Umerick Generating Ctation l^
=r
" i f r a ""a""'
' PECO ENERGY.
A Sanatoga. PA 19464 @ 20 l
l T.S.6.9.1.6 December 12, 1995 j
1 e
Docket Nos. 50-352 l
L 50-353 l
. License Nos. NPF-39 NPF-85 I
i U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 i
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 t
Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of November 1995 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours, w p1P6 Michael P. Gallagher Director - Site Engineering drh Enclosures cc:
T. T. Martin, Administrator, Region I, USNRC N. S. Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS 180003 1
V(,
951130 95121e0001 s
l<
PDR ADOCK 05000352 R,
--_.PDR.
.g.
l
)
I Docket No. 50-352 Attachment to Monthly Operating Report for November 1995 Umerick Generating Station z
Unit 1 i
November 1 through November 30,1995 l.
Narrativo Summarv of Ooeratina ExceIIences Unit 1 began the month of November at a nominal 100% of rated thermal power (RTP).
On November 19,1995 at 0010 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />, power was reduced to 92% RTP for main turbine valve testing. Power was restored to 100% RTP at 0336 hours0.00389 days <br />0.0933 hours <br />5.555556e-4 weeks <br />1.27848e-4 months <br />.
1 On November 27,1995 at 0240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br />, power was reduced to 88% RTP l
for main turbine valve testing. Power was restored to 98% RTP at 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />.
On November 29,1995 at 0941, power was reduced to 95% RTP in order to remove the sixth feedwater heaters from service. Power was restored to 100% RTP at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />.
Unit 1 ended this operating period at 100% of RTP.
11.
Chaffenges to Main Steam Safetv Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the l
month of November.
l l
t
AVEROGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 352 UNIT LIMERICK UNIT 1 DATE DECEMBER 12 1995 COMPANY PECO ENERGY COMPANY DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 ktONTH NOVEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1050 17 1060 2
1045 18 1055 3
1045 19 1048 4
1058 20 1059 5
1064 21 1051 6
1061 22 1062 7
1056 23 1050 8
1061 24 1059 9
1065 25 1055
-10 1052 26 1055 11 1048 27 1035 12 1065 28 1037 13 1060 29 1040 14 1055 30 1055 15 1056 10 1059
OPERATING. DATA REPORT DOCKET NO. 50 - 352
~
'DATE OECEMBER 12, 1995 COMPLETED BV PECO ENERGY COMPANY DAVID R, HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 OPERATING STATUS 1
UNIT NAME: LIMERICK U. ;IT 1 NOTES: THERE WERE NO LOAD DROPS 2.
REPORTING PERIOD:
NOVEMBiR. 1995 GREATER THAN 20% THIS MONTH.
- 3. LICENSED THERMAL POWER (MW'):
3293 4,
NAMEPLATE RATING (GROSS MwE):
1092
- 5. DESIGN ELECTRICAL RATING (NET MwE):
1055
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092 l
t
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1055 l
1 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANV (NET MwE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH vo-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 720 8.016 86.160
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7.371.4 71.479.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 720.0 7.230.4 70.255.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MwH) 2.361.274 23.390.343 217.706.881
- 17. GROSS ELECTRICAL ENERGV GENERATED (MWH) 788.100 7.646.700 70.830.980
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 758.883 7.373.458 68.017.464 PAGE 1 OF 2
OPERATING DATA REPORT (CONTINUED)
DOCKET MO. 50 - 352 DATE DECEMBER 12. 1995 THIS MONTH VR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 90.2 81.5
- 20. UNIT AVAILABILITV FACTOR 100.0 90.2 81.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.9 87.2 74.8
- 22. UNIT CAPACITV FACTOR (USING DER NET) 99.9 87.2 74.8
.. _ =
- 23. UNIT FORCED OUTAGE RATE O.0 5.1 4.3 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
1 REFUELING OUTAGE. SCHEDULED FOR 2/2/96 LASTING 22 DAYS, 25, IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUPz
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITV 12/19/84 12/22/84 INITIAL ELECTRICITV MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST OTR 66 2/01/86 P
PAGE 2 OF 2
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO, 50 - 352 UNIT NAME LIMERICK UNIT 1 DATE DECEMBER 12, 1995 REPORT MONTH NOVEMBER, 1995 COMPLETED BV PECO ENERGv'COuPANv
...._=__
DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING LIVERICM GENERATING STATION TELEPHONE (610) 718-3772 METHOD OF l LICENSEE
- SYSTEM COMPONENT CAUSE AND CORRECTIVE I
l SHUTTING DOWN!
