Monthly Operating Repts for Sept 1990 for Limerick Generating Station Units 1 & 2
ML20064B318
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/30/1990
From: Leitch G, Meck K
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9010160108
Download: ML20064B318 (11)


Text

~

. , 3906037860 T.S.6.9.1.6 l

PHILADELPHIA ELECTRIC COMPANY l L,lMERICK GENER ATING ST ATION P. O. DOX A S AN ATOG A, PENNSYLV ANI A 19444 l (216) 3271200, EXT. 3000 Oft AH AM M. LEITCH vi.. ........,

October 5, 1990  !

6.......................

50-353 License Nos. NPF-39 NPF-85 j r

, U. S. Nuclear Regulatory Commission '

Document Control Desk Attnt Washington, DC 20555 i

'I

Subject:

Limerick Generating Station Monthly Operating Report For i Units 1 and 2 i

Enclosed are the monthly operating reports for Limerick Units  :

1 and 2 for the month of September, 1990 forwarded pursuant to Technical Specification 6.9.1.6.

i t

t 1

Very tr ly urs, I

  • +

l KWM/dms {

4 Enclosure i i

cci T. T. Martin, Administrator, Region I, USNRC T. J. Kenny, USNRC Senior Resident Inspector I

l l

9010160108 yovywe  !

PDR ADOCK 05000332 .. i R PDC / '

i

/ j

39060378601, l

Dookst No. #60 362 )

Attachment to MontNy .;

Operating Report for l September 1990

[ UMERICK OENERATING STATION - l UNn i J SEPTEMBER 1 THROUGH SEPTEMBER 30,1990 l l l

- 1. NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES l Limerick Unt 1 began the month of September at a nominal 100% of rated thermal power, l

On September 7, at approximately 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />, a reactor power decrease was begun. The reactor
was manually scrammed at 2221 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.450905e-4 months <br />, from approximately 32% power, to the third refueling  !

outage Operational Condition (OPCON) 4 was entered on September 8 and 6was entered ,

on SepteW2er 13. ON September 24, OPCON 5* was entered and the first fuel bundle was  !

offloaded from the core. Limerick Unit 1 ended the month of September in OPCON 6* with .

, approximately one-quarter of the core off-loaded, in day 23 of a scheduled 75 day refueling outage, j Note: OPCON 5* equates to fuel movement. t Operational events that occurred during the month of September included: -)

- On September 16, D13 Diesel Generator (D/G) was run for its LOCA4.OOP test. As part .i of the LOOP testing, the diesel was started on a bus under voltage signal. It automatloally  !

closed onto the bus and loaded, however, a bus voltage of greater than 5.7 kV was noted.  !

Following voltage verification, the diesel was secured. The D13 sieguard bus and .

associated loads were declared inoperable. D13 safeguard bus and assochied loads were - _l' declared operable following various testing and receipt of an engineering evaluation on -

September 18. Following 013 D/G voltage regulator troubleshooting , repair of a suspect l rectifier selector switch, and replacement of a shutdown relay, a test run was successfully

  • performod on September 19. The LOCA/ LOOP test was next performed, resulting in a bus t, over voltage condition similar to the 9/15 event. The diesel was run several times during  ;

the following week for System Engineer and vendor troubleshooting of the voltage regulator, ,

The D13 D/G was run satisfactorNy on September 28. The diesel was then started on - t September 29 for performance of the LOCA-LOOP test. With the #1 rectifer bar* selected, -l a bus over voltage condition occurred and the diesel was shutdown. The diesel was -

restarted using the #2 rectifier bank and the LOCA-LOOP testing was completed i antisfactorly, The D13 D/G was declared operable on September 30.  ;

II. CHAT i FNGES TO THE MA!N STEAM SAFETY RELIEF VALVES l

There were no challenges to the Main Steam Safety Relief Valves during the month of September.

l \

l 5 l

1

4

  • 1 , is 4

, .33- ,

+

.. , a- i  :.

c: 4- .:-

.r,.

, ' t ,

l

@i > ,

t .

_N.' ?4' j  ;  ;.f.. .

f.

s .

A

M,, ,

s 3

'l i.

Q ,-'. h a

  • $  ;:7 Q s s

O~. .

.i .

- -3 . - .

', b , *

,Ftf') '. i. .

l

.i n

)

t . I.

