ML19330B389
ML19330B389 | |
Person / Time | |
---|---|
Site: | Hatch, Shoreham |
Issue date: | 07/14/1980 |
From: | Manry M GEORGIA POWER CO. |
To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
IEB-80-17, PM-80-709, NUDOCS 8007310527 | |
Download: ML19330B389 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D2901999-10-13013 October 1999
[Table view]Forwards SER Accepting Licensee 990305 Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation ML20217G2631999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Hatch Plant & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Regional Initiative Insps to Observe Const Activities Will Be Conducted ML20217G0401999-10-0707 October 1999 Forwards Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823-27.One Violation Occurred Being Treated as NCV ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20216G0251999-09-24024 September 1999 Concludes That All Requested Info of GL 98-01 & Supplement 1 Provided & Licensing Action for GL 98-01 & Supplement 1 Complete for Plant ML20216H3641999-09-20020 September 1999 Forwards NRC Form 536 in Response to AL 99-03, Preparation & Scheduling of Operator Licensing Exams ML20217B5271999-09-16016 September 1999 Forwards Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted HL-5839, Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-5731999-09-16016 September 1999 Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-573 ML20212A6411999-09-13013 September 1999 Forwards Safety Evaluation of Relief Request RR-V-16 for Third Ten Year Interval Inservice Testing Program HL-5837, Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification1999-09-13013 September 1999 Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl HL-5832, Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC1999-09-0101 September 1999 Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC HL-5825, Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations1999-08-20020 August 1999 Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations HL-5788, Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 141999-08-19019 August 1999 Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 14 HL-5827, Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d)1999-08-19019 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d) HL-5824, Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.111999-08-18018 August 1999 Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.11 ML20210T6421999-08-17017 August 1999 Discusses Licensee 950814 Initial Response to GL 92-01, Rev 1,Supp 1, Rv Structural Integrity (Rvid), Issued on 950519 to Plant.Staff Revised Info in Rvid & Being Released as Rvid Version 2 ML20210V3311999-08-13013 August 1999 Provides Synposis of NRC OI Report Re Alleged Untruthful Statements Made to NRC Re Release of Contaminated Matl to Onsite Landfill.Oi Unable to Conclude That Untruthful state- Ments Were Provided to NRC ML20210Q4821999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr,As Listed,Identifying Individual to Take Exam,Thirty Days Before Exam Date ML20210L7581999-08-0404 August 1999 Forwards Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210J9501999-08-0202 August 1999 Forwards SER Finding Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9021999-08-0202 August 1999 Forwards SER Finding Licensee Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5814, Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-5281999-07-30030 July 1999 Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 05000366/LER-1999-007, Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown1999-07-27027 July 1999 Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown ML20210E1601999-07-20020 July 1999 Forwards Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Noted Being Treated as Ncv.Team Identified Lack of Procedural Guidance for Identification & Trending of Repetitive Instrument Drift & Calibr Problems HL-5808, Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage1999-07-15015 July 1999 Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage HL-5810, Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions1999-07-15015 July 1999 Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions HL-5807, Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-14014 