Submits Requested Info Re NUREG-0737 Items Per Generic Ltr 82-10 on post-TMI Requirements.Schedules for Items I.C.1 & III.A.1.2 Not Submitted Since Commission to Reconsider Revised Implementation Schedule
ML20053E616
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 06/04/1982
From: Schuyler J
PACIFIC GAS & ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.3, TASK-1.C.1, TASK-2.D.1, TASK-2.K.3.30, TASK-2.K.3.31, TASK-3.A.1.2, TASK-3.A.2.2, TASK-3.D.3.4, TASK-TM GL-82-10, NUDOCS 8206090075
Download: ML20053E616 (5)


Text

_ .

t <

s DV . .,

J PACIFIC GAS AND ELECThIC '

C O M PANY e 'Ep 7 ,. ,  ; 77 BE ALE STR E ET, S AN FR ANCISCO, C ALIFORNt A 94106 TELEPHONE (415) 7814211

~ '" -,

3 P. O. 8 0x 74 4 2, S A N FR ANCISCO, C ALIFO R NI A 94120 TELECOPIER (415) 543 7813 T4 . -7 M1 :20 NSW June 4, 1982

.? .

Mr. Darrell G. Eisenhut, Director Division of Reactor Licensing i Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission '

Washington, DC 20555 Re: Docket No. 50-275 License No. DPR-76 Diablo Canyon Unit 1

Dear Mr. Eisenhut:

In accordance with NRC Generic Letter No. 82-10 (Post TMI Requirements), PGandE is submitting the requested information for NUREG-0737 items. However, specific schedules for items I.C.1

and III.A.1.2 are not submitted at this time as we understand the Com nission is to consider a revised implementation schedule for these HUREG-0737 items under SECY 82-311, " Requirements for Emergency Response Capabilities." We will provide the required information for these items in accordance with the approved SECY 82-111.

Our submittal consists of Enclosure A, " Items Which Have Been Completed," and Enclosure B, " Items Which Have Not Been Completed."

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

I am authorized to sign and file this submittal with,the NRC, and the matters set forth herein are true and correct to the best of my knowledge and belief.

Very truly yours, go3 h,0. SCHUYLER J

J. O. Schuyler i

8206090075 820604 PDR ADOCK 05000275 l

' '"" i

L~ 1 .

I l

( Mr. Darrell G. Eisenhut June 4, 1982 i l

Page 2 4

b Subscribed and sworn to before me this 4th day of June, 1982. ,

f.

SEAL Nancy J. Lemaster Nancy J. Lemaster, Notary Public in and for the City and County of San Francisco, State of California ,

My Commission expires April 14, 1986 Robert Chlbach '

Philip A. Crane, Jr.

Attorneys for Pacific Gas and Electric Company /

By Philip A. Crane, Jr.

Philip A. Crane, Jr.

E.R.Kendle/ PAC:nl Enclosures cc w/encls:

Mr. R. H. Engelken, Regional Administrator Region V U. S. Nuclear Regulatory Commission .

1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 Service List

~

i r

N.,.

r " +f

.. -( .

ENCIDSURE A- .

s , p

./, ITEMS Wi!ICH !! AVE BEEN 031pLETED

~

l

,(

, q >

wJ-~ ., , ,

/

N .,

- - NBC NRC Requirment ' Recmmended Schedule FG&E Status NUREG-07373m I.A.1.3.1 Revise administrative procedures October 1, 1982 Nuclear Plant Administrative .

Limit Overtime to limit overtime in accordance .

Procedure NPAP A-8 was revised with.NBC Policy. Staterent issued 2/23/81 to meet this requirment.

by Generic letter No. 82-02, ,

dated February 8, 1982.

- ~

I.A.1.3.2 NAu'gment current shift staffing July 1, 1982 s .[' Nuclear Plant Administrative Procedure NPAP A-104 was revised Minimum Shif t Crew to conform with minimum levels -

a

' set.forth on ,page 3-9 of NURIE-

5/13/80 and PG&E had sufficient 0737. licensed operators by 6/2/81 to

'N -

meet this requirment.

q II.D.i. Submit plant specific reports April 1, 1982 Jhe. plant specific report on the on relief and safety valve relief and safety valve program RV & SV Test Programs program. was subnitted on 3/31/82.

III.'A.1,K Prov!de jfor augmentation of July 1, 1982 Completion of this requirement Staf#ing levels for staffing in accordance with confimed in SER Supplement 14, Dnertency Situations Generic letter 81-10 dated April, 1981.

-: w1 2/18/81.

Modify facility as identified Plant Specific Proposals Licensee study found that no III.D.3.4 by licensee study. design changes were needed Control Rom (9/3/80) and confimed by SER liabitability

, Supp1 ment No.14.

n.y .,

1 h -__ -- hf1'T'WPCs as oua nv. um - . chm _

, y stu osuRs a ITD1S WHICll HAVE NOT BEEN CCNPIETED l

NIC IG&s Recorvnended Schedule Proposed Schedule  ;

NUREG-0737 Items NRC Requiranent .

Revise procedures by next First refueling after Will be established in I.C.1 mfueling outage. 10/1/82. accordance with " Staff Revise Bnergency Reconsnendations on the Procedures Requirenents for Dnergency Response Capability" (SECY 82-111) when approved.*

i l

July 1, 1982 I I. D. 1- 3 Submit report of msults of test July 1, 1982 '

Block Valve Test program.

Program .

One year after staff One year after staff II.K.3.30.& 31 Submit plant specific analyses. approval of model.

SB LOCA Analysis approval of model, Canplete modifications. October 1, 1982 Will be established in III.A.1.2 accordance with " Staff Upgrade anergency Reconinendations on the Support Facilities Requiroments for Dnergency Response Capability" (SECY 82-111) when approved.**

c October 1, 1982 October 1, 1992 III.A.2.2 Complete modifications.

Meteorological Data l

2-__ -

Enclosure B -

Itans Which Have Not Been Conpleted .

Page 2 o

  • Bnergency Procedures are to be revised in accordance with Westinghouse Owner's Group generic guldelines which are not yet available. PG&E personnel -

required to prepare revised energency procedures are the same as those required '

to perforn Control Room design review and development of safety parameter i

display systen displays. Time is needed to integrate the schedules for impleneptation of these and other anergency response capabilities after approval of staff requirements (SECY 82-111). Existing energency operating procedures have been upgraded to address the most significant emergency conditions. These upgraded procedures have been reviewed by NRC staff and, as revised in accordance with staff reconsnendations, were four.d to be acceptable for operation up to 100% of rated power.

I i

t

    • IGE has provided an interim EOF which was scheduled to be upgraded with new data systens equipment to meet the requironents of NUREG 0737 by October 1,1982; h(wever, the anergency Response Facilities Data Systems equirrnent supplier recently infonned us of a delay in shipnent from July 15, 1982 to Septeaber 15, 1982. This delay will not allow us to meet the reconnended NRC schedule of October 1, 1982. Also, time is needed to integrate the schedules for implomntation of these and other emergency response capabilities after approval of staff requironents (SECY 82-111). We are currently negotiating the shipping date with the vendor and when established will provide a proposed schedule to the 100. In addition, PG&E will plovide a pennanent EDP. Our letter dated Deconcer 20, 1981 to D.G. Eisenhut states the pennanent EOF will be conplete by July 1, 1983. With the constmetion contract recently awarded, we now believe this date nny be revised to Octobar 1,1983. 'Ihe pennanent BOF schedule will also be finalized when we provide our pn> posed schedule for i

the upgraded facility. (We plan to request a license amendment and ng;otiation of schedules upon Consnission approval of SFXX 82-111.)

i