1 r 5

,j F

t , I t V

-l-

, -; l .\ <

C. i

,. 't id  ; it m ,

75 ;

i

't

,6 A

- i: .f 1

-.\p

, if ,

L

.? . t ' .s

\1 f

r  ?

i r

- .J - <

W' i i e>6 o'i

  • i l' E4 N >' 8 1 e4- gMOi W i . e) < e H

e E

- g.

'f t-U l' 3 ..; ' k

) > me '

Ui e en g

>= >-'

OMC. I i i

  • i i n' O WI W D O O O' G' D 'O 'O ;Q ' O O O i e g' 2 ei >3 .g -

k- U O *== K .J t - t

== Wi M N W og W '.

et R t

.' i i 2 i .J ** e i r

31  !

Wi > g O' .c 5, 1

6

e. gtW- D: . '

8 et W ** 2 N W -

i e og . & I og e- . d .y'~

i e i . 33c e e ti g.

i ea &i gM Mg M -g r N i .J . i U N' W

@ U' R I 48 I W W ed U M' > >

J- Mi >= W O 6 5

  • is a as 1 et

@'u ea i

2m

.W,!

7 W

> .$ ,' W E

5 Di e 'i e-i

.J. 6a 33 e .J a i

-a ut *m > .

i m'O O 'i me - U 4 1 -l e W D we N >. .b e S' O e, .- M g @ @ b' ED ,

@l .J Qe&3 W g e .J w l e- ea . e e N t , . . tgN N .: N. N Ns N- N N M ,

'l O + t n

  • >= W > W <  :{

O ** e r s 3- w gt et 5 o <

6 k W W U

w en : U .J .J -

g

'2 W W s D -

> -3 W g

>: eJ \

(

i

.J 5 1

?. t b

i fa o

' 5; .W. o. n r. . e. e . n, ' .s o a : o- oo,a. o;o -

o-e c:- >3 N

  • N.N N e 4.

g

% $8

. We C C O . O :' O

.* * - C e .i W' st e.A eg e- * .e '

e

=>-

, e 4  ;

i - 48 4 -Q.-a :r

.a.

y. g n

_ B. d 5 a .-

W: a

- P W ,'g a > t.

lh Wi et et t

' y!

I N M m @

e > e N M 4 e-@. b' e'm.O-e e

4 e e i 2 e e- e* .: e

'g O

'j v

y i '

' 0

+

1

  • g e g, _ - - .' , ',

te '

i f

g

- . p' ,

r- .

O E==" "5 "'" "'" "'

39060U860 DOCCET NO. 50 - 352 ..- -....

DATE OCTOBER 1.1990 - - -

COwPLETED Bv PHILADELPHIA ELECTRIC COwcANv kARL wECM REPORTS SUPERVISOR BUSINESS UNIT LIwERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3370 ---

OPERATING STATUS __

l NOTES: NO LO40 REDUCTIONS GREATER l 1 UNIT NAME: LIwERICM UNIT T l

_ _ ... - ----- ____......_. l i THAN 20% CRIOR TO WANUA., t

2. REPORTING PERIOD: SEPTEwSER. 1990 g 3293 i SCRAw TO START 3RD REFUEL l
3. LICENSED THERwAL POWER (wwT): -- __ . g  ;

1130 OUTAGE. l 4 NAMEPLATE RATING (GROSS wwE): _... ___._.. _.

1 g

g 1055 I.

1

5. DESIGN ELECTRICAL RATING (NET wwE): ..._ .._.  ; g i i
6. wax!wUw DEPENDABLE CADACITY (GROSS wwE): 1092 g l

1055 i I 7 max!wUw DEPENDABLE CADACITY (NET wwE):

8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUwSER 3 THOOUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. DOWER LEVEL TO wHICH RESTRICTED. Is Aw fNET wwEl.
10. REASONS FOR RESTRICTIONS. IF ANv:

THIS woNTH VR-TO-DATE CUsutATIVE 11 HO'JRS IN REPORTING PERIOD 720 6.551 40.871

12. NUABER Or HOURS REACTOR WAS CRITICAL 166.3. 5.510.2 32.639.0

- 13. REACTOR RESEpvE SHUTDOWN HOURS 0.0 0.0 0.0 14 '40URS GENERATOR 04-LINE 166.3 5.373.6 32.045.4

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0. 0 - 0.0
16. GROSS THERMAL ENERGv GENERATED (www) 540.343 77.270.679 95.134.113
17. GDOSS ELECTRICAL ENERGY GENERATED (www) 173.910 5.555.990 30.742.560
18. NET ELECTRICAL ENERGv GENERATED (www) 164.701 5.339.695 2?.396.091 DAGE 1~O*-2 ac , , , . . . , - . , - - - ,,, , . . . . .