July 1999 Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants HL-5801, Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively1999-07-0909 July 1999 Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively HL-5796, Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl1999-07-0909 July 1999 Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl HL-5804, Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.2101999-07-0909 July 1999 Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.210 ML20209E4801999-06-30030 June 1999 Confirms 990630 Telcon Between M Crosby & DC Payne Re Arrangements Made for Administration of Licensing Exam at Plant During Weeks of 991018-1101 ML20196H8811999-06-25025 June 1999 Forwards Insp Repts 50-321/99-03 & 50-366/99-03 on 990418- 0529.No Violations Occurred.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations & Sound Engineering & Maint Practices HL-5790, Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants1999-06-21021 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20207E7561999-06-0303 June 1999 Informs of Completion of Review & Evaluation of Info Provided by Southern Nuclear Operating Co by Ltr Dtd 980608, Proposing Changes to Third 10-Yr Interval ISI Program Plan Requests for Relief RR-4 & R-6.Requests Acceptable HL-5763, Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel1999-05-20020 May 1999 Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel HL-5785, Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks1999-05-18018 May 1999 Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks ML20206Q0751999-05-0606 May 1999 Forwards Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted ML20206G1611999-05-0404 May 1999 Forwards SER Approving Util 990316 Revised Relief Request RR-P-14,for Inservice Testing Program for Pumps & Valves Pursuant to 10CFR50.55a(a)(3)(ii) ML20206P6921999-04-27027 April 1999 Discusses 990422 Public Meeting at Hatch Facility Re Results of Periodic Plant Performance Review for Hatch Nuclear Facility for Period of Feb 1997 to Jan 1999.List of Attendees & Copy of Handouts Used by Hatch,Encl HL-5777, Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed1999-04-26026 April 1999 Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed HL-5758, Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant1999-04-0909 April 1999 Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant ML20205T1831999-04-0909 April 1999 Informs That on 990316,S Grantham & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Ei Hatch NPP for FY00.Initial Exam Dates Are 991001 & 2201 for Approx 12 Candidates.Chief Examiner Will Be C Payne 1999-09-24 Category:INCOMING CORRESPONDENCE MONTHYEARML20216H3641999-09-20020 September 1999
[Table view]Forwards NRC Form 536 in Response to AL 99-03, Preparation & Scheduling of Operator Licensing Exams HL-5839, Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-5731999-09-16016 September 1999 Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-573 HL-5837, Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification1999-09-13013 September 1999 Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification HL-5832, Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC1999-09-0101 September 1999 Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC HL-5825, Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations1999-08-20020 August 1999 Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations HL-5788, Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 141999-08-19019 August 1999 Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 14 HL-5827, Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d)1999-08-19019 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d) HL-5824, Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.111999-08-18018 August 1999 Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.11 HL-5814, Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-5281999-07-30030 July 1999 Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 05000366/LER-1999-007, Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown1999-07-27027 July 1999 Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown HL-5810, Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions1999-07-15015 