MONTHYEARML20217D1211999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Lgs,Units 1 & 2. with ML20212A4481999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Limerick Generating Station,Units 1 & 2.With ML20210L7051999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Limerick Generating Station,Units 1 & 2.With ML20209D7741999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 ML20195G4651999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Lgs,Units 1 & 2 ML20209D7791999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Limerick Generating Station,Units 1 & 2 ML20195G4761999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Lgs,Units 1 & 2 ML20206N2901999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Limerick Generating Station,Units 1 & 2.With ML20205N9311999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Limerick Generating Station,Units 1 & 2.With ML20207J7461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Limerick,Units 1 & 2.With ML20199F9611998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Limerick Generating Station.With ML20206N4061998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Limerick Generating Station,Units 1 & 2.With ML20195C9771998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Limerick Generating Station,Units 1 & 2.With ML20154H5691998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Limerick Generating Station,Units 1 & 2.With ML20151X3511998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Limerick Generating Station Units 1 & 2.With ML20237B4711998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Limerick Generating Station,Units 1 & 2 ML20236P9781998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Limerick Generating Station,Units 1 & 2 ML20249A5331998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Limerick Units 1 & 2 ML20247H5071998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Limerick Generating Station ML20216F3601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Limerick Generating Station,Units 1 & 2 ML20216F3471998-02-28028 February 1998 Revised Monthly Operating Rept for Feb 1998 for Limerick Genrating Station,Unit 1 ML20216F9471998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Limerick Generating Station,Units 1 & 2 ML20202G5161998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Limerick Generating Station,Units 1 & 2 ML20198M1971997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Limerick Generating Station ML20203F8231997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Limerick Generating Station,Units 1 & 2 ML20199B7461997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Limerick Generating Station,Units 1 & 2 ML20211N9961997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Limerick Generating Station Units 1 & 2 ML20216J1301997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Limerick Generating Station,Units 1 & 2 ML20210L4971997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Limerick Generating Station ML20148K4131997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Limerick Generating Station,Units 1 & 2 ML20141A4831997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Limerick Generating Station Units 1 & 2 ML20137T4761997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Limerick Generating Station,Units 1 & 2 ML20135F6461997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Limerick Generating Station Units 1 & 2 ML20134F6371997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Limerick Generating Station Units 1 & 2 ML20133G5771996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Limerick Generating Station Units 1 & 2 ML20149M2801996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Limerick Generating Station Unit 1 & 2 ML20134J9041996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Limerick Generating Station Units 1 & 2 ML20128N3041996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Limerick Generating Station Unit 1 & 2 ML20117N2081996-08-31031 August 1996 Monthly Operating Repts for Limerick Generating Station for Aug 1996 ML20116K2331996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Limerick Generating Station Units 1 & 2 ML20115F0471996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Limerick Units 1 & 2 ML20117K9601996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Limerick Generating Station Units 1 & 2 ML20117E0851996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Limerick Generating Station Units 1 & 2 ML20107B6841996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Lgs,Units 1 & 2 ML20106H0561996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Limerick Generating Station ML20097D1581996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Limerick Generating Station Units 1 & 2 ML20096G1991995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Limerick Generating Station Units 1 & 2 ML20095E6141995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Limerick ML20094J2511995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Limerick Generating Station Units 1 & 2 ML20094J2771995-09-30030 September 1995 Revised Monthly Operating Rept for Sept 1995 for Limerick Generating Station Unit 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D1211999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Lgs,Units 1 & 2. with ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A8861999-09-13013 September 1999 Safety Evaluation Authorizing First & Second 10 Yr Interval