GINNA STATION DESIGN BASIS FLOODING STUDY FOR ROCHESTER GAS AND ELECTRIC CORPORATION August 1981 NUS Corporation 4 Research Place Rockville, Maryland 20850 81082400S7 810818 PDR ADOCK 05000244 P PDR ~
I
-8 ll I
TABLE OF CONTENTS Parcae
SUMMARY
AND RESULTS DEER CREEK WATERSHED RAINFALL FLOOD DISCHARGE FLOOD ELEVATION CONCLUSION REFERENCES 10 LIST OF TABLES Table 1 Hydrologic Soil Groups in Deer Creek Watershed Table 2 24-Hour Point Precipitation 12 Table 3 Time Distribution of 24-Hour Precipitation 13 Table 4 Deer Creek Watershed Unit Hydrograph (24 Hr, 14 1" Storm)
Table 5 Special Bridge Parameters 15 LIST OF FIGURES Figure 1 Deer Creek Watershed Location Map Figure 2 Deer Creek Watershed near Ginna Station 17 Figure 3 Return Periods for 24-Hour Precipitations 18 Figure 4 Unit Hydrograph for Deer Creek (24 Hr, 19 1" Storm)
Figure 5 Deer Creek Flood Hydrograph (24 Hr, 10" 20 Storm)
Figure 6 Stream Cross Sections Location Map 21 Figure 7 Deer Creek Cross Section Data ~
22
-E
.II II
'l I
-II L
g
~
I.I!
SUMMARY
AND RESULTS The purpose of this study was to determine the flood elevations in Deer Creek near the Ginna Generating Station for storms varying in severity from the 100-year precipitation to the Probable Maximum Precipitation (PMP). The peak discharges were estimated using the rainfall-runoff model developed by the Soil Conservation Service. The calculations were made with the HEC-1 Flood H dro ra h Packa e computer program. The water surface elevations were estimated with the HEC-2 Water Surface Profiles computer program. Both computer programs were developed by the U.S. Army Corps of Engineers. The results of the calculations are as follows:
Flood Elevation Return Flood at Culvert Bridge Period Precipitation Discharge near Ginna Station (Years) (Inches) ~cf s MSL 100 4.8 5,970" 264.1 500 5.9 6 i 974 265.0 1,000 6.3 7,633 265.6
-15)000* 8.0 10,109 267.4
-350,000* 10.0 12,076 268.7
<<] 07* 12.0 13,679 269.7 PMF 23.8 32,486 277.1 Based on straight-line extrapolation on Gumbel probability paper to provide order-of-magnitude approximation.
The conclusions of the study are:
o The 12" storm (about a 107-year event) and the 10" storm (about a 350,000-year event) are calculated to produce flood elevations of 269.7 ft and 268.7 ft (msl), respectively, near the Ginna Station. The plant grade elevation is at 270 ft (msl) .
o The Deer Creek PMF will flow over the plant yard of the Ginna Station.
o The elimination or improvement of the culvert bridge for minimizing the bridge backwater effect will not solve the Ginna Station flooding resulting from a Deer Creek PMF event.
I II
>II
)
g I
DEER CREEK WATERSHED Field reconnaissance of the Deer Creek watershed was conducted on June 3, 1981 to estimate the hydraulic characteristics of the watershed, particularly the channel and overbank areas. The watershed was walked from its mouth in Lake Ontario to the confluence of Deer and Mill Creeks. Location maps showing the Deer Creek watershed in relation to the Ginna Station are presented in Figures 1 and 2.
As determined from the U.S. Geological Survey 7.5 minute quadrangles,(1) the Deer Creek watershed has a drainage area of 13.9 square miles, a channel length of 11.5 miles, and a difference in elevation between its head and mouth of 405 feet.
There are two bridges (Figure 2) over Deer Creek that can influence the backwater elevations near the Ginna Station:
(a) The lower bridge is located about 880 feet upstream of the mouth. It has a trapezoidal bridge opening.