July 1999 Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions HL-5808, Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage1999-07-15015 July 1999 Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage HL-5807, Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-14014 July 1999 Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants HL-5804, Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.2101999-07-0909 July 1999 Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.210 HL-5796, Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl1999-07-0909 July 1999 Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl HL-5801, Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively1999-07-0909 July 1999 Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively HL-5790, Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants1999-06-21021 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants HL-5763, Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel1999-05-20020 May 1999 Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel HL-5785, Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks1999-05-18018 May 1999 Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks HL-5777, Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed1999-04-26026 April 1999 Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed HL-5758, Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant1999-04-0909 April 1999 Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant HL-5761, Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.211999-03-31031 March 1999 Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.21 HL-5750, Forwards Status of Decommissining Funding,Per Requirements 10CFR50.75(f)(1),on Behalf of Licensed Owners of Ei Hatch Nuclear Plant1999-03-30030 March 1999 Forwards Status of Decommissining Funding,Per Requirements 10CFR50.75(f)(1),on Behalf of Licensed Owners of Ei Hatch Nuclear Plant ML20205H1491999-03-25025 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Municipal Electric Authority of Georgia Is One of Licensed Owners of Ei Hatch,Owning 17.7% of Facility ML20205H1411999-03-24024 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirement for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Oglethorpe Power Corp Is One of Licensed Owners of Ei Hatch,Units 1 & 2,owning 30% of Facility ML20205H1381999-03-22022 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Georgia Power Is One of Licensed Owners of Ei Hatch,Units 1 & 2,owning 50.1% of Facility HL-5754, Forwards Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15, IAW Regulatory Commitments.Testing Identified No Major Problems.Startup Testing for Unit 1 Is Scheduled for Spring 1999 RFO1999-03-22022 March 1999 Forwards Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15, IAW Regulatory Commitments.Testing Identified No Major Problems.Startup Testing for Unit 1 Is Scheduled for Spring 1999 RFO HL-5753, Submits Response to Five Criteria Described in NUREG/CR-6396 Section 3.3.2.Attachment Contains Relief Request RR-P-14, Which Has Been Revised & Enhanced to Include Addl Info to Justify Proposed Alternative1999-03-16016 March 1999 Submits Response to Five Criteria Described in NUREG/CR-6396 Section 3.3.2.Attachment Contains Relief Request RR-P-14, Which Has Been Revised & Enhanced to Include Addl Info to Justify Proposed Alternative ML20205H1581999-03-16016 March 1999 Forwards Info for OLs DPR-5 & NPF-7 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Dalton Utilities Is One of Licensed Owners of Ei Hatch,Units 1 & 2,owning 2.2% of Facility HL-5757, Informs That SNC Withdraws SNC Proposed Rev to Plant Hatch QA Program Submitted 9901271999-03-15015 March 1999 Informs That SNC Withdraws SNC Proposed Rev to Plant Hatch QA Program Submitted 990127 HL-5756, Submits Summary Rept of Present Level & Source of Onsite Property Damage Insurance Coverage for Ei Hatch Nuclear Plant,Units 1 & 21999-03-12012 March 1999 Submits Summary Rept of Present Level & Source of Onsite Property Damage Insurance Coverage for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5751, Forwards Change to Hatch EP for Review & Approval,Per Requirements of 10CFR50,App E,Section Iv.B.Bases for Proposed EALs & Statements of Agreement