EVENT CODE CODE ACTION TO l TYPE DURATION REASON NO.i DATE I (1)
(HOURS)
(2)
REACTOR (3) l REPORT a (4)
(5)
PREVENT RECURRENCE 87 951119 S
000.0 B
4 N/A HA VALVEX l REACTOR POWER WAS REDUCED TO 92% DUE TO 4
MAIN TURBINE VALVE TESTING.
4 03 951127 5
000.0 B
4 N/A HA V'ALVEX REACTOR POWER WAS REDUCED TO 88% DUE TO 4
MAIN TURBINE VALVE TESTING, 4
09 951129 S
000.0 B
4 N/A CH HTEXCH REACTOR POWER WAS REDUCED TO 95% TO 4
REMOVE THE SIXTH FEEDWATER HEATERS FROM 4
SERVICE.
4
\\
l 4
t l
1 I
I t
I (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRV SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHF.R (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING
- LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE
.=
~ -.
-k
]
l ;.- -
1
~
Docket No.' 50-353 -
l-Attachment to Monthly y,
Operating Report for i'
November 1995 1
i i
l h~
Umerick Generating Smtion Unit 2 -
November 1 through November 30,1995
+
j l.
- Narrative Summarv of Ooeratina Excenences Unit 2 began the month of November at a nominal 100% of rated thermal power
i (RTP).
On November 3,1995 at 2204 hours0.0255 days <br />0.612 hours <br />0.00364 weeks <br />8.38622e-4 months <br />, power was reduced to 98% RTP i-for main turbine valve testing. Power was restored to 100% RTP on l
November 4,1995 at 0027 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br />, i
On November 8,1995 at 1218 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.63449e-4 months <br />, power was reduced to 98% RTP j
i for a control rod pattern adjustment. Power was restored to 100% RTP at 1315 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />5.003575e-4 months <br />.
i J.
On November 12,1995 at 0606 hours0.00701 days <br />0.168 hours <br />0.001 weeks <br />2.30583e-4 months <br />, power was reduced to 88% RTP for main turbine valve testing. Power was restored to 100% RTP shortly
[
thereafter.
On November 17,1995 at 2309 hours0.0267 days <br />0.641 hours <br />0.00382 weeks <br />8.785745e-4 months <br />, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP at 2312 l
hours.
[
On November 22,1995 at 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, a planned power reduction began i
to replace stator water cooling filters. Power was reduced to 21% RTP at 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br /> and the main turbine was removed from service at 2218 hours0.0257 days <br />0.616 hours <br />0.00367 weeks <br />8.43949e-4 months <br />. Repairs were completed and the main turbine was synchronized to the grid on November 23,1995 at 0932 hours0.0108 days <br />0.259 hours <br />0.00154 weeks <br />3.54626e-4 months <br />. Power was restored to 100% RTP on November 24,1995 at 0915 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.481575e-4 months <br />.
I On November 24,1995 at 2228 hours0.0258 days <br />0.619 hours <br />0.00368 weeks <br />8.47754e-4 months <br />, power was reduced to 90% RTP for a control rod pattern adjustment. Power was restored to 100% RTP on November 25,1995 at 022n hours, Unit 2 ended this opera *%g period at 100% of RTP.
4 ll.
Challences to Main Steam Safety Relief Valves l
There were no challenges to the Main Steam Safety Relief Valves during the 4
. month of November.
i 1
?-
4 nl'
CVERAGE DAILY UNIT POwEP LEVEL' DOCKET NO. 50 - 353 UNIT LIMERICK UNIT 2 DATE DECEMBER 12 1995 COMPANY PECO ENERGY COMPANY
+
DAVID R. HENRICK5 REPORTS ENGINEER-SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MONTH NOVEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-NET)
(MwE-NET) 1 1130 17 1139 2
1126 18 1134 3
1124 19 1139 4
1136 20 1138 5
1141 21 1139 6
1139 22 984 7
1135 23 361 8
1138 24 1076 9
1137 25 1133 10 1138 26 1137 11 1122 27 1154 12 1122 28 1145 t'
b 13 1133 29 1153 14 1130 30 1157 15 1134 16 1139 i
l l
f l
f OPERATING DATA REPORT DOCMET NO. 50 - 353 DATE DECEMBER 12. 1995 COMPLETED Bv PFCO ENERGY COMPANv DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING i
LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 OPERATING STATUS
- 1. UNIT NAME: LIMERICK UNIT 2 NOTES: THERE WAS 1 LOAD DROP 2.