(b) The upper bridge is located about 2300 feet upstream of the mouth and about 320 feet downstream of its confluence with Mill Creek. It is the road to the Station entrance. The bridge opening consists of five circular culverts, each 5 feet in diameter.
The soil mapping units in Deer Creek watershed were determined from the Soil Conservation Service soil survey for Wayne County.(2) The soil mapping units and the corresponding hydrologic soil groups(3) are shown in Table 1. The major portion of the watershed consists of the soil mapping units that correspond to hydrologic soil group "C". This group is defined as:
Soils having slow infiltration rates when thoroughly wetted and consisting chiefly of soils with a layer that impedes downward movement of water, or soils with moderately fine to fine texture. These soils have a slow rate of water transmission.(3)
I
-I 5
8 I
Based on the USGS topographic maps and the field reconnaissance information, the major land use and treatment in the watershed was estimated as row crops in good hydrologic condition.(3)
The channel of Deer Creek is generally well defined with a typical channel width of about 40 feet. However, the hydraulic characteristics of the channel and overbank areas differ significantly from the lower to upper reaches. The Manning's resistance coefficients were estimated using criteria described by Chow.(4) The characteristics of the lower, middle and upper reaches are as follows:
(a) Lower Reach (from mouth to the cross section near the visitor center, about 1820 feet upstream of mouth): The channel is generally clean and winding with some shallow pools, stones and weeds. The overbank areas are generally covered with medium to dense brush and trees. The Manning resistance coefficient for the channel and overbank areas was estimated as 0.045 and 0.05, respectively.
(b) Middle Reach (from cross section near the visitor center to the confluence of Deer and Mill Creeks, about 2620 feet upstream of mouth): The channel is clean and straight. The overbank areas are generally covered with short grass. The Manning resistance coefficient for the channel and overbank areas was estimated as 0.02 and 0.03, respectively.
is very weedy with heavy stands of underbrush. The overbank areas are generally covered with dense brush and trees. The Manning resistance coefficient for the channel and overbank areas was estimated as 0.10 and 0.06, respectively.
'I
-I gi I
~
~
a I
I
-Il
~
RAINFALL The rainfall used in this study ranges from the 100-year precipitation to the Probable Maximum Precipitation (PMP).
The 24-hour point precipitations for the Deer Creek watershed for return periods of 1 to 100 years were estimated from generalized charts of the United States.(
These data, shown in Table 2, were plotted on Gumbel extreme probability graph paper(6) to obtain estimates of the precipitation with return periods of 500 years and greater (Figure 3). The 500- and 1000-year precipitations were estimated as 5.9 and 6.3 inches, respectively. Rainfalls of 8.0, 10, and 12 inches, all with an estimated return period greater than 10,000 years, were also used in this study for comparison purposes.
The Probable Maximum Precipitation (PMP) for the Deer Creek watershed was estimated from a generalized chart of the United States east of the 105th meridian.(3) The 6-hour, 10-square mile PMP is 24.5 inches. The PMPs for 12, 24 and 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, as determined from depth-area-duration curves,(3) are 26.5, 29.4 and 31.4 inches, respectively.
I I
~
II II II
~
I
FLOOD DISCHARGE The peak discharges at the mouth of Deer Creek for the selected precipitations were estimated with the rainfall-runoff model developed by the Soil Conservation Service for small ungaged watersheds.(3) The calculations were made with the HEC-1 Flood H dro ra h Packa e computer program developed by the U.S. Army Corps of Engineers.(7) . The inputs to HEC-1 are described below.
The time distribution of rainfall developed by the U.S. Corps of Engineers( ) for the Standard Project Flood (SPF) and Probable Maximum Flood (PMF) was used in this study. Since the watershed is only 13.9 square miles in area, the areal reduction factor was not applied to the precipitation other than the PMP. For the latter case, a 24-hour PMP of 23.8 inches was calculated using an areal reduction factor of 0.81 as determined by the HEC-1 PMP option. The time precipitation distributions of the selected precipitations are shown in Table 3.
The watershed time of concentration, Tc, is given by:(
0.385 11.9 L3 Tc where:
L = channel length in miles H = elevation difference in feet.