from State & Local Governmental Authorities1999-03-0505 March 1999 Forwards Change to Hatch EP for Review & Approval,Per Requirements of 10CFR50,App E,Section Iv.B.Bases for Proposed EALs & Statements of Agreement from State & Local Governmental Authorities HL-5735, Provides NRC with Update Status of Progress Util Is Making Toward Development of Product That Was Originally Identified in to NRC1999-03-0202 March 1999 Provides NRC with Update Status of Progress Util Is Making Toward Development of Product That Was Originally Identified in to NRC HL-5737, Forwards Part of Table (Table 1) Util Provided in 980728 Response to RAI for GL 92-01,Rev 1,Suppl 1,reflecting Lower Shell Axial Welds Identified as C-4-A Through C-4-C & Lower Intermediate Axial Welds Identified as C-3-A Through C-3-C1999-02-0505 February 1999 Forwards Part of Table (Table 1) Util Provided in 980728 Response to RAI for GL 92-01,Rev 1,Suppl 1,reflecting Lower Shell Axial Welds Identified as C-4-A Through C-4-C & Lower Intermediate Axial Welds Identified as C-3-A Through C-3-C HL-5733, Forwards Rev 17A to Ei Hatch FSAR & Rev 14A to Fire Hazards Analysis & Fire Protection Program, for Plant.Encl Reflects Changes Made Since Previous Submittal.With Instructions1999-01-29029 January 1999 Forwards Rev 17A to Ei Hatch FSAR & Rev 14A to Fire Hazards Analysis & Fire Protection Program, for Plant.Encl Reflects Changes Made Since Previous Submittal.With Instructions HL-5729, Submits Proposed Rev to Plant QA Program as Described in Chapter 17 of Unit 2 Fsar,Per 10CFR50.54(a)(3).Rev Would Relocate to Controlled Document Other than Fsar,Units 1 & 2 Lists of SR SSC Comprising Items Covered Under QA Program1999-01-27027 January 1999 Submits Proposed Rev to Plant QA Program as Described in Chapter 17 of Unit 2 Fsar,Per 10CFR50.54(a)(3).Rev Would Relocate to Controlled Document Other than Fsar,Units 1 & 2 Lists of SR SSC Comprising Items Covered Under QA Program HL-5728, Requests That RPV Shell Weld Ultrasonic Exams Be Performed Using Techniques & Procedures,Iaw ASME Section Xi,App Viii, 1992 Edition,1993 Addendum,In Lieu of ASME Section XI,1989 Edition Exam Techniques & Procedures1999-01-19019 January 1999 Requests That RPV Shell Weld Ultrasonic Exams Be Performed Using Techniques & Procedures,Iaw ASME Section Xi,App Viii, 1992 Edition,1993 Addendum,In Lieu of ASME Section XI,1989 Edition Exam Techniques & Procedures HL-5725, Informs That SNC Intends to Examine Approx Dozen Weld Overlays During Unit 1 Spring 1999 Outage That to Date Have Not Been Examined Three Times Since Weld Overlay Was Supplied1999-01-0707 January 1999 Informs That SNC Intends to Examine Approx Dozen Weld Overlays During Unit 1 Spring 1999 Outage That to Date Have Not Been Examined Three Times Since Weld Overlay Was Supplied HL-5712, Forwards Ehnp Intake Structure License Rept, to Provide Example of Technical Content & Level of Detail Planned for Application for License Renewal,For NRC Review1999-01-0707 January 1999 Forwards Ehnp Intake Structure License Rept, to Provide Example of Technical Content & Level of Detail Planned for Application for License Renewal,For NRC Review 05000366/LER-1998-004, Forwards LER 98-004-01 Re Personnel Error Which Resulted in Condition Prohibited by Ts.Rev Is Necessary Because Original LER Reported Inadvertent Criticality Could Have Occurred1999-01-0404 January 1999 Forwards LER 98-004-01 Re Personnel Error Which Resulted in Condition Prohibited by Ts.Rev Is Necessary Because Original LER Reported Inadvertent Criticality Could Have Occurred HL-5710, Requests Approval of Alternative Reactor Vessel Weld Exam for Ehnp,Unit 1,per 10CFR50.55a(g)(6)(ii)(A)(5) for Permanently Excluding Exam of RPV Circumferential Shell Welds1998-12-0202 December 1998 Requests Approval of Alternative Reactor Vessel Weld Exam for Ehnp,Unit 1,per 10CFR50.55a(g)(6)(ii)(A)(5) for Permanently Excluding Exam of RPV Circumferential Shell Welds HL-5708, Provides Updated Response to RAI for GL 96-06, Waterhammer in Containment Coolers1998-11-20020 November 1998 Provides Updated Response to RAI for GL 96-06, Waterhammer in Containment Coolers HL-5687, Forwards Required 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment1998-10-19019 October 1998 Forwards Required 