,, Limerid Generating Station

.(: y

_r PECO NUCLEAR ercor - ,c - ,

eo Box 2300

,4 A ynit of PECO Energy Sanatoga, PA 19464-0920 T.S.6.9.1.6 November 13,1998 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington,DC 20555

Subject:

Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of October 1998 forwarded pursuant to Technical Specification 6.9.1.6.

Very truly yours, 4%

Joseph P. Grimes Director - Site Engineering Pah ,

Enclosures

/

h ji cc: H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, USNRC Senior Resident Inspector LGS J. D. von Suskil, Vice President, LGS G. H. Stewart, LGS Experience Assessment Branch, SSB2-4 S. A. Auve, LGS ISEG Branch, SSB4-2 9811170261 981031 P PER ADOCK 05000352 R PDR;

i Docket No. 50-352

,* Attachment to Monthly

. Operating Report for October 1998 ,

l \

! l i

Limerick Generating Station Unit 1 October 1 through October 31,1998

l. Narrative Summary of Operatina Experiences l

Unit 1 began the month of October 1998 at 100% of rated thermal power (RTP).  ;

i I

On October 7,1998 at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br />, power was reduced to 80% of RTP for reactor flux tilt testing and control rod pattern adjustments. Power was restored to 100% of RTP on October 13,1998 at 1958 hours0.0227 days <br />0.544 hours <br />0.00324 weeks <br />7.45019e-4 months <br />. )

On October 13,1998 at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, power was reduced to nominal 90% of RTP because of computer printout problems during a xenon transient. Power was restored  !

to 100% of RTP on October 14,1998 at 1048 hours0.0121 days <br />0.291 hours <br />0.00173 weeks <br />3.98764e-4 months <br />.

On October 18, '1998 at 0808 hours0.00935 days <br />0.224 hours <br />0.00134 weeks <br />3.07444e-4 months <br />, power was reduced to 90% of RTP for control rod l l exercise testing. Power was restored to 100% of RTP 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br />.

l l On October 25, 1998 at 0840 hours0.00972 days <br />0.233 hours <br />0.00139 weeks <br />3.1962e-4 months <br />, power was reduced to 90% of RTP for control rod exercise testing. Power was restored to 100% of RTP at 1149 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.371945e-4 months <br />.

t

, Unit 1 ended this month at 100 % RTP. l l

II. Challences to Main Steam Safety Relief Valves l

There were no challenges to the Main Steam Safety Relief Valves during the month of October. There have been no challenges to the Main Steam Safety Relief Valves year-l to-date.

L l'

s 4

i

.6 OPERATING' DATA REPORT

' DOCMET NO. 50-362 ..

DATE : NOVEMBER 13,1998 COMPLETED BY L PECO ENERGY COtFANY P. A. H8NCHEY .

REPORTS ENGINEER -

  • SITE ENGINEERING LIMERICK GENERATING STATION .

TELEPHONE (610)718 3797 -

OPERATING STATUS

1. UNIT NAME.

< LIMERsCK UNIT 1

2. REPORTING PERIOD:

OCTOBER,1998,

3. DESIGN ELECTRICAL RATING (NET MWE): 1134
4. MAXIMUM DEPENDA8LE CAPACITY (GROSS MWE): 1174
5. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1134 THIS MONTH YR-TO-DATE CUMULATIVE

6. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6.084.4 94,850.8
7. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
8. HOURS GENERATOR ON-LINE 745.0 5,800.8 93,174.8
9. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
10. NET ELECTRICAL ENERGY GENERATED (MWH) 802.925 6,179,084 92,339,882

. UNIT SHUTDOWNS o

DOCKET NO. 50-352 '

UNIT NAME LIMERICK UNIT 1 **

DATE NOVEMBER 13,1998 COMPLETED BY PECO ENERGY COMPANY

  • P. A. HINCHEY -

REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION -

REPORT MONTH OCTOBER,1998 TELEPHONE (610)716-3797 METHOD OF CAUSE AND CORRECTIVE '

TYPE DURATION REASON SHUTTING DOWN ACTION TO  ;

NO. DATE - (1) (HOURS) (2) REACTOR (3) PREVENT RECURRENCE 309 981007. S B 4 REACTOR POWER WAS REDUCED TO 80% DUE TO FLUX TILT TESTING TO SEARCH FOR FUEL LEAK ,

310 981013 F F 4 REACTOR POWER WAS REDUCED TO NOMINAL 90% DUE TO COMPUTER DATA BEING UNAVAILABLE DURING XENON TRANSIENT. d 311 981018 S B 4 REACTOR POWER WAS REDUCED TO 90% DOE TO CONTROL ROD EXERCISE TESTING.

312 981025 S B 4 REACTOR POWER WAS REDUCED TO 90% DUE TO CONTROL ROD EXCERCISE TESTING.

TOTAL HOURS

,t t

?

(1) (2) (3)

F-FORCED REASON METHOD S-SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL B - MAINTENANCE OR TEST 2-MANUAL SCRAM C - REFUELING 3- AUTOMATIC SCRAM D- REGUt.ATORY RESTRICTION 4-OTHER (EXPLAIN)

E - OPERATOR TRAINING + UCENSE EXAMINATION F- ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN) i 1

- _ _ . _ _ _ - _ . - _ . _ _ - _ - . _ _ . - _ - _ _ _ - . _ _ . - _ _ _ - - _ _ - - _ _ - - _ _ _ _ - - _ - - . - - . _ _ _ _ _ - - _ _ . - - - - _ - _ _ _ _ _ _ - - - _ - _ _ - - - - -_- _ + - _ _ -_-.___.__e.- _ . _ _ . - . - _ - _ _ - - - _ _ . _ _ - . _ - . - _ - - _ - - . . _ _ _ _ _ . _ . _ _ . - . _ . _ _ . - - .

Docket No. 50-353 Attachment to Monthly

.- .- Operating Report for October 1998 l

Limerick Generating Station Unit 2 October 1 through October 31,1998 I

1. Narrative Summary of Operatina Experiences l

Unit 2 began the month of October 1998 at 1000% rated thermal power (RTP).

On October 4,1998 at 0005 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, power was reduced to 92% of RTP for main turbine valve testing. Power was restored to 100% of RTP at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br />.

i On October 10,1998 at 2214 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.42427e-4 months <br />, power was reduced to 88% of RTP for main i turbine valve testing. Power was restored to 100% of RTP on October 11,1998 at 0147 hours0.0017 days <br />0.0408 hours <br />2.430556e-4 weeks <br />5.59335e-5 months <br />.

On October 17, 1998. at 0016 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />, power was reduced to 60% of RTP for control rod pattem adjustments and scram time testing. Power was restored to 100% of RTP on October 18,1998 at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />.

October 25,1998 at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, power was reduced to 95% of RTP for main turbine valve testing. Power was restored to 100% of RTP at 0142 hours0.00164 days <br />0.0394 hours <br />2.347884e-4 weeks <br />5.4031e-5 months <br />.  ;

i Unit 2 ended this month at 100% of RTP.

{:

I II. Challences to Main Steam Safety Relief Valves l' There were no challenges to the Main Steam Safety Relief Valves during the month of l October. There have been no challenges to the Main Steam Safety Relief Valves year-

l. to-date.

L I-l i

i-

OPERATING DATA REPORT -

DOCKET NO. 50 -353 *i DATE NOVEMBER 13,1908 COMPLETED BY - PECO ENERGY COMPANY P. A. HINCHEY ,

REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION .

TELEPHONE (610) 718-3797 OPERATING STATUS

1. UNIT NAME. LIMERICK UNIT 2

. 2. REPORTING PERIOD: OCTOBER,1998

3. DESIGN ELECTRICAL RATING (NET MWE): 1115
4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1155 S. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1115 THIS MONTH YR-TO-DATE CUMULATIVE
6. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6 938.3 71,085_3
7. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
8. HOURS GENERATOR ON-UNE 745.0 6,883.4 80,679.1
9. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
10. NET ELECTRICAL ENERGY GENERATED (MWH) 824,505 7,610,367 72,222.168

~

_o

UNIT SHUTDOWNS s

DOCKET NO. 50-353 UNIT NAME LIMERICKUNIT2 **

DATE NOVEMBER 13,1998 COMPLETED BY PECO ENERGYCOMPANY P. A.HINCHEY ,

REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION * .

REPORT MONTH OCTOBER,1998 TELEPHONE (610)718-3797 METHOD OF CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) PREVENT RECURRENCE 328 981004 S B 4 REACTOR POWER WAS REDUCED TO 92% DUE TO MAIN TURB!NE VALVE TESTING.

329 981010 S' B 4 REACTOR POWER WAS REDUCED TO 88% DUE TO MAIN TURBINE VALVE TESTING.

330 981017 S B 4 REACTOR POWER WAS REDUCED TO 80% DUE TO SCRAM TIME TESTING AND ROD PATTERN ADJUSTMENT 331 981025 S B 4 REACTOR POWER WAS REDUCED TO 95% DUE TO MAIN TURBINE VALVE TESTING.

TOTAL HOURS P

(1) (2) (3)

F-FORCED REASON METHOD S -SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL B- MAINTENANCE OR TEST 2- MANUAL SCRAM C- REFUELING 3- AUTOMATIC SCRAM D- REGULATORY RESTRICTION 4- OTHER (EXPLAIN)

E - OPERATOR TRAINING + LICENSE EXAMINATION F- ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

__ __--_ -- _ - _ _ _ - _ _ - - _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _