Limerid Generating Station
,,.(:
_r y
PECO NUCLEAR ercor -,c -,
eo Box 2300
,4 A ynit of PECO Energy Sanatoga, PA 19464-0920 T.S.6.9.1.6 November 13,1998 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington,DC 20555
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of October 1998 forwarded pursuant to Technical Specification 6.9.1.6.
Very truly yours, 4%
Joseph P. Grimes Director - Site Engineering Pah Enclosures h
ji
/
cc:
H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, USNRC Senior Resident Inspector LGS J. D. von Suskil, Vice President, LGS G. H. Stewart, LGS Experience Assessment Branch, SSB2-4 S. A. Auve, LGS ISEG Branch, SSB4-2 9811170261 981031 P PER ADOCK 05000352 R
PDR;
i Docket No. 50-352 Attachment to Monthly Operating Report for October 1998 l
\\
i Limerick Generating Station Unit 1 October 1 through October 31,1998 l.
Narrative Summary of Operatina Experiences Unit 1 began the month of October 1998 at 100% of rated thermal power (RTP).
i I
On October 7,1998 at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br />, power was reduced to 80% of RTP for reactor flux tilt testing and control rod pattern adjustments. Power was restored to 100% of RTP on October 13,1998 at 1958 hours0.0227 days <br />0.544 hours <br />0.00324 weeks <br />7.45019e-4 months <br />.
)
On October 13,1998 at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, power was reduced to nominal 90% of RTP because of computer printout problems during a xenon transient. Power was restored to 100% of RTP on October 14,1998 at 1048 hours0.0121 days <br />0.291 hours <br />0.00173 weeks <br />3.98764e-4 months <br />.
On October 18, '1998 at 0808 hours0.00935 days <br />0.224 hours <br />0.00134 weeks <br />3.07444e-4 months <br />, power was reduced to 90% of RTP for control rod l
exercise testing. Power was restored to 100% of RTP 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br />.
l l
On October 25, 1998 at 0840 hours0.00972 days <br />0.233 hours <br />0.00139 weeks <br />3.1962e-4 months <br />, power was reduced to 90% of RTP for control rod exercise testing. Power was restored to 100% of RTP at 1149 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.371945e-4 months <br />.
t Unit 1 ended this month at 100 % RTP.
l II.
Challences to Main Steam Safety Relief Valves l
There were no challenges to the Main Steam Safety Relief Valves during the month of October. There have been no challenges to the Main Steam Safety Relief Valves year-l to-date.
Ll' s
4 i
.6 OPERATING' DATA REPORT
' DOCMET NO. 50-362 DATE : NOVEMBER 13,1998 COMPLETED BY L PECO ENERGY COtFANY P. A. H8NCHEY REPORTS ENGINEER -
SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610)718 3797 OPERATING STATUS
- 1. UNIT NAME.
LIMERsCK UNIT 1
- 2. REPORTING PERIOD:
OCTOBER,1998,
- 3. DESIGN ELECTRICAL RATING (NET MWE):
1134
- 4. MAXIMUM DEPENDA8LE CAPACITY (GROSS MWE):
1174
- 5. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1134 THIS MONTH YR-TO-DATE CUMULATIVE
- 6. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6.084.4 94,850.8
- 7. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 8. HOURS GENERATOR ON-LINE 745.0 5,800.8 93,174.8
- 9. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 802.925 6,179,084 92,339,882
. UNIT SHUTDOWNS o
DOCKET NO. 50-352 '
UNIT NAME LIMERICK UNIT 1 DATE NOVEMBER 13,1998 COMPLETED BY PECO ENERGY COMPANY P. A. HINCHEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION -
REPORT MONTH OCTOBER,1998 TELEPHONE (610)716-3797 METHOD OF CAUSE AND CORRECTIVE '
TYPE DURATION REASON SHUTTING DOWN ACTION TO NO.
DATE -
(1)
(HOURS)
(2)
REACTOR (3)
PREVENT RECURRENCE 309 981007.
