Limerick G*nersting Station g.
v PECO NUCLEAR
December 11,1996 i
Docket Nos. 50-352 50-353 License Nos. NPF-39 l
NPF-85 l
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 l
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 i
i l
Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of November 1996 forwarded pursuant to Technical Specification 6.9.1.6.
l Very truly yours, Edward F. Sproat, III Director - Site Engineering j
drh j
Enclosures i
i
\\
i cc:
H. J. Miller, Administrator, Region I, USNRC
\\
N. S. Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS l
/\\l V
o D
Q
D l'A l
9612130235 961130 PDR ADOCK 05000352 R
Dock;t No. 50-352 Attachm:nt to Monthly Operating Report for November 1996 Limerick Generating Station Unit 1 November 1 through November 30,1996 P
l.
Narrative Summary of Operatino Experiences Unit 1 began the month of November 1996 at a nominal 100% of rated thermal power (RTP).
On November 1,1996 at 2145 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.161725e-4 months <br />, power was reduced to 98% of RTP for main turbine valve testing. Power was restored to 100% RTP at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />.
On November 8,1996 at 2241 hours0.0259 days <br />0.623 hours <br />0.00371 weeks <br />8.527005e-4 months <br />, power was reduced to 98% of RTP for main i
turbine valve testing. Power was restored to 100% RTP on November 9,1996 at 0002 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
i On November 12,1996 at 0920 hours0.0106 days <br />0.256 hours <br />0.00152 weeks <br />3.5006e-4 months <br />, power was reduced to 99% RTP for feedwater flow sensor problem. Power was restored to 100% RTP at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br />.
On November 16,1996 at 2045 hours0.0237 days <br />0.568 hours <br />0.00338 weeks <br />7.781225e-4 months <br />, power was reduced to 60% RTP for control rod exercise test and HCU maintenance. Powerwas restored to 100% RTP on November i
21,1996 at 0323 hours0.00374 days <br />0.0897 hours <br />5.340608e-4 weeks <br />1.229015e-4 months <br />.
On November 21,1996 at 2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br />, power was reduced to 95% RTP for control rod pattern adjustment. Power was restored to 100% RTP on November 22,1996 at 0057 j
hours.
On November 23,1996 at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP at 0345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br />.
On November 30,1996 at 0025 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP at 0127 hours0.00147 days <br />0.0353 hours <br />2.099868e-4 weeks <br />4.83235e-5 months <br />.
Unit 1 ended this month operating at 100% RTP.
i 11.
Challences to Main Steam Safety Relief Valves i
There were no challenges to the Main Steam Safety Relief Valves during the month of November.
e i
AVERAGE DAILY POWER LEVEL DOCKET NO. 50-352 UNIT LIMERICKUNIT1 DATE DECEMBER 10,1996 COMPANY PECO ENERGY COMPANY ROBERT A. BAXLEY REPORTS ENGINEER SITE ENGINEERING I.lMERICK GENERATING STATION TELEPHONE (610)718-3767 MONTH NOVEMBER,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) i '
1 1120 17 702 2
1121 18 682 3
1121 19 862 4
1121 20 762 5
1120 21 1108 i
6 1117 22 1116
?
7 1105 23 1120 I
8 1099 24 1124 i
f 9
1124 25 1119 I
10 1120 26 1110 i
11 1123 27 1127 r
12 1119 28 1123 p
13 1132 29 1123 4
14 1119 30 1123 15
-1127 16 1006 f
i I
I k
i i
i
1 r
OPERATING DATA REPORT DOCKET NO. 50 -352 DATE DECEMBER 10,1996 COMPLETED BY PECO ENERGY COMPANY ROBERT A. BAXLEY REPORTS ENGINEER i
SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610)718-3767 s
~
OPERATING STATUS
- 1. UNIT NAME:
LIMERICK. UNIT 1 NOTES: THERE WAS ONE LOAD DROP
- 2. REPORTING PERIOD:
_ NOVEMBER,1996_
GREATER THAN 20% THIS MONTH
- 3. LICENSED THERMAL POWER (MWT) ___
3458 DUE TO ON-LINE HCU
- 4. NAMEPLATE RATING (GROSS MWE):
1160 l
S. DESIGN ELECTRICAL RATING (NET MWE):
1105
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1145
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1105
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
[
f
- HIS MON"'H YR-TO-DATE CUMULATIVE l
- 11. HOURS IN REPORTING PERIOD 720 8,040 94,944
[
f
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 7'.U.0 7,159.7 79,383.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
- 14. HOURS GENERATOR ON-LINE 720.0 7,016.1 78,016.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,361,535 23,058,221 243,199,116
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 787,900 7,584,200 79,218,680 I
i
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 763.181 7,319.042 76,110.514 PAGE 10F 2
r OPERATING DATA REPORT (CONTINUED)
DOCKET NO.
