.:Y man - ~ nn,1 : L.ONG ISLAND LIGHTING ' COM PANY.
i-Q
[
[kh l
. SHOREHAM NUCLEAR POWER STATION.
Laweia.mwmunesed '
' P.O. BOX 618.' NORTH COUNTRY ROAD e WADING RIViER. N.Y.11792
- Direct Dial Number '
John D. Leonard, Jr.1 TVic3 President OfficeJof Corporate' Services
_and. Office of_ Nuclear SNRC-1745 AUG 211990:
U..S._ Nuclear Regulatory Commission 1
' ATTN:
Document Control Desk' 1
Washington, D.C.
20555 t
License Change Application #8 Operating License NPF-82 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322 Ref: (1) LILCO letter SNRC-1664 dated January 5, 1990 to the U.S.
g Nuclear. Regulatory Commission from William E.
- Steiger, j
Jr.; subject: License Change Application, Operating s
License NPF-82 Gentlemen:
Attached is License Change Application #8 requesting amendment of l
Operating License NPF-82 for the'Shoreham Nuclear Power Station
- (SNPS). :This amendment application is made to modify the full power (Technical Specifications (NUREG-1357,. April 1989, as amended)' that the Long Island Lighting Company -(LILCO) presently
- holds /for SNPSiby deleting the Independent Safety Engineering C
Groupi (ISEG) and its associated administrative controls.
f
! Justification'for this License. Change, as more fully described in l
the attachment,'is based on SNPS non-operating _-and defueled
[
condition,-the continued costs associated with maintaining an
-j ISEG,cand the limited number of design basis accidents (DBAs) and limited' number-'of-Commission issuances and Industry operating Experience l'ssuances' applicable to SNPS in our present defueled-condition.
Approval by the Commission's Staff of LILCO's previously
~
u' submitted license amendment request (reference 1) for the removal L
of operating authority would make this current license amendment h
moot.'1However, inasmuch as the review and approval schedule for L
the January,5,.1990 (reference 1) license amendment is t
lindeterminableLat this time, LILCO wishes to take advantage of
- the immediate relief'available upon NRC approval of this current l'
license-amendment request.
g()(
900B200377 900021 O m,,,<oa re seas.r' PDR ADOCK 05000322
,g P
PNV
y
..p-L
- i - '
.q 4
.LILCO's determination of the' acceptability of-the above change:
TappliesJonly-to.SNPS in its'defueled. condition and is not-considered to be'an irreversible step toward decommissioning and z
can be-re-established if fuel-is ever to be placed.back into the SNPS reactor.-
. -1 LILCO has; transmitted a copy of thisJrcquest'to the New York State Energy; Office in accordance with'10 CFR 50.91.
Also attached is one signed copy of a certificate of Service for.
License:; Change Application 40 to the New York State Energy Office.
.Very.truly:yours,
! &-.m o.
4 o n D.
Leonard, Jr Vi e President Offi elof~ Corporate Services t
and Office of Nuclea i
- 1 P/ap Attachment-o cc:-
D.
Ross
=New York State Energy Office S.
Brown:
1 T. T. Martin B.
Norris l
- ?