Limerick Generating Stations
~ w v
PECO NUCLEAR nco w c-Po Box 2300 A Unit of PECO Energy
%natoga. PA 194644)920 T.S.6.9.1.6 May 12,1997 Docket Nos. 50 352 50-353 License Nos. NPF-39 NPF-85
' U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subject; Limerick Generating Station Monthly Operating Report For Units I and 2 I
Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of April 1997 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours,
/
nes D. von Suskil 6
irector - Site Engineering f
bec Enclosures s
cc:
H. J. Miller, Administrator, Region I, USNRC N. S. Perry, USNRC Senior Resident inspector LGS W. G. MacFarland, Vice President, LGS 9705140332-970430 1
-i PDR ADOCK 05000352a R
PDRpi 140020 R l l ll lE. l
~.
~
Dock:t N3. 50-352 Attachment to Monthly Operating Report for j
April 1997 Limerick Generating Station Unit 1 i
April 1 through April 30,1997 l.
Narrative Summary of Operatina Experiences Unit 1 began the month of April 1997 at a nominal 100% of rated thermal power (RTP).
On April 4,1997 at 2032 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.73176e-4 months <br />, power was reduced to 98% of RTP for main turbine valve testing. Power was restored to 100% RTP at 2155 hours0.0249 days <br />0.599 hours <br />0.00356 weeks <br />8.199775e-4 months <br />.
On April 6,1997 at 2034 hours0.0235 days <br />0.565 hours <br />0.00336 weeks <br />7.73937e-4 months <br />, power was reduced to 98% of RTP to reduce main turbine condenser back pressure. Power was restored to 100% RTP on April 7,1997 at 0330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br />.
On April 11,1997 at 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br />, power was reduced to 98% of RTP for main turbine valve testing. Power was restored to 100% RTP at 1103 hours0.0128 days <br />0.306 hours <br />0.00182 weeks <br />4.196915e-4 months <br />.
On April 11,1997 at 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br />, power was reduced to 70% of RTP to prepare for main turbine generator maintenance.
On April 11,1997 at 2211 hours0.0256 days <br />0.614 hours <br />0.00366 weeks <br />8.412855e-4 months <br />, power was further reduced to 23% of RTP for main turbine generator maintenance. Power was restored to 100% RTP on April 18,1997 at 1402 hours0.0162 days <br />0.389 hours <br />0.00232 weeks <br />5.33461e-4 months <br />.
On April 26,1997 at 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br />, power was reduced to 98% of RTP for main turbine valve testing. Power was further reduced to 80% of RTP at 0859 due to power spiking
{
during the turbine valve testing. Powerwas restored to 100% RTP on April 271997 1
j at 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br />.
On April 29,1997 at 1952 hours0.0226 days <br />0.542 hours <br />0.00323 weeks <br />7.42736e-4 months <br />, power was reduced to 98% of RTP to prepare for a
]
reactor water clean up system outage. Power was restored to 100% RTP on April 30, i
1997 at 2155 hours0.0249 days <br />0.599 hours <br />0.00356 weeks <br />8.199775e-4 months <br />.
Unit i ended this month operating at 100% RTP.
II.
Challenaes to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of April.
c AVERAGE DAILY POWER LEVEL
~
DOCKETNO. 50-352 tJNIT LIMERICKUNIT1 DATE MAY8,1997 '
COMPANY PECO ENERGYCOMPANY BRUCE E. CANFIELD i
~
REPORTS ENGINEER.
