Letter Sequence Request |
---|
EPID:L-2018-RNW-0023, Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) (Open) EPID:L-2018-RNW-0024, Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement
Results
Other: ML18297A045, ML18319A184, ML18319A252, ML18345A244, ML18351A051, ML19015A243, ML19046A433, ML19098A810, ML19100A254, ML19107A021, ML19128A079, ML19140A449, ML19169A329, ML19198A059, ML19248C228, ML19267A042, ML19270E741, NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent
|
MONTHYEARML18121A0342018-03-29029 March 2018 Possible Topics for the April 17, 2018 Public Meeting with Dominion on Its Surry SLRA Project stage: Request ML18102A5692018-04-17017 April 2018 Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) Project stage: Request ML18129A3142018-05-16016 May 2018 04/17/2018 Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML18291A8422018-06-30030 June 2018, 15 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18291A8362018-06-30030 June 2018 Enclosure 4, Attachment 1: ANP-3679NP, Revision 0, Topical Report Project stage: Request ML18291A8352018-10-15015 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18291A8342018-10-15015 October 2018 Appendix E - Environmental Report Project stage: Request ML18297A0452018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18297A0932018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Request ML18319A2522018-11-16016 November 2018 Subsequent License Renewal Application Online Reference Portal (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML18319A1842018-11-26026 November 2018 Plan for the Operating Experience Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RWN-0023 and L-2018-RNW-0024 Project stage: Other ML18320A2362018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing Letter - v3 Project stage: Acceptance Review ML18320A2352018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing FRN - v2 Project stage: Request NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent2018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other ML18345A2442018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other ML18340A2652018-12-17017 December 2018, 21 December 2018 Notice of Intent to Prepare an Enviromental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML18340A2672018-12-17017 December 2018 Federal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18351A0512018-12-18018 December 2018 Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent License Renewal Project stage: Other ML18351A2572018-12-20020 December 2018 U.S. Nuclear Regulatory Commission Approval of Virginia Electric and Power Company'S Request for Withholding Information from Public Disclosure, Regarding the Application for Subsequent License Renewal of Surry Power Station, Unit Nos. 1 an Project stage: Withholding Request Acceptance ML19046A0092018-12-20020 December 2018 Comment (10) from Bettina Rayfield on Surry Power Station, Unit Nos. 1 and 2 Relicensing Project stage: Request ML18340A2662018-12-21021 December 2018 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML19024A1992019-01-0808 January 2019 Subsequent License Renewal Scoping Meeting Surry Power Station Units 1 and 2 Project stage: Meeting ML19016A0932019-01-12012 January 2019 Comment (1) of Erica Gray on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1542019-01-13013 January 2019 Comment (9) of W. Frank Adams on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0962019-01-14014 January 2019 Comment (3) of Kay Patrick on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0942019-01-14014 January 2019 Comment (2) of Scott Burger on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19017A0132019-01-16016 January 2019 Comment (4) of Anonymous Individual on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Units 1 and 2 Project stage: Request ML19025A1462019-01-20020 January 2019 Comment (5) of David Martin on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1492019-01-21021 January 2019 Comment (6) of Glen Besa on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1502019-01-22022 January 2019 Comment (7) of Scott Price on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1522019-01-22022 January 2019 Comment (8) of Randal Owen on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19015A2432019-01-22022 January 2019 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19042A1372019-01-29029 January 2019 Submittal of Supplement to Subsequent License Renewal Operating Licenses Application for Sufficiency Review Change Notice 1 Project stage: Supplement ML19046A4332019-03-0404 March 2019 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review (EPID: Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19044A6592019-03-0404 March 2019 License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Surry Power Station, Unit Nos. 1 and 2, Subsequent License Renewal Application Project stage: