Limerick GDnerCting Otation i
A Y
\\
PECO NUCLEAR gcggg=~
A UNir or /YCO ENf RCV Sanatoga PA 19464-0920 T.S.6.9.1.6 November 13,1996 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Contrd btA i
Washington, DC 20555 i
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 j
i Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the j
month of October 1996 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours, Edward F Sproat,Ill Director - Site Engineering drh Enclosures l
cc:
H. J. Miller, Administrator, Region I, USNRC N. S. Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS p'
9611100131 961031 PDR ADOCK 05000352 R
PDR g
180020 1
Docket Ns. 50-352 Attachment to Monthly Operating Report for October 1996 Limerick Generating Station Unit 1 October 1 through October 31,1996 1.
Narrative Summarv of Operatino Experiences i
i Unit 1 began the month of October 1996 at a nominal 100% of rated thermal power (RTP).
On October 4,1996 at 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br />, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP at 2305 hours0.0267 days <br />0.64 hours <br />0.00381 weeks <br />8.770525e-4 months <br />.
)
On October 11,1996 at 2253 hours0.0261 days <br />0.626 hours <br />0.00373 weeks <br />8.572665e-4 months <br />, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP on October 12,1996 at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.
On October 18,1996 at 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br />, power was reduced to 92% RTP for control rod pattern adjustment and main turbine valve testing. Power was restored to 100% RTP on October 19,1996 at 0139 hours0.00161 days <br />0.0386 hours <br />2.29828e-4 weeks <br />5.28895e-5 months <br />.
On October 22,1996 at 1144 hours0.0132 days <br />0.318 hours <br />0.00189 weeks <br />4.35292e-4 months <br />, power was reduced to 90% RTP for main turbine front standard oil leak. Power was restored to 100% RTP on October 22,1996 at 1446 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.50203e-4 months <br />.
On October 25,1996 at 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br />, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP on October 26,1996 at 0008 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Unit 1 ended this month operating at 100% RTP.
j ll.
Challenoes to Main Steam Safety Relief Valves j
There were no challenges to the Main Steam Safety Relief Valves during the month of October.
1 l
l l
AVERAGE DAILY POWER LEVEL-DOCKET NO. 50-352 4
UNIT LIMERICKUNIT1 DATE NOVEMBER 13,1996 COMPANY-PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATli3G STATION TELEPHONE (610)718-3772
{
MONTH OCTOBER,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 4 1
1105 17 1105 2
1113 18 1109 3
1113 19 1112 4
1117 20 1116 5
1121 21 1116 t
6 1115 22 1108 7
1117 23 1108 8
1113 24 1112 9
1117 25 1113 10 1113 26 1113 11 1122 27 1111
?
12 1117 28 1113 i
13 1113
~ 29 1121 14 1109 30 1108 15 1118 31 1116 16 1114
- - - _.. _... -.. - _ _ _ -.. -.. _ _... -.. - -. -. ~..., - -
-I
OPERATING DATA REPORT'-
I DOCKET NO. '50-352 I
DATE NOVEMBER 13,1996 COMPLETED BY PECO ENERGY COMPANY DAVID R.HENRICKS REPORTS ENGINEER SITE ENGINEERING i
UMERICK GENERATING STATION
[
TELEPHONE (610)718 3772 OPERATING STATUS
{
- 1. UNIT NAME. ------------------------.-----------------------
LIMERICK UNIT 1 i
- 2. REPORTING PERIOD: _ _ _ _ _ _ _ _ _ _ _ _, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ OCTOBE_R,1,996 GREATER THAN 20% THIS MONTH
- 3. LICENSED THERMAL POWER (MWT). _ _ _ _,,, _ _ _ _ _ _, _ _ _ _,, _ _ _ _ _ _ _ _ _ _ _3458
- 4. NAMEPLATE RATING (GROSS MWE): __________________,___________1,1_00_
- 5. DESIGN ELECTRICAL RATING (NET MWE): _____________.,____________11_05
[
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):,,__.___,_____________1145,
- 7. MA)0 MUM DEPENDABLE CAPACITY (NET MWE): ______,________________1_105 j
8.' IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
[
L
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
~i
- 11. HOURS IN REPORTING PERIOD 745 7.320 94,224 i
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6,439.7 78,863.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 14. HOURS GENERATOR ON-LINE 745.0 6,296.1 77,296.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,568.918 20,096,686 240,837,581
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 857,300 6,796,300 78,430,780
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 829,445 6,555,881 75,347,333 j
t PAGE 1 OF 2 i
--.-m..