S B
4 REACTOR POWER WAS REDUCED TO 80% DUE TO FLUX TILT TESTING TO SEARCH FOR FUEL LEAK 310 981013 F
F 4
REACTOR POWER WAS REDUCED TO NOMINAL 90% DUE TO COMPUTER DATA BEING UNAVAILABLE DURING XENON TRANSIENT.
d 311 981018 S
B 4
REACTOR POWER WAS REDUCED TO 90% DOE TO CONTROL ROD EXERCISE TESTING.
312 981025 S
B 4
REACTOR POWER WAS REDUCED TO 90% DUE TO CONTROL ROD EXCERCISE TESTING.
TOTAL HOURS
,t t
?
{
(1)
(2)
(3)
F-FORCED REASON METHOD S-SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL B - MAINTENANCE OR TEST 2-MANUAL SCRAM C - REFUELING 3-AUTOMATIC SCRAM D-REGUt.ATORY RESTRICTION 4-OTHER (EXPLAIN)
E - OPERATOR TRAINING + UCENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN) i 1
+ -
e.-
Docket No. 50-353 Attachment to Monthly Operating Report for October 1998 l
Limerick Generating Station Unit 2 October 1 through October 31,1998 I
1.
Narrative Summary of Operatina Experiences Unit 2 began the month of October 1998 at 1000% rated thermal power (RTP).
l On October 4,1998 at 0005 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, power was reduced to 92% of RTP for main turbine valve testing. Power was restored to 100% of RTP at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br />.
i On October 10,1998 at 2214 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.42427e-4 months <br />, power was reduced to 88% of RTP for main turbine valve testing. Power was restored to 100% of RTP on October 11,1998 at 0147 hours0.0017 days <br />0.0408 hours <br />2.430556e-4 weeks <br />5.59335e-5 months <br />.
On October 17, 1998. at 0016 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />, power was reduced to 60% of RTP for control rod pattem adjustments and scram time testing. Power was restored to 100% of RTP on October 18,1998 at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />.
October 25,1998 at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, power was reduced to 95% of RTP for main turbine valve testing. Power was restored to 100% of RTP at 0142 hours0.00164 days <br />0.0394 hours <br />2.347884e-4 weeks <br />5.4031e-5 months <br />.
i Unit 2 ended this month at 100% of RTP.
{:
II.
Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of l'
l October. There have been no challenges to the Main Steam Safety Relief Valves year-l.
to-date.
L I-l i
i-
OPERATING DATA REPORT -
DOCKET NO. 50 -353
- i DATE NOVEMBER 13,1908 COMPLETED BY - PECO ENERGY COMPANY P. A. HINCHEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3797 OPERATING STATUS
- 1. UNIT NAME.
LIMERICK UNIT 2
. 2. REPORTING PERIOD:
OCTOBER,1998
- 3. DESIGN ELECTRICAL RATING (NET MWE):
1115
- 4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1155 S. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1115 THIS MONTH YR-TO-DATE CUMULATIVE
- 6. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6 938.3 71,085_3
- 7. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 8. HOURS GENERATOR ON-UNE 745.0 6,883.4 80,679.1
- 9. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 824,505 7,610,367 72,222.168
~
_o
UNIT SHUTDOWNS s
DOCKET NO. 50-353 UNIT NAME LIMERICKUNIT2 DATE NOVEMBER 13,1998 COMPLETED BY PECO ENERGYCOMPANY P. A.HINCHEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION *.
REPORT MONTH OCTOBER,1998 TELEPHONE (610)718-3797 METHOD OF CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
PREVENT RECURRENCE 328 981004 S
B 4
REACTOR POWER WAS REDUCED TO 92% DUE TO MAIN TURB!NE VALVE TESTING.
329 981010 S'
B 4
REACTOR POWER WAS REDUCED TO 88% DUE TO MAIN TURBINE VALVE TESTING.
330 981017 S
B 4
REACTOR POWER WAS REDUCED TO 80% DUE TO SCRAM TIME TESTING AND ROD PATTERN ADJUSTMENT 331 981025 S
B 4
REACTOR POWER WAS REDUCED TO 95% DUE TO MAIN TURBINE VALVE TESTING.
TOTAL HOURS P
(1)
(2)
(3)
F-FORCED REASON METHOD S -SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL B-MAINTENANCE OR TEST 2-MANUAL SCRAM C-REFUELING 3-AUTOMATIC SCRAM D-REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
E - OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
.