Other ML19044A5562019-03-0404 March 2019 License Renewal Environmental Site Audit Plan Regarding the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Other ML19095A6662019-03-31031 March 2019, 2 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Request ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 Project stage: Request ML19095A6002019-04-0202 April 2019 Enclosure 1 - Topics That Require a SLRA Supplement Project stage: Request ML19095A5972019-04-0202 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Supplement ML19087A2662019-04-0303 April 2019, 30 April 2019 Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site Project stage: Request ML19106A3332019-04-0404 April 2019, 5 April 2019 Draft Environmental Rai'S for Surry Power Station Subsequent License Renewal Application Project stage: Request ML19114A4352019-04-11011 April 2019 RAIs 4-4-19 r3 Project stage: RAI ML19114A4232019-04-11011 April 2019 Final Environmental Rai'S for Surry Subsequent License Renewal Application Project stage: Request ML19106A4022019-04-11011 April 2019 Request for Additional Information Set 1 - Surry SLRA Environmental Review Project stage: RAI ML19107A0192019-04-16016 April 2019, 29 April 2019 Summary of the Subsequent License Renewal Environmental Audit Project stage: Request ML19107A0202019-04-16016 April 2019 Audit Need Update Tracking Spreadsheet Project stage: Request ML19098A8102019-04-17017 April 2019 On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other ML19106A4162019-04-25025 April 2019 Summary of the Subsequent License Renewal Severe Accident Mitigation Alternatives Audit Project stage: Other ML19100A2542019-04-29029 April 2019 Schedule Revision for the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Other 2019-01-14
[Table View] |
Similar Documents at Surry |
---|
Category:Journal Article
MONTHYEARML19235A0802019-08-19019 August 2019 Thermo-Lag Website ML19235A0792019-08-19019 August 2019 Pyrocrete Website ML19235A0782019-08-19019 August 2019 Mineral Wool Website ML19235A0772019-08-19019 August 2019 Micarta Website ML19235A0762019-08-19019 August 2019 Marinite Website ML19235A0752019-08-19019 August 2019 Marinite Slide Plates Products - Piping Tech ML19235A0742019-08-19019 August 2019 Kbs Sealbags Website ML19235A0732019-08-19019 August 2019 Gypsum Website ML19235A0722019-08-19019 August 2019 Duxseal Website ML19235A0712019-08-19019 August 2019 Cerafiber Website ML19235A0702019-08-19019 August 2019 Cera Blanket Website ML19235A0692019-08-19019 August 2019 Bio K-10 Website ML19235A0682019-08-19019 August 2019 3M Interam Website ML19093B1121978-07-14014 July 1978 Response to Concerns Use of a Certain Type Cable Manufactured by the Continental Wire and Cable Company 2019-08-19
[Table view] Category:Report
MONTHYEARML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML23054A1922023-02-22022 February 2023 ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22263A3642022-05-23023 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 ML22263A3692022-05-0101 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML20091L9852021-05-0404 May 2021 Record of Decision ML20091L9832021-05-0404 May 2021 SLR License ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20296A6802020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML20076A5762020-05-28028 May 2020 Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19235A0702019-08-19019 August 2019 Cera Blanket Website ML19235A0802019-08-19019 August 2019 Thermo-Lag Website ML19235A0742019-08-19019 August 2019 Kbs Sealbags Website ML19235A0682019-08-19019 August 2019 3M Interam Website ML19235A0722019-08-19019 August 2019 Duxseal Website ML19235A0782019-08-19019 August 2019 Mineral Wool Website ML19235A0692019-08-19019 August 2019 Bio K-10 Website ML19235A0732019-08-19019 August 2019 Gypsum Website ML19235A0712019-08-19019 August 2019 Cerafiber Website ML19235A0752019-08-19019 August 2019 Marinite Slide Plates Products - Piping Tech ML19235A0762019-08-19019 August 2019 Marinite Website ML19235A0772019-08-19019 August 2019 Micarta Website ML19235A0792019-08-19019 August 2019 Pyrocrete Website ML19204A3582019-06-30030 June 2019 WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. ML19163A1542019-06-0606 June 2019 SLRA - Attachment 4D Letter - Draft to Dominion ML19140A2762019-05-20020 May 2019 Essential Fish Habitat Mapper Results for Surry Power Station ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML18218A1712018-07-31031 July 2018 Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report ML18108A1232018-04-11011 April 2018 Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1) ML17325A7792017-11-22022 November 2017 Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009) ML17339A1752017-09-0707 September 2017 Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. ML17241A0462017-08-24024 August 2017 Submittal of Cycle 28 Startup Physics Tests Report ML17251A9002017-06-0505 June 2017 Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 ML16355A1722016-12-20020 December 2016 Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review ML15335A0932015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force Review ML15244B2052015-08-24024 August 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report ML15097A0782015-04-0707 April 2015 Soarca Surry 2005 Site File ML15072A2992015-03-16016 March 2015 Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 ML15078A2882015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218 2023-05-31
