Monthly Operating Repts for Feb 1996 for Limerick Generating Station
ML20106H056
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 02/29/1996
From: Gallagher M, Henricks D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9603200136
Download: ML20106H056 (11)


Text

{{#Wiki_filter:\\ Limerick Caneriting Stitli e =au v PECO ENERGY

fJra"""'

Sanatoga. PA 19464-0920 T.S.6.9.1.6 March 13, 1996 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of February 1996 forwarded pursuant to Technical Specification 6.9.1.6. Very truly yours, d qf<451 ) Michael P. Gallagher Director - Site Engineering drh Enclosures cc: T. T. Martin, Administrator, Region I, USNRC N. S. Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS i 180096 9603200136 960229 gDR ADOCK05000g2 -{ f[JLyL ljy

) Docket No. 50-352 Attachment to Monthly Operating Report for February 1996 i Umerick Generating Station Unit 1 February 1 through February 29,1996 1. Narrative Summarv of Ocerei;nc Exoeriences Unit 1 began the month of February at 87% of rated thermal power (RTP) in end of cycle coastdown. On February 2,1996 at 0200 hours, power reduction commenced in preparation to shutdown for Unit 1 sixth refueling outage (1R06). Power was reduced to 22% RTP and the main turbine was removed from service at 0900 hours. The planned shutdown was postponed to support power generation requirements and the main turbine was returned to service at 1625 hours. On February 2,1996 at 2253 hours, power ascension began. The unit was i restored to 80% RTP on February 4,1996 at 0251 hours. On February 5,1996 at 1500 hours, power reduction commenced in preparation to shutdown for 1R06. Power was reduced to 22.5% RTP and the main turbine was removed from service at 2200 hours. The unit was manually scrammed at 2300 hours to start 1R06. On February 6,1996 at 0953 hours, the unit entered operational condition 4, Cold Shutdown, and at 1531 hours, the mode switch was placed in Refuel. On February 23,1996 at 1534 hours, operational condition 4 was entered when the reactor pressure vessel head was fully tensioned. On February 28,1996 at 0221 hours, the reactor mode switch was placed in Startup, control rod withdrawal commenced at 0855 hours and the reactor was critical at 1351 hours. Unit 1 ended this operating period in operational condition 2 with startup in progress following 1R06 and reactor pressure at 960 psig. 11. Challenges to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of February, l l 4

r DOCKET NO. 50-352 UNIT LIMERICKUNIT1 DATE MARCH 13,1996 COMPANY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER t SITE ENGINEERING LIMERICKGENERATING STATION TELEPHONE (610)71EL3772 MONTH FEBRUARY,1996 t DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 805 '17 0 2 212 18 0 3 275 19 0 i 4 843 - 20 0 5 615 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 3 14 0 15 0 16 0 r

's OPERATING DATA REPORT ~ DOCKET NO. 50 - 352 DATE MARCH 13,1996 ~ COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 OPERATING STATUS

1. UNIT NAME:

LIMERICK UNIT 1 NOTES: THERE WERE TWO LOAD DROPS

2. REPORTING PERIOD:

FEBRUA_RY 1996 2 GREATER THAN 20% THIS MONTH

3. LICENSED THERMAL POWER (MWT) 3293 ASSOCIATED WITH COASTDOWN FOR
4. NAMEPLATE RATING (GROSS MWE):

1092 THE 1RO6 REFUELING OUTAGE

5. DESIGN ELECTRfCAL RATING (NET MWE):

1055 AND EXTENDED OPERATION TO

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1092, SUPPORT PJM POWER SHORTAGE.
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1055

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVELTO WHICH RESTRICTED,IF ANY(NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 896 1,440 88,344
12. NUMBER OF HOURS REACTOR WAS CRITICAL 153.1 897.2 73,120.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 110.6 854.6 71,854.5
15. UNIT RESERVE SHUTDOWN HOUNS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 219,806 2,401,949 222,542,844
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 70,300 780,500 72,414,980
18. NET ELECTRICAL ENERGY GENERATED (MWH) 64,134 746,141 89,537,613 PAGE 1 OF 2

OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 352 ~ DATE MARCH 13,1996 THIS MONTH YR-TO-DATE CUMULATIVE

19. UN!T SERVICE FACTOR 15 9 %

59.3 % 81.3 % ,3

20. UNIT AVAILABILITY FACTOR 15.9 %

59.3 % 81.3 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 8.7 %

49.1 % 74.6 %

22. UNIT CAPACITY FACTOR (USING DER NET) 8.7 %

49.1 % 74.6 %

23. UNIT FORCED OUTAGE RATE

.0 % .0 % 4.3 %

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE. DATE AND DURATION OF EACH):

MAINTENANCE OUTAGE IS SCHEDULED FOR 3GW9E LASTING S DAYS.

