ML19344E362

From kanterella
Revision as of 06:31, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Part 21 Interim Rept Re Defective Control Transformer Used at Circuit Breaker in Motor Control Ctr.Transformer Operated During Scheme Checking But Failed When Valve Was Connected. Investigation Will Be Completed by 801120
ML19344E362
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 08/08/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To:
References
REF-PT21-80-271-000 AECM-80-184, NUDOCS 8008280450
Download: ML19344E362 (2)


Text

At isoscu is a mKi n m uu nai it om. v u i ius, sss v .

s . wL i i IL COMPANY fWE 4 LjOQ e PART 21 IDEHTIFICATION NO. O -J7/ er o DATE OF lBTER. 5MM#d D00(ET NO. 60 - W6 ; fo 9/ 7 DATE DISTRIBUTED h//V//o

/ '/ .

PRIGIIRL EPORT SUPPlfENTARY 2

DISTRIBUTION:

EACTOR (R) FUEL CYCLE & SAFEGUARDS (S) _

FRTERIALS (M)

IE FILES IEFILES AD/ROI (2) IEFILES AD/SG AD/RCI AD/ FREI AD/ROI EGIONS I,II,III,IV,V EGIONS I,II,III,IV,V EGIONS I,II,III,IV,V VENDOR BR R-IV VEiOOR BR. R-IV - VENDOR BR R-IV NTES / FCE SS-396 LDEB / ffA FIB 5715 NRR/ DOL AEOD MB 7602 LDEB/FPA M B 5715 ffSS / SG SS-881 AE0D M8 7602 LDEB / IPA M 8 5715 NRR/ DOE NRR/DSI hSLBP E/W 450- AEOD M B 7602 NMT '~

SAP /SP MB-7210A ASLBP E/W 450 -

NRR/ DOL CENTRALFILES 016 CENTRALFIlfS 016 ASLBP E/W 450 '

N FILES ( CHRON) CBRPAL FILES (CHRON)

CENTPALFILES SS-396 CENTRALFILES 016 PDR IPDR PDR CENTRAL FILES (CHR0fD g 1 EPA [PDR TERA iPDR TERA ACTION:

PRELIMINARY EVALUATION OF THE~ ATTACHED REPORT INDICATES LEAD RESPONSIBILITY FOR FOLLONJP AS SFOWN BELOW:

ffSS [

. r[IE NRR[ OTHER [

i So

> FFMSI Pa' 8/1/80 '

800828.0 '/ N --

s g7i s k i MISSISSIPPI POWER & LIGHT COMPANY

NuctEAR eaooucTioN DEPARTMENT August 8, 1980

. Office oC Inspection & Enforcement U. S. Nuclear Regulatory Commission Region Il j- - O 8 d' 101 Marietta St., NW Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

~~

SUBJECT:

Grand Gulf Nuclear Statien Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/41, Status Report, Defective Impervitran Transformer AECM-80/184 On July 11, 1980, Mississippi Power & Light notified Mr. F.

Cantrell of your offic'e of a Potentially Reportable Deficiency (PRD) at the Grand, Gulf Nuclear Station (GCNS) construction site.

The deficiency pertains to a defective control transformer used at a circuit breaker in a Motor Control Center (MCC).

The MCC supplies power to a Motor Operated Valve (MOV) in the High Pressure Core Spray (HPCS) System. The transformer operated during the scheme checking of the circuit but failed when the MOV was connected.

Our investigation into this condition is in progress. We ex-pect to complete the investigation and determine reportability under both 10CFR50.55(e)1and 10CFR21 by November 20, 1980.

Yours truly, ~

l

-llt :5'~}ljf c

(f. P. McGaughy, Jr.

Assistarit Vice President, Nuclear Production ATR:mt cc: Mr. N.'L. Stampley r. Victor Stello, Director y Mr. R. B. McGehee Division of Inspection & Enforcement Mr. T. B. Connef U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Member Middle South Utilities System

.