ML19343B150

From kanterella
Revision as of 08:40, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Part 21 Rept Re Defective Itt Grinnell Recirculation Pump Hanger Components,Initially Reported on 801027.Cause Undetermined.Supplier Info Will Be Evaluated in Final Deficiency Rept by 810304
ML19343B150
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 11/24/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-80-318-000 AECM-80-293, NUDOCS 8012150011
Download: ML19343B150 (5)


Text

l&BDDSP.DiOODDGOEEi 7pgJeocolmooaoaootocopomwo c m oc w m o m -

~5Hr-coo Nwled COMPANY RVED Con w P eihrt

. PART 21 IDENTIFICATION NO. 'do S

D5TE OF LETTFA u\t M

  • o D00(ET NO. t$o-% Mn DATEDISTRIBlfTED nhlbo p.m. ORIGlihlREPOR'T$ SUPPLEBITARY DISTRIBUTION:

. 3  ;$

m my EACTOR (R) j_ FUELCYCLE& SAFEGUARDS (S) i fa IE F.!LES IEID IEFli.ES EES IEFILES AD/SG 2 I AD/FFFSI AD/ROI EGIONS I,II,III,IV,V EGIONS I,II,III,IV,V EGIONS I,II,III,IV,V VENDOR BR R-IV WJ00R BR. R-IV VENDOR BR. R-IV LOEB / FPA FIB 5715 IE'ES / FQG SS-396 NRR/ DOL AEOD FIB 7602 LDEB/FPA FijB5715 ifES / SG SS-881 NRR/ DOE AEOD FIG 7602 LDEB/I'PA FIB 5715 NRP/DSI . ASLBP EA 450 AEOD FI6 7602 T -

SAo/SP fig-7210A ASLBP EM 450 1 NRR/ DOL -

CENTPAL FILES 016 CBURALFILES 016 ASLBP E M 450 CBHPE FIS ( GRDN) CBHPd FIE (GRON) i CBERAL FILES 016 PDR CENTRALFILES SS-396

! CENTPAL FILES (GR0fD , LPDR PDR PDR TEPA LPDR l mR -

1 M m*

\ -

ACTION:

l l

PRELIMINARY EVALUATION OF THE' ATTACHED REPORT INDICATES LEAD RESPONSIBILITY FOLL0 HUP .AS SFOhN BELOW:

IE

.. E ,

. ,NRR2 IESS _

OlliER _-

EES 80121500// EV 8 G 80 M so l- tt.lt!te

N2c. Pc.r+ 2.Ito e ts.-ae-ooo

] MIESISSIPPI POWER & LIGHT COMPANY

= Helping Bu:Id Mississippi P. O. B OX 164 0 J A C K10N MIS SIS SIP PI 3 9 2 05 JAMES P. McGAUGHY. JR.

  • ssiswe vica ms.co.1 November 24, 1980 Office of Inspection & Enforcement U. S. Nuclear Regulatory Co==ission Region II 101 Marietta Street, N.W.

Suite 3100 Atlants, Georgia 30303 Attenthn: Mr. J. P. O'Reilly, Director

Dear 'r. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/41M File 0260/15525/15526 PRD-80/65, Status Report, Uait 1 Defective Recirculation Puup Esager Co ponents AECM.-80/293 On October 27, 1980, Mississippi Power & Light Co pany noti-fied Mr. J. Rausch of yout office of a Potentially Reportable Defi-ciency (P'.D) at the Grand Gulf Nuclear Station (GGNS) construction site. This deficiency concerned the inspection of the recirculation pu=p hanger co=ponents supplied by ITT Grinnell. The co=ponents had loose threads which exceeded the vendor's tolerances as evaluated by an ITT Grinnell representative.

Our investigation as to the reportability of this issue is still in progress. Thus far cur investigation has not identified condi-tions which would be reportable under 10CFR50.55(e) or 10CFR1}. We expect to provide yoa our final report on this =atter by March 4, 1981. These actions are being tracked under Bechtel Quality Action Request F-252. Our status report is attached.

Yours truly, w

y J. P. McGaughy, Jr.

VDH:=t Attach =ent cc: Mr. N. L. Sta=pley

  • Mr. Victer Stello, Direct V Mr. R. B. McGehee Divisien cf Inspection & Enforce =ent Mr. T. B. Conner C. S. Nuclear Regulatorv Cc==ission Washington. D.C. 20555 Member Middle South Utilities System

Paga 1 of 1

. k FINAL REPORT FOR PRD-80/65 I. Description of Deficiency The Grand Gulf Nuclear Station uses reactor recirculation pumps supplied by ITT Grinnell. An inspection performed by this vendor revealed that certain hanger components they supplied with the Unit I reactor recirculation pumps had loose threads exceeding tolerances. These components and associated part numbers were as follows:

a. Clevis, four (4) each: Q1B33G002H301A, E301B, E302B, H304B
b. Coupling (Turnbuckle), one (1) each: QlB33G002H302A
c. Large Rods, 2b" X 5'8h", two (2) each: Q1B33G002E302A, H302B
d. Constant Support Springs, three (3) each: QlB33G002E301A, H301B, H303A This finding was reported on Bechtel Condition Report CR 4553.

II. ,Pcoposed Resolution of the Deficiency Mississippi Power & Light Company is working with the constructor, the NSSS supplier, and the vendor to resolve this deficiency by performing the following actions:

a. Deter =ine the cause of the deficiency.
b. Identify corrective action and action to prevent recurrence.
c. Determine the effect on the safety of plant operations over the lifetime of the plant.

III. Status of the Proposed Resolution General Electric is evalucting the infor=ation supplied to them by IIT Grinnell on this matter and will respond by January 1981.

We expect to complete the evaluation and determine reportability no later than March 4, 1981. -

IV. Reason for Delay in Final Report Evaluation actions are not complete.

V. Proposed Final Report Date March 4, 1981.

w e

- - . - - - . -.e-- . . , - . v -s.. . e, - .. . , - -. - - 4 y e.