Inservice Insp Plan Requestss for Relief RR-01 ML20212A4481999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Limerick Generating Station,Units 1 & 2.With ML20211E9891999-08-20020 August 1999 LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5 ML20210L7051999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Limerick Generating Station,Units 1 & 2.With ML20209G0211999-06-30030 June 1999 GE-NE-B13-02010-33NP, Evaluation of Limerick Unit 2 Shroud Cracking for at Least One Fuel Cycle of Operation ML20209D7741999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 ML20207H8331999-05-31031 May 1999 Non-proprietary Rev 0 to 1H61R, LGS - Unit 2 Core Shroud Ultrasonic Exam ML20195G4651999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Lgs,Units 1 & 2 ML20209D7791999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Limerick Generating Station,Units 1 & 2 ML20195B3021999-05-0606 May 1999 Rev 0 to PECO-COLR-L2R5, COLR for Lgs,Unit 2 Reload 5 Cycle 6 ML20206N2901999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Limerick Generating Station,Units 1 & 2.With ML20195G4761999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Lgs,Units 1 & 2 ML20206D8971999-04-22022 April 1999 Rev 2 to PECO-COLR-L1R7, COLR for Lgs,Unit 2 Reload 7, Cycle 8 ML20205N8341999-04-0101 April 1999 Part 21 Rept Re Automatic Switch Co Nuclear Grade Series X206380 & X206832 Solenoid Valves Ordered Without Lubricants That Were Shipped with Std Lubrication to PECO & Tva.Affected Plants Were Notified ML20205N9311999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Limerick Generating Station,Units 1 & 2.With ML20204G9851999-03-11011 March 1999 Safety Evaluation Re Revised Emergency Action Levels for Limerick Generating Station,Units 1 & 2 ML20207J7461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Limerick,Units 1 & 2.With ML20199G2371999-01-31031 January 1999 Rev 0 to NEDO-32645, Limerick Generating Station,Units 1 & 2 SRV Setpoint Tolerance Relaxation Licensing Rept ML20199L5301999-01-19019 January 1999 Special Rept:On 981214,seismic Monitor Was Declared Inoperable.Caused by Spectral Analyzer Not Running.Attempted to Reboot Sys & Then Sent Spectral Analyzer to Vendor for Analysis & Rework.Upgraded Sys Will Be Operable by 990331 B110078, Rev 1 to GE-NE-B1100786-01, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 11998-12-31031 December 1998 Rev 1 to GE-NE-B1100786-01, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 1 ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20199F9611998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Limerick Generating Station.With ML20198C7151998-12-10010 December 1998 Rev 1 to COLR for LGS Unit 1,Reload 7,Cycle 8 ML20198A3871998-12-10010 December 1998 Safety Evaluation Supporting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20206N4061998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Limerick Generating Station,Units 1 & 2.With ML20199E3281998-11-23023 November 1998 Rev 2 to PECO-COLR-L2R4, COLR for Lgs,Unit 2,Reload 4,Cycle 5 ML20195C9771998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Limerick Generating Station,Units 1 & 2.With ML20154H5691998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Limerick Generating Station,Units 1 & 2.With ML20151X3511998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Limerick Generating Station Units 1 & 2.With ML20237F0291998-08-27027 August 1998 Special Suppl Rept:On 960425,one Loose Part Detection Sys (Lpds) Was Identified to Be Inoperable.Initially Reported on 960531.Caused by Loose Parts Detector Module.Repairs Performed & Intermittent Ground No Longer Present ML20237D1041998-08-17017 August 1998 Books 1 & 2 of LGS Unit 1 Summary Rept for 960301-980521 Periodic ISI Rept 7 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20236X7641998-07-31031 July 1998 Rev 0 to SIR-98-079, Response to NRC RAI Re RPV Structural Integrity at Lgs,Units 1 & 2 ML20237B4711998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Limerick Generating Station,Units 1 & 2 ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20151Z4881998-06-30030 June 1998 GE-NE-B1100786-02, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 2 ML20236P9781998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Limerick Generating Station,Units 1 & 2 ML20196K1801998-06-30030 June 1998 Annual 10CFR50.59 & Commitment Rev Rept for 970701-980630 for Lgs,Units 1 & 2. with ML20249B3501998-06-11011 June 1998 Rev 1 to PECO-COLR-L2R4, COLR for LGS Unit 2 Reload 4,Cycle 5 ML20249A5331998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Limerick Units 1 & 2 ML20247M7071998-05-14014 May 1998 Safety Evaluation Supporting Amend 128 to License NPF-39 ML20217Q5101998-05-0404 May 1998 Safety Evaluation Supporting Amend 127 to License NPF-39 ML20247H5071998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Limerick Generating Station ML20216F3601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Limerick Generating Station,Units 1 & 2 ML20217M0791998-03-31031 March 1998 Safety Evaluation Supporting Amends 125 & 89 to Licenses NPF-39 & NPF-85,respectively ML20217D5701998-03-20020 March 1998 Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 ML20216F9471998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Limerick Generating Station,Units 1 & 2 ML20216F3471998-02-28028 February 1998 Revised Monthly Operating Rept for Feb 1998 for Limerick Genrating Station,Unit 1 1999-09-30
[Table view] |
Text
Lim: rick Gmtre. ting Stxtion
. =
-=.
