ML20056G341

From kanterella
Revision as of 04:59, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Cooper Nuclear Station Semiannual Operating Rept, Radioactive Effluents,Jan-June 1993. Informs That Because of Flooding Which Occurred Around Plant,Census of Conditions of First Half of 1993 Not Taken
ML20056G341
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/25/1993
From: Horn G
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20056G342 List:
References
NSD931012, NUDOCS 9309030022
Download: ML20056G341 (1)


Text

r-I GENERAL OFFICE P O BOX 499. COLUMBUS. NEBRASKA 68632-0499 w

Nebraska Public Power District *%"e"sTdE**

- ~. _ - - -

. , , NSD931012 August 25, 1993 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Subj ect: Semi-Annual Radioactive Material Release Report Cooper Nuclear Station NRC Docket No. 50-298, DPR-46 Gentlemen:

In accordance with Srecification 6.5.1.F of the Cooper Nuclear Station Technical Specifications, the Nebraska Public Power District submits the Cooper Nuclear Station Semi-Annual Radioactive Material Release Report for the period January 1,1993, through June 30, 1993.

A land use census is taken every year for the area within three miles of the plant as required by Cooper Nuclear Station Technical Specification 4.21.F. The

, census data is used in performing calculations, and the results of these calculations appear in the Cooper Nuclear Station Semi-Annual Radioactive Material Release Report. For the Report for this period, land use census data from 1992 and 1993 was used. Typically only 1993 data would be used, but because of the flooding which occurred around Cooper Nuclear Station, a census representative of the conditions of the first half of 1993 could not be taken.

Details concerning this change are given in the Semi-Annual Radioactive Material Release Report for January 1, 1993, through June 30, 1993, on page B116 of Appendix B and page C4 of Appendix C.

p In accordance with 10 CFR 50.4(b)(1), we are enclosing one signed original of the report for your use, one copy to the Regional Office, and one ccpy to the NRC Resident Inspector.

Should you have any questions or comments regarding this report, please contact my ffice.

./

. Horn V@1' c President - Nuclear GRH/hch:gls Enclosures cc: U.S. Nuclear Regulatory Commission

, Regional Office - Region IV NRC Senior Resident Inspector

~

Ceoper Nuclear Station n r. -

9309030022 930825 PDR ADOCK O yB 9g d (\

=u=~==w==nw=,== - = = = = ==

wansm&mma

= = ====m