ML16340C443

From kanterella
Revision as of 22:44, 18 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP OP-0 Re Reactor Trip W/Safety Injection & EP OP-2 Re Loss of Coolant.Proprietary Info Deleted Per Generic Ltr 81-27
ML16340C443
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/19/1982
From: Crane P
PACIFIC GAS & ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML16340C442 List:
References
GL-81-27, NUDOCS 8203310363
Download: ML16340C443 (2)


Text

0 PA.CIP IC GA.S A.ND ELECTRIC COMPS.KT P. O. BOX 7442 ~ 77 BEALE STREETr 31ST FLOORS'SAN FRANCISCO'ALIFORNIA 94106 TELEPHONE (415) 781 4211 TELECOPIER (415) 543-7813 Harch 19, 19 Hr. R. H. Engelken, Regfonal hdmfnf strator Offfce of Inspectfon and Enforcement Reafon Y U. S. Nuclear Regulatory Coamfssfon 1450 Narfa Lane, Sufte 210 walnut Greek, CA 94596 Re: Docket Mo. 50-275 Docket Mo. 50<<323 Lfcense No. DPR-76 Dfablo Canyon Unfts 1 and 2

Dear Mr. Engelken:

In accordance fifth Sectfon Y, 'Iwplementfng Procedures', of 10 CFR 50, Appendfx E, se are submfttfng three copfes of each of the updates fifth to the detafled Impleaentfng Procedures for the Dfablo Canyon Power Plant Unfts 1 and 2 Emergency Plan as lfsted on the attached. Concur rently, ten copfes of each update are befng submftted to Hr.. Harold. R Denton, Dfrector- of Nucl ear Reactor Regul atf on Mfthfn Procedure R-l, Revfsfon 6,, there fs proprfetary and/or prfvacy fnformatfon. Thfs occurs on page 14 of 14 and both pages of the attachment entftled 'Safety, Health and Clafms Personnel to be Contacted for Reportfng of In4urfes at Dfablo Canyon". The noted fnformatfon has been bracketed fn accordance NRC Generfc Letter No. 81-27.

/ /0 CP'88K

~eeBP5'2033i0363 820329 PDR ADOCK 05000275 F PDR

REGULAT 'INFORMATION DISTRIBUTION STEM (RIDS)

FACIL:50 275 Diablo Canyon Nuclear Power Planti Unit ii Pacific Ga 05000275 50 323 Diablo Canyon Nuclear Power BYNAME Planti Unit 2i Pacif<c Ga= 05000323 AUTH AUTHOR AFFILIATION CRAiVEgP ~ A, Pacific Gas 8 Electr ic Co.

REC IP ~ NAME RECIPIENT AFFILIATION ENGELKKN>R H, ~ Region Si Office of Director

SUBJECT:

forwards Central Files version of revised emergency plan imolementina oroceduresiincludina Procedures EP OP 0 re reactor trin w/safety in, lection 8 EP OP 2 re loss of secondary coolant'roprietary info identified.

DISTRIBUTION CODE: X005S COPIES RECEIVED:LTR l>>"'NCL L SIZE:

TITLE: Knj'er o Plan (CF Avail )

NOTES:J Hanchett icy PDR 05000275 1cy PDR Documents'<Hanchett Documents'f 05000323 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NANE I.TTR ENCI. ID CODE/NAME LTTR ENCL LIC BR 43 BC 1 0 BUCKLEYi8~ 01 1 ADH/D 02 1 1 FEMA REP 0 IV 0'9 1 1 I 08 1 1 IE/DEP DIR 1 0 IK/DKP/EPDB Ob 1 1 IE/DKP/KPLB 03 3 3 NRR/DS I/AEB 1 1 NRR/OS I/RAB 1 0 RKG F ILES 07 1 1 l9 ~l TOTAL NU~BER OF COPIES REQUIRED: LTTR ENCL