- . . .-- - ~. -. . . - . _.
l Limstick GanIrating Station
, A
_y PECO NUCLEAR eeco ree,2vcomneev Po Box 2300 A UNIT Or PECO ENtucy Sanatoga. PA 19464-o020 l
I 1
T.S.6.9.1.6 j 1
s
- April 9,1997 l
Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subject; Limerick Generating Station Monthly Operating Report For Units 1 and 2 0
Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of March 1997 forwarded pursuant to Technical Specification 6.9.1.6.
s l Very truly yours, j 4
h[ ;
. Edward F. Sproat, III !
Director - Site Engineering bec I Enclosures I H. J. Miller, Administrator, Region I, USNRC I cc: 'g N. S. Perry, USNRC Senior Resident Inspector LGS W. G MacFarland, Vice President, LGS h +
9704160102 970331 .g PDR ADOCK 05000352 -
p PDR
~
]
l
@,E5EU.N.E.ISE
_ _ _ _ . __ _. ._ . _ _ . . . . _ . _ . _ . _ _ . _ . _ . . _ . ~ . _ . . . .. . . . . .__ .
Dock 1t No. 50-352 1 Attichmant to Monthly l
. Operating Report for
! . . March 1997 Limerick Generating Station
- . Unit 1 I
- March 1 through March 31,1997 4 ' l. Narrative Summary of Operatina Experiences Unit i began the month of March 1997 at a nominal 100% of rated thermal power (RTP).
i On March 1,1997 at 0303 hours0.00351 days <br />0.0842 hours <br />5.009921e-4 weeks <br />1.152915e-4 months <br />, power was reduced to 98% of RTP for main turbine ;
valve testing. Power was restored to 100% RTP at 0351 hours0.00406 days <br />0.0975 hours <br />5.803571e-4 weeks <br />1.335555e-4 months <br />.
4
- On March 7,1997 at 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br />, power was reduced to 98% of RTP for main turbine l valve testing. Power was restored to 100% RTP at 2318 hours0.0268 days <br />0.644 hours <br />0.00383 weeks <br />8.81999e-4 months <br />.
t On March 14,1997 at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, power was reduced to 98% of RTP for main turbine j - valve testing. Powerwas restored to 100% RTP at 2318 hours0.0268 days <br />0.644 hours <br />0.00383 weeks <br />8.81999e-4 months <br />.
- .\
l
. On March 21,1997 at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, power was reduced to 92% of RTP for main turbine valta testing. Power was restored to 100% RTP on March 22,1997 at 0110 hours0.00127 days <br />0.0306 hours <br />1.818783e-4 weeks <br />4.1855e-5 months <br />.
t !
On March 28,1997 at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, power was reduced to 98% of RTP for main turbine )
- valve testing. Power was restored to 100% RTP on March 28 at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />.
Unit 1 ended this month operating at 100% RTP.
i -
t l li. Challenoes to Main Steam Safety Relief Valves I
} There were no challenges to the Main Steam Safety Relief Valves during the month of March.
V
- . _ _ . _ . . . . . . . _ . .m .
AVERAGE DAILY POWER LEVEL - ,
DOCKET NO. 50-352 ,
UNIT LIMERICKUNIT1 DATE APRIL 9,1997 -
3 COMPANY PECO ENERGY COMPANY BRUCE E. CANFIELD f REPORTS Ei4GINEER -
SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610)718-3794 L10 NTH MARCH,1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1115 17 1119 2 1110 18 1115 3 1119 19 1115 4 1119 20 1115 5 1119 21 1107 r 6 1115 22 1103 7 1123 23 1116 8 1115 24 1120 9 1119 25 1112 10 1119 26 1103 i l
11 1119 27 1102 ;
12 1123 28 1090 y 13 1119 29 1095 5
14 1119 30 1096 6
15 1118 31 1101 16 1123 s
I i
OPERATING DATA REPORT DOCKET NO. 50- 352 DATE APRIL 9,1997 -
COMPLETED BY PECO ENERGY COMPANY BRUCE E. CANFIELD REPORTS ENGINEER
~
SITE ENGINEERING LIMERICK GENERATING STATION i TELEPHONE (610)718 3794 OPERATING STATUS
- 1. UNIT NAME: L. I.M. .ER.I.C..K UN.._IT 1..
- 2. REPORTING PER!OD: MA,R_CH,1997_,
GREATER THAN 20% THIS MONTH.
- 3. LICENSED THERMAL POWER (MWT):- 3456
- 4. NAMEPLATE RATING (GROSS MWE): 1100
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1105
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1145
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1105
- 8. IF CHANGES OCCUR IN CAPAChY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED,:F ANY(NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 2.160 97,848
- 12. NUMBER OF HOURS REACTOR WAS CRillCAL 744.0 2,160.0 82,287.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 ,
- 14. HOURS GENERATOR ON-LINE 744.0 2,160.0 80,920.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,570,899 7,462,708 253,216,871 ,
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 854,300 2,488,800 82,560,380
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 828,168 2,409.513 79,342,610 PAGE 10F 2
. _ _ _ _ _ - . - _ = _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ - _ . .-
OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 -352 .