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment HL-5573, Withdraws Requesting Exemption from Requirements of GDC 56 with Respect to Ei Hatch,Unit 2 Reactor bldg-to- Suppression Chamber Vacuum Relief Sys Design Due to Listed Reasons1998-10-19019 October 1998 Withdraws Requesting Exemption from Requirements of GDC 56 with Respect to Ei Hatch,Unit 2 Reactor bldg-to- Suppression Chamber Vacuum Relief Sys Design Due to Listed Reasons HL-5686, Informs That Corrective Actions Relative to Thermo-Lag 330-1 Issues Are Complete1998-10-16016 October 1998 Informs That Corrective Actions Relative to Thermo-Lag 330-1 Issues Are Complete HL-5697, Requests Delay of Insp of RPV Circumferential Shell Welds for Two Operating Cycles as Outlined in NRC Info Notice 97-63,Suppl 1 & That Proposed Alternative Be Authorized Per 10CFR50.55a(a)(3)(i),per1998-10-16016 October 1998 Requests Delay of Insp of RPV Circumferential Shell Welds for Two Operating Cycles as Outlined in NRC Info Notice 97-63,Suppl 1 & That Proposed Alternative Be Authorized Per 10CFR50.55a(a)(3)(i),per HL-5689, Forwards Request for NRC Finding of Exigent Circumstance Re License Amend for Extended Power Update Operation.Changes Would Be Made While Plant Is Operating,Which as Stated,Has Potential to Create Unnecessary Plant Transients1998-09-30030 September 1998 Forwards Request for NRC Finding of Exigent Circumstance Re License Amend for Extended Power Update Operation.Changes Would Be Made While Plant Is Operating,Which as Stated,Has Potential to Create Unnecessary Plant Transients HL-5680, Informs NRC of Util Plans & Schedule for Exam of Unit 1 RPV Shell Welds.Util Anticipates Having Final Relief Request Submitted to NRC for Review by 9907011998-09-18018 September 1998 Informs NRC of Util Plans & Schedule for Exam of Unit 1 RPV Shell Welds.Util Anticipates Having Final Relief Request Submitted to NRC for Review by 990701 HL-5673, Informs NRC That Util Intends to Load Four Lead Use Assemblies Into Unit 2 Core as Part of Reload 14/Cycle 15 During Fall 1998 Refueling Outage.Proprietary Info Encl. Proprietary Info Withheld,Per 10CFR2.7901998-09-18018 September 1998 Informs NRC That Util Intends to Load Four Lead Use Assemblies Into Unit 2 Core as Part of Reload 14/Cycle 15 During Fall 1998 Refueling Outage.Proprietary Info Encl. Proprietary Info Withheld,Per 10CFR2.790 1999-09-20 Category:UTILITY TO NRC MONTHYEARML20059L1841990-09-20020 September 1990
[Table view]Informs of Promotion of Jg Wynne to Position of Facility Operations Div Manager,Effective 900827 SNRC-1758, Informs That W Uhl Resigned from Util on 900831 & No Longer Needs to Maintain Senior Reactor Operator License 44311990-09-18018 September 1990 Informs That W Uhl Resigned from Util on 900831 & No Longer Needs to Maintain Senior Reactor Operator License 4431 SNRC-1753, Forwards Rev 5 to Security Training & Qualification Plan.Rev Withheld1990-09-18018 September 1990 Forwards Rev 5 to Security Training & Qualification Plan.Rev Withheld SNRC-1755, Forwards Rev 5 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)1990-09-13013 September 1990 Forwards Rev 5 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) HL-1176, Forwards Updated Listing of Outstanding Licensing Requests for Plant,Tabulated Chronologically by Util Submittal Date1990-09-12012 September 1990 Forwards Updated Listing of Outstanding Licensing Requests for Plant,Tabulated Chronologically by Util Submittal Date HL-1278, Responds to NRC Re Violations Noted in Insp Repts 50-321/90-15 & 50-366/90-15.Corrective Actions: Mispositioned Valves 1E21-F025B & 1E21-F027B Placed in Correct Positions & Technicians Disciplined1990-09-12012 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-321/90-15 & 50-366/90-15.Corrective Actions: Mispositioned Valves 1E21-F025B & 1E21-F027B Placed in Correct Positions & Technicians Disciplined SNRC-1754, Requests That Annual License Fee for FY91 Be Held in Abeyance Pending Disposition of 900105 Amend Request1990-09-0707 September 1990 Requests That Annual License Fee for FY91 Be Held in Abeyance Pending Disposition of 900105 Amend Request HL-1237, Requests Permission to Use Facility Reactor Bldg Crane to Move Large Shipping Casks,Per Tech Spec 3.10.F.1 & 4.10.F.11990-09-0404 September 1990 