Letter Sequence Request |
---|
EPID:L-2022-LLR-0084, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 (Open) |
|
MONTHYEARCNL-22-024, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-03-15015 March 2022 American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 Project stage: Request ML22342B2482022-12-0808 December 2022 ASME OM Code Inservice Testing Program Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Project stage: Request ML22343A0002022-12-0909 December 2022 Response to Request for RAI on ASME Operation & Maintenance Code Inservice Testing Program - Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Project stage: Request ML23054A1922023-02-22022 February 2023 ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information Project stage: Request ML23102A2832023-04-25025 April 2023 ASME OM Code Inservice Testing Program Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Project stage: Other 2022-03-15
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:Report
MONTHYEARML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML23054A1922023-02-22022 February 2023 ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22263A3642022-05-23023 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 ML22263A3692022-05-0101 May 2022 Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML20091L9852021-05-0404 May 2021 Record of Decision ML20091L9832021-05-0404 May 2021 SLR License ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20296A6802020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML20076A5762020-05-28028 May 2020 Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19235A0702019-08-19019 August 2019 Cera Blanket Website ML19235A0802019-08-19019 August 2019 Thermo-Lag Website ML19235A0742019-08-19019 August 2019 Kbs Sealbags Website ML19235A0682019-08-19019 August 2019 3M Interam Website ML19235A0722019-08-19019 August 2019 Duxseal Website ML19235A0782019-08-19019 August 2019 Mineral Wool Website ML19235A0692019-08-19019 August 2019 Bio K-10 Website ML19235A0732019-08-19019 August 2019 Gypsum Website ML19235A0712019-08-19019 August 2019 Cerafiber Website ML19235A0752019-08-19019 August 2019 Marinite Slide Plates Products - Piping Tech ML19235A0762019-08-19019 August 2019 Marinite Website ML19235A0772019-08-19019 August 2019 Micarta Website ML19235A0792019-08-19019 August 2019 Pyrocrete Website ML19204A3582019-06-30030 June 2019 WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. ML19163A1542019-06-0606 June 2019 SLRA - Attachment 4D Letter - Draft to Dominion ML19140A2762019-05-20020 May 2019 Essential Fish Habitat Mapper Results for Surry Power Station ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML18218A1712018-07-31031 July 2018 Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report ML18108A1232018-04-11011 April 2018 Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1) ML17325A7792017-11-22022 November 2017 Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009) ML17339A1752017-09-0707 September 2017 Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. ML17241A0462017-08-24024 August 2017 Submittal of Cycle 28 Startup Physics Tests Report ML17251A9002017-06-0505 June 2017 Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 ML16355A1722016-12-20020 December 2016 Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review ML15335A0932015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force Review ML15244B2052015-08-24024 August 2015 Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report ML15097A0782015-04-0707 April 2015 Soarca Surry 2005 Site File ML15072A2992015-03-16016 March 2015 Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 ML15078A2882015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218 2023-05-31
[Table view] Category:Miscellaneous
MONTHYEARML23054A1922023-02-22022 February 2023 ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML20091L9832021-05-0404 May 2021 SLR License ML20091L9852021-05-0404 May 2021 Record of Decision ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20076A5762020-05-28028 May 2020 Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment ML19163A1542019-06-0606 June 2019 SLRA - Attachment 4D Letter - Draft to Dominion ML19140A2762019-05-20020 May 2019 Essential Fish Habitat Mapper Results for Surry Power Station ML18108A1232018-04-11011 April 2018 Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1) ML17325A7792017-11-22022 November 2017 Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009) ML15335A0932015-12-15015 December 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force Review ML15097A0782015-04-0707 April 2015 Soarca Surry 2005 Site File ML15072A2992015-03-16016 March 2015 Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 ML15078A2872015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 1 Through 2-114 ML15078A2892015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-219 Through the End ML15078A2882015-03-12012 March 2015 Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218 