[Table view] Category:Technical
MONTHYEARML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML22263A3642022-05-23023 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 ML22263A3692022-05-0101 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20296A6802020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19235A0802019-08-19019 August 2019 Thermo-Lag Website ML19235A0682019-08-19019 August 2019 3M Interam Website ML19235A0692019-08-19019 August 2019 Bio K-10 Website ML19235A0702019-08-19019 August 2019 Cera Blanket Website ML19235A0792019-08-19019 August 2019 Pyrocrete Website ML19235A0712019-08-19019 August 2019 Cerafiber Website ML19235A0722019-08-19019 August 2019 Duxseal Website ML19235A0732019-08-19019 August 2019 Gypsum Website ML19235A0742019-08-19019 August 2019 Kbs Sealbags Website ML19235A0752019-08-19019 August 2019 Marinite Slide Plates Products - Piping Tech ML19235A0762019-08-19019 August 2019 Marinite Website ML19235A0772019-08-19019 August 2019 Micarta Website ML19235A0782019-08-19019 August 2019 Mineral Wool Website ML19204A3582019-06-30030 June 2019 WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML18218A1712018-07-31031 July 2018 Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report ML17339A1752017-09-0707 September 2017 Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. ML17241A0462017-08-24024 August 2017 Submittal of Cycle 28 Startup Physics Tests Report ML17251A9002017-06-0505 June 2017 Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 ML16355A1722016-12-20020 December 2016 Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review ML15244B2052015-08-24024 August 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report ML14086A1732014-04-0909 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14079A0182014-02-27027 February 2014 30-Day Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML14002A1452014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14043A4442014-02-12012 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Surry Power Station, Units 1 and 2, TAC Nos.: MF1002 and MF1003 (Revision 2) ML13179A0152013-05-31031 May 2013 Units I and 2, Qualification of the ABB-NV and Wlop CHF Correlations in the Dominion VIPRE-D Computer Code ML11215A0592011-06-30030 June 2011 WCAP-17345-NP, Rev 2, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (3-Loop Model 44F/ Model 51F), Attachment 5 to 11-403 ML1023904192010-08-31031 August 2010 DOM-NAF-2, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code. ML1026002162010-05-13013 May 2010 Engineering Transmittal, ET-CEP-10-0006, Revision 0, Evaluation of Aluminum Conduit Seal Penetration Fire Tests, Dated May 13, 2010, North Anna and Surry Power Stations Units 1 and 2 (Redacted Version), Enclosure 2 ML0930701642009-10-15015 October 2009 Technical Report No. EE-0116, Revision 5 ML0926606162009-08-27027 August 2009 LTR-SGMP-09-108 NP-Attachment, Response to NRC Request for, Additional Information on H*; Model 44Fand Model 51F Steam Generators. ML0921504622009-06-30030 June 2009 WCAP-17092-NP, Revision 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 51F), Attachment 6 ML0921202022009-05-0606 May 2009 LTR-SGMP-09-64 Rev. 2 Np, Surry, Unit 1, Support for Emergency Technical Specification Amendment to Address Permeability Variation Signals at the Tube Ends. ML0826107152008-09-17017 September 2008 Final Precursor Analysis - Surry 2 (LER 281/06-002) ML0823200152008-08-18018 August 2008 Cycle 22 Startup Physics Tests Report 2023-05-31
[Table view] |
Text
PRODUCT SELECTION GUIDE Industrial Insulation
AVAILABLE SHAPES AND SIZES Form Pipe Size in/mm Thickness in/mm Pipe Insulation 1/2 - 24 / 15-600 1-3 / 25-76 Thermo-1200' Quad Segments 20-37 / 500-925
Hex Pipe Covering 38-52 / 950-1300
1 1/2-3 / 38-76 1 1/2-3 / 38-76 Calcium Silicate Pipe & Block Insulation Curved Segments30-126 / 700-3200 1 1/2-3 / 38-76 3-V Scored Block 30 min / 750 min 1 1/2-4 / 38-102 Beveled Lags 126 min / 3200 min 1 1/2-3 / 38-76 Flat Block Flat Surface 1-4 / 25-102 THERMAL PERFORMANCE ASTM C335 (PIPE) ASTM C518 (FLAT)