.DATE. APRIL 9,1997 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 % 100.0 % 82,7 %
- 20. UNIT AVAILABILITY FACTOR ' 100.0 % 100.0 % 82.7 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.7 % 101.0 % 76.4 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.7 % 101.0 % 76.4 %
- 23. UNIT FORCED OUTAGE RATE - .0% .0 % 4.1 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
PLANNED MAINT OUTAGE,4/11/97, SCHEDULED 2 DAY DURATION
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY mfd APRIL 85 04/13/85 COMMERCIAL OPERATION 1ST QTR 86 0201/86 i
t PAGE 2 OF 2
UNIT SHUTDOWNS AND POWER REDUCTIONS .. ,
i DOCKET NO. 50-352 ., l UNITNAME UMERICKUNIT1 '
r DATE APRIL 9.1997 -
COMPLETED BY PECO ENERGY COMPANY BRUCE E. CANFIELD REPORTS ENGINEER .
SITE ENGINEERING ;
UMERICK GENERATING STATION [
REPORT MONTH MARCH,1997 TELEPHONE (610)718-3794 ;
i METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 181 970301 S 1.0 8 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO ;
MAIN TURBINE VALVE TESTING. .;
182- 970307 S 1.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 90% DUE TO MAIN TURBINE VALVE TESTING. j 183 970314 S 1.0 B 4 N/A HA VALVEX . REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
184 970321 S 2.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 92% DUE TO MAIN TURBlNE VALVE TESTING 185 970329 S 1.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO !
MAIN TURBINE VALVE TESTING 6.0 TOTAL HOURS
(
t i
'f f
(1) (2) (3) (4) f F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S- SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2.MANUALSCRAM ENTRY SHEETS FOR LICENSEE C- REFUELING 3- AUTOMATIC SCRAM EVENT REPORT (LER) l D- REGULATORY RESTRICTION 4-OTHER (EXPLAIN) FILE (NUREG-0161) ,
E - OPERATOR TRAINING + LICENSE EXAMINATION 1 F- ADMINISTRATIVE (5)
G- OPERATIONAL ERROR (EXPLAIN) EXHIBIT 1- SAME SOURCE H - OTHER (EXPLAIN)
'l Dock:t No. 50-353 Attichmint to Monthly Operating Report for j , ,
March 1997 l I
4 l
j Limerick Generating Station L Unit 2
- March 1 through March 28,1997 i - 1. Narrative Summary of Operatina Experiences i
1 i Unit 2 began the month of March 1997 at 25% rated thermal power (RTP) in power ascension
- from a refueling outage. l
! On March 3,1997 Power was restored to 100% RTP at 1509 hours0.0175 days <br />0.419 hours <br />0.0025 weeks <br />5.741745e-4 months <br />.
On March 4,1997 at 2025 hours0.0234 days <br />0.563 hours <br />0.00335 weeks <br />7.705125e-4 months <br />, power was reduced to 65% of RTP due to a feedwater heat
' exchangerleak. Powerwas restored to 100% RTP on March 7,1997 at 0044 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br />.
On March 8,1997 at 2214 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.42427e-4 months <br />, power was reduced to 88% of RTP for main turbine valve
- . testing. Power was restored to 100% RTP on March 9, at 0059 hours6.828704e-4 days <br />0.0164 hours <br />9.755291e-5 weeks <br />2.24495e-5 months <br />.
t i On March 15,1997 at 1345 hours0.0156 days <br />0.374 hours <br />0.00222 weeks <br />5.117725e-4 months <br />, power was reduced to 98% of RTP for main turbine valve j testing. Power was restored to 100% RTP at 1428 hours0.0165 days <br />0.397 hours <br />0.00236 weeks <br />5.43354e-4 months <br />.
3 On March 23,1997 at 0740 hours0.00856 days <br />0.206 hours <br />0.00122 weeks <br />2.8157e-4 months <br />, power was reduced to 85% of RTP due to a main transformer high combustible gas reading. Powerwas restored to 100% RTP on March 24, at 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />.
l On March 27,1997 at 1436 hours0.0166 days <br />0.399 hours <br />0.00237 weeks <br />5.46398e-4 months <br />, power was reduced to 86% of RTP due to tuibine generator i excitor alterex in contact with its bearing.
3 Unit 2 ended this operating penod at 22% of RTP. l II. Challenaes to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of March. ;
(
.- . ~ .- .. ..-.-. . - . .. . _ -.- . _ - , . . . . .. . _ - - ..
AVERAGE DAILY POWER LEVEL. ..