........-,,,........_.,...,........._._,,m
.~_ _-_..-.....__. -._,
OPERATING DATA REPORT (CONTINUED)
DOCKET NO.
50-352 DATE. NOVEMBER 13,1996 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 %
86.0 %
82.0 %
- 20. UNIT AVAILABfUTY FACTOR 100.0 %
86.0 %
82.0 %
1 21 UNIT CAPACITY FACTOR (USING MDC NET) 100.8 %
81.5 %
75.5 %
j
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.8 %
81.5 %
75.5 %
- 23. UNIT FORCED OUTAGE RATE
.0%
4.1 %
4.3 %
j
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICI1Y MID APRIL 85.
04/13/85 COMMERCIAL OPERATION 1ST QTR 86 02/01/86 t
PAGE 2 OF 2 4.- -mm
. m..
. m
.-.-.m m
m.m m-=-.-
-- -m m
- UNIT SHUTDOWNS AND POWER REDUCTIONS L
DOCKETNO. 50-352 UNITNAME UMERICKUNIT1 DATE NOVEMBER 13,1996 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION REPORT MONTH OCTOBER,1996 TELEPHONE (610)7183772 l
r METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 153 961004 S
0.0 B
4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
154
=* 1 S
0.0 B
4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VAL *K TESTING.
155 961018 b
0.0 B
4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 92% DUE TO CONTROL ROD PATTERN ADJUSTMENT AND MAIN TURBINE VALVE TESTING.
156 961022 F
0.0 A
4 N/A HA TURBIN REACTOR POWER WAS REDUCED TO 90% DUE TO A MAIN TURBINE FRONT STANDARD OIL LEAK.
157 961025 S
0.0 B
4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO l
MAIN TURBINE VALVE TESTING.
TOTAL HOURS 00 l
t l
f
-}
I (1)
(2)
(3)
(4)
[
F-FORCED REASON METHOD EXHtBIT G -INSTRUCTIONS i
S -SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA i
B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE i
I C-REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + UCENSE EXAMINATION F-ADMINISTRATIVE (5)
G -OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLA!N) i
?
~
Docket No. 50-353 l
Att: chm:;nt to Monthly Operating Report for October 1996 i
Limerick Generating Station i.
Unit 2 October 1 through October 31,1996 i.
Narrative Summary of Operatina Exoeriences Unit 2 began the month of October 1996' at a nominal 100% of rated thermal power (RTP).
On October 4,1996 at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, power was reduced to 98% RTP for main turbine valve l
testing. Power was restored to 100% RTP on October 5,1996 at 0017 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br />, i
l-On October 6,1996 at 0358 hours0.00414 days <br />0.0994 hours <br />5.919312e-4 weeks <br />1.36219e-4 months <br />, power was reduced to 59% RTP for a Generator Stator l
Cooling Y-strainer replacement. Power was further reduced to 22% RTP and the main
?
l turbine was tripped at 0918 hours0.0106 days <br />0.255 hours <br />0.00152 weeks <br />3.49299e-4 months <br />. The main turbine was synchronized to the grid at 1348 and power was restored to 100% RTP on October 7,1996 at 1057 hours0.0122 days <br />0.294 hours <br />0.00175 weeks <br />4.021885e-4 months <br />.
l On October 9,1996 at 1207 hours0.014 days <br />0.335 hours <br />0.002 weeks <br />4.592635e-4 months <br />, power was reduced to 94% RTP for removal of the 6* feedwater heaters from service.' Power was restored to 100% RTP at 1341 hours0.0155 days <br />0.373 hours <br />0.00222 weeks <br />5.102505e-4 months <br />.
4 On October 12,1996 at 2305 hours0.0267 days <br />0.64 hours <br />0.00381 weeks <br />8.770525e-4 months <br />, power was reduced to 83% RTP for condensate pump motor repair work. Power was further reduced to 55% RTP to remove a reactor feed pump. Power was restored to 100% RTP on October 17,1996 at 0102 hours0.00118 days <br />0.0283 hours <br />1.686508e-4 weeks <br />3.8811e-5 months <br />.
On October 18, at 2015 hours0.0233 days <br />0.56 hours <br />0.00333 weeks <br />7.667075e-4 months <br />, power was reduced to 98% RTP for main turbine valve l
testing. Power was restored to 100% RTP at 2105 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.009525e-4 months <br />.
