ML19225C941
ML19225C941 | |
Person / Time | |
---|---|
Site: | Saint Lucie, North Anna, Turkey Point |
Issue date: | 07/30/1979 |
From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
To: | Haass W Office of Nuclear Reactor Regulation |
References | |
L-79-2-2, NUDOCS 7908030330 | |
Download: ML19225C941 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999
[Table view]Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML17355A4601999-10-26026 October 1999
[Table view]Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 1999-09-09 Category:UTILITY TO NRC MONTHYEARML18153C3661990-09-20020 September 1990
[Table view]Forwards Topical Rept VEP-NE-3-A, Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code. ML20065D5671990-09-20020 September 1990 Forwards Rev 15 to Security Personnel Training & Qualification Plan.Rev Withheld ML17348A5661990-09-14014 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. ML17223A9401990-09-13013 September 1990 Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility ML17223A9341990-09-10010 September 1990 Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl ML20059H7391990-09-10010 September 1990 Forwards Rev 15 to ISFSI Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20064A5201990-09-0707 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-15 & 50-339/90-15.Corrective Actions:Procedures Revised to Include Tolerance Bands for Temp Control Switch Setpoints & Involved Personnel Counseled ML20059H2931990-09-0707 September 1990 Advises of Review & Approval of ASME Section XI Inservice Insp Program Interval 1 Repair & Replacement Program Change to Applicable Code Edition & Addenda ML17348A5461990-09-0707 September 1990 Forwards 1990 Inservice Insp Refueling Outage Summary Rept of NDE Activities 900206-0404 First Refueling Outage Second Period Second Insp Interval. ML17348A5501990-09-0707 September 1990 Forwards Jul 1990 Integrated Schedule Regulatory Rept for Facilities ML17348A5521990-09-0606 September 1990 Forwards Matrix of Changes to Emergency Power Sys That Affect Revised Tech Specs Issued on 900828.Matrix Sent for Info & to Assist in NRC Review of No Significant Hazards Rept for Revised Tech Specs ML20059E5481990-08-31031 August 1990 Forwards Supplemental Info Re Deletion of Pressurizer Safety Valve Requirement During Mode 5.Current Tech Spec Requiring One Operable Safety Valve in Mode 5 Unnecessary & May Be Deleted ML17348A5431990-08-31031 August 1990 Forwards Objectives for 901108 Emergency Plan Exercise. Exercise Will Involve Participation by Local Emergency Response Agencies & State Emergency Response Personnel & Will Not Be Evaluated by FEMA L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 81990-08-30030 August 1990 Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 ML18153C3451990-08-29029 August 1990 Forwards Proprietary Semiannual Fitness for Duty Program Performance Data Rept for 900103-0630.Rept Includes Summaries of Mgt Sanctions Imposed,Actions Taken to Correct Program Weaknesses & Events Reported to Nrc.Encl Withheld ML17223A9201990-08-28028 August 1990 Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr ML17348A5361990-08-27027 August 1990 Forwards Turkey Point Units 3 & 4 Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Health Physics Procedure HP-48, Process Control Program for Dewatering Radwaste Liners. ML17348A5171990-08-24024 August 1990 Forwards Ref Matl in Preparation for Operator License Exams Scheduled for Wk of 901029,per NRC 900628 Request ML18153C3391990-08-22022 August 1990 Requests Approval for Use of Plugs Fabricated of nickel- chromium-iron Uns N-06690 Matl (Alloy 690) to Plug Tubes in Steam Generators for Mechanical & Welded Applications ML17223A8911990-08-20020 August 1990 Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant1990-08-16016 August 1990 Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant ML20063Q1241990-08-15015 August 1990 Provides Supplemental Info for 900115 Tech Spec Change Request Re Max Allowable Control Rod Drop Time.Retained DNBR Margin Tracked & Documented by Calculational Note ML17348A5051990-08-15015 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Turkey Point Units 3 & 4 & Revise Rept for June 1990 for Unit 3 ML20059B0111990-08-14014 August 1990 Requests That Encl Intervenor Motion for Extension of Time to Appeal to Docketing & Svcs Branch Re Tech Spec Replacement Hearing Be Provided.Motion Inadvertently Omitted in Svc of Request on 900813 ML17348A4971990-08-10010 August 1990 Responds to Violations Noted in Insp Repts 50-250/90-18 & 50-251/90-18.Corrective Actions:Unit Stabilized in Mode 3, Operating Surveillance Procedures 3/4-OSP-089 Revised & Event Response Team Formed ML17223A8751990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor IR 05000335/19900141990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML20058N5941990-08-0808 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-11 & 50-339/90-11.Corrective Actions:Procedure Revised to Limit Applicablity to Small Refueling Cavity Leaks & Listed Evaluations & Revs Will Be Made to EOP ML18153C3171990-08-0101 August 1990 Resubmits Synopsis of Changes to Updated Operational QA Program Topical Rept Vep 1-5A ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing ML18153C3101990-07-26026 July 1990 Forwards Decommissioning Financial Assurance Certification Rept..., Nuclear Decommissioning Trust Agreement & Nonqualified Nuclear Decommissioning Trust Amended & Restated Trust