Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23167B007 | 31 May 2023 | Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary | Subsequent License Renewal |
ML23103A228 | 12 April 2023 | Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code | Shutdown Margin Anticipated operational occurrence Post Accident Monitoring B.5.b Exemption Request Fuel cladding Fire Protection Program |
ML23054A192 | 22 February 2023 | ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information | |
ML22353A620 | 19 December 2022 | Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code | |
ML22263A364 | 23 May 2022 | Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 | |
ML22263A369 | 1 May 2022 | Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 | |
ML21175A247 | 24 June 2021 | 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- | |
ML20091L985 | 4 May 2021 | Record of Decision | Incorporated by reference License Renewal Subsequent License Renewal Environmental Justice |
ML20091L983 | 4 May 2021 | SLR License | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Cyber Security Fire Protection Program GOTHIC |
ML21042B321 | 11 February 2021 | Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code | |
ML20296A680 | 22 October 2020 | ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 | Finite Element Analysis Weak link |
ML20247J616 | 3 September 2020 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML20203M160 | 20 July 2020 | VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status | Anchor Darling |
ML20076A576 | 28 May 2020 | Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment | Safe Shutdown High winds Internal Flooding FLEX Fukushima Dai-Ichi Earthquake Minimum staff Backfit |
ML19249B772 | 29 August 2019 | Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Internal Flooding Reserve Station Service Transformer Operating Basis Earthquake Operator Manual Action FLEX Design basis earthquake Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19249B768 | 29 August 2019 | Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) | Safe Shutdown Boric Acid Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Reserve Station Service Transformer Operating Basis Earthquake Operator Manual Action Emergency Lighting FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19249B774 | 29 August 2019 | Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Internal Flooding Reserve Station Service Transformer Operating Basis Earthquake Operator Manual Action FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19249B778 | 29 August 2019 | Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 | |
ML19235A070 | 19 August 2019 | Cera Blanket Website | |
ML19235A080 | 19 August 2019 | Thermo-Lag Website | Coatings |
ML19235A074 | 19 August 2019 | Kbs Sealbags Website | |
ML19235A068 | 19 August 2019 | 3M Interam Website | Fire Barrier Coatings Earthquake |
ML19235A072 | 19 August 2019 | Duxseal Website | |
ML19235A078 | 19 August 2019 | Mineral Wool Website | |
ML19235A069 | 19 August 2019 | Bio K-10 Website | |
ML19235A073 | 19 August 2019 | Gypsum Website | |
ML19235A071 | 19 August 2019 | Cerafiber Website | |
ML19235A075 | 19 August 2019 | Marinite Slide Plates Products - Piping Tech | |
ML19235A076 | 19 August 2019 | Marinite Website | Coatings |
ML19235A077 | 19 August 2019 | Micarta Website | |
ML19235A079 | 19 August 2019 | Pyrocrete Website | |
ML19204A358 | 30 June 2019 | WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. | Safe Shutdown Earthquake Aging Management Earthquake |
ML19163A154 | 6 June 2019 | SLRA - Attachment 4D Letter - Draft to Dominion | Packing leak Aging Management |
ML19140A276 | 20 May 2019 | Essential Fish Habitat Mapper Results for Surry Power Station | |
ML19095A602 | 2 April 2019 | Enclosure 2 - SLRA Mark-Ups Change Notice 2 | Boric Acid Ultimate heat sink Non-Destructive Examination Fire Barrier Coatings Temporary Modification Aging Management Foreign Material Exclusion Moisture barrier License Renewal Subsequent License Renewal Earthquake Control of Heavy Loads Biofouling EVT-1 Liquid penetrant Pressure Boundary Leakage Through Wall Leak Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld Power Uprate Measurement Uncertainty Recapture |
ML19011A172 | 4 January 2019 | Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Time to boil Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19011A173 | 4 January 2019 | Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19011A174 | 4 January 2019 | Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML18218A171 | 31 July 2018 | Attachment 5, ANP-3676NP, Revision 0, Surry Fuel-Vendor Independent Small Break LOCA Analysis, Licensing Report | Loop seal Hydrostatic |
ML18108A123 | 11 April 2018 | Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1) | Nondestructive Examination Dissimilar Metal Weld |
ML17325A779 | 22 November 2017 | Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009) | |
ML17339A175 | 7 September 2017 | Structural Integrity Associates Report No. 1601007.401, September 2017, Flaw Tolerance Evaluation of the Hot Leg Surge Line Nozzles Using ASME Code Section XI, Appendix L. | Operating Basis Earthquake Finite Element Analysis Design basis earthquake |
ML17241A046 | 24 August 2017 | Submittal of Cycle 28 Startup Physics Tests Report | |
ML17251A900 | 5 June 2017 | Enclosure 2, Attachment E to 17-296, WEKO-SEAL - Recommended Installation Procedures for Water and Waste-Water Piping, Miller Pipeline, Revised 03/05/17 | |
ML16355A172 | 20 December 2016 | Storm Surge Technical Evaluation Report Surry Power Station Hazard Reevaluation Review | High winds Hydrostatic |
ML15335A093 | 15 December 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force Review | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML15244B205 | 24 August 2015 | Virginia Electric and Power Company (Dominion) Surry Power Station Unit 1, Cycle 27 Startup Physics Tests Report | |
ML15097A078 | 7 April 2015 | Soarca Surry 2005 Site File | |
ML15072A299 | 16 March 2015 | Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 | |
ML15078A288 | 12 March 2015 | Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218 | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |