February 2004 Monthly Operating Report for Pilgrim Nuclear Power Station
ML040760708
Person / Time
Site: Pilgrim
Issue date: 03/08/2004
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.022
Download: ML040760708 (2)


Text

AtrE- Entergy Nuclear Operations, Inc.

aEtergy Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 March 8, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 February 2004 Monthly Operating Report LETTER NUMBER: 2.04.022

Dear Sir or Madam:

In accordance with Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning.

Should you have questions or comments concerning this report, please contact Mr. Bryan Ford at (508) 830-8403.

Sincerely, Step n . ethay Director, Nuclear Assessinent MJG/dm

Attachment:

February 2004 Monthly Operating Report (1 page) cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 204022

, 70--2,4'

4 OPERATING DATA REPORT DOCKET NO. 50-293 UNIT NAME Pilgrim 1 DATE March 03, 2004 COMPLETED BY Mary J. Gatslick  ;

TELEPHONE (508) 830-8373

, . . I -

REPORTING PERICID: February 2004

1. Design Electrical Rating 690.00
2. Maximum Dependable Capacity (MWe-Net) 684.70 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 696.00 1,440.00 191,594.90
4. Number of Hours Generator On-line 696.00 1,440.00 189,384.95
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 479,839.04 992,808.88 112,645,487.3 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The period began and ended with the unit on line, operating at 100% power (2028 MWt). There were no power reductions during this reporting period.

1 2 Reason: Method:.

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1