ML20006A506

From kanterella
Revision as of 16:02, 17 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1989 for Point Beach Nuclear Plant,Units 1 & 2
ML20006A506
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/31/1989
From: Krause C
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20005G904 List:
References
NUDOCS 9001290046
Download: ML20006A506 (7)


Text

, , _ . . . - _ _ - _ - _ - - _ .-- - - _ _ ._ _ _ _ _ _ _ _ -

~;; .

OPERATING DATA REPORT- i

-DOCKET NO. 50-266.

  • L DATE January 5,.1990 '

COMPLETED BY C. W.'KRAUSE TELEPHONE 414 221 2001 OPERATING ST*TUS -

. . .. . . . . . . . . . . . . . ~ . . .. .. .. .~ .

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES. .
2. REPORTING PERIOD: DECEMBER 1989 . .
3. LICENSED THERMAL POWER (MWT): 1518.5. . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MNE}: 509. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
  • NOT APPLICABLE
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) . NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE ,

THIS MONTH .YR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 8,760 167,904
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,728.3 138,343.8 '[
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.7
14. HOURS GENERATOR ON LINE 744.0 7,706.8 135,539.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 837.9 'I
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,124,510 11,125,568 188,468,392
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 381,630 3,775,640 63,604,690 >j
18. NET ELECTRICAL ENERGY GENERATED (MWH) 365,895 3,606,223 60,590,691 ,
19. UNIT SERVICE FACTOR 100.0 38.0 80.7
20. UNIT AVAILABILITY FACTOR 100.0 88.0 81.2  ;
21. UNIT CAPACITY FACTOR (USING MDC NET) 101.4 84.9 74.0
22. UNIT CAPACITY FACTOR (USING DER NET) 99.0 82.8 72.6
23. UNIT FORCED OUTAGE RATE O.0 0.0 1.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Fifty day refueling and maintenance outage scNduled to commence March 31, 1990.

25. IF SHUTDOWN AT END OF REPORT PERIOD, E.e'tIMATED DATE OF STARTUP: NOT SHUTDOWN ~l DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 9001290046 900109 PDR R ADOCK 05000266 PDR .. _. ._ _

- 4 JhQlI

~

DOCKET NO. . 266 ' AE d

~"

UNIT NAME~ Point' Beach, Unit li ~ ~

DATE ' January 5, 1990-i.

COMPLETED BY- C. W. Krause

! TELEPHONE. "414/221-2001 AVERAGE DAILY UNIT POWER LEVEL l

l MONTH DECEMBER ~1989 AVERAGE ' AVERAGE AVERAGE DAILY- DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe' NET DAY MWe NET DAY MWe NET 1 496 11 495 21- 492-2 495 12 494 22 492 3 475 13 495 23 492 4 495 14 495 24 493 5 496 15 495 25 488-6 496 16 494 26 493 7 495 17 495 27 493 8 494 18 493 28 494 9 496 19 493 29 493 10 471 20 492 30 494 31 473 EQR-28a (04-86)

~' e-

-_ _ _- _ _ . _ _ . _ _ _ _ _ _ _ . _ _ _ m . . _ 4 ...d

- ;- m gy,, m.:

, ~ ;y..

.31

, su --g -

450L 266- O

~

'^

UNIT SHUTDOWNS'AND POWER: REDUCTIONS.

DOCKET NO.?

UNIT:NAME.. ~ Point Beach Unit'l W

.DATE. _

January-5,.1990--

. REPORT MONTH DECEMBER ^1989  : COMPLETED.BY C. W. Krause:

TELEPHONE 414/221-2001 o 4J c~ c<

c tu a n o 4 c'

o to e w +1 4 - 'o. CD o Ee d io e 4J :3 - to ' es' oe No. Date $ 8 $d .$ .'O O$ c0 4J Licensee Event N3 O'E Cause &" Corrective. Action H j"' # yyy- Report No. go go To Prevent Recurrence E .c vs 1F: Forced 2 Reason: 3 Method: 4 Exhibit F-Instructions, S: Scheduled A - Equipment Failure (explain) 1 -' Manual for preparation 'of B - Maintenance or Test 2 - Manual Scram data entry. sheets C - Refueling' 3 - Automatic Scram- LER file (NUREG-0161) ~

l D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown l Licensing Exam 5 - Reduced ~ Load SExhibit H-Same. Source F - Administrative 6 - Other-(explain)-

G - Operational Error (explain)

H --Other (explain)

EQR-28B (04-87) i_ .. . -.. .

f$[ "'- '

,. ,( ,c- i >

~t -.

NARRATIVE-

SUMMARY

OF OPERATING EXPERIENCE

w. ,

Docket!No. 50-266 L Unit Name Point Beach Unit 1

~Date January 5, 1990

) Completed By C. W. Krause i Telephone 414/221-2001 ,

. Unit 1 operated at approximately 494 MWe net throughout the D ' period with no significant load reductions. Primary to secondary leakage was stable at a detectable rate.

'On December 10,-1989, the No. 2 turbine governor valve closed when a relay card in the governor electro-hydraulic system failed.

The valve closing. caused a' change in power which was sensed by the reactor. This initiated a-false " control rod drop" signal o .and subsequently-turbine power self-adjusted to approximately 410 MWe, After seven-hours of investigation and corrective maintenance, the unit returned to full power operations.

