Monthly Operating Repts for Feb 1997 for Limerick Generating Station Units 1 & 2
ML20135F646
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 02/28/1997
From: Baxley R, Sproat E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9703130239
Download: ML20135F646 (11)


Text

Limirick Gsnrrating St: tion y

R eeco ree<ovcomneev

~

PO Box 2300 A UNIT of PECO ENrecy Sanatoga, PA 19464-0920 T.S.6.9.1.6 March 12,1997 Docket Nos. 50-352 50-353 License Nos. NPF-39

]

NPF-85 1

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of February 1997 forwarded pursuant to Technical Specification 6.9.1.6.

Very truly yours, Edward F. Sproat, III' Director - Site Engineering drh Enclosuret cc:

H. J. Miller, Administrator, Region I, USNRC N. S. Perry, USNRC Senior Resident Inspector LGS

/[

W. G. MacFarland, Vice President, LGS all p

9703130239 970228 PDR ADOCK 05000352

$,$Eg,g,ggg R

N

Dock t No. 50-352 Attachm:nt to Monthly Operating Report for February 1997 Limerick Generating Station Unit 1 February 1 through February 28,1997 1.

Narrative Summary of Operatina Experiences Unit 1 began the month of February 1997 at a nominal 100% rated thermal power (RTP).

On February 7,1997 at 2350 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94175e-4 months <br />, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP on February 8,1997 at 0151 hours0.00175 days <br />0.0419 hours <br />2.496693e-4 weeks <br />5.74555e-5 months <br />.

On February 13,1997 at 2215 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.428075e-4 months <br />, power was reduced to 91% RTP for main turbine valve testing and rod pattern adjustment. Power was restored to 100% RTP at 2323 hours0.0269 days <br />0.645 hours <br />0.00384 weeks <br />8.839015e-4 months <br />.

On February 16,1997 at 0041 hours4.74537e-4 days <br />0.0114 hours <br />6.779101e-5 weeks <br />1.56005e-5 months <br />, power was reduced to 93% RTP for main steam isolation valve testing. Power was restored to 100% RTP at 0528 hours0.00611 days <br />0.147 hours <br />8.730159e-4 weeks <br />2.00904e-4 months <br />.

On February 22,1997 at 1122 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.26921e-4 months <br />, power was reduced to 98% RTP for main turbine valve testing. Power was restored to 100% RTP at 1718 hours0.0199 days <br />0.477 hours <br />0.00284 weeks <br />6.53699e-4 months <br />.

Unit 1 ended this month operating at 100% RTP.

II.

Challences to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of February.

n-

. ~ -. - ~.. -

-... - -..... -. -.. ~..-.

.. ~........- _.

... -.I AVERAGE DAILY POWER LEVEL DOCKET NO. 50-352 UNIT LIMERICKUNIT1 DATE MARCH 10,1997 COMPANY PECO ENERGY COMPANY

- r

'tOBERT A BAXLEY REPORTS ENGINEER i

SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610)7183767 MONTH FEBRUARY,1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MNE-NET) 1 1111 17 1120 2

1120 18 1111 3

1111 19 1119 4

1120 20 1103 5

1111 21 1104 j

6 1120 22 1095 7

1120 23 1110 t

t 4

8 1112 24 1112 9

1122 25 1117 to 1121 26 1109 11 1121 27 1097 12 1118 28 1109 13 1118 14 1116 15 1119 16 1103 b

I b

-u.-

. -.. ~.. -... -. - _. -

OPERATING DATA REPORT t

l DOCKET NO. 50 -352 DATE MARCH 10,1997 -

COMPLETED BY PECO INERGY COMPANY ROBERT A. BAXLEY REPORTS ENGINEER

.l SITE ENGINEERING j

LIMERICK GENERATING STATION TELEPHONE (610) 718-3767

. OPERATING STATUS t

1. UNIT NAME:

LIM _E..R. I.C. K...U...N.._I.T 1

2. REPORTING PERIOD:

FEBRUARY,1997~~~

GREATER THAN 20% THIS MONTH.