-g i

. DOCKET N0.7 . , 50 - 354 b ~ ; . . . . . ,,,

OPER3 TING DATA REPORT (CONTINUE 3) 3906037860}

~

- 7 r r, _;

.L.L DATE OCTOBER 1.1990 -

_~

..=--

THIS MONTM VR-TO-DATE CUWULATIVE 23.1- 87.0 - 78.4

19. UMIT SERV!CE FACTOR' . .-- ---- --

23.* 82.0 78.4

20. UNIT AVAILASILITY FACTOR __

21.7. 77.3 ^ 68.2 21 UNIT' CAPACITY F ACT OR (USING MDC NET) ....._....-- _. -

-_= -

21.7 77.3 68.2-

22. UNIT CAPACITY FACTOR (USING DER NET) - .._.

O.0 3.6 3.0 .

23. UNIT FORCED OUTAGE RATE . . . . . . . _ . -_.- -. ...____ ....

2A. SHUTDOwwS' SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH)-

REFUELING OUTAGE: SEPTEmeEn 07.1990: 75 Days _

25. IF SHUTD0mN AT END OF REPORT PERIOD. ESTIMATED DATE 08 STARTUP:

FORECAST ACHIEVED.

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITV 12/19/8A 12/22/8A INITIAL ELECTRICITY WID APRIL 95 4/13/95 COMMERCIAL OPERATrow 1ST OTR 96 2'01/90'

- PAGE'2.0F'.2- -

s=

u T g,.

me

'g e " "

a e .,

m w- ve , gyw ,-- ...ww gy "ew w--,

p= 'e w w .q. '-e- ' owisa w - -w_'<T -e*44* - - W W M v w-'sep69+'PW-' tee'-

Wf**e'tr'ePtM*'aae***- -WrTV5'-'

W WW **49T-1A NNF'w' W'5Ti SM-WV W W ' tw Fwhm ie t' v + 1 it avw-***'ha-d'-'* Tem . i mm-en r,w-m

UNIT SHUTDOWN 3 TND POWE!? REDUCTIONS DOCMET NO. 50 - 352 __

UNIT NAME LINERIC UNIT.I DATE OCTOBE2 1.1990 REPORT MONTH SEPTEMBER. 1990 COMPLETED SW PHILADELPHIA ELECTRIC CO ANY MARL MECR REPORTS SUPERVISO4

.USINESS .I1 LINERICM GENERATING STATION 3906037860 TELEPHONE (215)-327-1200 EXTENSION 3320 I  ! l l l NETHOD OF l LICENSEE lSYSTEwlCOmpONENTI CAUSE AND CORRECTIVE lTYPElDURATIONIREASONISHUTTING DOWNl EVENT l CODE l CODE l ACTION TO I

NO.I DATE 1 (1)! (HOURS)l -(2) i REACTOR (3) l REPORT a I (4) I (5)  ! PREVENT RECURRENCE

. _- =_.--------------------------

35 l 900907 i S l 553.7 I C l 2 ) N/A 1 ZZ l ZZZZZZ l LOAD WAS REDUCED 68% FOLLOwED BY A l l I I l l l l WANUAL SCRAW TO BEGIN THE THIRD l

I l i l 1 l 8 REFUELING OUTAGE.

f l 1 I i - --- l l l l l l 1 1 1 553.7 I I i l I l L (2) (3) (4)

(1)

= - FORCED R E A SOe. wETWD EXHIBIT G- INSTRUCTIONS A - EOUIPMENT FAILURE tEkPLAIN)

-' WANUAL . FO# PREPARATION 08 DATA S- SCHEDULED ENTRY SHEETS FOR LICENSEE e - MAINTENANCE OR TEST 2 - WANUAL SCRAM.

C - REFUELING 3 - AUTOMATIC SCRAW. EVENT REPORT-(LER)

D - REGULATORV RESTRICTION 4 - OTHER (EMPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING

  • LICENSE ENAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EMPLAIN) EXHIBIT I - SA*E SOURCE 4

  • e 4

A 9 e pe y- .g- .g.9%.p i.7--- .-p e =a # ,..ger g-a-s-wwi-. gay r-%- .ge9 $ym,w.e mir-=w y --p* es w%g.4-m, g y9 9 u.r .v g _, , , j