Mean Temp. Btu.in/(hr . ft2 . 0F) W/mºC Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC .344 .050 .355 .051 200ºF / 93ºC .389 .056 .373 .054 300ºF / 149ºC .437 .063 .397 .057 400ºF / 204ºC .486 .070 .428 .062 500ºF / 260ºC .538 .078 .465 .067 600ºF / 316ºC .591 .085 .509 .559 700ºF / 371ºC .647 .093 .559 .081 Thermo-1200'* is a water-resistant, molded, high-temperature, SPECIFICATION COMPLIANCE ASTM C533 Type I Material Specification - Passes ASTM C795 / C871 / C692 Corrosion Austenitic abuse-resistant pipe and block insulation composed of hydrous ASTM C1617 Corrosion - Passes Stainless Steel - Passes calcium silicate. Recommended for use in the industrial processing ASTM E136 Non-Combustible - Passes and power generation industries. Integral to Thermo-1200' is XOX For more information, refer to product data sheet IND-303 Corrosion Inhibitor, a distinctive formula and process that actively *Thermo-1200' water resistant calcium silicate is not hydrophobic. Thermo-1200' is designed to be able to withstand short periods of rainfall without absorbing water in excess. The volume of water absorption depends on the duration of exposure and the amount of rainfall. The inhibits corrosion to outside surfaces of pipe and equipment. insulation is not meant to withstand extreme weather conditions without jacketing. While this new water resistant feature can be helpful during prolonged field installations, it is nevertheless recommended that an installer weatherproof and jacket the thermal insulation as soon Operating Temperature Limit: 1200°F (650°C) as it is feasibly possible. Should water enter the system, the corrosion inhibitors will still activate to continue to help combat corrosion at a chemical level, and once the system reaches operating temperatures, the water will vaporize and leave the system.
Sproule-1200' AVAILABLE SHAPES AND SIZES Form Pipe Size in/mm Thickness in/mm Expanded Perlite Pipe & Block Insulation Pipe Insulation 1/2 - 24 / 15-600 1- 4 / 25-102 Quad Segments 24 - 40 / 600-1000 1 1/2-3 / 38-76 Scored or V-Grooved Block 30 min / 750 min 1 1/2-4 / 38-102 Flat Block Flat Surface 1-4 / 25-102 THERMAL PERFORMANCE ASTM C335 (PIPE) ASTM C518 (FLAT)
Mean Temp. Btu.in/(hr . ft2 . 0F) W/mºC Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC .412 .059 .438 .063 200ºF / 93ºC .481 .069 .476 .069 300ºF / 149ºC .548 .079 .515 .074 400ºF / 204ºC .611 .088 .557 .080 500ºF / 260ºC .671 .097 .601 .087 600ºF / 316ºC .728 .105 .646 .093 700ºF / 371ºC .782 .113 .694 .100 Sproule-1200' is a preformed, high-temperature, non-wicking pipe and block insulation composed of expanded perlite that SPECIFICATION COMPLIANCE ASTM C610 Material Specification - Passes is uniformly reinforced with a high-strength fiber. Integral to ASTM C1617 Corrosion - Passes Sproule-1200' is XOX Corrosion Inhibitor, a distinctive formula ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes and process that actively inhibits corrosion to outside surfaces ASTM E136 Non-Combustible - Passes of pipe and equipment.
For more information, refer to product data sheet IND-200 Operating Temperature Limit: 1200°F (650°C)
InsulThin HT AVAILABLE SHAPES AND SIZES Hydrophobic Microporous Blanket Insulation Roll Size Roll Weight Dimensions 36 Wide 45lbs 10mm x 36 x 25
5mm x 36 x 50 60 Wide 75lbs 10mm x 60 x 25
5mm x 60 x 50 THERMAL PERFORMANCE Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.189 0.027 200ºF / 93ºC 0.195 0.028 400ºF / 204ºC 0.213 0.031 600ºF / 316ºC 0.237 0.034 SPECIFICATION COMPLIANCE InsulThin HT is a high-temperature, hydrophobic, thin, flexible, ASTM C1676 Material Specification - Passes microporous blanket insulation. Microporous insulation is a ASTM C1617 Corrosion - Passes highly efficient insulation material and has been in service in a ASTM C665 Corrosivity to Steel - Passes variety of industrial and commercial insulation applications for ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes more than 35 years. ASTM E84 Surface Burning Characteristics - Flame Spread-0, Smoke Developed-0 Operating Temperature Limit: 1200°F (650°C) For more information, refer to product data sheet IND-700 2
MinWool-1200 Pipe AVAILABLE SHAPES AND SIZES Mineral Wool Insulation Form Pipe Size in/mm Thickness in/mm One Piece 1/2 - 6 / 15-152 1-6 / 25-152 Two Piece 7-24 / 175-600 1-6 / 25-152 Four Piece 25-44 / 625-1100 1-6 / 25-152
(1/2 increments)
THERMAL PERFORMANCE Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.23 0.033 200ºF / 93ºC 0.28 0.040 400ºF / 204ºC 0.40 0.058 600ºF / 316ºC 0.56 0.081 MinWool-1200 Pipe is a water-repellent pipe insulation made of SPECIFICATION COMPLIANCE ASTM C547 Material Specification Types I, II, IV - Passes inorganic fibers derived from basalt, a volcanic rock. It is made ASTM C665 Corrosivity to Steel - Passes with a thermosetting resin binder. Advanced manufacturing BS EN 13472 Short-Term Water Absorption technology ensures consistent product quality, with high fiber density and low shot content, for excellent performance in high- For more information, refer to product data sheet IND-401 temperature, thermal control and fire-resistant applications.
