__
Limeric.k Generstmg Station
,.+n
=y l
RECO NUCLEAR
[31T;?~
A usa or itco hva S""'"* ^ * *
- T.S.6.9.1.6 February 13,1998 Docket Nos. 50 352 50 353 License Nos NPF 39 NPF 85 U S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station Monthly Operating Report For Units I and 2 Enclosed are the monthly operating repons for Limerick Units 1 and 2 for the month of January 1998 forwarded pursuant to Technical Specification 19,1,6.
Very truly yours,
-Joseph P, Grimes Director - Site Engineering pah Enclosures
- 11. J. Miller, Administrator, Region I, USNRC cc:
A. L. Burritt, USNRC Senior Resident inspector LGS l [_
J. D. von Suskil, Vice President, LGS Q
Pon* T N h oi' lElllI%,II,%III R
Docket No. 50 352 Att:chmtnt to Monthly Operating Report for January 1998 Limerick Generating Station Unit 1 January 1 through January 31,1998 1.
Narrative Summary of Operatina Exocriences Unit 1 began the month of January 1998 at 77% of rated thermal power (RTP) while performing replacement of the 'A' Condensate Pump.
On January 4,1998 at 0138 hours0.0016 days <br />0.0383 hours <br />2.281746e-4 weeks <br />5.2509e-5 months <br />, power was restored to 100% of RTP.
On January 4,1998 at 2029 hours0.0235 days <br />0.564 hours <br />0.00335 weeks <br />7.720345e-4 months <br />, power was reduced to 78% of RTP for a control rod pattern adjustment. Power was restored to 100% RTP on January 5,1998 at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.
On January 10,1998 at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, power was reduced to 98% of RTP for main l
turbine valve testing. Power was restored to 100% RTP at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br />.
On January 17,1998 at 2036 hours0.0236 days <br />0.566 hours <br />0.00337 weeks <br />7.74698e-4 months <br />, power was reduced to 98% of RTP for main l
turbins valve testing. Power was further reduced to 90% RTP at 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br /> for control valve testing, then further reduced to 75% RTP at 2315 for planned withdrawal of control rod 50-27 to position 46. Power was restored to 100% RTP on January 18,1998 at 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />.
On January 24,1998 at 2157 hours0.025 days <br />0.599 hours <br />0.00357 weeks <br />8.207385e-4 months <br />, power was reduced to 98% of RTP for main turbine valve testing. Power was restored to 100% RTP at 2320 hours0.0269 days <br />0.644 hours <br />0.00384 weeks <br />8.8276e-4 months <br />, On January 27,1998 at 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br />, power was reduced to 97% of RTP to optimize Recirc pump / piping vibration conditions.
On January 30,1998 at 2146 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.16553e-4 months <br />, power wa* 'urther reduced for a controlled plant shut down to perform a planned outage to reson, primary containment unidentified leakage and repair a HPCI turbine exhaust valve.
Unit 1 ended this month operating at 0% RTP, 11.
Challenoes to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of January.
1 i
i OPERATING DATA REPORT f
i DOCKET NO_ 50 -352 i
i DATE FEBRUARY 13,1998 f
1 COMPLETED BY PECO ENERGY COMPANY i
V.T. ANGUS REPORTS ENGINEER STTE ENGINEERING UMERICK GENERATING STATX)N TELEPHONE (sto) 71EL3767 t
j l
i l
1 OPERATING STATUS l
i 1 UNIT NAME-
_ _ _ _ _. UMERICK UNIT 1 2 REPORTING PERIOD.