Requests Permission to Use Facility Reactor Bldg Crane to Move Large Shipping Casks,Per Tech Spec 3.10.F.1 & 4.10.F.1 SNRC-1752, Forwards Revised Tech Specs Re Defueled Status of Plant,Per Agreements Reached W/Nrc at 900802 Meeting1990-08-30030 August 1990 Forwards Revised Tech Specs Re Defueled Status of Plant,Per Agreements Reached W/Nrc at 900802 Meeting ML20028G8441990-08-27027 August 1990 Forwards Owners Data Rept for Inservice Insp Ei Hatch Nuclear Plant Unit 1 Feb-June 1990. ML20059C6551990-08-27027 August 1990 Informs of Intention to Transfer Right of Way for Road 451 to Appling County So Road Can Be Straightened & Paved. Transfer Will Have No Significant Impact on Use of Road & Site Emergency Plan HL-1250, Forwards Post-Refueling Outage Startup Test Rept,Unit 1 Cycle 13, Per Tech Spec 6.9.1.1.Rept Presents Static & Dynamic Functional Core Tests Performed During Startup from Spring 1990 Maint/Refueling Outage1990-08-27027 August 1990 Forwards Post-Refueling Outage Startup Test Rept,Unit 1 Cycle 13, Per Tech Spec 6.9.1.1.Rept Presents Static & Dynamic Functional Core Tests Performed During Startup from Spring 1990 Maint/Refueling Outage HL-1245, Forwards Fitness for Duty Performance Data for First Six Month Reporting Period,Per 10CFR26.71d1990-08-23023 August 1990 Forwards Fitness for Duty Performance Data for First Six Month Reporting Period,Per 10CFR26.71d SNRC-1747, Forwards Semiannual Radioactive Release Rept for First & Second Quarters 1990 & Revised ODCM1990-08-23023 August 1990 Forwards Semiannual Radioactive Release Rept for First & Second Quarters 1990 & Revised ODCM ML20056B5041990-08-21021 August 1990 Forwards Application for Amend to License NPF-82,consisting of License Change Application 8,modifying Tech Specs by Deleting Independent Safety Engineering Group & Associated Controls ML20056B3011990-08-20020 August 1990 Forwards Revised Ei Hatch Nuclear Plant,Units 1 & 2 Inservice Insp Program Second 10-Yr Interval, for Review & Approval.Program Will Be Implemented While Awaiting SER SNRC-1750, Amends Util 900810 Request for Interim Relief from Tech Spec Limiting Condition for Operation 3.7.1.2.b.3 Associated W/ Plant Svc Water sys-shutdown.Requests That Relief Be Granted Starting 900817 & Ending 9009081990-08-15015 August 1990 Amends Util 900810 Request for Interim Relief from Tech Spec Limiting Condition for Operation 3.7.1.2.b.3 Associated W/ Plant Svc Water sys-shutdown.Requests That Relief Be Granted Starting 900817 & Ending 900908 PM-90-110, Forwards fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.71(d)1990-08-13013 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.71(d) SNRC-1743, Advises That Util Eliminated Positions of Outage & Mod Div Manager & Outage Engineer.Safety Significance of Changes Evaluated.No Impact Exist Because Util Contractually Prohibited from Operating Facility1990-08-10010 August 1990 Advises That Util Eliminated Positions of Outage & Mod Div Manager & Outage Engineer.Safety Significance of Changes Evaluated.No Impact Exist Because Util Contractually Prohibited from Operating Facility SNRC-1746, Requests Interim Relief from Limiting Condition for Operation 3.7.1.2.b.3 Re Tech Spec for Plant Svc Water Sys - Shutdown1990-08-10010 August 1990 Requests Interim Relief from Limiting Condition for Operation 3.7.1.2.b.3 Re Tech Spec for Plant Svc Water Sys - Shutdown SNRC-1744, Forwards Rev 1 to, Environ Qualification Rept for Class 1E Equipment for Shoreham Nuclear Power Station Unit 1 Lilco. Provides Technical Justification for Rev1990-08-10010 August 1990 Forwards Rev 1 to, Environ Qualification Rept for Class 1E Equipment for Shoreham Nuclear Power Station Unit 1 Lilco. Provides Technical Justification for Rev HL-1215, Informs of Implementation of Amend 169 to Facility Tech Specs1990-07-26026 July 1990 Informs of Implementation of Amend 169 to Facility Tech Specs HL-1035, Forwards Nuclear Decommissioning Funding Plan for Plant,Per 10CFR50.75(b) & 33(k).Reasonable Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Each Unit on Current Expiration Date Exists1990-07-25025 July 1990 Forwards Nuclear Decommissioning Funding Plan for Plant,Per 10CFR50.75(b) & 33(k).Reasonable Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Each Unit on Current