SITE ENGINEERING UMERICK GENERATING STATON
' TELEPHONE (610)718N
. DAY-AVERAGE DAftY POWER LEVEL DAY AVERAGE DAtLY POWER LEVEL (MWE-NED (MWEWET) -
1 1100 17 748 2
1100 18 1056 3
1096 19 1102 4-1092 20 1106 5
1009
- 21
- 1106 6
1096
~
22 1006 7
1091 23 1102
~8 1104 24 1097 9
1121 25 1093 10 1116 26 959 11 770 27 1001 12 0
28 1093 13 0
29 1002 14 0
30 1096 15 283 16 040 so-_,
--,,,m._
,,.1___,
OPERATING DATA REPORT DOCKET NO, 50- 352
? DATE - MAY 8,1997 COMPLETED BY PECO ENERGY COMPANY-BRUCE E. CANFIELD REPORTS ENGINEER -
SITE ENGINEERING LIMERCK GENERATING STATION TELEPHONE ' (610)718m OPERATING STATUS
- 1. UNIT NAMEL LIMERICK UNIT 1 NOTES: THERE WAS 1 LOAD DROP GREATER.
- 2. REPORTING PERIOD-APRIL,_1997 THAN 20% THtS MONTH DUE TO
- 3. LICENSED THERMAL POWER (MWT):
3458 MAIN TURB GEN MAINTENANCE.
- 4. NAMEPLATE RATING (GROSS MWE):
1180
- 5. DESIGN ELECTRICAL RATING (NET MWE):
11(Mi
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)-
1145
- 7. MAXIMUM DEPENDABLE CAPACI'Y (NET MWE):
1105
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS,lF ANY:
THIS MONTH YR-TO-DATE -
CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719
' 2,879 96,567
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,879.0 83,006.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 644.0 2,804.0 81,564.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 -
0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,064,173 9,528,880 255,281,043 j-
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 881,800 3,170,200 83,241,980
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 869,495 3,089,006 80,002,105 l
PAGE 1 OF 2 i
.. ~.
9._
OPERATING DATA REPORT (CONTINUED)
DOCKET NO.
50 -362 DATE MAY 8,1997 _
~
~
THIS MONTH
- YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 89.6 %
97.4 %
82.7 %
- 20. UNIT AVAllABIUTY FACTOR 89.6 %
97.4 %.
- 82.7 %
' 21. UNIT CAPACITY FACTOR (USING MDC NET) 83.0 %
96.5 %
76.5 % '
- 22. UNIT CAPACITY FACTOR (USING DER NET) 83.0 %
96.5 %
76.5 %
- 23. UNIT FORCED OUTAGE RATE
.0 %
.0 %
4.1 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATilS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED INITIAL CRITICAUTY 12/11W84 12f?2fB4 INITIAL ELECTRICITY MID APRIL 86 04/13/85 COMMERCIAL OPERATION 1ST QTR 86 02J01/86 w.
PAGE 2 OF 2
--.. _ ~
l
. UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-352 r
UNITNAME UMER!CKUNIT1 DATE MAY8,1997 COMPLETED BY PECO ENERGY COMPANY BRUCE E. CANFIELD REPORTS ENGINEER i
SITE ENGINEERING LIMERICK GENERATING STATION REPORT MONTH APRIL,1997 TELEPHONE (610)718-3794 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 186 970404 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
187 970406 S
B 4
N/A HA TURBIN REACTOR POWER WAS RFDUCED TO 98% TO REDUCE TGRBINE BACV.r'RESSURE.
188 970411 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 90% DUE TO MAIN TURBINE VALVE TESTING.
189 970411 S
B 4
N/A HA GENERA REACTOR POWER WAS REDUCED TO 70% FOR TURBINE GENERATOR MAINTENANCE.
190 970412
't 75.0 B
4 N/A HA GENERA REACTOR POWER WAS FURTHER REDUCED TO 23%, MAIN TURBINE WAS TAKEN OFF UNE FOR GENERATOR MAINTENANCE.
191 970426 S
B 4
N!A HA VALVEX REACTOR POWER WAS REDUCED TO 80% DUE TO MAIN TURBINE VALVE TESTING.