3906037860 1; r

- t

' Dookst No. #50 353 [

Attachment to Monthly i Operating Report for . l September 1990 l

r UMERICK GENERATING STATION UNIT 2 i SEPTEMBER 1 THROUGH SEPTEMBER 30,1990 j J.,

i

1. NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES Limerick Unit 2 began the month of September at a nominal 98% of rated thermal power. On j September 1, reactor power was reduced to 00% to repair an Electrohydraulic Control (EHC) system i leak on #4 Main Turbine Control Valve. Retum to power was begun on September 2 and reactor -

power achieved 100% on Septomber 5 following completion of LPRM onlibrations. On ember '

8, reactor power was briefly reduced to 90% to perform Main Turbine Control Valve test . On September 10, at 0911 hours0.0105 days <br />0.253 hours <br />0.00151 weeks <br />3.466355e-4 months <br />, the reactor automatically scrammed due to a Nuolear Steam upply Shutoff System (NSSSS) Group l isolation signal created during survet:ance testing. . On September 13, at 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br />, the reactor achieved criticailty, and the main turbine generator was synchronized .- j to the grid at 2112 hours0.0244 days <br />0.587 hours <br />0.00349 weeks <br />8.03616e-4 months <br /> on September 14. Power ascension was continued and the reactor  ;

reached 100% power on September 16. On September 17, reactor power was briefly reduced to  !

90% to perform a Control Rod Pattom adjustment. On September 20, reactor power was briefly  !

reduced to 95% to perform a Control Rod Pattom adjustment. Umerick Unit 2 ended the month of September at a nominal 100% of rated thermal power, ,

Operational events that occurred during the month of September included: '

i On September 10, a full NSSSS Group 1 MSIV isolation occurred due to an instrument  !

failure. This occurred when a plant operator was reading the Turbine Enclosure Steam  !

Tunnel Temperature D!V 4 switches in the Auxiliary Equipment Room, concurrent with l&C  ?

testing of the NSSSS Main Steam line DIV 1 temperature instrumentation. Following the  ;

MSIV isolation, the reactor scrammed with the reactor vessel leve' 'xreasing to 48' and .  !

pressure rising to 1112 psig. HPCI and RCIC both started, but due to the short duration of I the initiation signal, only RCIC injected to the reactor vessel. HPCI was run in the full flow .

test mode. The 'N' SRV opened initially on the pressure spike and the K, M, H, S and E SRV's were cycled to contral reactor pressure. The plant entered OPCON 4 at 2209 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.405245e-4 months <br />.

On September 11, l&C replaced the faulty temperature switch (TTS-025-216D) and satisfactorily performed a cal / functional test.

1

-1 i

11. CHAli FNGES TO MAIN S1EAM SAFETY RELIEF VALVES l

There was one challenge to the Main Steam Safety Relief valves during the month of September, i The 'N' SRV opened when reactor pressure rose to 1112 psig following a scram due to an inadvertent NSSSS Group 1 MSIV isolation. This pressure is within the allowable setpoint range per I Technical Specifications. See Operational Events section above for details.

)

a l

l

. 1

.m .

' p; q 3g p[n 9 .I,( N M i.

y; * ' 4 f .; .

2

% w- .;A;f: ' .K ' a . ,

^,- '

--n' ' '

i)

' +>. ,

-;; ,f},'l&m'l _ 4

, O iv +

,. s

V
$
J- *

, 4 y ~ ,. l.

3-

=t g!' . ,

'l t..

1G

ot ,

-1 W: -

9 l

< 5

.Q) t ,

'Nk ' -1 i t' ts

, , i: * ,;

-i=- - .s, t

..t '

4 .+g. $j.

4 af,-f 5' . g yj d <

r

^.

') .

I!L.- , ' i-

  1. '. ,& i 4 L S i
Xf ,

' '7: 't

, , e . ..

N 7 T 3. ~ m ., . y ,-:

r

'. N.

s 7 . .

b r I t l

ny 5

, #1

,,. l.^

J e I > t' Qt W , e t- F0- N$ i t 4 1 2 Mi s W 4 4 O Me .J .-l. .

s.

I me 6 1 i > 34' 4. ' i

" Ql

':l.-

.., 4, 1 I -( ' .Ql > - , ' ; }-

> *= t

, W- @ GA i * <

m i R6 > . - . ,. .

,.** i : '.' II

.r ty , : . E e

! ee ue 0

m W1 2 <>l-x!