ML14251A0352014-08-28028 August 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML14086A1942014-04-0909 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14092A4142014-03-31031 March 2014 Response to March 12, 2012 Information Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1 ML13172A0092013-07-0101 July 2013 Nd 2, Closure Evaluation for Report Pursuant to 10 CFR 50.46(a)(3) Concerning Significant Emergency Core Cooling System Evaluation Model Error Related to Nuclear Fuel Thermal Conductivity Degradation ML12293A4512012-10-22022 October 2012 ACRS Assessment of the Quality of Selected NRC Research Projects- Fy 2012 ML12257A0862012-09-20020 September 2012 Review of the 2011 Refueling Outage System Generator Tube Inservice Inspection Report ML12166A1342012-06-27027 June 2012 Closeout of Bulletin 2011-01, Mitigating Strategies. ML12166A5192012-06-14014 June 2012 Transmittal of Final Accident Sequence Precursor (ASP) Analysis ML12073A3852012-03-0808 March 2012 Resources Services, Inc., Notification Letter That Surry Power Station Not Received a Copy of the Waste Shipment Record (Wsr) Signed by the Owner or Operator of the Designated Waste Disposal Site ML12046A8492012-02-27027 February 2012 Review of the Steam Generator Tube Inservice Inspection Report for the Refueling Outage in 2010 ML12024A0782011-12-28028 December 2011 State-of-the-Art Reactor Consequence Analysis (Soarca); Exclusive Summary for the Full NUREG for Peach Bottom and Surry ML1120701442011-07-26026 July 2011 Draft Letter Report, Entitled Risk-Informing EP Oversight: Evaluation of EALs Using Saphia Pilot Study of Peach Bottom and Surry ML1019304172010-05-0606 May 2010 Tritium Database Report ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML12124A2972010-03-11011 March 2010 Soarca Documents Review/Approval Process ML12124A2962010-02-25025 February 2010 Soarca Peer Review Comments ML0929905702009-10-26026 October 2009 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules ML0921908942009-08-0404 August 2009 Units 1 & 2, Millstone, Units 2 and 3 and Kewaunee - Approved Topical Report DOM-NAF-2, Revision 0.1-A ML0820701992008-07-18018 July 2008 Order EA-03-009 Sixty-Day Report Reactor Pressure Vessel Head Inspection Results ML0705903272007-02-27027 February 2007 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0623300712006-08-16016 August 2006 Fitness-for-Duty Program Semi-Annual Performance Data Report ML0634101622006-02-27027 February 2006 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0523501142005-08-22022 August 2005 Fitness-For-Duty Program Semi-Annual Performance Data Report ML0523504842005-08-22022 August 2005 Owner'S Activity Reports ML0518804802005-07-0707 July 2005 Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML0514603252005-05-25025 May 2005 .2 & 3, North Anna Power Station Units 1 & 2, Surry Power Station Units 1 & 2 - Nuclear Liability Insurance Endorsement ML0506001202005-02-28028 February 2005 Owner'S Activity Reports ML0505403042005-02-22022 February 2005 Fitness-for-Duty Program Semi-Annual Performance Data Report Correction of Information ML0505300392005-02-21021 February 2005 Fitness-for-duty Program Semi-Annual Performance Data Report ML0424501642004-08-31031 August 2004 Transmittal of Fitness-for-Duty Program Semi-Annual Performance Data Report for Millstone, North Anna, and Surry Power Stations ML0318903372003-07-10010 July 2003 Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Millstone, Nort ML0234303432002-12-0202 December 2002 Response to Request for Additional Information, Dominion'S Reload Nuclear Design Methodology Topical Report ML19094A2461971-11-0404 November 1971 Transmittal of Final Report Concerning the Operating License Review 2023-02-22
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 22, 2023 10 CFR 50.55a U.S. Nuclear Regulatory Commission Serial No.: 23-030 ATTN: Document Control Desk NRA/GDM: RO Washington, D.C. 20555-0001 Docket No.: 50-280 License No.: DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 ASME OM CODE INSERVICE TESTING PROGRAM ALTERNATIVE REQUEST V-01, USE OF MECHANICAL AGITATION PROCESS FOR PRESSURE ISOLATION VALVE 1-51-241 SEAT LEAKAGE TESTING SUPPLEMENTAL INFORMATION By letters dated December 8 and 9, 2022 [Agencywide Document Access and Management System (ADAMS) Accession Nos. ML223428248 and ML22343A000, respectively], Virginia Electric and Power Company (Dominion Energy Virginia) requested Nuclear Regulatory Commission (NRC) approval of inservice testing (1ST) alternative request (AR) V-01 for Surry Power Station (SPS) Unit 1. The 1ST AR proposed using a mechanical agitation process for pressure isolation valve 1-Sl-241, which is the Low Head Safety Injection to Reactor Coolant System cold leg isolation check valve, to assist in achieving acceptable seat leakage test results in lieu of meeting specific 1ST requirements in the ASME OM Code. The NRC provided verbal authorization of the AR on December 9, 2022.