PECO NUCLEAR ;!f2"m?"*""
A UNir or PECO Emucy Sanatoga PA 19464-0920 T.S.6.9.1.6 September 14,1998 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Docament Control Desk Washington, DC 20555 l
Subject:
Limerick Generating Station j Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of August 1998 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours,
-Josebh P. Grimes Director - Site Engineering pah Enclosures cc: H. J. Miller, Administrator, Region I, USNRC er h A. L. Burritt, USNRC Senior Resident Inspector LGS /
J. D. von Suskil, Vice President, LGS G. H. Stewart, LGS Experience Assessment Branch, SSB2-4 S. A. Auve, LGS ISEG Branch, SSB4-2 i' [ ,
O N 352 PDR
. )
Docket No. 50-352 Attachment to Monthly )
Operating Report for ?
August 1998 i
Limerick Generating Station Unit 1 August i through August 31,1998
- 1. Narrative Summarv of Operatino Experiences Unit 1 began the month of August 1998 at 22% of rated thermal power (RTP).
l August 1,1998 at 0501 hours0.0058 days <br />0.139 hours <br />8.28373e-4 weeks <br />1.906305e-4 months <br />, the main turbine generator was synchronized to the grid after an EHC leak on the #4 main turbine control valve was repaired. (
August 2,1998 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> Power was restored to 100% of RTP.
On August 3,1998 at 0018 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />, power wcs reduced to 82% of RTP for a control rod pattern adjustment. Power was restored to 100% of RTP at 0356 hours0.00412 days <br />0.0989 hours <br />5.886243e-4 weeks <br />1.35458e-4 months <br />. !
On August 6,1998 at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br />, power was reduced to 95% of RTP for a control rod pattern adjustment. Power was restored to 100% of RTP at 1810 hours0.0209 days <br />0.503 hours <br />0.00299 weeks <br />6.88705e-4 months <br />.
On August 10,1998 at 1426 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.42593e-4 months <br />, power was reduced to 90% of RTP due to loss of the Perklomen pumps for cooling tower make-up. Power was restored to 100% of RTP i at 1736 hours0.0201 days <br />0.482 hours <br />0.00287 weeks <br />6.60548e-4 months <br />. l 1
On Augu!t 16,1998 at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, power was reduced to 95% of RTP for main j turbine valve testing. Power was restored to 100% of RTP at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />.
Unit i ended this month ~at 100 % RTP.
i 11.' Challences to Main Steam Safety Ref sf Valves There were no challenges to the Main Steam Safety Relief Valves during the month of August. There have been no challenges to the Main Steam Safety Relief Valves year-to-date. I J
l
OPERATING DATA REPORT DOCKET NO. 50 -352 DATE SEPTEMBER 14,1998 ~
COMPLETED BY PECO ENERGY COMPANY P. A. HINCHEY REPORTS ENGINEER SITE ENGINEERING
- LIMERICK GENERATING STATION TELEPHONE (610)718-3797 OPERATING STATUS
- 1. UNIT NAME.