The time of concentration for the Deer Creek watershed is 4.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. The basin lag is approximately 0.6 Tc, or 2.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
The amount of rainfall in a period of 5 to 30 days preceding a particular storm is referred to as antecedent rainfall. The resulting condition of the watershed in regard to potential runoff is referred to as an antecedent moisture condition. In general, the heavier the antecedent rainfall, the greater the direct runoff that
-I I
I
occurs from a given storm. The antecedent moisture condition AMC-II, used in this study, is defined as:
"The average case for annual floods, that is, an average of the conditions which have preceded the occurrence of the maximum annual flood on numerous watersheds."(3)
Precipitation losses were estimated using the direct runoff curve number, CN, which is a function of the hydrologic soil group, the land use and cover, and the antecedent moisture condition. For a hydrologic soil group "C", land use characterized as row crops in good hydrologic condition, and an antecedent moisture condition of AMC-II, the curve number for the Deer Creek watershed was estimated as CN=85.(3)
The calculated unit hydrograph for the Deer Creek watershed is shown in Table 4 and Figure 4. For illustration purposes, the hydrograph for the flood discharge of 12,076 cfs is shown in Figure 5. The estimated peak discharges and precipitation losses for the selected precipitations are as follows:
Estimated Return Precipitation Peak Period Precipitation Losses Discharge (Years) Inches) ~Inches cfs 100 4.8 1.62 5,970 500 5.9 1.69 6,974 1,000 6.3 l. 71 7,633
-15~000* 8.0 l. 79 10,109
-350,000* 10.0 1. 84 12,076
~ ]07* '2.0 1.89 13,679 PMF 23.8 1.99 32,486
- Based on straight-line extrapolation on Gumbel probability paper to provide order-of-magnitude approximation.
- 5 Il II
~ b
'I I
r I
FLOOD ELEVATION The water surface profiles for the peak flood discharges were calculated using the HEC-2 Hater Surface Profiles computer program developed by the U.S. Army Corps of Engineers.(9) The calculational procedure used in HEC-2 is the standard step method for calculating backwater curves. The inputs to HEC-2 are described below.
Boundary geometry for the analysis of the fl'ood discharges was specified in terms of ground surface profiles (cross sections) and the distances between them (reach lengths). Cross sections, as shown in Figure 6, were located at intervals along Deer Creek to characterize the flow carrying capability of the channel and overbank areas. Eleven of the cross sections were surveyed for this study. Selected cross sections for Deer Creek are shown in Figure 7 to give indication of channel geometry.
Several types of loss coefficients were selected for use in HEC-2 to evaluate head losses:
(a) Manning resistance coefficient for friction losses (b) Contraction and expansion coefficients to evaluate transition losses between cross sections (c) Bridge loss coefficients to evaluate losses related to weir shape, pier configuration, and pressure flow.
The hydraulic characteristics of the channel and overbank areas determine the cross section conveyance. The Manning's coefficients used in this study are as follows:
Reach (feet above Mannin 's Coefficient mouth) Channel Overbank 0-1820 0.045 0.05 1820-2620 0.02 0.03 2620 0.1 0.06
I I
- I I
I I
.a
The contraction and expansion coefficients are used to estimate losses associated with changes in the shape of cross sections. Transitions through channel sections in Deer Creek are gradual. Consequently, O.l and 0.3 were used for the contraction and expansion coefficients, respectively. The corresponding coefficients for the bridge sections were 0.3 and 0.5.(9)
The HEC-2 special bridge method was used to model the'ridges. The culvert bridge was approximated as an equivalent area rectangular bridge opening. The special bridge coefficients used in the calculations are shown in Table 5.(9) Zn order to examine the backwater effect of the culvert bridge, calculations were also made to determine the water elevations assuming that the culvert bridge is not in existence. The estimated water surface elevations at the culvert bridge location near the Ginna Station are as follows:
Estimated Water Surface Elevations (ft) at the Return Culvert Brid e Location near Ginna Station Period (Years) With Culvert Brid e Without Culvert Brid e 100 264. 1 263.7 500 265.0 264.6 lI 000 265.6 265.2
-15 (000* 267.4 267.1
-350,000* 268.7 268.1
~ ]07* 269 ' 269.0 PMF 277.1 276.0
- Based on straight-line extrapolation on Gumbel probability paper to provide order-of-magnitude approximation.