Agreement, Per 10CFR50.75 ML17223A8631990-07-25025 July 1990 Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17223A8621990-07-25025 July 1990 Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 L-90-282, Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790)1990-07-25025 July 1990 Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790) ML17348A4691990-07-23023 July 1990 Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request ML17348A4141990-07-20020 July 1990 Responds to Violations Noted in Insp Repts 50-250/90-14 & 50-251/90-14.Corrective Actions:Breakers Closed,Returning Monitoring Sys to Operable Level & Briefings Held to Explain Rvlms Sys Theory to Operations Control Room Personnel ML17348A4191990-07-20020 July 1990 Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921 ML17348A4201990-07-20020 July 1990 Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per 890605 Ltr ML20055H5651990-07-20020 July 1990 Requests for Temporary Waiver of Compliance from Requirement of Tech Spec 3.3.1.1,Table 2.3-2 Re Response Time Testing. Request Does Not Pose Significant Hazards Consideration L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders1990-07-20020 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders ML17223A8581990-07-19019 July 1990 Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML17348A4171990-07-19019 July 1990 Forwards May 1990 Integrated Schedule Regulatory Rept for Plant ML17348A4121990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML18153C2901990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Listed Transmitters Compiled.Transmitters Found Installed within Reactor Protection or ESFAS Have Been Replaced ML17223A8491990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor ML17223A8521990-07-17017 July 1990 Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program ML17348A4251990-07-17017 July 1990 Withdraws 900207 & 0424 Proposed Changes to Tech Specs Re Util Nuclear Review Board Composition ML20055F9361990-07-16016 July 1990 Advises That No 30-day Rept Will Be Made Re Degradation of Seismic Support Bolts of post-accident Hydrogen Recombiners 1-HC-HC-1 & 2-HC-HC-1 1990-09-07 |
Text
e '
P o PJ)X E23100 r/IM11. F L A 32152
[,..,_ m (.~ . ., r z , %, l d, w.*,
} * *
'4 11 ii :
Z.T. ]u! Z M t__ ( ,,, y a >
n or, w u :, ,, a .a : m ,,
July 30, 1979 L-79-202 Of fice of fluelear Reactor Regulation Attention: Walte r P. Haasa, Ch ie f Quality Assurance Branch Di.vinion of Project Itanagement U.S. Nuclear Regulatory Cornission Washington, DC 20555
Dear Mr. Hauss:
Re- Florida Po.ier & Light Company QA Topical Peport, FPLTOAR l-76A, Proposed navision 3 Isttached are forty copie , of a revision to Appendix C of the PPL Topical Qualit'/ Accurance Report. The revision provides an alternative to the AtC I U45.2.2-1972 requirer.ent for inspection of rigging and handling aquip-rie n t . "ih i o is identical to the a.1vance copy of the al t e rn a ti ve th.'. was t:elecopied to Mr. Liede rbach, of your of fice , on July 13, 1979. Pleam inclub this Paga (Page 6 o f 6) with Pc vision 3 wlitch it currently u ider re v iew.
Very truly youro,
. j
}. A . i i:'z R Od!
j'l Lb i' R. 2E. Uhrig Vice President FJ U : dII!s :DL Attachrants cc: fir . Ja.mes P. O'Reilly, Office of I&E, Region II A. Schwencer, Chief, Operating Reactors Branch I Robert Lowenstein, Ecquire 7,
4-,
a OJL _
7 9 0 8 0 3 0N 3 c3 - r o PLOPLE SERVit i P L ( 'i' L E
TOPICAL QUALITY ASSURANCE REPORT Appendix C_
3
$ 5 R ev.
4..
=s BASELINE DOCUMENT MATRIX Date guly 10, 1979 nonioA POM A & UGMT COMPW Page 6 of 6 MISI N45.2.4-1972 ANSI N45.2.4-1972, Paragraph 2.5.2 requires that equipment be " suitably marked to indicate date of next required calibration". In lieu of marking equipment, FPL has chosen to control calibration of installed instrumentation and control equipment by maintaining records for each piece of equipment by instrument tag number (or equivalent) to show that established schedules and procedures for calibration have been followed.
ANSI M45.2.ll-1974 ANSI N45.2.11-1974, Paragraph 11.4 requires that " audits shall include an evalua-tion of des tgn quality assurance policies, practices, procedures and instructions
. . . ." FPL's design quality assurance (and all other QA elements') policies, procedures and instructions are included in FPL's Quctlity Assuranco Program documentation. The Quality Assurance Department evaluates all of this documenta-tion in reviews performed during " development and revision. Accordingly, FPL dces not require subsequent (and redundant) evaluations of these Quality Assurance Program policies, procedures and instructions during audits. FPL audits will include evaluations of the adequacy of the practicas which are the implementation of these policies, procedures and instructions.
RISI ;345.2.2-1972 ANSI N45.2.2-1972, Paragraph 7.4 requires that an .nspection program be established for handling equipment and rigging, including methods for identifying acceptable and nonconforming items. In lieu of having a program of periodic, documented in-spections of rigging and handling equipment, FPL's practice at operating plants is to have the individual user determine the equipment's acceptability prior to each use. This practice also precludes the need for a system to indicate the acceptability of rigging and ' - dling equipment. Installed cranes are inspected on a periodic basis ad will not be subjected to this prior-to-use inspection.
453 033