992 970429 S
B 4
N/A VALVEX REACTOR POWER WAS REDUCED TO 98% TO PREPARE FOR A REACTOR CLEANUP SYSTEM L
OUTAGE.
t TOTAL HOURS 75.0 (1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G-IMTRUCTIONS
[
S-SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA i
B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FON UCENSEE i
C-REFUEUNG 3-AUTOMATIC SCRAM EVENT REPORT (LER)
{
D-REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG4161)
E - OPERATOR TRAINING + UCENSE EXAMINATION F-ADMINISTRATIVE (5)
G -OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H -OTHER (EXPLAIN)
. m.
.m
.m
-r
..e m
m
l Docket Ns. 50-353 Attachment t3 Monthly l
. Operating Report for April 1997 Umenck Generating Station Unit 2 April 1 through April 30,1997 1.
Narrative Summary of Operatina Experiences Unit 2 began the month of April 1997 at 22% rated thermal power (RTP) in power ascension from a main turbine generator outage 1
On April 7,1997 power was restored to 100% RTP at 0644 hours0.00745 days <br />0.179 hours <br />0.00106 weeks <br />2.45042e-4 months <br />.
1 On April 12,1997 at 0244 hours0.00282 days <br />0.0678 hours <br />4.034392e-4 weeks <br />9.2842e-5 months <br />, power was reduced to 98% of RTP for main turbine valve testing. Power was restored to 100% RTP on April 12, at 0316 hours0.00366 days <br />0.0878 hours <br />5.224868e-4 weeks <br />1.20238e-4 months <br />.
On April 16,1997 at 1925 hours0.0223 days <br />0.535 hours <br />0.00318 weeks <br />7.324625e-4 months <br />, power was reduced to 85% of RTP for high main turt>ine generator bearing vibration.
On April 16,1997 at 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br />, power was reduced to 60% of RTP for main turbine generator bearing vibration. Power was further reduced to 49% of RTP at 2052. Power was increased to 52% of RTP on April 17, at 1830 after the main turbine generator vibration had stabilized.
On April 17,1997 at 0740 hours0.00856 days <br />0.206 hours <br />0.00122 weeks <br />2.8157e-4 months <br />, power was slowly increastd with additional monitoring of the main turbine generator being performed. On April 18 at 0630 power reached 71% of RTP.
Power was restored to 100% of RTP on April 19, at 0636 hours0.00736 days <br />0.177 hours <br />0.00105 weeks <br />2.41998e-4 months <br />.
On April 20,1997 at 0812 hours0.0094 days <br />0.226 hours <br />0.00134 weeks <br />3.08966e-4 months <br />, power was reduced to 90% of RTP for a control rod pattom adjustment. Power was restored to 100% RTP on April 20, at 0919 hours0.0106 days <br />0.255 hours <br />0.00152 weeks <br />3.496795e-4 months <br />.
On April 24,1997 at 0939 hours0.0109 days <br />0.261 hours <br />0.00155 weeks <br />3.572895e-4 months <br />, power was reduced to 85% of RTP for main turbine generator bearing vibration. Power was further reduced to 70% of RTP at 1759 hours0.0204 days <br />0.489 hours <br />0.00291 weeks <br />6.692995e-4 months <br />.
On April 28,1997 at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />, power was increased to 85 % RTP.
On April 30,1997 at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br />, power was reduced to prepare for a main tubine generator outage. Power was reduced to 30% of RTP at 2326 hours0.0269 days <br />0.646 hours <br />0.00385 weeks <br />8.85043e-4 months <br />.
Unit 2 ended this operating period at 30% of RTP.
11.
Challences to Main Steam Safety Relief Valves l
There were no challenges to the Main Steam Safety Relief Valves during the month of April.
AVERAGE DAILY POWER LEVEL DOCKET NO.- 30-353
' UNIT UMERICKUNIT 2 DATE MAY8,1997 COMPAM PECO ENERGY COMPANY
' BRUCE E CANFIELD REPORTS ENGINEER
^
SITE ENGNEERING UMERICKGENERATING STATION '
TELEPHONE (610)7183794 MONTH APRIL.1997 DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWEM MWE-NET) 1 0
17 500 2'
O 18 779 3
0 19 1098 4
385 20 1124 5
808 21 1123 6
954 22 1128 7
1093 23 1130 8
1111 24 982 fe 1135 25 776 10 1135 26 785 11 1132 27 790 12 1119 28 844 13 1115 29 960 -
14 1118 30 8R2 15 1122 16 1020
-. - ~
_______m____-___
_.__-.a.__.__.__.
u.