~~

i

3. UCENSED THERMAL POWER (MWT) 3458 1

1180

4. NAMEPLATE RATING (GROSS MWE):

1105

5. DESIGN ELECTRICAL RATING (NET MWE):
6. MAXIMUM DEPU4DABLE CAPACITY (GROSS MWE):

1145

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1105

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:

I

9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):

i

10. REASONS FOR RESTRICTIONS,IF ANY:

j C

THIS MONTH YR-TO-DATE CUMULATIVE

[

11. HOURS IN REPORTING PERIOD 672 1,41 6 97,104
12. NUMBER OF HOURS REACTOR V!AS CRITICAL 672.0 1,416.0 81,543.4

' O.0 0.0 0.0

13. REACTOR RESERVE SHUTDOWN HOURS tF2.0 1,416.0 80,176.0
14. HOURS GENERATOR ON-LINE

{

15. UNIT RESERVE SHUTDOWN HOURS 0.7 0.0 0.0 2',645,972 A
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,321,1N 4,891,809
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)

- 774,000 1,634,300 81,706,080

18. NET ELECTRICAL ENERGY GENERATED (MWH) 748,102 1,581,345 78,514.442 3

t 5

PAGE 1 OF 2

?

=

OPERATING DATA REPORT (CONTINUED) -

DOCKET NO.

50 - 352

~

DATE MARCH 10,1997 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 %

100.0 %

82.6 %

20. UNIT AVAILABILITY FACTOR 100.0 %

100.0 %

82.6 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 100.7 %

101.1 %

76.2 %

22. UNIT CAPACITY FACTOR (USING DER NET) 100.7 %

101.1 %

76 2 %

23. UNIT FORCED OUTAGE RATE

.0 %

.0 %

4.1 %

24. SHUTDOWNS SCHEDUI ED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATIOld OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/B4 INITIAL ELECTRICITY MID APRIL 85 04/13/65 COMMERCIAL OPERATION 1ST QTR 86 0201/86 i

=

' PAGE 2 OF 2 r

..1_,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-352 UNITNAME UMERICKUNIT1 DATE MARCH 10,1997 COMPLETED BY PECO ENERGY COMPANY ROBERT A. BAXLEY REPORTS ENGINEFR SITE ENGINEERING LIMERICK GENERAThNG STATION REPORT MONTH FEBRUARY 1997 TELEPHONE (610)71ELT167 I

METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE

' DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HL **S)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 177 970207 S

B 4

N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.

178 970213 S

B 4

N/A HA VALVEX ttEACTOR POWER WAS REDUCED TO 91% DUE TO MAIN TURBINE VALVE TESTING AND CONTROL ROD PATTERN ADJUSTMENT.

179 970216 S

B 4

N/A CD VALVEX REACTOR POWER WAS REDUCED TO 93% DUE TO MAIN STEAM ISOLATION VALVE TESTING.

180 970222 S

B 4

N/A HA VALVEX REACTOR POWER WAS REDUCED TO 98% DUE TO MAIN TURBINE VALVE TESTING.

TOTAL HOURS

[

F (1)

(2)

(3)

(4)

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S-SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B -MAINTENANCE OR TEST 2-MANUALSCRAM ENTRY SHEETS FOR UCENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)

D-REGULATORY RESTRICTION 4-OTHER (EXPLAIN)

FILE (NUREG4161) i E - OPERATOR TRAINING + UCENSE EXAMINATION F - ADMINISTRATIVE (5)

G-OPERATIONAL ERROR (EXPLAIN)

EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)

{

i

~...

~

Dockst No. 50-353 i

Attachm:nt to Monthly Operating Report for l

February 1997 Limerick Generating Station Unit 2 February 1 through February 28,1997 l

l.

Narrative Summary of Operatina Experiences

. Unit 2 began the month of February 1997 at 0% rated thermal power (RTP) shutdown for a refueling outage I

On February 26,1997 at 0356 hours0.00412 days <br />0.0989 hours <br />5.886243e-4 weeks <br />1.35458e-4 months <br />, the mode switch was moved to start up. The reactor was taken critical at 0714 hours0.00826 days <br />0.198 hours <br />0.00118 weeks <br />2.71677e-4 months <br />.

On February 27,1997 at 0939 hours0.0109 days <br />0.261 hours <br />0.00155 weeks <br />3.572895e-4 months <br />, the mode switch was put in run.

On February 28,1997 at 0616 hours0.00713 days <br />0.171 hours <br />0.00102 weeks <br />2.34388e-4 months <br /> the main generator was syncronized to the grid for a three hour thermal soak period. The generator was tripped during a planned turbine valve tightness test at approximately 0915 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.481575e-4 months <br />. At 1026 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.90393e-4 months <br /> the turbine was syncronized to

~ the grid ending the refuel outage.

Unit 2 ended this operating period at 23% of RTP.

II.

Challenoes to Main Steam Safety Relief Valves i

There were no challenges to the Main Steam Safety Relief Valves during the month of February.

...... ~_._.

.. ~....

.. -. ~~ ~.

~

AVERAGE DAILY POWER LEVEL -

DOCKET NO. 50-353 UNIT LIMERICKUNIT2 DATE MARCH 10,1997 COMPANY PECO ENERGY COMPANY.