Operating Temperature Limit: 1200°F (650°C)
MinWool-1200 Preformed Pipe AVAILABLE SHAPES AND SIZES Mineral Wool Insulation Standard Thickness
Single Layer: 1-4 thick Double Layer: Over 4 thick in 1/2 increments Pipe Size: 1/2 - 36 Available in iron and copper tubing sizes THERMAL PERFORMANCE Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.25 0.036 200ºF / 93ºC 0.30 0.044 400ºF / 204ºC 0.44 0.064 600ºF / 316ºC 0.62 0.090 MinWool-1200 Preformed (PF) Pipe insulation is made of inorganic fibers derived from basalt, a volcanic rock. It is made with a SPECIFICATION COMPLIANCE ASTM C547 Material Specification Types III - Passes thermosetting resin binder. PF Pipe insulation is a factory V-grooved ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes mineral wool board that is formed to specific pipe sizes and provided ASTM E84 Surface Burning Characteristics - Flame Spread - 25, Smoke Developed - 50 or less in half cylinder sections with a variety of facing options.
Operating Temperature Limit: 1200°F (650°C) For more information, refer to product data sheet IND-423 MinWool-1200 Field-Formed Pipe AVAILABLE SHAPES AND SIZES Mineral Wool Insulation Standard Thickness
Single Layer: 11/2-4 thick Double Layer: Over 4 thick in 1/2 increments Pipe Size: 21/2-72 Available in NPS pipe sizes and copper tubing sizes THERMAL PERFORMANCE Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.25 0.036 200ºF / 93ºC 0.30 0.044 400ºF / 204ºC 0.44 0.064 600ºF / 316ºC 0.62 0.090 MinWool-1200 Field-Formed Pipe insulation is made of inorganic SPECIFICATION COMPLIANCE ASTM C547 Material Specification Types III - Passes fibers derived from basalt, a volcanic rock. It is made with a ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes thermosetting resin binder. Field-Formed Pipe insulation is a factory ASTM E84 Surface Burning Characteristics - Flame Spread - 25, Smoke Developed - 50 or less V-grooved mineral wool board with a unique contact adhesive in the grooves. It is manufactured to specific pipe sizes with a variety of For more information, refer to product data sheet IND-420 facing options. It ships flat and allows for easy forming at the job site.
Operating Temperature Limit: 1200°F (650°C) 3
MinWool-1200 Precision Cut AVAILABLE SHAPES AND SIZES Mineral Wool Insulation Standard Thickness Facings Available
Single Layer: 1-4 thick Sizes 1/2 - 2 are supplied with no facing Double Layer: Over 4 thick in 1/2 increments Sizes 21/2 and above are supplied with a Pipe Size: 1/2 -72 fiberglass mat facing Available in iron and copper tubing sizes Other facings available include: ASJ and FSK THERMAL PERFORMANCE Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.25 0.036 200ºF / 93ºC 0.30 0.044 400ºF / 204ºC 0.44 0.064 600ºF / 316ºC 0.62 0.090 MinWool-1200 Precision Cut (PC) Pipe insulation is made of SPECIFICATION COMPLIANCE ASTM C547 Material Specification Types III - Passes inorganic fibers derived from basalt, a volcanic rock. It is made with ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes thermosetting resin binder. PC Pipe insulation (without adhesive) is ASTM E84 Surface Burning Characteristics - Flame Spread - 25, Smoke Developed - 50 or less a factory V-grooved mineral wool board manufactured to specific pipe or vessel sizes with a variety of facing options. It ships flat in For more information, refer to product data sheet IND-422 4 mil plastic and allows easy forming at the job site.
