Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25
ML15072A299
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/16/2015
From: Gross K
Plant Licensing Branch II
To: Heacock D
Virginia Electric & Power Co (VEPCO)
Gross K
References
TAC MF4163
Download: ML15072A299 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D;C. 20555-0001 .

March 16, 2015 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

REVIEW OF THE FALL 2013 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT REGARDING SURRY POWER STATION, UNIT 1 REFUELING OUTAGE 25 (TAC NO. MF4163)

Dear Mr. Heacock:

By letter dated May 6, 2014 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML14135A365), Virginia Electric and Power Company (the licensee) submitted steam generator tube inspection results from the fall 2013 inspections at Surry Power Station, Unit 1, during refueling outage 25. The licensee provided additional information in a letter dated November 19, 2014 (ADAMS Accession No. ML14335A606).

The N RC staff has completed its review of these reports and concludes that you provided the information required by your technical specifications and that no additional follow-up is required at this time. The staff's review of the reports is enclosed.

Sincerely,

~~~

Karen Cotton Gross, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reacto~ Regulation Docket No. 50-280

SURRY POWER STATION, UNIT 1

SUMMARY

OF THE STAFF'S REVIEW OF THE FALL 2013 STEAM GENERATOR TUBE INSERVICE INSPECTIONS FOR REFUELING OUTAGE 25 TAC NO. MF4163 DOCKET NO. 50-280 By letter dated May 6, 2014 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML14135A365}, Virginia Electric and Power Company (the licensee) submitted steam generator (SG) tube inspection results from the fall 2013 inspections at Surry Power Station, Unit 1, during refueling outage 25. The licensee provided additional information in a letter dated November 19, 2014 (ADAMS Accession No. ML14335A606).

Three replacement SGs at Surry, Unit 1, were installed in 1981. Westinghouse fabricated the replacement SGs and each SG contains 3,342 thermally treated Alloy 600 tubes. Each tube has a nominal outside diameter of 0.875 inches and a nominal wall thickness of 0.050 inches. The tubes were hydraulically expanded at both ends for the full length of the tubesheet and are supported by a number of stainless steel tube support plates. The U-bends of the tubes installed in rows 1 through 8 were thermally stress relieved after bending.

The licensee provided the scope, extent, methods, *and results of their SG tube inspections in the document's referenced above. In addition, the licensee described.corrective actions (e.g., tube plugging) taken in response to the inspection findings.

After review of the information provided by the licensee, the U. S. Nuclear Regulatory Commission (NRC) staff had the following commenVobservation:

  • The Surry, Unit 1, SGs have operated for 316.8 effective full power months (EFPM) since
  • installation. This includes 15.9 EFPM of operation between installation and the first inservice inspection.
  • Based on a review of the information provided by the licensee, the NRC staff concludes that the licensee provided the information required by their technical specifications. The SG tube inspections at Surry, Unit 1, appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units.

ML14335A606).

The NRC staff has completed its review of these reports and concludes that you provided the information required by your technical specifications and that no additional follow-up is required at this time. The staffs review of the reports is enclosed.

Sincerely,

/RAJ Karen Cotton Gross, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-280 cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-1 R/F RidsAcrsAcnwMailCenter Resource AJohnson, NRR RidsNrrDorllpl2-1 Resource RidsNrrDorlDpr Resource GKulesa, NRR RidsNrrLASFigureoa Resource RidsNrrPMSurry Resource RidsNrrDirsltsb Resource KKarwoski, NRR RidsRgn2MailCenter Resource AHuynh, NRR ADAMS Accession Number: ML15072A299

  • Concurrence by SE OFFICE NRR/LPL2-1 /PM NRR/LPL2-1/LA NRR/DE/SGTB NRR/LPL2-1 /BC NAME KCotton SFigureoa GKulesa* RPascarelli (SWilliams for)

DATE 03/16/15 03/16/15 12/31/14 03/16/15