ROBERT A. BAXLEY REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION t

TELEPHONE (610)718-3767 MONTH FEBRUARY,1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 0

17 0

2 0

18 0

t 3

0 19 0

4 0

20 0

5 0

21 0

6 0

22 0

i 7

0 23 0

8 0

24 0

9 0

25 0

to 0

26 0

11 0

27 0

12 0

28 94 13 0

14 0

15 0

t 16 0

u wc-m

-+

1

-e

< ~

_..m.-

m. _. _. -

-.m.

. =,... _. - -

b OPERATING DATA REPORT DOCKET NO. 50 -353 DATE MARCH 10,1997 p

COMPLETED BY PECO ENERGY COMPANY 1

i ROBERT A. BAXLEY REPORTS ENGINEER -

SITE ENGINEERING LIMERICK GENERATING STATION i

TELEPHONE (610)718-3767 OPERATING STATUS 1.- UNIT NAME:

LIMERICK _ UNIT,2 NOTES: THERE WAS ONE LOAD DROP

2. REPORTING PERIOD:

FEBRUARY,1997 1

GREATER THAN 20% THIS MONTH

3. LICENSED THERMAL POWER (MWT) 3458 ASSOCIATED WITH 2R04.

1163

4. NAMEPLATE RATING (GROSS MWE):

t 1115

5. DESIGN ELECTRICAL RATING (NET MWE):
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

1155

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1115_

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:

l

9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

?

THIS MONTH YR-TO-DATE CUMULATlVE y

672 1,41 6 62,616

11. HOURS IN REPORTING PERIOD 63.8 775.8 56,803.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 0.0
13. REACTOR RESERVE SHUTDOWN HGURS 16.6 727.6 55,686.7
14. HOURS GENERATOR ON-LINE 1

?

0.0 0.0 0.0

15. UNIT RESERVE SHUTDOWN HOURS i

16.~ GROSS THERMAL ENERGY GENERATED (MWH) 26,568 1,984,140 178,408,884 i

i

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 2,000 640,800 50,031.080

-389 612,446 56,917,177

18. NET ELECTRICAL ENERGY GENERATED (MWH)

E r

PAGE 1 OF 2 i

. OPERATING DATA REPORT (CONTINUED)

DOCKET NO. '

50 -353 l

DATE MARCH 10,1997 -

THIS MONTH YR-TO-DATE CUMULATIVE 2.5 %

S1.4 %

88.9 % -

19. UNIT SERVICE FACTOR 2.5 %

51.4 %

88.9 % '

20. UNIT AVAILABluTY FACTOR

.1 %

38.8 %

84.7 %

21. UNIT CAPACITY FACTOR (USING MDC NET)

.1 %.

38.8 %

84.7 %

22. UNIT CAPACITY FACTOR (USING DER NET)

.0 #i

.D %

3.5 %

23. UNIT FORCED OUTAGE RATE
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE ANO DURATION Of EACHL
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP; FORECAST ACHIEVED
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

INITIAL CRITICAUTY 08/12/89 08/12/89 INITIAL ELECTRICITY 0001/89 0001/89 COMMERCIAL OPERATION 02/01/90 01A)S/90 PAGE 2 OF 2

=. -

- _ - _ ~.. ~

.. _. ~ ~. -

.- ~.

. - ~ -.-....- -.... -.

~n UNIT SHUTDOWNS AND POWER REDUCTIONS I

DOCKET NO. 50-353 UNITNAME LIMERICKUNIT2 DATE MARCH 10.1997 COMPLETED BY PECO ENERGY COMPANY ROBERT A. BAXLEY REPORTS ENGINEER SITE ENGINEER;NG t

t UMERICK GENERATING STATION REPORT MONTH FEBRUARY.1997 TELEPHONE (610)7183767

- t METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1?

(HOURS)

(2)

REACTOR (3)

REPORTS (4)

(S)

PRE'KNT RECURRENCE l

i i

186 970201 S

655.4 C

4 N/A RC FUELXX REACTOR WAS SHUTDOWN FROM PREVIOUS REPORTING PERIOD DUE TO 2R04 REFUEUNG

[

OUTAGE.

i TOTAL HOURS 655.4 i

L i

i a

v I

I p

I i

k 4

(1)

(2)

(3)

(4) t F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A-EQUlPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C-REFUEUNG 3-AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + UCENSE EXAMINATION (5)

F-ADMfNISTRATIVE EXHIBIT I-SAME SOURCE G-OPERATIONAL ERROR (EXPLA N)

H -OTHER (EXPLAIN) i L

.