To facilitate completion of its written safety evaluation (SE) for 1ST AR V-01, the NRC technical staff requested supplemental information regarding a previous engineering evaluation performed for the mechanical agitation process, specifically, Reference 4 listed in Attachment 2 of the December 8, 2022 submittal. The requested information is provided in the attachment.
Should you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.
Respectfully, r
James E. Holloway Vice President - Nuclear Engineering and Fleet Support
Serial No.23-030 Docket No. 50-280 Supplemental Information - 1ST AR V-01 Page 2 of 2 Regulatory commitments contained in this correspondence: None
Attachment:
Supplemental Information, Engineering Technical Evaluation ETE-SU-2021-0034, Revision 0, Engineering Evaluation for Mechanical Agitation of 1-Sl-241 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303 Mr. L. John Klos - Surry NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, Maryland 20852 Mr. G. Edward Miller - North Anna NRC Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, Maryland 20852 NRC Senior Resident Inspector Surry Power Station
Serial No.23-030 Docket No. 50-280 Attachment SUPPLEMENTAL INFORMATION ENGINEERING TECHNICAL EVALUATION ETE-SU-2021-0034, REVISION 0 ENGINEERING EVALUATION FOR MECHANICAL AGITATION OF 1-51-241 Virginia Electric and Power Company (Dominion Energy Virginia)
Surry Power Station Unit 1
Serial No.23-030 Docket No. 50-280 Attachment SUPPLEMENTAL INFORMATION ENGINEERING TECHNICAL EVALUATION ETE-SU-2021-0034, REVISION 0 ENGINEERING EVALUATION OF MECHANICAL AGITATION PROCESS FOR PRESSURE ISOLATION VALVE 1-Sl-241 SURRY POWER STATION UNIT 1 Purpose The purpose of this Level 1 ETE is to provide an engineering evaluation for 1-Sl-241 which initially did not pass its 1ST Program scheduled leak rate test during the performance of Operations Test Procedure 1-OPT-Sl-014, "Cold Shutdown Test of SI Check Valves to RCS Cold Legs," (Step 7.2.1.e), and subsequently required mechanical agitation in order confirm the valve is able to perform its design safety function.