LIMERICK UNIT 1
- 2. REPORTING PERIOO:
AUGUST 1998
- 3. DESIGN ELECTRICAL RATING (NET MWE): 1134
- 4. MAXIMUM DEPENDABLE CAP /4 TTY (GROSS MWE): 1174
- 5. MA)0 MUM DEPENDABLE CAPACITY (NET MWE): 1134 THIS MONTH YR-TO-DATE . CUMIX.ATIVE
- 6. NUMBER OF HOURS REACTOR WAS CRITICAL - 744.0 4,500.4 93,385.8
- 7. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 ' O.0
- 8. HOURS GENERATOR ON-LINE 73A.0 4,415.8 91,700.8
- 9. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 815,905 4,573,301 90,733,879 1
'b
. = _ _ ._ . .
UNIT SHUTDOWNS .
DOCMETNO. 50-352 .
UNITNAME LIMERICKUN!T1 -
DATE SEPTmnsq14,1gge COMPLETED BY PECO ENERGYCOWANY P. A.HINCHEY REPORTS ENGINEER SITE ENGINEERING UMERICK GENERATING STATION REPORT MONTH AUGUST,1998 TELEPHONE (610)7183797 METHOD OF CAUSE AND CORRECTNE TYPE DURATION _ REASON SHUTTING DOWN ACTION TO NO. DATE '(1) (HOURS) (2) REACTOR (3) PREVENT RECURRENCE 300 900001 F. 5.0 A 4 REACTOR POWER WAS REDUCED TO 0% BECAUSE OF .
CONTINUATION OF FORCED OUTAGE TO REPAIR EHC LEAK.
REACTOR POWER WAS RESTORED TO 100% AFTER REPAIRS WERE COMPLETED 301 900833 S H 4 REACTOR POWER WAS REDUCED TO 82% TO PERFORM ROD PATTERN ADJUSTMENT.
302 Canana .S H 4 REACTOR POWER WAS REDUCED TO 96% DUE TO ROD PATTERN ADJUSTMENT.
303 980610 F F. 4 REACTOR POWER WAS REDUCED TO 90% DUE TO LOSS OF COOUNG TOWER MAKE-UP.
304 900816 S B 4 REACTOR POWER WAS REDUCED TO 95% DOE TO MAIN TURBINE VALVE TESTING.
l TOTAL HOURS 5.0 l
(1) (2) (3)
F-FORCED REASON . [ METHOD S -SCHEDULED A- EQUIPMENT FAILURE (EXPl.AIN) 1 - MANUAL B -MAINTENANCE OR TEST 2-MANUAL SCRAM C-REFUEUNG 3- AUTOMATIC SCRAM D-REGUt.ATORY RESTRICTION 4-OTHER (EXPUUN)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMIN *cTRATNE G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
1 1
Docket No. 50-353 Attachment to Monthly Operating Report for August 1998 Limerick Generating Station Unit 2 August 1 through August 31,1998
- 1. Harrative Summary of Operatino Experiences Unit 2 began the month of August 1998 at 1000% rated thermal power (RTP).
August 1,1998 at 2305 hours0.0267 days <br />0.64 hours <br />0.00381 weeks <br />8.770525e-4 months <br />, power was reduced to 96% of RTP for main turbine valve testing. Power was restored to 100% of RTP on August 2,1998 at 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />.
August 8,1998 at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br />, power was reduced to 96% of RTP for main turbine valve testing. Power was further reduced to 85% to scram time test and restore control rod 06-31. Power was restored to 100% of RTP on August 9,1998 at 0340 hours0.00394 days <br />0.0944 hours <br />5.621693e-4 weeks <br />1.2937e-4 months <br />.
On August 10,1998 at 1423 hours0.0165 days <br />0.395 hours <br />0.00235 weeks <br />5.414515e-4 months <br />, power was reduced to 90% of RTP due to loss of the Perkiomen pumps for cooling tower make-up. Power was restored to 100% of RTP at 1651 hours0.0191 days <br />0.459 hours <br />0.00273 weeks <br />6.282055e-4 months <br />.
