V
- $
- J- *
, 4 y ~ ,. l.
3-
=t g!' . ,
'l t..
1G
- ot ,
-1 W: -
9 l
< 5
.Q) t ,
'Nk ' -1 i t' ts
, , i: * ,;
-i=- - .s, t
..t '
4 .+g. $j.
4 af,-f 5' . g yj d <
r
^.
') .
I!L.- , ' i-
- '. ,& i 4 L S i
- Xf ,
' '7: 't
, , e . ..
N 7 T 3. ~ m ., . y ,-:
r
'. N.
s 7 . .
b r I t l
ny 5
, #1
,,. l.^
J e I > t' Qt W , e t- F0- N$ i t 4 1 2 Mi s W 4 4 O Me .J .-l. .
s.
I me 6 1 i > 34' 4. ' i
" Ql
':l.-
.., 4, 1 I -( ' .Ql > - , ' ; }-
> *= t
, W- @ GA i * <
m i R6 > . - . ,. .
,.** i : '.' II
.r ty , : . E e
! ee ue 0
m W1 2 <>l-x!
>E si W m M
O
- m@. e*~^'e
. o-o g-
- o. o
'G Os @ m'*@ c.8C, mo-o e
o ' e o- o
- 6. f*a -@
9.9
' m :.: 0-'e--
- @ /. M o o *~c' *o- .;
a ,
Wt > hl ** e
- s- * * e ' e- ' *- e * ' :
.l 3. 1. .J l m a et :4 D i Wl > g Oe Q -i i
aHW Di w i e WmE N: W 5 em se i ~&EW 9* Q ,
i e Ii g@
3Dd i e g'
i e- & - h i ,
M g i -
J V Mg N. .W
.m Ui a1 W WeMu Mi > ' :;~b
- .J M *< l W D S W W em e i W . g giee 2g a 4 .i
> 4 iW Qi .J ' J m us O=
'I W -
,3 e- m- a e3 -
.J Oea tU'.I 4W3m N- > b b m D * ~ N M w th @ <h e, ' - @ O. '
- n e t .J lQin g g S .J ==*i (.
o e- e- e N aN N -.N N. N' N-NJ N - N M;
0
- > W > W O ** >- 7 .l 2 2 4- 4 '!
D Q h )'
> 3 W Q W *{
' b. * . w u .a J ;r T U W W 4 5- o e >
-f Q W 's t
'> J
! . .J ty.
m g .
4 W ')
O. -S cf Om i -
c; W- n> .
'O4 ' us M Os g g' e @ r. g cp e.O . Q Q . O ..N N. ,i Ol . >2 m e M f's - cp is m in N .'e, @ t ,
N- @$ J e' @ e @ m & C O C O' #9 9- Os i' {
'W pq mW ; e- e e e
'~
> e i eg *;4 '
4 h =
n4 -
W l us t O i$
$Qi < q
,.i W t- Er e4 W h 9 >' i t.
Wt '( J mt .
.g I 3
> > e H M M sn 4 r~ e- 0 O e t< M 4 , e. @
2 4 e e- e- e 'e- .r . . - .,
-a
.- t -
~.
y
':h s 1-
,:r
, , 7 g
- a i. . .
,j lp s i ,. 't
.- -. . - , . s.. 3 , ., ,.
OPE 20 TING DATA LEPORT 3906037840? m . -- - -:
DOCMET NO. 50 - 353 --- ---
DATE OCTOBER 1.1990 - --______ ,
COMPLETED BV PHILADELPHIA- _ELECTRIC .
COMPANY MARL WECK REPORTS SUPERVISOR BUSINESS UNIT LIwERICE GENERATING STATION TELEPHONE (215) 32T-1200 EXTENSION 3320 - _ -
OPERATING STATUS ---------
l NOTES: THERE WAS ONE LOAD REDUCTION I 1 UNIT NAME: LIMERICK UNIT 2 i
._______..____.____________________ g I GREATER THAN 20% PRIOR TO AN l
- 2. REPORTING PERIOD: SEPTEwSER. 1990 _ ____ g 3293 l AUTO SCRAW FROM 100%. l
- 3. LICENSED THERwAL POWER (wwT): ..______________ g 113e l~
4 NAMEPLATE RATING (GROSS wwE): _______________
i
.g 1055 l'
- 5. DESIGN ELECTRICAL RATING (NET wwE): ______ __ g l 1 l'
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): __.. 1097 l l
i 7 MAXIMUU DEPENDABLE CAPACITY (NET WWE): 1055 I - .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. DOwE# LEVEL TO WHICH RESTRICTED. IF ANV (NET WWE):
- 10. REASONS FOR RESTRICTIONS. IF ANr.
THIS MONTH VR-TO-DATE' CumutATIVE T2O 6.383 6.363.
11 HOURS IN REPORTING PERIOD ___-___
- 12. NUMBER OF M9URS REACTOR WAS CRIT 1 CAL 638.9- 5.350.3' .