As shown, the backwater effect due to the culvert bridge will raise the PMF elevation to about one foot above the natural flood level condition (i.e., without the bridge) . For the other floods considered in this study, the water level raised by the bridge backwater effect is less than one foot.
The lower bridge near the Deer Creek mouth has a relatively large bridge opening and is not considered as a potential location to cause significant backwater effect on the various flood levels.
III II II I
I I
I i
l I
I LI
CONCLUSION The following conclusions can be drawn from the foregoing study results:
a) The 12" storm event with a return period approximating 107 years is calculated to produce a flood peak of 13,679 cfs and a flood elevation of 269.7 ft (msl) at the culvert bridge near the Ginna Station. The plant grade elevation is at 270 ft (msl).
b) The - 10" storm event with a return period approximating 350,000 years is calculated to produce a flood peak of 268.7 ft (msl) at the culvert bridge near the Ginna Station.
c) The water level produced by a Probable Maximum Flood of 32,486 cfs on Deer Creek near the station is calculated to be 277.1 ft (msl) . Since the plant grade is 270.0 ft (msl), the Deer Creek PMF will flow over the plant yard of the Ginna Station. A similar flood study previously conducted by the U.S.
Nuclear Regulatory Commission( 0) has calculated a Deer Creek PMF of 37,500 cfs with a flood elevation of about 275 ft (msl). The differences between these two study results are probably caused by the use of differently assumed model input parameters, such as the runoff curve number in HEC-1 and the roughness and transition loss coefficients in HEC-2. It is to be noted that this study has used field surveyed cross sections which provide more reliable channel geometry data.
d) The backwater effect due to the culvert bridge will raise the PMF elevation by about one foot above the natural flood level condition. Since the predicted PMF level is more than one foot higher than the plant grade, the elimination or improvement of the culvert bridge for minimizing the backwater effect will not solve the Ginna Station flooding resulting from a Deer Creek PMF event.
(-
I I
'll I
- I I
REFERENCES
- 1. 74 Minute uadran les: Furnaceville N.Y. Photorevised 1969 ; Ninemile Point N.Y. 1971 ; Webster, N.Y. (Photorevised 1978); Ontario, N.Y.
(Photorevised 1978), U.S. Department of the Interior, Geological Survey.
- 2. Soil Surve of Wa ne Count , New York, U.S. Department of Agriculture, Soil Conservation Service (October 1978).
- 3. Desi n of Small Dams, U.S. Department of the Interior, Bureau of Reclamation (1977).
- 4. Ven Te Chow, 0 en-Channel H draulics, McGraw-Hill Book Co., New York (1959).
- 5. Rainfall Fre uenc Atlas of the United States for Durations from 30 Minutes to 24 Hours and Return Periods from 1 to 100 Years, Technical Paper No. 40, U.S.
Department of Commerce, Weather Bureau (May 1961).
- 6. Probabilit Tables for the Anal sis of Extreme-Value Data, Applied Mathematics Series 22, National Bureau of Standards, U.S. Department of Commerce (July 1953) .
- 7. HEC-1 Flood H dro ra h Packa e (Feb. 1981 version), User Manual, U.S.
Department of the Army, Corps of Engineers, Hydrologic Engineering Center (July 1981).
- 8. Standard Pro'ect Flood Determinations, EM-1110-2-1411, U.S. Department of the Army, Office of the Chief of Engineers (March 25, 1952) .
- 9. HEC-2 Water Surface Profiles (A irl 1980 version , User Manual, U.S.
Department of the Army, Corps of Engineers, Hydrologic Engineering Center (January 1981).