Expiration Date Exists SNRC-1738, Responds to NRC Re Violations Noted in ORAT Insp Rept 50-322/89-80 Re Failure to Address IE Info Notice 86-002.Rev to Environ Qualification Operability Code & Intent of Eear 87-017 Provides Sufficient Bases1990-07-24024 July 1990 Responds to NRC Re Violations Noted in ORAT Insp Rept 50-322/89-80 Re Failure to Address IE Info Notice 86-002.Rev to Environ Qualification Operability Code & Intent of Eear 87-017 Provides Sufficient Bases SNRC-1737, Forwards License Change Application 7 Requesting Amend to License NPF-82,conforming to Guidance of Generic Ltr 88-12 Re Fire Protection Requirements1990-07-20020 July 1990 Forwards License Change Application 7 Requesting Amend to License NPF-82,conforming to Guidance of Generic Ltr 88-12 Re Fire Protection Requirements SNRC-1732, Responds to Generic Ltr 90-03 Re Relaxation of NRC Position in Generic Ltr 83-28,Item 2.2,Part 2 Re Vendor Interface for safety-related Components1990-07-18018 July 1990 Responds to Generic Ltr 90-03 Re Relaxation of NRC Position in Generic Ltr 83-28,Item 2.2,Part 2 Re Vendor Interface for safety-related Components ML20044A9131990-07-0606 July 1990 Forwards Util Response to NRC Bulletin 90-001 Re Loss of fill-oil in Transmitters Mfg by Rosemount.No Model 1153 Series B Transmitters Installed at Plant SNRC-1735, Submits Organization Changes for WE Steiger & Jd Leonard Effective 9007091990-07-0303 July 1990 Submits Organization Changes for WE Steiger & Jd Leonard Effective 900709 HL-1158, Forwards Rev 0 to SIR-90-039, Flaw Evaluation & Weld Overlay Designs for Ei Hatch Unit 1 Spring 1990 Refueling Outage. Rept Details IGSCC Exam Results,Weld Overlay Design & Evaluation of Weld Shrinkage Stresses1990-06-29029 June 1990 Forwards Rev 0 to SIR-90-039, Flaw Evaluation & Weld Overlay Designs for Ei Hatch Unit 1 Spring 1990 Refueling Outage. Rept Details IGSCC Exam Results,Weld Overlay Design & Evaluation of Weld Shrinkage Stresses ML20044A3641990-06-28028 June 1990 Forwards Joint Application for Amend to License NPF-82, Designating Long Island Power Authority as Plant Licensee Upon or After NRC Amends License to Nonoperating Status SNRC-1733, Submits QC Div 1990 Staffing Rept,Per Sc Contention 13(d) Settlement Agreement.Actual Manhour Requirements for QC Under Projection Reported for Previous 2 Yrs1990-06-28028 June 1990 Submits QC Div 1990 Staffing Rept,Per Sc Contention 13(d) Settlement Agreement.Actual Manhour Requirements for QC Under Projection Reported for Previous 2 Yrs ML20043F4741990-06-11011 June 1990 Requests Approval of Decommissioning Funding Method Set Forth in Encl Site Cooperation & Reimbursement Agreement Between Lilco & Long Island Power Authority ML20043E6691990-06-0707 June 1990 Forwards Rev 0 to Core Operating Limits Rept for Operating Cycle 13, Per Amend 168 to License DPR-57 ML20043D5761990-06-0505 June 1990 Requests Interim Relief from Action Requirements of Tech Specs 3.3.7.9,3.7.7.2,3.7.7.3 & 3.7.8 Re Establishing & Maintaining Continuous Fire Watches &/Or Hourly Fire Watch Patrols ML20043C8621990-05-31031 May 1990 Submits Certification That Operator Licensing Simulation Facility Located at Plant Meets NRC Requirements ML20043C3081990-05-30030 May 1990 Requests Interim Relief from Requirements of License Condition 2.C.(13),pending Dispostion of Util 891215 Request for Exemption from 10CFR50.54 & Amend to License.Condition Concerns Quarterly Emergency Plan Drills ML20043A9721990-05-18018 May 1990 Advises That,Effective 900501,LJ Calone & Ja Notaro Will No Longer Need to Maintain Senior Operator Licenses PM-90-072, Forwards Listed Lers,Updating Original Repts for Corrective Actions Deferred Due to State of Ny - Lilco Shoreham Settlement Agreement1990-05-16016 May 1990 Forwards Listed Lers,Updating Original Repts for Corrective Actions Deferred Due to State of Ny - Lilco Shoreham Settlement Agreement ML20042H0091990-05-14014 May 1990 Forwards Completed Questionnaire for Each Applicable Type of Operational Insp,Audit or Evaluation as Identified,Per Generic Ltr 90-01 ML20043A8081990-05-0707 May 1990 Forwards Response to NRC 900410 Ltr Re Violations Noted in Insp Repts 50-321/90-07 & 50-366/90-07.Encl Withheld (Ref 10CFR73.21) ML20042F3331990-05-0101 May 1990 Provides Response to Generic