_ _ _ _.___ _ _ _m-_
1
OPERATING DATA REPORT DOCKET NO. 50 -353 DATE MAY 8,1997 COMPLETED BY PECO ENERGY COMPANY BRUCE E. CANFIELD REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610)718-3794 OPERATING STATUS
- 1. UNIT NAME-LtMERICK UNIT 2 NOTES: THERE WERE 3 LOAD DROPS
- 2. REPORTING PERIOD-.
APRit.1997_
GREATER THAN 20% THIS MONTH
- 3. UCENSED THERMAL POWER (MWT)
. _ _ _._ _,3458 DUE TO TURB GEN ALTEREX
- 4. NAMEPLATE RATING (GROSS MWE):
1163 BEARING VIBRATION.
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1115
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1155
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1115 B. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
E
- 9. POWER LEVEL TO WHICH RESTRICTED,ll ANY(NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN HEPORTING PERIOD 719 2,879 64,079
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,238.8 58,266.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 646.0 2,093.6 57,032.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,933,826 6,174,420 182,599,164
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 643,800 2,044,300 60,434,580
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 620,Ee0 1,967,800 58,272,531 PAGE 1 OF 2
4.a 4
OPERATING DATA REPORT (CONTINUED)
_~
DOCKET NO.
50 -363 DATE-MAY 8,1997
.T 4
s THIS MONTH YR-TCMMTE CUMULATIVE
- 19. UNil SERVICE FACTOR -
89.8 %
' 72.7 %
80.0 %
- 20. UNIT AVAllABILITY FACTOR -
89.8 %
72.7 %
80.0 % i
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 77.4 %
61.3 %
84.7 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 77.4 %
61.3 %
84.7 %
- 23. UNIT FORCED OUTAGE RATE
.0 %
.0 %
3.5 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
PLANNED MAINT OUTAGE. S01517 SCHEDULED 5 DAY DURATION
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
S 08/97
- 28. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS)-
FORECAST ACHIEVED INITIAL CRITICAUTY 08/12NIO 08/12/89 INITIAL ELECTRICITY 0001M19 0001A50 COMMERCIAL OPERATION 0201/90 01108/90 i
PAGE 2 0F 2
-~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-353
~
UNIT NAME UMERICK UNIT 2 DATE MAY 8,1997 COMPLETED BY PECO ENERGY COMPANY BRUCE E. CANFIELD REPORTS ENGINEER SITE ENGINEERING UMERICK GENERATING STATION REPORT MONTH APRIL,1997 TELEPHONE (610)718-3794 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 172 970401 S
73.0 B
4 N!A HA GENERA REACTOR POWER HAD BEEN REDUCED TO 22%
AND THE MAIN TURBINE WAS OFF LINE FOR GENERATOR ALTEREX REPAIR.
173 970412 S
B 3
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 90% DUE TO MAIN TURBINE VALVE TESTING.
174 970416 F
A 4
N/A HA GENERA REACTOR POWER WAS REDUCED TO 49% DUE TO TURB GEN ALTEREX BEARING VIBRATION.
175 970420 S
H 4
N/A RB CONROD REACTOR POWER WAS REDUCED TO 90% FOR A CONTROL ROD PATTERN ADJUSTMENT.
176 970424 F
A 4
N/A HA GENERA REACTOR POWER WAS REDUCED TO 30% DUE TO TURB GEN ALTEREX BEARING VIBRATION.
TOTAL HOURS 73 0 (1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C - REFUEUNG 3-AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG4161)
E - OPERATOR TRAINING + UCENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)
- - -