Operating Temperature Limit: 1200°F (650°C)
MinWool-1200 Pipe & Tank Wrap AVAILABLE SHAPES AND SIZES Mineral Wool Insulation Roll Length ft/m Width in/m Thickness in/mm 18 / 5.5 48 / 1.22 11/2 / 40 16 / 4.9 48 / 1.22 2 / 50 14 / 4.3 48 / 1.22 21/2 / 65 12 / 3.7 48 / 1.22 3 / 75 10 / 3.1 48 / 1.22 31/2 / 90 8 / 2.4 48 / 1.22 4 / 100 THERMAL PERFORMANCE Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.23 0.033 200ºF / 93ºC 0.28 0.040 400ºF / 204ºC 0.40 0.058 600ºF / 316ºC 0.56 0.081 MinWool-1200 Pipe & Tank Wrap insulation is made of SPECIFICATION COMPLIANCE inorganic fibers derived from basalt, a volcanic rock. It is made ASTM C553 Mineral Fiber Blanket Specification Types I, II,III,IV, V, VI - Passes with a thermosetting resin binder. Advanced manufacturing ASTM C665 Corrosivity to Steel - Passes technology ensures consistent product quality, with high fiber ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes ASTM E84 Surface Burning Characteristics / Flame Spread - 25, Smoke Developed - 50 or less density and low shot content, for excellent performance in high-ASTM E136 Non-Combustible - Passes (mineral wool only) temperature, thermal control and fire-resistant applications.
Operating Temperature Limit: 1200°F (650°C) For more information, refer to product data sheet IND-415 MinWool-1200 Lamella Tank Wrap AVAILABLE SHAPES AND SIZES Mineral Wool Insulation Standard Thickness
Single Layer: 1-4 thick Facings Available
Standard is fiberglass mat Available with ASJ THERMAL PERFORMANCE Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.29 0.042 200ºF / 93ºC 0.36 0.052 400ºF / 204ºC 0.54 0.078 600ºF / 316ºC 0.82 0.118 SPECIFICATION COMPLIANCE MinWool-1200 Lamella Tank Wrap is a flexible mineral wool wrap ASTM C1393 Material Specification / Complies ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes insulation. It is a lightweight, high-performance insulation for high-ASTM E84 Surface Burning Characteristics / Flame Spread - 25, Smoke Developed - 50 or less temperature applications. This insulation is produced to fit large ASTM E136 Non-Combustible - Passes (mineral wool only) diameter pipe, duct, tanks and equipment, ranging in temperatures from below ambient up to 1000°F continuous maximum service temperature. For more information, refer to product data sheet IND-424 Operating Temperature Limit: 1200°F (650°C) 4
MinWool-1200 Industrial Board AVAILABLE SHAPES AND SIZES Mineral Wool Insulation Nominal Densities (lb/ft3/kg/m3) Sizes in/mm Thicknesses in/mm 1240 (4 / 48) 24 x 48 / 610 x 1219 1-4 / 25-102 1260 (6 / 96) 36 x 48 / 914 x 1219 (All Densities) 1280 (8 / 128) (All Densities) Foil Scrim Polyethylene 1210 (10 / 160) (FSP) facing may be 1212 (12 / 192) available on a
made-to-order basis THERMAL PERFORMANCE*
Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.25 0.036 200ºF / 93ºC 0.30 0.043 400ºF / 204ºC 0.42 0.061 600ºF / 316ºC 0.56 0.081 MinWool-1200 Industrial Board insulation is made of inorganic SPECIFICATION COMPLIANCE ASTM C612 Material Specification - Complies fibers derived from basalt, a volcanic rock. It is made with a ASTM C665 Corrosivity to Steel - Passes thermosetting resin binder. Advanced manufacturing technology ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes ensures consistent product quality, with high fiber density and ASTM E136 Non-Combustible - Passes low shot content, for excellent performance in high-temperature,
- Thermal Performance listed for 1280 density only - for other densities and more information, refer to thermal control and fire-resistant applications. product data sheet IND-402 Operating Temperature Limit: 1200°F (650°C) 1 thickness available in 8#, 10# and 12# densities only MinWool-1200 Flex Batt AVAILABLE SHAPES AND SIZES Mineral Wool Insulation Nominal Densities (lb/ft3/kg/m3) Sizes in/mm Thicknesses in/mm 1240 (4 / 48) 24 x 48 / 610 x 1219 1-4 / 25-102 1260 (6 / 96) 36 x 48 / 914 x 1219 (All Densities) 1280 (8 / 128) (All Densities) 1210 (10 / 160)
1212 (12 / 192)
THERMAL PERFORMANCE*
Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.25 0.036 200ºF / 93ºC 0.30 0.043 400ºF / 204ºC 0.42 0.061 600ºF / 316ºC 0.56 0.081 MinWool-1200 Flexible Batt insulation is made of inorganic SPECIFICATION COMPLIANCE ASTM C612 Material Specification - Complies fibers derived from basalt, a volcanic rock. It is made with a ASTM C665 Corrosivity to Steel - Passes thermosetting resin binder. Advanced manufacturing technology ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes ensures consistent product quality, with high fiber density and ASTM E136 Non-Combustible - Passes low shot content, for excellent performance in high-temperature,
- Thermal Performance listed for 1280 density only - for other densities and more information, refer to thermal control and fire-resistant applications. product data sheet IND-406 Operating Temperature Limit: 1200°F (650°C) 1 thickness available in 8#, 10# and 12# densities only MinWool-1200 Metal Mesh Blanket AVAILABLE SHAPES AND SIZES Mineral Wool Insulation Standard Thickness
Single Layer: 1-4 thick in 1/2 increments Standard Width: 24 Standard Length: 48 THERMAL PERFORMANCE*
Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.25 0.036 200ºF / 93ºC 0.30 0.043 400ºF / 204ºC 0.42 0.061 600ºF / 316ºC 0.56 0.081 SPECIFICATION COMPLIANCE ASTM C592 Specification of Metal Mesh Covered Blanket Type I,II,III - Complies ASTM C665 Corrosivity to Steel - Passes MinWool-1200 Metal Mesh Blanket (MMB) insulation is made ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes of inorganic fibers derived from basalt, a volcanic rock, with ASTM E136 Non-Combustible - Passes a thermosetting resin binder. MMB is a mineral wool blanket
- Thermal Performance listed for 1280 density only - for other densities and more available with a variety of metal mesh options mechanically information, refer to product data sheet IND-406 applied to one or both surfaces.
Operating Temperature Limit: 1200°F (650°C) 5
MinWool-1200 Mitered Fittings AVAILABLE SHAPES AND SIZES Mineral Wool Insulation Standard Thickness Facings Available
Single Layer: 1-4 thick Sizes 1/2 - 2 are supplied with no facing Double Layer: Over 4 thick in 1/2 increments Sizes 21/2 and above are supplied with a Sizes available up to a 72 IPS but vary by thickness fiberglass mat facing Available in NPS pipe sizes and copper tubing sizes Other facings available include: ASJ and FSK THERMAL PERFORMANCE Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 100ºF / 38ºC 0.25 0.036 200ºF / 93ºC 0.30 0.044 400ºF / 204ºC 0.44 0.064 600ºF / 316ºC 0.62 0.090 MinWool-1200 Mitered Fittings are made of inorganic fibers derived from basalt, a volcanic rock. It is made with thermosetting resin SPECIFICATION COMPLIANCE ASTM C547 / C585 MICA Fabrication Standards - Complies binder. These mitered and bonded fittings are for standard short and ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes long radius and non-standard radius sweep elbows found in normal ASTM E84 Surface Burning Characteristics - Flame Spread - 25, Smoke Developed - 50 or less piping schemes. Fittings are manufactured from MinWool-1200 Preformed Pipe Insulation and mitered into precision segments. For more information, refer to product data sheet IND-419 Operating Temperature Limit: 1200°F (650°C)
Super Caltemp Gold 1700 AVAILABLE SHAPES AND SIZES Calcium Silicate Pipe & Block Insulation Form Pipe Size in/mm Thickness in/mm 3-V Scored Block 30 min / 750 min 1 1/2-3 / 38-76 Flat Block Flat Surface 1-3 / 25-76 THERMAL PERFORMANCE Mean Temperature Btu.in/(hr . ft2 . 0F) W/mºC 200ºF / 93ºC 0.54 0.078 400ºF / 204ºC 0.61 0.088 600ºF / 315ºC 0.67 0.097 800ºF / 427ºC 0.73 0.105 Super Caltemp Gold 1700 block is an inorganic, non-combustible, SPECIFICATION COMPLIANCE high-temperature insulation that is composed primarily of hydrous ASTM C533 Type II Material Specification - Passes ASTM C795 / C871 / C692 Corrosion Austenitic Stainless Steel - Passes calcium silicate. The insulation is tailored for systems operating up ASTM E136 Non-Combustible - Passes to 1700°F (927°C). Super Caltemp Gold 1700 meets or exceeds the physical and thermal property requirements of ASTM C533, Type II.