- 10. Evaluation of SEP To ics II-3.A, II-3.B, and II-3.C H drolo , Floodin and Ultimate Heat Sink R.E. Ginna Nuclear Plant, U.S. Nuclear Regulatory Commission, Operating Reactors Branch 05, Division of Licensing (December 12, 1980) .
-II (Il il I
I
-I
~
~
ig
I, goal TABLE 1 HYDROLOGIC SOIL GROUPS IN DEER CREEK WATERSHED Soil Ma in Unit H drolo ic Soil Grou Alluvial Land I Alton Gravelly Sandy Canadaigua Silt Loam Loam Cazenovia Gravelly Silt Loam Collamer Silt Loam I Elnora Loamy Fine Sand Hilton Gravelly Loam Niagara Silt Loam Ovid Silt Loam Rhinebeck Silty Clay Loam lj Sodus Gravelly Fine Sandy Loam Williamson Silt Loam
- II I
I I
l, l
I I
I I
TABLE 2 24-HOUR POINT PRECIPITATION Return Period Precipitation (Years Inches 2.1 2.4 3.0 10 3.5 25 4.0 50 4.5 100 4.8 f,g I
I I
~
<'l
TABLE 3 TIME DISTRIBUTION OF 24-HOUR PRECIPITATION Time Distribution for Indicated 24-Hour Preci itation (Inches)
Duration
~Hours 4.8 9. 9 6.3 8.0 10 ~ 0 12.0 23.81 0-6 0. 05 0.06 0.06 0.08 0.32 0. 64 0.93 6-12 0.38 0.47 0.50 0.64 1.10 1.66 1.62 12-18 4.18 5.13 5.48 6.96 7 '2 8.70 19.86 18-24 0.19 0.24 0.25 0.32 0.66 1.00 1.41 Note: The time distribution of the maximum 6-hour precipitation expressed as a percentage of the maximum 6-hour precipitation is as follows:
Duration Percent of Maximum (Hours) 6-Hour Preci itation 0-1 10 1-2 12 2-3 15 3-4 38 4-5 14 5-6 11 I
I
- I I
I I
I
.I
TABLE 4 DEER CREEK WATERSHED UNIT HYDROGRAPH (24 HR F 1 STORM)
'ime Discharge Time Discharge (Hours) ~CFS ) ~HQSFS) ~CFS 7.5 241 0.5 195 8 ' 180 1.0 591 8.5 134 1.5 1,225 9.0 102 2.0 1,936 9.5 77 2.5 2,299 10.0 58 3.0 2F343 10.5 44 3.5 2F144 11.0 33 4.0 lF 829 11.5 25 4.5 1,378 12.0 20 5.0 994 12.5 5.5 772 13.0 10 6.0 569 13.5 6.5 430 14 0~
7.0 320 14. 5
t I
~
jl ig
'/
II I
l t
J I
t i.'
TABLE 5 SPECIAL BRIDGE PARAMETERS Lower Upper Coefficient Bridcre ~Beid e Pier shape coefficient for use in Yarnell's energy Oe9 l. 25 equation Total loss coefficient for 1.6 1.8 use in orifice flow equation Coefficient of discharge for 3.0 3.0 use in weir flow equation i'
I jl I
I
~l I
I I
I
.I
\
NEW YORK STATE
/
I 'i 10 8 6 4 2 0 10 )
t 1000 FEET Figur e 1 - Deer Creek Water shed Location Hao (Source: USGS Haps (1) )
,I
'-'E l
l
.I i
~i ~~~ufo V 'j ClNHg tt tt o I
~j ~~ II~
~ ~ c+
~ II~
II ~WER BRtDGE
+ ~gI
~
~~ vt.'i~as II~ ctgt~
~ III ~ II I
I I
UPPf'g NIDCiE (cggygt7 allDGQ ) III~ ~
J /W g 'I 5 4 3 2 1 0 o0 0 I IIII0 C
100 FEET Figur e 2 Deer Cr eek 01ater shed near Ginna Station (Sour ce: RGSE Dr,awing No. SK447-93)
I I
l
12 10 5 10 50 10 103 10 10 10' RETURN PERIOD-YEARS I 2 3 4 5 3 7 8 9 fo ff f2 f3 H IS REDUCED VARIATE-Y F'iguve 3 Return Peviods foe 2I1-Houv Precipitations
lii I
l
2500 2000 1500 H
1000 500 4 8 10, 12 14 16 TIME (HOURS)
Figure 4 Unit Hydrograph for Deer Creek (24 Hr., 1" Storm)
I l
I I
I
,l
20000 15000 10000 5000 10 15 20 25 30 TIME (HOURS)
Figure 5 Deer Creek Flood Hydrograph (29 Hr., l0" Storm)
I) i L
ll I/
"I I
.l
Wr.