Safety related maintenance conducted during the period included:

. packing adjustments to service water pump P-32C; calibration of auxiliary feedwater flow transmitters.FT-4007 and FT-4014; modifications to~DYOC and DYOD inverter transfer switches; repairs.to pressurizer spray valve controller HC-431H; repairs to auxiliary feedwater pump bearing cooling supply solenoid valve;

' repairs 1to a tube-leak on emergency diesel glycol cooler HX-55B; seal and outboard bearing replacement on component water cooling pump P-11B; and the restoration of a yellow bus power supply to residual heat removal controller instrument ~HC-626.

i

OPERATING DATA,REPCRT- '

~

DOCKET! NO.E 50--301 m

. g .

c.;~-.

DATE: January 5, 1990 .' - '

C. W. KRAUSE ~-

. COMPLETED.BY TELEPHONE '414-221 2001 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
2. REPORTING PERIOD: DECEMBER 1989 . .
3. LICENSED THERMAL POWER (MWT):- 1518.5 . .
4. NAMEPLATE RATING (GROSS MWE): '523.8 . ..
5. DESIGN ELECTRICAL; RATING (NET MWE):- 497. .. ,
6. MAXIMUM DEPENDABLE CAPACITY-(GROSS MWE): 509. ..~ .
7. MAXIMUM DEPENDABLE CAPACI'IT (NET MNE): 485. . . . . . . . . .. . . . . . . . . . . . .. . ~ .
8. IF CHANGES OCCUR IN CAPACITY RATINGS-(ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS,-(IF ANY): NOT' APPLICABLE THIS MONTH YR TO DATE CUMULATIVE -
11. HOURS IN REPORTING PERIOD 744 8,760 -152,689
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,243.6 133,345.8
13. REACTOR RESERVE SHUTDONN HOURS 0.0 0.6 -216.7
14. HOURS GENERATOR ON LINE 744.0 7,108.7 131,205.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 4.8 302.2 ,
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,123,322 10,637,702 186,583,536 ~
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 387,780 3,651,520 63,325,220
18. NET ELECTRICAL ENERGY GENERATED (MNH)- .371,856 3,484,188 60,338,610 i 19. UNIT SERVICE FACTOR 100.0 81.1 85.9 '!
20. UNIT AVAILABILITY FACTOR 100.0 81.2 86.1
21. UNIT CAPACITY FACTOR (USING MDC NET) 103.1 82.0 80.7
22. UNIT CAPACITY FACTOR (USING DER NET) 100.6- 80.0 79.5-
23. UNIT FORCED OUTAGE RATE O.0 1.8 1.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND' DURATION OF EACH):

l NONE I

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDONN
l DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

'I

. _ _ _ _ _ _ _ _ _ _ _ - - . - _ _ _ _ _ _ _ _ - - _ - _ _ _ . - - - _ - - . -- = . _ - - -

^

y , .z(.,,

~

~

. . . , . A- ~4

j

. :< . 5 y

~ ~

UNIT: SHUTDOWNS AND' POWER REDUCTIONS DOCKETE NO.- 55--301 E C

~

TUNIT NAME J JPoint Beach Unit 2 9

.DATE- January 5, .?.990-

' REPORT MONTH! DECEMBER 1989

COMPLETED BYa C . -W. Krause=

TELEPHONE'. 414/221-2001-J.

'o 9^

d^- e4 4-4 Q co d' o to d o 54 e' w r4 La o - CD o Ev . . C no 0 4:3 to : 'O C # 00 o0 No. Date- S 8:0 e ,0Y O Licensee' Event' NE $3 ' Cause!& Corrective Action H y* ~N y y y. Report No.. gu gu ~ To Prevent. Recurrence E .c tn 1 F: Forced 2 Reason: 3 Method: 4 Exhibit F-Instructions S: Scheduled A - Equipment Failure (explain) 1 Manual for preparation of-B - Maintenance or Test- 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation-of E - Operator Training & Previous Shutdown-Licensing Exam 5 - Reduced Load . sExhibit H-Same Source-F - Administrative 6 - Other (explain)

G - Operational' Error (explain)

H -'Other-(explain).

EQR-28B (04-87)

., ...-+~ ,

.g_..

pic, ' W. ,

1

<c1 ,

!Q:l

'l y; h g's '

j' i ,

NARRATIVE-

SUMMARY

OF OPERATING ~ EXPERIENCE

. Docket No.o 50-301

'- / ,

. Unit,Name

' Point Beach Unit'2 ,

Date January 5, 1990 Completed By- C.'W. Krause l Telephone: 414/221-2001 Unit 2 operated at approximately 501 MWe net throughout'the j period with no- significant load reductions. Primary to secondary ,

leakage was less than one-gallon per day.

On December 5, 1989; the unit surpassed 63 billion KWh of -

+ generation.

'i i On' December 11, 1989, two maintenance workers received first and second~ degree burns from hot 1 water and steam while conducting

~

n corrective maintenance on a: heater drain pump discharge check valve. ..The workers were transported to a local hospital for  ;

, evaluation and treatment.

-Safety related maintenance conducted during the period included:

L calibration of four " Bank D" rod insertion limit modules; gasket i replacement of component cooling water check valve 2-724B; tightening.the' flange of CVCS temperature control valve

_2-TCV-130; calibration of reactor coolant loop A flow

-transmitters FT-411 and FT-413; repairs to pressurizer pressure

bistable'PC-430E/F; limit switch adjustments to safety injection

" valve-motor operator 2-827A; and analysis of a vibration problem

'on~ residual. heat removal pump 2-P-10B.