Operating Temperature Limit: 1700°F (927°C) For more information, refer to product data sheet IND-305 Super Firetemp AVAILABLE TYPES AND SIZES High-Temperature Insulation Types Board Dimensions Thickness in/mm Super Firetemp L 4ft x 8ft 3/4 - 3 / 13 - 76 Super Firetemp M 4ft x 8ft 1/2 - 3 / 13 - 76 Super Firetemp H 4ft x 8ft 1/2 -2 / 13 - 51 Super Firetemp X 4ft x 8ft 1/2 - 2 / 13 - 51 Super Firetemp S 4ft x 8ft 1/2 - 11/2 / 13 - 38
(1/2 increments)
AVAILABLE DENSITIES Type Density (Avg.) ASTM C656 Super Firetemp L 20 pcf (288 kg / m3) Type II, Grade 5 Super Firetemp M 28 pcf (449 kg / m3) Type II, Grade 6 Super Firetemp H 35 pcf (561 kg / m3) Type II, Grade 6 Super Firetemp X 40 pcf (641 kg / m ) 3 Type II, Grade 7 Super Firetemp S 55 pcf (881 kg / m ) 3 Type II, Grade 8 Super Firetemp boards are inorganic, high-temperature boards SPECIFICATION COMPLIANCE ASTM C795 Corrosion Austenitic Stainless Steel - Passes with exceptional strength and insulating qualities, produced ASTM E136 Non-Combustible - Passes in various densities. Super Firetemp boards are suitable for fire protection applications, refractory backup, and can be For more information, refer to product data sheets:
machined into component parts of many shapes and sizes. IND-103(L), IND-104(M), IND-105(H), IND-106(X), IND-107(S)
Continuous Temperature Limit: Varies by product type 6
Accessories Insulation Product Accessories Insulkote ET Calbond Gold Weather Protective Coating High-Temperature Glue Developed as a high-quality protective coating, Insulkote CalBond Gold is a modified, silicate-based glue for ET is a compound of selected and processed bitumens thermal insulations. It sets quickly to provide a high-and mineral fillers. It is recommended for weather- temperature bond for porous insulating materials.
protecting insulated vessels, tanks, piping, equipment CalBond Gold is useful for bonding sections of calcium and duct work. Insulkote ET is a non-vapor barrier, silicate or perlite high-temperature pipe or block weather-proof coating for use over thermal insulation insulation and to make mitered elbows, large insulating where breathing is required. sections or other special shapes.
For more information, refer to product data sheet IND-10 For more information, refer to product data sheet IND-11 CalCoat-127 Super Calstik One Coat Finishing Cement High-Temperature Glue CalCoat-127 is a proprietary blend of hydraulic cement, Super Calstik is a modified, silicate-based glue. It sets calcium silicate and inorganic mineral fibers with quickly to provide a high-temperature bond for porous corrosion inhibitors that provides a smooth finish insulating materials. Super Calstik is used for bonding over high-temperature insulation. CalCoat-127 is and sealing joints in Super Firetemp high-temperature recommended for finishing use with calcium silicate insulation. It is used in walls, structural steel, cable or perlite insulation in high-temperature piping and trays and other fire-rated applications.
equipment applications.
For more information refer, to product data sheet IND-108 For more information, refer to product data sheet IND-13 7
Technical specifications as shown in this literature are intended to be used as general guidelines only. Please refer to the Safety Data Sheet and product label prior to using this product. The physical and chemical properties of the products listed herein represent typical, average values obtained in accordance with accepted test methods and are subject to normal manufacturing variations. They are supplied as a technical service and are subject to change without notice. Any references to numerical flame spread or smoke developed ratings are 717 17th St.
not intended to reflect hazards presented by these or any other materials under actual fire Denver, CO 80202 conditions. Check with the Regional Sales Office nearest you for current information.
800-866-3234 JM.com All Johns Manville products are sold subject to Johns Manvilles standard Terms and Conditions, which includes a Limited Warranty and Limitation of Remedy. For a copy of the Johns Manville standard Terms and Conditions or for information on other Johns Manville thermal insulation and systems, visit www.jm.com/terms-conditions or call (800)654-3103.
IND-902 02/13/19 (Replaces 02/23/18) © 2019 Johns Manville All Rights Reserved