REPORTING PERIOD:
NOVEMBER. 1995 GREATER THAN 20% THIS MONTH i
3.
LICENSED THERMAL POWER (MWT):
3458 TO REPLACE THE STATOR WATER l
g 4
NAMEPLATE RATING (GROSS uwE):
1163 COOLING FILTERS.
1 5.
DESIGN ELECTRICAL RATING (NET MwE):
1115
- 6. MAXIMUM DE P END A t:, E CAPACITY (GROSS MWE): ]5
- 7. MAXIMUM DEPENDABLE v.ACITY (NET MWE):
1115 8.
IF CHANGES OCCUR IN C A P.,
ITV RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS 9.
POWER LEVEL TO WHICH RESTRICTED. IF ANV (NET MWE):
l
- 10. REASONS FOR RESTRICTIONS. IF ANV:
THIS MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 8.016 51.672
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7.425.8 46.788.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 708.8 7.242.9 45.847.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GRCE THERMAL ENERGv GENERATED (MWH) 2.421.828 23.572.764 145.802.347 17 GROSS r_tCTRICAL ENERGY GENERATED (MWH) 818.000 7.830.500 48.214.080
- 18. NET ELECTAICAL ENERGY GENERATED (MWM) 794.719 7.562.766 46.464.966 PAGE 1 OF 2
3<
OPERATING DATA REPORT (CONTINUED)
DOCAET NO. 50 - 353 DATE DECEMBER 12. 1995 4
4 THIS MONTH VR-TO-DATE CUuuLATIVE
- 19. UNIT SERVICE FACTOR 98.4 90.4 88.7
- 20. UNIT AVAILABILITY FACTOR 98.4 90.4 88.7 21 UNIT CAPACITY FACTOR (USING MDC NET) 99.0 84.9 84.5
.-_.......-~
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.0 84.9 84.5
- 23. UNIT FORCED OUTAGE RATE 1.6 2.9 3.4 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTMS (TYPE. DATE. AND DURATION OF EACM):
1
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO CCMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITV 09/01/89 09/01/89 COMMERCIAL OPERATION C2/01/90 01/08/90 s
)
PAGE 2 OF 2 9
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 353 UNIT NAME LIMERICA UNIT 2 DATE DECEMBER 12. 1995 REPORT MONTH NOVEMBER, 1995 COMPLETED DV PECO ENERGY COMPANY DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) T18-3772 l
, SHUTTING DOwNi EVENT CODE l CODE ACTION TO METHOD OF l LICENSEE ESYSTEMICOMPONENT CAUSE AND CORRECTIVE TVPE DURATION REASON NO.
DATE (1)
(HOURS)
(2) l REACTOR (3) i REPORT a (4) l (5)
PREVENT RECURRENCE I
l I
1 78 951103 S
070.0 B
4 N/A HA VALVEX l REACTOR POWER WAS REDUCED TO 98% DUE TO 4
i MAIN TURBINE VALVE TESTING, 4
79 951108 S
000.0 B
4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 98% DUE TO 4
CONTROL ROD PATTERN ADJUSTMENT.
4 SO l 951112 S
000.0 B
4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 88% DUE TO 4
l MAIN TURBINE VALVE TESTING.
4 I
i 81 l 951117 5
f 000.0 B
4 l
N/A HA VALVEX l REACTOR POWER WAS REDUCED TO 98% DUE TO 4
i
! MAIN TURBINE VALVE TESTING.
4 I
i 82 951122 F
011.2 A
4 l
N/A l
HF l FILTER
- l. REACTOR POWER WAS REDUCED TO 21% AND TME 4
}
l l GENERATOR WAS TAKEN OFF THE GRID TO 4
{
}
l REPLACE THE STATOR WATER COOLING FILTERS 4
i i
l 83 l 951124 S
000.0 B
l 4
h/A l
RS CONROD REACTOR POWER WAS REDUCED TO 90% DUE TO 4
l CONTRCD ROD PATTERN ADJUSTMENT.
4 l
1 4
l l __.-_
l l
I I
11.2 I
I i
l t
l l
(1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S-SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE i
%