Design Inputs and Assumptions
- 1. The Safety Injection (SI) system provides the piping, motive force, and valves necessary to ensure delivery of a sufficient amount of water to the Reactor Coolant System (RCS) to remove latent heat and decay heat from the reactor core during and following a limiting event. (Ref. 5, Table 4.1-1, Req. 1)
- 2. The SI system includes check valves in the injection lines to the RCS that provide an isolation barrier for those portions of SI piping that are at a lower pressure than the RCS. (Ref. 5, Table 4.1-1, Req. 6)
- 3. The maintenance procedures for SI system components ensure the total SI system leakage outside containment does not exceed allowable limits. Check valves are designed and tested to ensure back leakage to the Refueling Water Storage Tank (RWST) remains within acceptable limits. (Ref. 5, Table 4.2-1, Req. 4)
- 4. The SI system check valves that comprise the Reactor Coolant Pressure Boundary (RCPB) isolation barrier are periodically leak tested to ensure that leakage remains below allowable values. (Ref. 5, Table 4.2-1, Req. 5)
Discussion
Background
The SI system has several equipment locations that consist of two in-series swing check valves. These valves are 6-inch, 1500 lb Velan valves that provide a flow path from the Low/High Head SI pumps to the Hot and Cold Legs of the RCS. These check valves serve the following functions:
Page 1 of 8
Serial No.23-030 Docket No. 50-280 Attachment
- Provide a boundary between the higher pressure of the RCS and the lower pressure of the SI system,
- Prevent an lntersystem Loss of Coolant Accident (ISLOCA), and
- Provide a flow path from the SI pumps to the Hot and Cold Legs of the RCS.
Per Surry Power Station (SPS) Units 1 and 2 Technical Specifications (TS) Table 4.1-2A, "Minimum Frequency for Equipment Tests," these check valves are tested every refueling outage (RFO) and after each time the plant is placed in Cold Shutdown for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> if testing has not been performed in the last nine months. This testing ensures the valves perform their RCS pressure boundary function satisfactorily.
Testing Conditions During testing in accordance with 1-OPT-Sl-014, RCS pressure is significantly lower than normal operating RCS pressure to prove that the check valves being tested will remain seated throughout the operating cycle. During this test, the Low Head Safety Injection (LHSI) to A Cold Leg Check Valve (1-Sl-241) experiences a smaller differential pressure than during normal operation. The unsatisfactory leakage exhibited by 1-Sl-241 is most likely caused by the top of the swing check valve disc contacting the top of the seat, but the bottom hanging up enough to allow leak-by. By design, when the check valve is closing, the top of the disc is intended to hit the top of the seat first and then differential pressure across the valve drives the disc until it becomes fully seated.
Impact of Mechanical Agitation The in-series configuration of 1-Sl-241 with its associated downstream check valve results in the valve being exposed to a reduced differential pressure during performance of 1-OPT-Sl-014. As a result, inadequate closing pressure against the valve disc can result in the bottom of the disc not fully contacting the bottom of the seat. When unsatisfactory values for check valve leakage have been obtained in the past, mechanical agitation has been used successfully to fully seat the check valve.
Mechanical agitation of the check valve body induces vibration in the hanger pin and shoulder of the disc to allow gravity and system pressure to fully seat the valve disc.
The bodies of the SI check valves are 316 Stainless Steel, which is not a brittle material, and is therefore not susceptible to cracking from mechanical agitation. Additionally, discussions with the valve manufacturer (Velan) determined that it is acceptable to mechanically agitate check valves to enhance disc seating, and that Velan has never experienced problems as a result of this practice. To date, there has been no degradation or damage found on any check valves resulting from mechanical agitation.
Page 2 of 8
Serial No.23-030 Docket No. 50-280 Attachment While there have been no issues found to date as a result of mechanical agitation, due to heightened awareness at the station level to this practice, the following measures have been incorporated into station processes:
- Current procedures require Plant Manager approval to perform mechanical agitation.
- Each valve that is mechanically agitated requires a Condition Report, Engineering Evaluation, and a Work Order to open and inspect the check valve during the next refueling outage.
Failure of the as-found leak rate test reflects an 1ST program test failure. The mechanical agitation subsequently performed to meet TS leakage criteria could mask degradation internal to the valve. As such, it must now be considered to be degraded until proven otherwise.
Discussion of Design Functions Design Function 1: Allow flow of borated water to the core Forward flow capability of 1-Sl-241 was verified during the performance of 1-OPT-Sl-002 on May 3, 2021. Mechanical agitation will not prevent flow through the valve in the forward direction, it merely uses vibration to assist gravity and system pressure to achieve a better seating profile of the valve; therefore, the valve will continue to satisfy this design function.