August 15,1998 at 2235 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.504175e-4 months <br />, power was reduced to 96% of RTP for main turbine valve testing. Power was restored to 100% of RTP on August 16,1998 at 2350 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94175e-4 months <br />. j l
August 23,1998 at 0053 hours6.134259e-4 days <br />0.0147 hours <br />8.763227e-5 weeks <br />2.01665e-5 months <br />, power was reduced to 96% of RTP for main turbine l valve testing. Power was further reduced to 89% of RTP for a control rod pattem I adjustment at 0153 hours0.00177 days <br />0.0425 hours <br />2.529762e-4 weeks <br />5.82165e-5 months <br />. Power was restored to 100% of RTP at 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />.
August 29,1998 at 2144 hours0.0248 days <br />0.596 hours <br />0.00354 weeks <br />8.15792e-4 months <br />, power was reduced to 96% of RTP for main turbine valve testing. Power was restored to 100% of I JP at 2255 hours0.0261 days <br />0.626 hours <br />0.00373 weeks <br />8.580275e-4 months <br />.
Unit 2 ended this month at 100% of RTP.
11.- Challenaes to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of August. There have been no challenges to the Main Steam Safety Relief Valves year-to-date.
OPERATING DATA REPORT DOCMET NO. ' 50-363 L DATE : SEPTNR 14,1998
~
COMPLETED BY PECO ENERGY COMPANY .
P. A.HINCHEY REPORTS ENGINEER S(TE ENGINEERING
. UMERICK GENERATING STATION TELEPHONE (610)718 3797.
OPERATING STATUS
- 1. UNIT NAME.
LIMERICK UNIT 2
- 2. REPORTINC MRIOO*-
AUGUSTdS98,
- 3. DESIGN ELECTRICA4. RATING (NET MWE): 1115
- 4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1156-
- 5. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1115 THIS MONTH YR-TO-DATE CUMULATNE
- 6. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,473.3 - 69.6203
- 7. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 8. HOURS GENERATOR ON-UNE 744.0 5.418.4 68.214.1
- 9. UNIT RESERVE SHUTDOWN HOURS . 0.0 0.0 0.0
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 829,503 5,979,947 70fA1748
~ DOCKETNO. 50-3S3 ~.
UNITNAME UMERICKUNIT2 .
DATE SEPTEMBER 14,1998 COMPLETED BY PECO ENERGY CORF.UfY '
F. A. HINCHEnf
, REPORTS EP:GNEER SITE ENGINEERING LNERICK GENERATING STATION -
REPORT MONTH AUGUST,19C TELEPHONE (610)718-3797
~
METHOD OF CAUSE AND CORRECTNE '
TYPE DURATION REASON SHUTTING DOWN ACTION TO NO. DATE- (1) (HOURS) (2) REACTOR (3) PREVENT RECURRENCE 318 cannni S B 4 REACTOR POWER WAS REDUCED TO 911% DUE TO MAIN .
TURBINE VALVE TESTING.
319 annann S B 4 REACTOR POWER WAS REDUCED TO 911% DUE TO MAIN TURBINE VALVE TESTING AND FURTHER TO 85% TO SCRAM TIME TEST & RESTORE CONTROL ROO 06-31.
320 91pl810 F H 4 REACTOR POWER WAS REDUCED TO 90% DUE TO LOSS OF 4 COOUNG TOWER MAKE-UP.
321 900815 S B 4 REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
322 N S B- 4- REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING AND FURTHER TO 89% FOR ROD PAT ADJ.
f 323 980829 S B 4 REACTOR POWER WAS REDUCED TO 93% DUE TO MAIN TURE4.NE VALVE TESTING.
- TOTALHOURS (1) (2) (3)
F-FORCED REASON METHOD S-SCHEDULED A- EQUIPMENT FAILURE (EXPUUN) 1 - MANUAL B - MAINTENANCE OR TEST 2-MANUAL SCRAM C-REFUEUNG 3- AUTOMATIC SCRAM D- REGUt.ATORY RESTRICTION .
4 -OTHER(EXPLAIN)
E - OPERATOR TRAthlNG + LICENSE EXAMINATION F- ADMINISTRATNE G-OPERATIONAL ERROR (EXPLAIN)
H -OTHER (EXPLAIN)
_ _ _ _ _ _ .