ONP~
Q /
gf fl
CINNR Spa I ~~ J
.":If ot I
0>> I>> ( eo O
i.', I: FIICK / /'r g
,)
~ I~
~ I~
LON(tR SRIDCL-
~ II~
~ I I120 tt'~ 280 III I: 2(00 i V PPLR II(IDGE (CULVIRT P2(IDGL1 2620 Poo jl:
J g/ ~ SI'ctlcII>> (r ((Ir g 'I 0(20 tlret Irrn Houth to Scut lan ~ 2200
~ Srcticn Seta I(cn tt(po (trpa I >>>>ct(rne n (I o>>c>>rn(
Sectlcn Data lrne Survey
( 5 4 3 2 1 0 100 FEET Figur e 6 Stream Cr oss Sections Location Map (Sour ce: RGSE Dr awing No. SK447-93)
II I
~
SECZICN 100 GEVATIOI (FEED IN S IN QXI RN 4S ON ON TN SCO SN IIXS IIN IZW 1&8 DISTANCE <FEED SECTS T 200 ELECTION IFEED IN S IN DSI SCN 4N ON OCQ TN ICCI SN INS I IN INC ISN OISThlCE IFKED Figure 7 Deer Creek Cross Section Data (Looking Downstream)
Il I
Q I
I g
I I'I i
I g
~
SECTICN 470 GXVATI IVI SEED IN E IN ZS $$ 4S IW IW TN SN 161 IIW I IN I EN le DIETAtCE SEED SECTICET 580 GXVATIN IFEED IS I IN IKQ I IN IRN 13CS OIETAICE tFEED FIGURE 7 Continued "I
I I
I I
I I
I I
~ ', I S
I 1 1 l P
~, I
- 'll ll '
I S
(I Cg (I
i i
SECTICN 900 E1EVATIN OTXD IN 3 IN 2N 3IS 4S 3N NO TN SS CM II3S I IN I2N ISO DISTANCE OEED
~m 920 ELEVATOR <FEED
-IN 3 FN 2IS 3M 4N EN SQ TN 8N IXS I N I IN I 2N I3N DISTAKX 0%ED FIGURE 7 Continued iJ)
I I
SKTIaT 1120 ELEVhTI(8 (FEETI IW I IN EN RS 4W QS IW TW OW ON IIV'IW IEW IKS OISTllCE tFEXTI SECZICR 1420 GEVhT ITII ITTETI IW O IN ZN %S IN SS CW TN OW OW INS I IW ICOSI IOW DIOTPICE ITEETI FIGURE 7 Continued
'I I
I I
I I
SKTICN 1820 EILYATII3I STEED IN II IN 2NI 3N 4N N3 IXe TIO 8%I I33I IN3 I IN I 2N I3N OISTAICE ITXED SECZI(Ã 22B0 ELWATIIII (FEED "IN 3 IN 3N 4N SS 8%I TN SN ON IIEN I IN I2N l3N DISTAICE INDEED FIGURE 7 Continued
SECTICN 2300 ELEVATICH <FEED IM I IM EM SS AM EM OW TM Ml QS IÃ0 IIM ISS I3OI DISTNCE OXEP SKTICN 2320 GLVATIW (FEED IM 1 IM IM XO AM EM CM FM 8%I OM IIES II M MS IÃN OIETANX OXEN FIGURE 7 - Continued