Design Function 2: Provide an isolation barrier between the RCS and SI system It has been demonstrated that mechanical agitation does not cause damage to the valve internals but rather assists in seating the valve at low system pressure test conditions. Once the valve is confirmed closed at the lower test pressure, with or without mechanical agitation, the higher system pressures to which the valve will be exposed during normal plant operation ensure the valve remains seated and thus maintains its design ISLOCA function.
Following a LOCA, 1-Sl-241 would remain open in response to continued SI or recirculation cooling water system flow, or, if required to be closed during recovery, the associated upstream MOV would be closed to ensure isolation of the containment penetration.
Design Function 3: Total SI system leakage outside containment does not exceed limits As long as the valve can be confirmed to meet its TS required leakage criteria at the lower test pressure during performance of 1-OPT-S1-014, the higher operating pressures associated with normal plant operation are sufficient to ensure the valve will Page 3 of 8
Serial No.23-030 Docket No. 50-280 Attachment remain seated and maintain its leakage function for the planned operating cycle. If acceptable leakage can be obtained after mechanical agitation, the valve has the capability to perform its TS required function. Since the leakage measured following mechanical agitation of the valve was 0.0 gpm, the TS Surveillance for back leakage is satisfied.
Design Function 4: Leakage from each individual SI check valve below limits Per TS Table 4.1-2A, these check valves are tested every RFO and after each time the plant is placed in Cold Shutdown for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> if testing has not been performed in the past nine months. This ensures the valve can perform its RCS pressure boundary function satisfactorily. This TS Surveillance has been met as leakage past 1-SI-241 was measured to be 0.0 gpm during the performance of 1-OPT-Sl-014 and will continue to be met throughout the planned operating cycle for the reasons previously stated.
1-SI-241 History A previous occurrence of mechanical agitation of 1-Sl-241 occurred in 2006. During 1-OPT-Sl-014, leakage exceeded the acceptance criteria and mechanical agitation was used to obtain an as-left leakage value of 0.0159 gpm. Work Order (WO) 38075489801 was generated after mechanical agitation to open and inspect 1-Sl-241 during the next refueling outage in the fall of 2007. This WO was completed on November 6, 2007, with closure comments indicating the check valve seat was lapped and the as-left blue check was satisfactory. During testing in accordance with 1-OPT-Sl-014 on November 19, 2007, leakage for 1-Sl-241 was measured at 0.9 gpm. The valve was mechanically agitated, and an as-left leakage rate was measured at 1.82 gpm. Another performance of 1-OPT-Sl-014 occurred on November 20, 2007. During this performance, 1-SI-241 had measured leakage of 1.321 gpm. The valve was mechanically agitated, and an as-left leakage rate was measured at 1.6 gpm. WO 38079340901 was created to open and inspect the check valve. This WO was completed on November 25, 2007, with closure comments indicating the check valve internals had been rebuilt with a satisfactory as-left blue check. A Velan vendor was also brought in to provide additional direction and to improve maintenance practices and procedural guidance during the rebuild. During subsequent testing in accordance with 1-OPT-Sl-014 on November 27, 2007, leakage for 1-S1-241 was measured to be O gpm.
Historical test results for 1-SI-241 during the performance of 1-OPT-Sl-014 have consistently been approximately 0.0 gpm since the valve was rebuilt in 2007. During the most recent performance of 1-OPT-Sl-014 on May 27, 2021, a leak rate of 0.0 gpm was achieved after one attempt at mechanical agitation, which demonstrates the integrity of the valve seat and disc. Based on the propensity of this valve design to exhibit leak-by under low test pressure conditions, and the consistent zero leakage valve performance exhibited since it was rebuilt in 2007, there is adequate basis to conclude the cause of the initial high leakage during the leakage test event reflects a testing anomaly and not the existence of valve internal degradation. This will be Page 4 of 8
Serial No.23-030 Docket No. 50-280 Attachment validated by the procedural requirement to open and inspect the check valve during the next refueling outage under WO 38204242376 as initiated by Condition Report 1173987.