Ltr 89-19, Safety Implication of Control Sys in LWR Nuclear Power Plants. Plant Procedures Address Possibility of Vessel Overfill Events & Training Alert Operators to Potential Overfills ML20042E8241990-04-27027 April 1990 Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow. Licensee Will Not Use Channel Boxes for Second Bundle Lifetime,Therefore,Bulletin Does Not Apply to Facility ML20042E2001990-04-17017 April 1990 Advises That H Carter,M Herlihy,J Reid,J Dunlap & a Burritt Resigned from Util & No Longer Need to Maintain Operator Licenses ML20012F5391990-04-0606 April 1990 Discusses Layup Implementation Program & Site Characterization Program for Plant.Util Intends to Remove Neutron Instrumentation & Other Selected Reactor Pressure Vessel Internals in Order to Obtain More Accurate Profile ML20012F0011990-04-0606 April 1990 Forwards Rev 19 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML20012E2821990-03-28028 March 1990 Requests Interim Relief from Requirement That Util Conduct FEMA-graded Exercise of Util Offsite Emergency Response Plan by End of 1990 & That NRC-graded Exercise Be Deferred Pending Review of Proposed Defueled Emergency Plan ML20012E2771990-03-27027 March 1990 Forwards 1990 Internal Cash Flow Projection for Facility,Per 10CFR140.21 ML20012D2071990-03-22022 March 1990 Notifies That Listed Employees No Longer Need to Maintain Listed Senior Reactor & Reactor Operators Licenses ML20012C7781990-03-16016 March 1990 Requests Interim Relief from Certain Requirements Re Emergency Diesel Generators for Plant,Pending Disposition of Util Outstanding Request in 900105 Ltr to Amend License to Create Defueled Facility OL ML20012C7571990-03-15015 March 1990 Forwards Request for limited-scope Exemption from fitness- for-duty Requirements of 10CFR26.Util Also Requests That Exemption Be Granted & Remain in Effect Until NRC Approves Final Disposition of OL 1990-09-07 |
Text
__ _ _ _ _ _ _ .
. 5 Georga Pue< Comp;,,j 6 p _
Pos:Ottee Gca 442 B:. rey Ge'yg a 31513 Tele;-o e 912 M7-7781 ,.,
I;) h'
-8g, , _ , , , ,
912 53' 9444 e i .> s ~. ~ , , .
- NT* f, 'T '
b Edwin t. Hatch Nuclear Plant 3 m gg AJg : 4I Georgia Power July 14, 1980 PM-80-709 PLANT E. I. HATCH IES 80-17 Prompt Reporting Confirmation United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Suite 3100 101 Marietta Street Atlanta, Georgia 30303 ATTENTION: Mr. James P. O'Reilly Below is a summary of events for Units 1 and 2 of Plant Hatch that were reported per IEB 80-17, part 6a. These events were discussed with your Mr. Nolan on July 12, 1960, at 12:00 PM EDT.
Unit 1 On July 11, 1980, the LPCI inverter R44-S003 was declared inoperable twice due to its having tripped at the following times: 1) From 1220 CDT to 1315 CDT and 2) From 2045 CDT to 2140 CDT. In each case, the inverter was inoperative only during the time period when it was tripped. Loss of this inverter removes control power for valves Ell-F007B, and Ell-F015B, rendering the "B" loop of RHR inoperative.
Unit 2 At 0705 CDT on July 11, 1980, the normal supply breaker to 4KV bus 2F tripped, placing the bus on alternate feed. At 1200 CDT, the c1 ternate supply breaker tripped leaving bus 2F de-energized. The following safety related equipment was rendered inoperative: RHR pumps 2C and 2D, RHRSW pump 2C, PSW pumps 2C and 2D, CRD pump 2B, Standby PSW pump 2P41-C002. After a preliminary investigation for the problem was conducted, the bus was re-energized at 1250 CDT. At 1500, while investigating the cause for the breaker trips, a jumper was found to be missing in the < neutral leg of the protective relay -
current loop. The absence of the jumper had caused a false current value to be present in the neutral leg.
8U07310 %
(
l At 0455 on 7-11-80, HPCI was being used to control reactor pressure following a scram. The motor to valve 2E41-F006 burned up while in use, rendering HPCI inoperative. The motor from valve 2E41-F007 was removed and installed on 2E41-F006. Valve 2E41-F007 was locked in the open position. At 0030 on July 12, 1980, HNP-2-3302 (MOV operability procedure) was sucessfully completed for valve 2E41-F006. At 0330, HPCI was declared operable. ,
2 dr W I
. M,a6ry g Plant Manqger HLS/hh xc: R. J. Kelly W. A. Widner C. L. Coggin R. D. Baker Control Room File
.