On October 25,1996 at 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br />, power was reduced to 98% RTP for main turbine l
l valve testing. Power was restored to 100% RTP at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br />.
l Unit 2 ended this operating period at 100% of RTP.
11.
Challenoes to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of October.
i i
AVERAGE DAILY POWER LEVEL DOCKET NO. 50-353 UNIT UMERICKUNIT2 DATE NOVEMBER 13,1996 i
COMPANY PECO ENERGY COMPANY DAVID R. HENRICKS L
REPORTS ENGINEER -
7 SITE ENGINEERING L
LIMERICK GENERATING STATION I
TELEPHONE (610)718-3772
[
MONTH OCTOBER,1996 r
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(MWE-NET)
(MWE-NET) 1 1120 17 1100 2
1122 18 1107 3
1126 19 1115 4
1127 20 1115 5
1122 21 1114 6
434 22 1112 7
1023 23 1110 8
1123 24 1111 9
1107 25 1114 I
h 10 1117 26 1111 11 1117 27 1105 l
12 1106 28 1108 13 706 29 1112 14 656 30 1105 15 777 31 1112 16 793 i
L
OPERATING DATA REPORT DOCKET NO. 50 -353 DATE NOVEMBER 13,1996 COMPLETED BY PECO ENERGY COMPANY '
DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 OPERATING STATUS
- 1. UNIT NAME: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _L_IM_E_R_IC_K_U_N_IT_ 2_
- 2. REPORTING PERIOD: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,, _ _ _ _ _ _ _ _ OCTOBE_R 1996 t
GREATER THAN 20% THIS MONTH
- 3. LICENSED THERMAL POWER (MWT). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _3458 DUE TO GENERATOR STATOR
- 4. NAMEPLATE RATING (GROSS MWE): __-------------------------------
COOUNG REPAIR AND CONDENSATE 1163
- 5. DESIGN ELECTRICAL RATING (NET MWE): __________________________11_15 PUMP VfBRATIONS.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
_____________________1155
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _______________________1_115
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745 7,320 59,736
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7,297.0 54,829.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 740.5 7,227.2 53,819.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,417,165 24,705,711 173,051,444
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 801,000 8,212.200 57,290,080
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
'774,572 7,941,540 55,245,171 i
i PAGE 10F 2 j
. _-- _.,- __.. -. _ - - _ _ _. _ - _ -...- -..~ - _ _..,,_ ~._ - - _-__ - ___.
~
k OPERATING DATA REPORT (CONTINUED)
=
DOCKET NO.
50-353 DATE NOVEMBER 13,1996 THIS MONTH YR-TO-DATE CUMULATIVE '
- 19. UNIT SERVICE FACTOR 99.4 %
98.7 %
90.1 %
- 20. UNIT AVAILABILITY FACTOR 99.4 %
98.7 %
90.1 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 93.2 %
97.3 %
86.3 %
7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 93.2 %
97.3 %
86.3 %
i
- 23. UNIT FORCED OUTAGE RATE
.6 %
1.3 %
3.1 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
REFUELING OUTAGE SCHEDULED FOR 1/2497 LASTING 25 DAYS.
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED g
INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 0901/89 I
COMMERCIAL OPERATION 02/01/90 01/08/90 b
PAGE 2 OF 2
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-353
(-
UNIT NAME UMERICKUNIT2 DATE NOVEMBER 13,1996 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING UMERICK GENERATING STATION REPORT MONTH OCTOBER,1996 TELEPHONE (610)718-3772 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE t
i 144 961004 S
0.0 B
4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
145 961006 F
4.5 A
4 N/A HA FILTER REACTOR POWER WAS REDUCED TO 22% DUE TO REPLACEMENT OF THE GENERATOR STATOR COOLING "Y" STRAINER.
146 961009 S
0.0 H
4 N/A CH HTEXCH REACTOR POWER WAS REDUCED TO 94% DUE TO
[
REMOVAL OF SIXTH FEEDWATER HEATERS FROM SERVICE FOR COASTDOWN.
147 961012 F
0.0 A
4 N/A HH PUMPXX REACTOR POWER WAS REDUCED TO 55% DUE TO REMOVAL OF A REACTOR FEED PUMP AND A CONDENSATE PUMP CAUSED BY VIBRATION PROBLEMS.
148 961018 S
0.0 B
4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
149 961025 S
0.0 B
4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
TOTAL HOURS 4.5 (1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B -MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C-REFUEUNG 3 - AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + UCENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)
--