>E si W m M

O

- m@. e*~^'e

. o-o g-

o. o

'G Os @ m'*@ c.8C, mo-o e

o ' e o- o

6. f*a -@

9.9

' m :.: 0-'e--

- @ /. M o o *~c' *o- .;

a ,

Wt > hl ** e

  • s- * * e ' e- ' *- e * '  :

.l 3. 1. .J l m a et :4 D i Wl > g Oe Q -i i

aHW Di w i e WmE N: W 5 em se i ~&EW 9* Q ,

i e Ii g@

3Dd i e g'

i e- & - h i ,

M g i -

J V Mg N. .W

.m Ui a1 W WeMu Mi > '  :;~b

.J M *< l W D S W W em e i W . g giee 2g a 4 .i

> 4 iW Qi .J ' J m us O=

'I W -

,3 e- m- a e3 -

.J Oea tU'.I 4W3m N- > b b m D * ~ N M w th @ <h e, ' - @ O. '

n e t .J lQin g g S .J ==*i (.

o e- e- e N aN N -.N N. N' N-NJ N - N M;

0

  • > W > W O ** >- 7 .l 2 2 4- 4 '!

D Q h )'

> 3 W Q W *{

' b. * . w u .a J ;r T U W W 4 5- o e >

-f Q W 's t

'> J

! . .J ty.

m g .

4 W ')

O. -S cf Om i -

c; W- n> .

'O4 ' us M Os g g' e @ r. g cp e.O . Q Q . O ..N N. ,i Ol . >2 m e M f's - cp is m in N .'e, @ t ,

N- @$ J e' @ e @ m & C O C O' #9 9- Os i' {

'W pq mW  ; e- e e e

'~

> e i eg *;4 '

4 h =

n4 -

W l us t O i$

$Qi < q

,.i W t- Er e4 W h 9 >' i t.

Wt '( J mt .

.g I 3

> > e H M M sn 4 r~ e- 0 O e t< M 4 , e. @

2 4 e e- e- e 'e- .r . . - .,

-a

.- t -

~.

y

':h s 1-

,:r

, , 7 g

- a i. . .

,j lp s i ,. 't

.- -. . - , . s.. 3 , ., ,.

OPE 20 TING DATA LEPORT 3906037840? m . -- - -:

DOCMET NO. 50 - 353 --- ---

DATE OCTOBER 1.1990 - --______ ,

COMPLETED BV PHILADELPHIA- _ELECTRIC .

COMPANY MARL WECK REPORTS SUPERVISOR BUSINESS UNIT LIwERICE GENERATING STATION TELEPHONE (215) 32T-1200 EXTENSION 3320 - _ -

OPERATING STATUS ---------

l NOTES: THERE WAS ONE LOAD REDUCTION I 1 UNIT NAME: LIMERICK UNIT 2 i

._______..____.____________________ g I GREATER THAN 20% PRIOR TO AN l

2. REPORTING PERIOD: SEPTEwSER. 1990 _ ____ g 3293 l AUTO SCRAW FROM 100%. l
3. LICENSED THERwAL POWER (wwT): ..______________ g 113e l~

4 NAMEPLATE RATING (GROSS wwE): _______________

i

.g 1055 l'

5. DESIGN ELECTRICAL RATING (NET wwE): ______ __ g l 1 l'
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): __.. 1097 l l

i 7 MAXIMUU DEPENDABLE CAPACITY (NET WWE): 1055 I - .

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. DOwE# LEVEL TO WHICH RESTRICTED. IF ANV (NET WWE):
10. REASONS FOR RESTRICTIONS. IF ANr.

THIS MONTH VR-TO-DATE' CumutATIVE T2O 6.383 6.363.

11 HOURS IN REPORTING PERIOD ___-___

12. NUMBER OF M9URS REACTOR WAS CRIT 1 CAL 638.9- 5.350.3' .

5.350.3 0.0 0.0 0.0

. 13. REACTOR RESERVE SHUTDOWN HOURS _________... ..__ .______ -- -__-

612.0 5.061.7 5.061.7 -

14 HOURS GENERATOR ON-LINE ___________. _______ .- - - - - ---

. 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

16. GROSS THERNAL ENERGV GENERATED /* W ) . 1.917.766 16.053.183 16.053.183 17 GROSS ELECTRICAL ENERGV GENERATED (NwH) 633.900 5.291.016 '5.291.016
18. NET ELECTRICAL ENERGv GENERATED (#wH) 600.471 5.095.255 5.085.255 PAGE-1 OF 2 e

6 e .

u.__ _-r. -s e .-- ..m s _.. -%n-___.2 .1._ _ -t. .= v".- ee-* - *- ++ey ==-e w e- r- .-+-w+ i+ra y

