ML23167B00731 May 2023Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation SummarySubsequent License Renewal
ML23103A22812 April 2023Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer CodeShutdown Margin
Anticipated operational occurrence
Post Accident Monitoring
B.5.b
Exemption Request
Fuel cladding
Fire Protection Program
ML22263A36423 May 2022Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95
ML22263A3691 May 2022Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190
ML21175A24724 June 20212020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....-
ML21042B32111 February 2021Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code
ML20296A68022 October 2020ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06Finite Element Analysis
Weak link
ML20203M16020 July 2020VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & StatusAnchor Darling
ML19249B77429 August 2019Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated)Safe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Reserve Station Service Transformer
Operating Basis Earthquake
Operator Manual Action
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19249B77829 August 2019Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1
ML19249B76829 August 2019Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated)Safe Shutdown
Boric Acid
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Reserve Station Service Transformer
Operating Basis Earthquake
Operator Manual Action
Emergency Lighting
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19249B77229 August 2019Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated)Safe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Internal Flooding
Reserve Station Service Transformer
Operating Basis Earthquake
Operator Manual Action
FLEX
Design basis earthquake
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19235A08019 August 2019Thermo-Lag WebsiteCoatings
ML19235A06819 August 20193M Interam WebsiteFire Barrier
Coatings
Earthquake
ML19235A06919 August 2019Bio K-10 Website
ML19235A07019 August 2019Cera Blanket Website
ML19235A07919 August 2019Pyrocrete Website
ML19235A07119 August 2019Cerafiber Website
ML19235A07219 August 2019Duxseal Website
ML19235A07319 August 2019Gypsum Website
ML19235A07419 August 2019Kbs Sealbags Website
ML19235A07519 August 2019Marinite Slide Plates Products - Piping Tech
ML19235A07619 August 2019Marinite WebsiteCoatings
ML19235A07719 August 2019Micarta Website
ML19235A07819 August 2019Mineral Wool Website
ML19204A35830 June 2019WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2.Safe Shutdown Earthquake
Aging Management
Earthquake
ML19095A6022 April 2019Enclosure 2 - SLRA Mark-Ups Change Notice 2Boric Acid
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Coatings
Temporary Modification
Aging Management
Foreign Material Exclusion
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
Control of Heavy Loads
Biofouling
EVT-1
Liquid penetrant
Pressure Boundary Leakage
Through Wall Leak
Through-Wall Leakage
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
Measurement Uncertainty Recapture
ML19011A1744 January 2019Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting DocumentsSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19011A1734 January 2019Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting DocumentsSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19011A1724 January 2019Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up)Safe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Time to boil
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML18218A17131 July 2018Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing ReportLoop seal
Hydrostatic
ML17339A1757 September 2017Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L.Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
ML17241A04624 August 2017Submittal of Cycle 28 Startup Physics Tests Report
ML17251A9005 June 2017Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17
ML16355A17220 December 2016Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation ReviewHigh winds
Hydrostatic
ML15244B20524 August 2015Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report
ML14086A1739 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML14079A01827 February 201430-Day Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46
ML14002A14519 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Battery sizing
Earthquake
ML14043A44412 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Surry Power Station, Units 1 and 2, TAC Nos.: MF1002 and MF1003 (Revision 2)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Battery sizing
Earthquake
ML13179A01531 May 2013Units I and 2, Qualification of the ABB-NV and Wlop CHF Correlations in the Dominion VIPRE-D Computer Code
ML11215A05930 June 2011WCAP-17345-NP, Rev 2, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (3-Loop Model 44F/ Model 51F), Attachment 5 to 11-403Finite Element Analysis
ML10239041931 August 2010DOM-NAF-2, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code.B.5.b Mitigating Strategies
Exemption Request
Fuel cladding
ML10260021613 May 2010Engineering Transmittal, ET-CEP-10-0006, Revision 0, Evaluation of Aluminum Conduit Seal Penetration Fire Tests, Dated May 13, 2010, North Anna and Surry Power Stations Units 1 and 2 (Redacted Version), Enclosure 2Boric Acid
Fire Barrier
Coatings
Temporary Modification
Cyber Security
Aging Management
Time Critical Operator Action
B.5.b Mitigating Strategies
Exemption Request
Maintenance Rule Program
Fire Protection Program
ML09307016415 October 2009Technical Report No. EE-0116, Revision 5Offsite Dose Calculation Manual
ML09266061627 August 2009LTR-SGMP-09-108 NP-Attachment, Response to NRC Request for, Additional Information on H*; Model 44Fand Model 51F Steam Generators.Finite Element Analysis
ML09215046230 June 2009WCAP-17092-NP, Revision 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 51F), Attachment 6Hydrostatic
Finite Element Analysis
ML0921202026 May 2009LTR-SGMP-09-64 Rev. 2 Np, Surry, Unit 1, Support for Emergency Technical Specification Amendment to Address Permeability Variation Signals at the Tube Ends.
ML08261071517 September 2008Final Precursor Analysis - Surry 2 (LER 281/06-002)Mission time
Significance Determination Process
ML08232001518 August 2008Cycle 22 Startup Physics Tests ReportFuel cladding