Conclusions The current Unit 1 ASME OM Code of Record, paragraph ISTC-3630(f), prescribes that valves or valve combinations with leakage rates exceeding the values specified by the Owner shall be declared inoperable and either repaired or replaced. A retest demonstrating acceptable operation shall be performed following any required corrective action before the valve is returned to service.
Although 1-Sl-241 did not initially pass the scheduled 1ST Program leakage test during the performance of 1-OPT-Sl-014 on May 27, 2021, ample evidence exists following mechanical agitation to conclude the valve is capable of performing its design function throughout the next planned operating cycle. The valve remains capable of performing all stated design functions within the Updated Final Safety Analysis Report (UFSAR),
TS, and Design Bases. The flow path for borated water to the core is still maintained, and the RCS pressure isolation boundary has been verified as evidenced by the measured as-left leakage of 0.0 gpm. WO 38204242376 has been created to open and inspect 1-Sl-241 during the next refueling outage. Any valve degradation identified will be repaired, and a leakage rate test demonstrating acceptable operation will be performed prior to returning the valve to service. For the purpose of meeting TS leakage criteria, 1-OPT-Sl-014 can be dispositioned as satisfactory with respect to leak rate testing of 1-Sl-241. For the purpose of operability determination, until maintenance is performed to confirm no valve degradation exists, 1-Sl-241 should be characterized as not fully qualified.
Precautions and Limitations N/A Recommendations Perform WO 38204242376 - OPEN/INSPECT CHECK VALVE next RFO (1R31).
Corrective Action Review Board approval required for extension.
Engineering recommends that valve 1-Sl-241 be considered operable but not fully qualified, and 1-OPT-Sl-014 to be dispositioned as satisfactory.
References
- 1. OPT-Sl-014, "Cold Shutdown Test of SI Check Valves to RCS Cold Legs."
- 2. OPT-Sl-023, "Cold Shutdown Test of SI Check Valves to RCS Hot Legs."
- 3. ET S-95-0455, Rev 0, "Mechanical Agitation of Check Valves, SPS Unit 1 & 2."
Page 5 of 8
Serial No.23-030 Docket No. 50-280 Attachment
- 4. SPS Technical Specifications, Sections 3.1, 3.3, 4.1.
- 5. SDBD-SPS-SI, "System Design Basis Document, Safety Injection."
- 6. Updated Final Safety Analysis Report, Rev. 52.04, Surry Power Station.
- 7. CM-M-ETE-101, "Engineering Technical Evaluations (ETEs)."
- 8. VTM V637-00011, "Velan Check Valves 2 1/2" - 24".
- 9. 1-OPT-Sl-007, "Refueling Test of the High Head Safety Injection Check Valves to the Cold Legs."
Page 6 of 8
Serial No.23-030 Docket No. 50-280 Attachment 1-51-241 Valve Information Manufacturer: Velan Model Number: B14-3114B-13MS Model Number Designation:
B Butt Welded 14 6" Size 3 1500# Class 11 Swing Check Valve 4 Vertical Orientation B Bolted Bon net 13 Stainless Steel Body, Forged 316, CF3M MS Stellite 6 Disk and Seat Hardfacing Page 7 of 8
Serial No.23-030 Docket No. 50-280 Attachment
'\.
\
)
I
/
C:
f&. l . '4'J.'L ES. 0£.,.§ [ bl\EI() JN ,.-.otCJlD/t~;:: IU TH .-.sMc Em;. M
}14) CIJ5/T()IER' llf ,C. -c:
. \'Ill.. *E !<'£ [
OOEFF Cl r Page 8 of 8