25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

3/1/96

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICAUTY 12/1964 12Q2/84 INITIAL ELECTRICITY MID APRIL 85 041325 COMMERCIAL OPERATION IST QTR 86 0201/86 i PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-352 UNIT NAME LIMERICKUNIT1 DATE MARCH 13,1996 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING UMERICK GENERATING STATION REPORT MONTH FEBRUARY,1996 TELEPHONE (610)718-3772 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE - ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 95 900202 S 0.0 C 4 N/A RC FUEDOC REACTOF-POWER WAS REDUCED TO 22% DUE TO COASTDOWN FOR 1RO6 REFUEUNG OUTAGE. 96 980202 S 7.4 C 2 N/A RC FUEU0C REACTOR WAS CRITICAL, BUT GENERATOR WAS TAKEN OFF GRID FOR 1RO6 REFUEUNG OUTAGE. GENERATOR WAS THEN PLACE BACK ON GRID TO SUPPORT PJM POWER SHORTAGE. 97 980205 S 578.0 C 2 N/A RC FUEDOC REACTOR WAS SHUTDOWN FOR 1R06 REFUEUNG OUTAGE. TOTAL HOURS 585.4 (1) (2) (3) (4) F-FORCED REASON METHOD EXHIBIT G-INSTRUCTIONS S-SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-REFUEUNG 3-AUTOMATIC SCRAM EVENT REPORT (LER) D-REGULATORY RESTRICTION 4-OTHER (EXPLAIN) FILE (NUREG4161) E - OPERATOR TRAINING + UCENSE EXAMINATION F - ADMINISTRATIVE (5) i G-OPERATIONAL ERROR (EXPLAIN) - EXHIBIT I-SAME SOURCE H-OTHER (EXPLAIN) I

-. -... -. - -. - - _ - - - ~ Docket No. 50-353 Attachment to Monthly Operating Report for February 1996 Limerick Generating Station Unit 2 February 1 through February 29,1996 1. Narrative Summarv of Ocerei;ric Exoeriences Unit 2 began the month of February at a nominal 100% of rated thermal power (RTP). On February 9,1996 at 2229 hours, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP at 2330 hours. On February 10,1996'at 2214 hours, power was reduced to 88% RTP for main turbine valve and RPS testing. Power was restored to 100% RTP on February 11,1996 at 0016 hours. On February 17,1996 at 0145 hours, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP at 0245 hours. On February 23,1996 at 2330 hours, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP on February 24,1996 at 0035 hours. Unit 2 ended this operating period at 100% of RTP. II. Cha!Ienoes to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of February.

~ AVERAGE DA!LY POWER LEVEL DOCKET NO. 50-363 UNIT LIMERICKUNIT2 DATE MARCH 13,1996 COMPANY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610)718-3772 MONTH FEBRUARY,1996 l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1140 17 1135 2 1127 18 1139 3 1128 19 1134 4 1136 20 1130 5 1129 21 1130 6 1140 22 1125 7 1133 23 1124 8 1133 24 1122 9 1132 25 1126 10 1120 26 1133 11 1116 27 1120 12 1148 28 1126 13 1132 29 1129 14 1133 15 1133 16 1138 -.--,--_L,_--1A.----

~, OPERATING DATA REPORT ~ DOCKET NO. 50-353 DATE MARCH 13,1996 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LNERICK GENERATING STATION TELEPHONE (610)716-3772 l. OPERATING STATUS l

1. UNIT NAME-

_LN.E_R__ICK_UN_IT 2_

2. REPORTING PERIOD:

FEBRUARYJ996 GREATERTHAN20%THIS MONTH. +

3. UCENSED THERMAL POWER (MWT).__

3455

4. NAMEPLATE RATING (GROSS MWE):

116_3 i

5. DESIGN ELECTRICAL RATING (NET MWE):

1115 i

6. MAXNUM DEPENDABLE CAPACITY (GROSS MWE):

1155 f

7. MAXNUM DEPENDABLE CAPACITY (NET MWE):

1115

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,lF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 696 1,440 53,856 -
12. NUMBER OF HOURS REACTOR WAS CRITICAL 696.0 1,440.0 48,972.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-UNE 696.0 1,440.0 46,031.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,404,137 4,899,763 153,245,496
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 813,800 1,W19,600 50,737,400
18. NET ELECTRICAL ENERGY GENERATED (MWH) 787,035 1,607,878 48,911,500 PAGE 1 OF 2

OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 353 DATE MARCH 13,1996 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 %

100.0 % 89.2 %

20. UNIT AVAILABiUTYFACTOR 100.0 %

100.0 % 89.2 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 101.4 %

100.1 % 85.2 %

22. UNIT CAPACITY FACTOR (USING DER NET) 101.4 %

100.1 % 85.2 %

23. UNIT FORCED OUTAGE RATE

.0 % .0 % 3.2 %

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

EQUIPMENT REUABluTY OUTAGE SCHEDULED FOR 5/12/96 LASTING S DAYS.

25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICAUTY 08/12/89 08/12/89 INITIAL ELECTRICITY 0001/89 0001/89 COMMERCIAL OPERATION 0201/90 01/08/90 P PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-363 UNIT NAME UMERICKUNIT2 DATE MARCH 13,1996 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING UMERICK GENERATING STATION REPORT MONTH FEBRUARY,1996 TELEPHONE (610)7183772 METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 93 980209 S 0.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING. 94 980210 S 0.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 88% DUE TO MAIN TURBINE VALVE AND RPS TESTING. 95 900217 S 0.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING. 96 900223 S 0.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING. TOTAL HOURS 0.0 ? (1) (2) (3) (4) F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C-REFUEUNG 3-AUTOMATIC SCRAM EVENT REPORT (LER) D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN) FILE (NUREG4161) E - OPERATOR TRAINING + UCENSE EXAMINATION F-ADMINISTRATIVE (5) G-OPERATIONAL ERROR (EXPLAIN) EXHIBIT I-SAME SOURCE H -OTHER (EXPLAIN) -}}