50 - 352 DATE DECEMBER 10,1996 h
THIS MONTH YR-TO-DATE CUMULATIVE i
I
- 19. UNIT SERVICE FACTOR 100.0 % -
87.3 %
82.2 %
1
- 20. UNIT AVAILABILITY FACTOR 100.0 %
87.3 %
82.2 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 95.9 %
82.8 %
75.7 %
i
- 22. UNIT CAPACITY FACTOR (USING DER NET) 95.9 %
82.8 %
75.7 %
l
- 23. UNIT FORCED OUTAGE RATE
.0 %
3.7 %
4.2 %
}
t
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
f
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
{
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 04/13/85 I
COMMERCIAL OPERATION 1ST QTR 86 02/01186 l
i t
r i
i L
i PAGE 2 OF 2 i
__ _ _.. _ _ -.. - _... _. _.. _... _ _.. -.. _ _ _ _ _. _ _ -, _. _ _ _...... _ -.. _ _ - _ _ _. _ n
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-352 UNIT NAME UMERICKUNIT1 DATE DECEMBER 10,1996 COMPLETED BY PECO ENERGY COMPANY ROBERT A. BAXLEY REPORTS ENGINEER SITE ENGINEERING UMERICK GENERATING STATION REPORT MONTH NOVEMBER,1996 TELEPHONE (610)718-3767 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 158 961101 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
10 961108 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURB!NE VALVE TESTING.
160 961112 F
B 4
N/A IF INSTRU REACTOR POWER WAS REDUCED TO 99% DUE TO A COMPUTER POINT PROBLEM ASSOCIATED WITH TOTAL FEEDWATER FLOW.
161 961116 S
B 4
N/A RB CONROD REACTOR POWER WAS REDUCED TO 97% DUE TO CONTROL ROD EXERCISE TEST.
162 961116 S
B 4
N/A RB CRDRVE REACTOR POWER WAS REDUCED TO 60% DUE TO HCU ON-UNE MAINTENANCE.
163 961121 S
B 4
N/A RB CONROD REACTOR POWER WAS REDUCED TO 95% DUE TO CONTROL ROD PATTERN ADJUSTMENT.
164 961123 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VAVLE TESTING.
165 961130 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
TOTAL HOURS e
(1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C-REFUEUNG 3 - AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG-0161)
E-OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G-OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)
j
+
i Dockst No. 50-353 Attachm:nt to Monthly Operating Report for l
November 1996 Limerick Generating Station i
3 Unit 2 I
November 1 through November 30,1996 1.
Narrative Summary of Operatina Experiences Unit 2 began the month of November 1996 at a nominal 100% of rated thermal power f
(RTP).
i On November 2,1996 at 0116 hours0.00134 days <br />0.0322 hours <br />1.917989e-4 weeks <br />4.4138e-5 months <br />, power was reduced to 98% RTP for main turbine l
valve testing. Power was restored to 100% RTP at 0416 hours0.00481 days <br />0.116 hours <br />6.878307e-4 weeks <br />1.58288e-4 months <br />.
On November 6,1996 at 1424 hours0.0165 days <br />0.396 hours <br />0.00235 weeks <br />5.41832e-4 months <br />, power was reduced to 95% RTP for removal of the 5* feedwater heaters from service. Power was restored to 100% RTP at 1801 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.852805e-4 months <br />.
On November 8,1996 at 2046 hours0.0237 days <br />0.568 hours <br />0.00338 weeks <br />7.78503e-4 months <br />, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP at 2238 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.51559e-4 months <br />.
On November 10,1996 at 1243 hours0.0144 days <br />0.345 hours <br />0.00206 weeks <br />4.729615e-4 months <br />, power was reduced to 88% RTP for main turbine valve testing. Power was restored to 100% RTP at 1515 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.764575e-4 months <br />.
On November 15,1996 at 1445 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.498225e-4 months <br />, power was reduced to 99% RTP due to power I
level instrumentation problem. Power was restored to 100% RTP at 1501 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.711305e-4 months <br />.
On November 16,1996 at 0152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br />, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP at 0254 hours0.00294 days <br />0.0706 hours <br />4.199735e-4 weeks <br />9.6647e-5 months <br />.
On November 17,1996 at 0240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br />, power was reduced to 96% RTP due to vibration j
induced on the RHR shutdown cooling retum valve. Power was restored to 98% RTP at 0410 and remained at 98% RTP due to end of cycle coast down.