DOCRE T NO. , 50 - - JM OPEOGTING DATd f.EPORT (CONTINt*ED) 3906037860' DATE OCTOBER 1.1990 ---

THIS WONTH VR-TO-DATE CU#ULATIVE 85.0 79.3 79.3

19. UNIT SERVICE FACTOR ....__._-_.. - - _ - _ - _.-

85.0 79.3 79.3

20. UNIT AVAILABILITV FACTOR _ _ _ . _ _ -

80.1 75.5 75.5

21. UNIT CAPACITY FACTOR (USING MDC NET) __.._..... _ _

80.1 's . 5 75.5

22. UNIT CAPACITv FACTOR (USING DER NET) -_

15.0 12.8 12.8

23. UNIT FORCED OUTAGE RATE ___ .._- -- ._ _ ______ ___ .. --

24 SHUTDOWNS SCHEDULED OVER NEXT 6 wueYHS (TvPE. DATE. AND DURATION 08 EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUp:

FORECAST ACHIEVED

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITV 08/12/89 08/12/89 INITIAL ELECTRICITv 09/01/89 09/01/89 COwwEDClat OPERATION 02/01/90 07/09/90 PAGE 2 05 2

-.:. - _. m- .=,.em .- . -- , e- = v u.- 4--u -

UNIT SHUTDOWN 3 END POWE3 REDUCTIONS DOCKET NO. 50 - 353 __ _ _ __

UNIT NAME LINERICt -- - _ . - - -UNIT Z -

DATE OCTO9E3 1.1990 -_--


__ _= ----= _ _

CO*PLETED By PHILADELPHIA ELECTRIC COMPANY REPORT MONTH SEPTEMBER. 1990 ---.---.. -- _ - ~ = -

MARL MECK REPORTS SUPERv!SoR SUSINESS UNIT 3906037860 LINERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 l 1  ;

i i WETHOD OF I LICENSEE ISYSTEMICO*PONENTI CODECAUSEI AND CORRECTIVE ACTION TO I lTVPE' DURATIONlREASONISHUTTING DOWN1 EVENT l CODE I

'NO.) DATE I (1). (HOURS)l (2) l REACTOR (3) l REPORT s ! ___-

(4) 1 _ __

(5) l PREVENT RECURRENCE -_ __ _-_

l' I I i 1 i i i 4 N/A 1 ZZ i ZZZZZZ l LOAD WAS REDUCEO 40% TO REPAIR AN EHC 24 $ 900901 i F ' C00.0 1 A l 1 l LEAM ON s4 MAIN TURBINE CONTROL VALVE.

l l l l l I i . I I  !

L ZZ ll ZZZZZZ l LOAD WAS REDUCED 10% TO PERFORw MAIN N/A 25 I 900900 l 5 000.0 l F l 4 l l l 11 I TURBINE CONTROL VALVE TESTING.

l l l l I I I l I i I I 26 i 900910 l F I 108.0 l G l 3 l 2-90-015 l ZZ l ZZZZZZ l REACTOR AUTO #ATICALLv SCRAensED DUE TO 1 I I I i 1 1 I AN NS$55 GROUP 1 ISOtATION SIGNAL 1

i I I l 1 l CREATED DURING TEST PERFORMANCE.

! I I I i i I i  ! I 27 l 900917 i S 000.0 l F 1 4 I N/A I ZZ l ZZZZZZ l LOAD WAS REDUCED 10% TO PERFORW CONTROL l l 1 1 I ROD PATTERN ADJUSTWENT.

1 i l 1 I I l I f f f f f 26 ! 900920 i S I 000.0 I F  ! 4 i- N/A i ZI I ZZZZZZ l LOAD wAS REDUCED 5% TO PERFORF CONTROL i l i I i I ROD PATTERN ADJUSTWENT.

l l l l I l ---- 1 l 1  ! 108.0 l [ f f (

(2) .(3) (4)

(t) r - FORCED REASON WETHOD EXHIBIT G- INSTRUCTIONS A'- EOUIPMENT FAILURE (EMPLAIN) 1 - MANUAL FOR PREPARATION Or' DATA

. S - SCHEDtfLED ENTRY SHEETS FOR LICENSEE 8 - MAINTENANCE OR TEST 2 - MANUAL SCRAW.

C - PEFUELING 3 - AUTOWATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY DESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

, E - OPERATOR TRAINING

  • LICENSE EXAMINATION F - ADw!NISTRAT!vE -(5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(ERPLAIN) EmHIe!T I - SA#E SOURCE 8