_ __ _ _ _ _ _ _ __ __.tANUARY,1998 i
t
- 3. DESIGN ELECTRICAL RAT!NG (NET uwEy:
1105 4 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) 1145
{
- 5. MAXIMUM DEPENDABLE L%PACITY (NET MWE):
i 1105 l
l t
i f
Tilts MONTH YR-TCM) ATE CUMULATTVE f
i l
l 6 NUMBER OF HOURS REACTOR WAS CRITICAL 7240 7240 89.510 4
{
- 7. REACTOR RESERVE SHUTDOWN HOURS 00 00 00
- 8. HOURS GENERATOR ON-LINE 723 0 723.0 88.0170 i
9 UNIT RESERVE SHUTDOWN HOURS 0.0 00 00
)
f
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 775,422 775.422 86.936.000 i
h
)
. _.... _ _ _ _. ~ _. _ - -
_m.-_--.
m.-.<
m..-~
UNIT SHUTDOWNS
- [
j i'
l-DOCKET NOf 50-352 l
UNIT MAME LIMERX;K UNIT T j
DATE FEBRUARY 13,1988 COMPLETED BY PECO ENERGY COMPANY f
)-
V.T. ANGUS REPORTS ENGNEER SITE ENGINEER 1NG LIMERICK GENERATING STATON I
. REPORT hCNTH JANUARY,1996 TELEPHONE (610)7183757 l
METHOD OF CAUSE AND CORRECTIVE TYPE DURATON REASON SHUTTING DOWN ACTON TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
PREVENT RECURRENCE
{
a 246 900101 F
A 4
REACTOR POWER WAS REDUCED TO 77% DUE TO FAlLURE OF g
THE 1 A CCNDENSATE PUMP.
?
247 900104 S
B 4
REACTOR POWER WAS REDUCED TO 78% DUE TO ROD i
PATTERN ADJUSTMENT l
248 900110 S
B 4
REACTOR POWER WAS REDUCED TO 98% DUE TO WuN
[
TURBWE VALVE TESTmG.
249 900117 S
B 4
REACTOR POWER WAS REDUCED TO 9es DUE TO MAN I
f TURBINE VALVE TESTING.
250 900117 S
B 4
REACTOR POWER WAS FURTHER REDUCED TO 90% DUE TO CONTROL VALVE TESTING.
l 251 980117 S
B 4
REACTOR POWER WAS FURTHER REDUCED TO 75% DUE TO PLANNED WITHDRAWAL OF ROO 50 27.
252 980124 S
B 4
REACTOR POWER WAS REDUCED TO 98% DUE TO TURBINE 1
VM'K TESTING.
253 980127 F
H 4
REACTOR POWER WAS REDUCED TO 97% DUE TO RECIRC
}
PUuPmPmGvieRATON.
254 900130 S
20 0 A
1 REACTOR POWER WAS FURTHER REDUCED TO O% DUE TO FAILURE OF HPCI TURBINE EXHAUST VALVE.
(
j.
I TOT AL HOURS 20 0 i
(
(1)
(2)
(3)
I F-FORCED REASON METHOD S-SCHEDULED A-EOUIPMENT FAILURE (EXPLAIN) 1 -MANUAL 4
j B - N. NANCE OR TEST 2-MANUAL SCRAM l
C - REFUELING 3-AUTOMATIC SCRAM D-REGULATORY RESTRfCTION 4-OTHER (EXPUuN)
E - OPERATOR TRAINING + UCENSE EXAMMATION i
F-ADMINtSTRATTVE I
G-OPERATsONAL ERROR (EXPLAM)
H-OTHER (EXPLAM) 4 t
-.,.=
~-.
-~
N
~.
j.
Dock;t No. 50 353 Att: chm nt to Monthly l
Operating Report for January 1998 j
Limerick Generating Station Unit 2 January 1 through January 31,1998 l.
N3 native Summary of Operatingl.xDeriences i
l Unit 2 began the month of January 1998 at 100% rated thermal power (RTP).
4 4
i l
On January 3,1998 at 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br />, power was reduced to 98% of RTP for main turbine valve testing. Power was restored to 100% RTP at 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br />.
l 1
On January 10,1998 at 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br />, power was reduced to 87% of RTP for main turbine valve testing, main steam isolation valve testing and a rod pattern adjustment.
Power was restored to 100% RTP on January 11,1998 at 0520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br />, i
On January 18,1998 at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br />, power was reduced to 98% of RTP for main 4
turbine valve testing. Power was restored to 100% RTP at 0430 hous.
On January 24,1998 at 0220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br />, power was reduced to 90% of RTP for taking the 6 'A' feedwater heater out of service and for main turbine valve testing. Power was restored to 100% RTP on January 25,1998 at 0722 hours0.00836 days <br />0.201 hours <br />0.00119 weeks <br />2.74721e-4 months <br />, j
On January 27,1998 at 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br />, power was reduced to 93% of RTP to place the 6
'A' feedwater heater in service and for rod pattern adjustments. Power was restored to 100% RTP on January 28,1998 at 0153 hours0.00177 days <br />0.0425 hours <br />2.529762e-4 weeks <br />5.82165e-5 months <br />.
l 1
Unit 2 ended this operating period at 100% of RTP.
3 II.
Challenoes to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of January.
L d
i
.,c--,,-w,,---
y y-4--,.
y,
,.y-,-3 ym-.
- m m e-
.--wv--v,-7,*-,cyw i
-,-c3.r, - - - -,---.-,
v.
41,
---e
-.w-
+
OPERATING DATA REPORT DOCKET NO. 50 353 DATE FEGRUARY 13,1996 COMPLETED BY PECO EEERGY COMPANY V.T. ANGUS l
REPORTS ENGNEER SITE ENONEERING LIMERICK GENERATNG STATION TELEPHONE (610)71S.3757 OPERATING STATUS
- 1. WT MME:
.. _ _, ___ __ _L E W W 2
- 2. REPORTING PERIOD:
_ _ JANUARY,1998
- 5. MAXIMUM OEPENDABLE CAPACITY (NET WE)'
1115 THtS MONTH YR-T04 ATE CUMULATTVE 6 NUMBER OF HOURS REACTOR WAS CRITICAL 744 0 7440 64.891 0
- 7. REACTOR RESERVE SHUTDOWN HOURS 00 00 00
- 8. HOURS GENERATOR ON-LINE 744 0 744 0 63.539 7 9 UNIT RESERVE SHUTDOWN HOURS 00 00 00
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 839.235 839.235 65.451.036 i
(
,,....... _ -.....,....., =....
UNIT SHUTDOWNS DOCC:ETNO. 50-353 UNITNd.JE UMERICKUNIT2
.. ATE FEBRUARY 13.1996 COMPLETc0 BY PECO ENERGY COMPANY V. T. ANGUS REPORTS ENGNEER StTE ENQNEERING UMERICK GENERATING STATX)N RE? ORT MONTH JANUARY,1996 TELEPHONE ($10)7183757 I
METHOO OF CAUSE AND CORRECTIVE TYPE DURATh.)N REASON SHUTTWG DOWN ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
PREVENT RECURRENCE 255 900103 S
B 4
REACTOR POWER WAS REDUCED TO 98% DUE TO TURBINE VALVE TESTING.
256 900110 S
B 4
REACTOR POWER WAS REDUCED TO 87% DUE TO ROD PATTERN ADJUSTMENT AND TURB:NE VALVE TEST:NG.
257 900118 S
B 4
REACTOR POWER WAS REDUCED TO 98% DUE TO TURBWE VALVE TESTING 258 900124 S
A 4
REACTOR POWER WAS REDUCED TO 90% DUE TO REMOVC.T,6A FEEDWATER HEATER FROM SERVICE FOR VALVE REPAIRS.
259 900124 S
B 4
WHfLE REACTOR POWER WAS REDUCED TO 90%. TURBWE VALVE TESTING WAS PERFORWtD.
260 900127 S
A 4
REACTOR POWER WAS REDUCED TO 93% DUE TO PLACING THE SA FEEDWATER HEATER BACKIN SERVICE..
261 980127 S
E 4
WHILE REACTOR POWER WAS REDUCED TO 93% ROD PATTERN ADJUSTMENT WAS PERFORMED TOTAL HOURS (1)
(2)
(3)
F-FORCED REASON METHOO S - SCHEDULED A-EQU!PMENT FAILURE (EXPLAIN) 1 - MANUAL B - MAINTENANCE OR TEST 2-MANUAL SCRAM C-REFUEUNG 3-AUTOMATIC SCRAM D-REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
E-OPERATOR TRAINING + UCENSE XAMINATON F-ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
L____
.