ML20059L184

From kanterella
Jump to navigation Jump to search
Informs of Promotion of Jg Wynne to Position of Facility Operations Div Manager,Effective 900827
ML20059L184
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 09/20/1990
From: Leonard J
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9009260199
Download: ML20059L184 (2)


Text

_ _ _ _ _ .

+ -

i-lo W M@ .~

LONG ISLAND LIGHTING COM AANY SHOREHAM NUCLEAR POWER STATION P.O. BO K 610. NORT H COUNTRY RO AD

  • WADINO RIVEF N.Y 11792 JOHN D. LEONARD, JR.

VCE PRESCENT OFFCE OF CORPORAtt SERVCt8 AND VCE PRESIDENT.OFFCE OF NUCLt AR SNRC-1756 SEP 2 01990 O. S. Nuclear Regulatory Commission ATTN Document Control Desk washington, D.C.- 20555 Personnel Change Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322 Reft LILCO (A.F. Earley, Jr.) Letter to NRC (W. Russell) dated July 5, 1989 Gentlement In keeping with our commitment to provide the NRC Staff with timely information concerning personnel changes, LILCO announces the following change:

1- J. G. Wynne, the prior Operator Training Supervisor in the Training Department within the Office of Corporate Services is promoted to the position of SNPS Operations Division Manager.

This change-became effective August 27, 1990.

Please be advised that LILCO has reviewed the change to ensure that qualified personnel continue to carry out the duties and responsibilities of-the position described in licensing basisLILCO documents such as the SNPS Updated Safety Analysis Report.

concludes, with one exception, that the person designated to carry out the duties and responsibilities of the praltion described above meets or exceeds the qualification requirements

. described in the licensing design basis. For the position of Manager, Operations Division, the desigr...ed individual does not fully' meet the statement of qualifications in Section 13.1.3.2 of the USAR, since he has not participated in the management activities of an operating nuclear power plant during two months lj 0-I operations above 20% power or a routine refueling outage.

_ n. w 9009260199 90n920 PDR ADOCK 05,00322 H PDC po0W 1

I' t , SNRC-1756 Page 2 In accordance with the referenced letter LILCO will maintain Shorenam in a shutdown condition until it is transferred to an agency of the State of New York. Should this situation change, LILCO will ensure that its qualification commitment for Manager Operations Division is fulfilled or justifiably reduced. Until we are able to transfer Shoreham to LIPA or an agency of the State of New York, LILCO concludes that the designated individual can acceptably carry out the duties and responsibilities of this position and that his lack of operating experience, as described above, has no safety significance at Shoreham because the plant will be maintained in a shutdown condition.

Should you have any questions concerning these changes please do not hesitate to contact my office.

Very truly yours,

_- i d bdhk Join D. Leonard, Jr Vi e President Offi of Corporate Services an I Office of Nucle MP/ap cc: S. Brown T. T. Martin B. Norris


.._.-_.m__ . _ _ _ _ _ _ _ , , _