On November 23,1996 at 0336 hours0.00389 days <br />0.0933 hours <br />5.555556e-4 weeks <br />1.27848e-4 months <br />, power was reduced to 95% RTP for main.
turbine valve testing. Power was restored to 96% RTP at 0355 hours0.00411 days <br />0.0986 hours <br />5.869709e-4 weeks <br />1.350775e-4 months <br />.
Unit 2 ended this operating period at 92% of RTP in end of cycle coast down.
l ll.
Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of November.
w
e AVERAGE DAILY POWER LEVEL DOCKET NO.~ 50-353 l
UNIT LIMERICKUNIT2
^
DATE DECEMBER 10,1996 COMPANY PECO ENERGYCOMPANY ROBERT A. BAXLEY i
REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610)7184767 L
MONTH NOVEMBER,1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1114 17 1080 l
t 2
1113 18 1076 t
3 1112 19 1076 4
1107 20 1079 5
1095 21 1075 6
1086 22 1059 l
7 1082 23 1000 8
1000 24
'1057 f
9 1097 25 1044 l
10 1092 26 1034 11 1105 27 1037 t
12 1105 28 1033 t
13 1104 29 1029 14 1101 30 1025
?
15 1100 l
t 16 1100 i
i
?
[
1 P
OPERATING DATA REPORT l
DOCKET NO. 50 353 DATE DECEMBER 10,1996 COMPLETED BY PECO ENERGY COMPANY ROBERT A. BAXLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610)7184767 OPERATING STATUS
- 1. UNIT NAME:
L.lMERICK UNIT.2 NOTES: THERE WERE NO LOAD DROPS
- 2. REPORTING PERIOD:
NOVEMBER,1996, GREATER THAN 20% THIS MONTH.
- 3. LICENSED THERMAL POWER (MWT)
- 3458,
- 4. NAMEPLATE RATING (GROSS MWE):
1163
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1115
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1.,1,55
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1115
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 8,040 60,456
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 8,017.0 55,549.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 720.0 7,947.2 54,539.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,431,289 27,136,900 175,482,713
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 803,000 9,015,800 58,093,680
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 776,488 8,718,028 56,021,850 PAGE 1 OF 2 V
. _. _.... ~.
5 OPERATING DATA REPORT (CONTINUED) l' DOCKET NO.
50 -3S3 DATE DECEMBER 10,1996 1
THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 %
98.8 %
902 %
[
- 20. UNIT AVAILABILITY FACTOR 100.0 %
98.8 %
90.2 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 96.7 %
97.2 %
86.4 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.7 %
97.2 %
86.4 %
- 23. UNIT FORCED OUTAGE RATE
.0 %
1.2 %
3.0 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
f REFUELING OUTAGE SCHEDULED FOR 1/31/97 LASTING 25 DAYS.
L
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED INITIAL CRITICAUTY 08/12/89 08/12/89 INITIAL ELECTRICITY 0901/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90 5
(
i l
l 1
1 PAGE 2 OF 2 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-353 UNIT NAME UMERICK UNIT 2 DATE DECEMBER 10,1996 COMPLETED BY PECO ENERGY COMPANY -
ROBERT A. BAXLEY REPORTS ENGINEER SITE ENGINEERING UMERICK GENERATING STATION REPORT MONTH NOVEMBER,1996 TELEPHONE (610)718-3767 i
METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE-ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 150 961102 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
151 961106 S
H 4
N/A CH HTEXCH REACTOR POWER WAS REDUCED TO 95% DUE TO REMOVAL OF FIFTH FEEDWATER HEATERS FROM SERVICE FOR COASTDOWN.
[
t 152 961108 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
153 961110 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 88% DUE TO MAIN TURBINE VALVE TESTING.
i 154 961115 F
A 4
N/A IF INSTRU REACTOR POWER WAS REDUCED TO 99% DUE TO POWER LEVEL INSTRUMENTATION PROBLEM.
l 155 961116 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.
156 961117 F
H 4
N/A CF VALVEX REACTOR POWER WAS REDUCED TO 96% DUE TO VIBRATION INDUCED ON THE RHR SHUTDOWN I
COOLING RETURN VALVE.
157 961123 S
B 4
N/A HA VALVEX REACTOR POWER WAS REDUCED TO 95% DUE TO
(
MAIN TURBINE VALVE TESTING.
TOTAL HOURS (1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S - SCHEDULED A-EQUlPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA l
B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG4161)
E - OPERATOR TRAINING + UCENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H -OTHER (EXPLAIN) l