5.350.3 0.0 0.0 0.0
. 13. REACTOR RESERVE SHUTDOWN HOURS _________... ..__ .______ -- -__-
612.0 5.061.7 5.061.7 -
14 HOURS GENERATOR ON-LINE ___________. _______ .- - - - - ---
. 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERNAL ENERGV GENERATED /* W ) . 1.917.766 16.053.183 16.053.183 17 GROSS ELECTRICAL ENERGV GENERATED (NwH) 633.900 5.291.016 '5.291.016
- 18. NET ELECTRICAL ENERGv GENERATED (#wH) 600.471 5.095.255 5.085.255 PAGE-1 OF 2 e
6 e .
u.__ _-r. -s e .-- ..m s _.. -%n-___.2 .1._ _ -t. .= v".- ee-* - *- ++ey ==-e w e- r- .-+-w+ i+ra y
DOCRE T NO. , 50 - - JM OPEOGTING DATd f.EPORT (CONTINt*ED) 3906037860' DATE OCTOBER 1.1990 ---
THIS WONTH VR-TO-DATE CU#ULATIVE 85.0 79.3 79.3
- 19. UNIT SERVICE FACTOR ....__._-_.. - - _ - _ - _.-
85.0 79.3 79.3
- 20. UNIT AVAILABILITV FACTOR _ _ _ . _ _ -
80.1 75.5 75.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) __.._..... _ _
80.1 's . 5 75.5
- 22. UNIT CAPACITv FACTOR (USING DER NET) -_
15.0 12.8 12.8
- 23. UNIT FORCED OUTAGE RATE ___ .._- -- ._ _ ______ ___ .. --
24 SHUTDOWNS SCHEDULED OVER NEXT 6 wueYHS (TvPE. DATE. AND DURATION 08 EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUp:
FORECAST ACHIEVED
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITV 08/12/89 08/12/89 INITIAL ELECTRICITv 09/01/89 09/01/89 COwwEDClat OPERATION 02/01/90 07/09/90 PAGE 2 05 2
-.:. - _. m- .=,.em .- . -- , e- = v u.- 4--u -
UNIT SHUTDOWN 3 END POWE3 REDUCTIONS DOCKET NO. 50 - 353 __ _ _ __
UNIT NAME LINERICt -- - _ . - - -UNIT Z -
DATE OCTO9E3 1.1990 -_--
__ _= ----= _ _
CO*PLETED By PHILADELPHIA ELECTRIC COMPANY REPORT MONTH SEPTEMBER. 1990 ---.---.. -- _ - ~ = -
MARL MECK REPORTS SUPERv!SoR SUSINESS UNIT 3906037860 LINERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 l 1 ;
i i WETHOD OF I LICENSEE ISYSTEMICO*PONENTI CODECAUSEI AND CORRECTIVE ACTION TO I lTVPE' DURATIONlREASONISHUTTING DOWN1 EVENT l CODE I
'NO.) DATE I (1). (HOURS)l (2) l REACTOR (3) l REPORT s ! ___-
(4) 1 _ __
(5) l PREVENT RECURRENCE -_ __ _-_
l' I I i 1 i i i 4 N/A 1 ZZ i ZZZZZZ l LOAD WAS REDUCEO 40% TO REPAIR AN EHC 24 $ 900901 i F ' C00.0 1 A l 1 l LEAM ON s4 MAIN TURBINE CONTROL VALVE.
l l l l l I i . I I !
L ZZ ll ZZZZZZ l LOAD WAS REDUCED 10% TO PERFORw MAIN N/A 25 I 900900 l 5 000.0 l F l 4 l l l 11 I TURBINE CONTROL VALVE TESTING.
l l l l I I I l I i I I 26 i 900910 l F I 108.0 l G l 3 l 2-90-015 l ZZ l ZZZZZZ l REACTOR AUTO #ATICALLv SCRAensED DUE TO 1 I I I i 1 1 I AN NS$55 GROUP 1 ISOtATION SIGNAL 1
i I I l 1 l CREATED DURING TEST PERFORMANCE.
! I I I i i I i ! I 27 l 900917 i S 000.0 l F 1 4 I N/A I ZZ l ZZZZZZ l LOAD WAS REDUCED 10% TO PERFORW CONTROL l l 1 1 I ROD PATTERN ADJUSTWENT.
1 i l 1 I I l I f f f f f 26 ! 900920 i S I 000.0 I F ! 4 i- N/A i ZI I ZZZZZZ l LOAD wAS REDUCED 5% TO PERFORF CONTROL i l i I i I ROD PATTERN ADJUSTWENT.
l l l l I l ---- 1 l 1 ! 108.0 l [ f f (
(2) .(3) (4)
(t) r - FORCED REASON WETHOD EXHIBIT G- INSTRUCTIONS A'- EOUIPMENT FAILURE (EMPLAIN) 1 - MANUAL FOR PREPARATION Or' DATA
. S - SCHEDtfLED ENTRY SHEETS FOR LICENSEE 8 - MAINTENANCE OR TEST 2 - MANUAL SCRAW.
C - PEFUELING 3 - AUTOWATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY DESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)
, E - OPERATOR TRAINING
- LICENSE EXAMINATION F - ADw!NISTRAT!vE -(5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(ERPLAIN) EmHIe!T I - SA#E SOURCE 8
e o
-O
- - , . . ,- ,m._g.,g , q. --
g - e w y w .,-y ye-, .,y - g - -,, -