DOCKET NO, 50-353 ' ,
UNIT LIMERICK UNIT 2 -
DATE APRIL 9,1997 ~
COMPANY PECO ENERGYCOMPANY BRUCE E. CANFIELD
- REPORTS ENGINEER '
SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610)718-3794
-(
MONTH MARCH,1997 -
t DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 309 17 1130 2 686 18 1'30 ;
3 1075 19 1134 4 1044 20 1125 5 901 21 1120
~
6 961 22 935 7 1140 23 1021 :
8 1123 24 1131 9 1135 25 1131 i
10 1135 26 1110 11 1130 27 1004 L
12 1138 28 775 .i
~
13 1138 29 792 i
14 1129 30 771 ,
t 15 1132 31 0 ;
i 16 1138 l
b
. . , . _ - , _ _ ._ _ ...w -- --_ _ ___w____-_.____- . . - .-_n - .__ a e_- __ . - - - _ _ _ , - _ _ _ . _
~.
OPERATING DATA REPORT DOCKET NO. 50 -3S3 DATE APR!L 9,1997 -
COMPLETED BY PEC 3 ENERGY CCMPANY i"!UCE E. CANFIELD REPORTS ENGINEER '
SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610)718-3794 OPERATING STATUS
- 1. UNIT NAME- __
LIMERICK UNIT 2 NOTES: THERE WERE 2 LOAD DROPS
- 2. REPORTING PERIOD: MA.RCH,1997 GREATER THAN 20% THIS MONTH
- 3. LICENSED THERMAL POWER (MWT): _ _ _3458 DUE TO RECIRC PUMP 4 NAMEPLATE RATING (GROSS MWE): ..._ .1163 VIBRATIONSB FEEDWATER HTR
- 5. DESIGN ELECTRICAL RATING (NET MWE): _.
1115 LEAK AND TURB GEN ALTEREX
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): __ 11_55 BEARING
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1115
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
IN CONTACT WITH ITS
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
'c. REASON 5 FOR RESTRICTIONS,IF ANY:
i THIS MONTH YR-TO-DATE CUMULATIVE
- 91. HOURS IN REPORTING PERIOD 744 2,160 63,360
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 1,519.8 57,547.0
- 13. REACTOR RESER'E SHUTDOWN HOURS OO O.0 0.0
- 14. HOURS GENERATOR ON-LINE 720.0 1,447.6 56,386.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.256,453 4,240,593 180,665,337
- 17. GROSS SLECTRICAL ENERGY GENERATED (HWH) 759,700 1,400,500 59,790,780
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 734,774 1,347,220 57,651,951 PAGE 1 OF 2
OPERATING DA FA REPORT (CONTINUED)
DOCKET NO. 50-353 -
DATE APRIL 9.1997 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 96.8 % 67.0 % 89.0 %
- 20. UNIT AVAILABILITY FACTOR 96.8 % 67.0 % 89.0 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 88.6 % 55.9 % 84.8 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 88.6 % 55.9 % 84.8 %
- 23. UNIT FORCED OUTAGE RATE .0 % .0 % 3.5 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
PLANNED MAINT OUTAGE. 3/31/97 SCHEDULED 4 DAY DURATION
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 403/97
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01 M 90 PAGE 2 OF 2
UNIT SHUTDOWNS AND POWER REDUCTIONS
{
DOCKET NO. 50-353 UNIT NAME LIMERICK UNIT 2 -
DATE APRIL 9,1997 i COMPLETED BY PECO ENERGY COMPANY I BRUCE E. CANFIELD REPORTS ENGINEER -
SITE ENGINEERING [
LIMERICK GENERATING STATION t REPORT MONTH MARCH,1997 TELEPHONE (610)718-3794 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO i NO DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 167 970304 F 28.0 A 4 N/A CH HTEXCH REACTOR POWER WAS REDUCED TO 65% DUE TO FEEDWATER HEAT EXCHANGER LEAK.
168 970308 S 2.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 88% DUE TO MAIN TI)RBINE VALVE TESTING. L 189 970315 S 1.0 8 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
i 170 970323 F 17.0 A 4 N/A EG TRANSF REACTOR POWER WAS REDUCED TO 85% DUE TO l MAIN TRANSFORMER HIGH COMBUSTIBLE GAS READING.
171 970327 F 105.0 A 4 N/A HA TURBiN REACTOR POWER WAS REDUCED TO 86% DUE TO TURBINE GENERATOR EXCITOR ALTEREX IN CONTACT WITH ITS BEARING. .
TOTAL HOURS 153 0 ,
i (1) (2) (3) (4)
F-FORCED REASON METHOD EXHIBIT C -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2- MANUAL SCRAM ENTRY SHEETS FOR UCENSEE i C - REFUELING 3- AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN) FILE (NUREG4161) ,
E - OPERATOR TRAINING + LICENSE EXAMINATION r F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE H - OTHER (EXPLAIN)
_-____-_-____-__-_______ _ _ - _ _ _ _ _ _ _ _ _ _ - - _ - _ _ _ _ __ - _ _ - . _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ =