Part 21 Rept Re Defective GE Circuit Breakers in metal-clad Switchgear.Snap Ring Deformed by Links in Breaker Mechanism Moving Out of Alignment.Caused by Loose Breaker Main Output Cranks.Breakers Returned to GE
ML19330B853
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/23/1980
From: Wild P
STONE & WEBSTER ENGINEERING CORP.
To:
References
REF-PT21-80-258-000, REF-PT21-80-258-001 NUDOCS 8008070075
Download: ML19330B853 (3)


Text

x nu - mnim, a ru uni rnu r

4. .
-- -

), p si,

.

IWAh 21 f w IDENTIFICATION M-M57-NO. 600 CD'9ANY R@ E f Mf& . h

_~..

-

DATE OF LETTER _ '7 RD DOCKET NO S'O -32.2_

DATE DISTRIBUTED 7/a&/ Fo ORIGINAL REPORT [

SUPPLBENTARY

_

{ DISTRIBUTION:

{; REACTOR (R) 2 FLEL CYCLE &

~

SAEGUARDS (S)

-

FRTERIALS (FD h IE FIES IEFILES 5 AD/R01'(2) IEFILES AD/SG h

t1 AD/RCI(2) AD/FFFSI AD/ROI g EGIONS I,II,III,IV,V REGIONSI,II,III,IV,V REGIONSI.,II,III,IV,V b _ VENDOR BR. R-IV . . VENDOR BR R-IV VENDOR BR. R-IV o-4 L0EB / BPA FTB 5715 N ES / FCBS SS-396

~

& NRR/D3L

@ AEOD FTB 76T LDEB / IPA F1B 5715 R SS / SG SS-881

% NRR/ DOE AEDD FIB 7602 LDEB / FPA FIB 5715 1 NRR/DSI CENTPAL FIES t. AEOD FIB 7602 1NRR/ DST CENTRAL FILES ( G RON)

CENTRALFILES 016 NRR/ DOL PDR CBERAL FILES (CHRON)

L CENTRALFILES 016 LPDR CENTPAL FILES SS-396

, CB6 PAL FILES (CHR0tD TERA '

PDR

( M IPDR LPDR

b. TERA L

TERA ACTION:

PRELIMINARY EVALUATION OF THE ATTACHED REPORT INDICATES LEAD RESPONSIBILITY FOR

l. FOLLOWJP AS SHOWN BELOW:

( .

IE X NRR ffES __ OTHER

~

-

2L SG j FFMSI

.

p REV:7/9/80 k80.080Y0b7f. $' .

- -

--

,

-

/- * *

, -

L

'

, ,

$ TONE 6 WEBSTER ENGINEERING CORPORATION ~

.? e 245 SUMMen STaccT. BOSTON. M ASSACHUSETTS

,

'

ADDRESS ALL CORRESPONDENCE TO P.O. BOX 2325. BOSTON. MASS. 02107 I

W.U.TELCx: 84-0001 m onst c ucts..e E *=="'"~'-

  • " ==::,, .

.

g.'f.',*o*

rg, ....

_

. . **"tO""3.. -

-

wAsusmeToN. O.C. * * *

'

,.

-

_

.

~; - .

. . . Mr. Victor Stello, Director
July 23,-1980

_

Office of Inspection and. Enforcement a-

, U.S. Nuclear Regulatory Commission Washington, DC 20555

.

Dear Mr. Stello:

-

NOTIFICATION OF DEFECT,10CFR21 b SHOREHAM NUCLEATi POWER STATION - UNIT 1

} _

LONG ISTAND LIGHTING COMPANY

_

Stone & Webster Engineering Corporation (S&W), pursuant to the provisions of 10CFR21, hereby provides notification of a " defect" concerning the

" Shoreham Nuclear Power Station, Unit 1, owned by Long Island Lighting Company (LILCO) and for which S&W provided both engineering and construc-tion services.

-

In accordance with the requirements of Section 21.21(b)(3), the following information is submitted:

1. Name and address of the individual informing the Commission:

Mr. P. A. Wild, Director of Engineering Stone & Webster Engineering Corporation Post Office Box 2325 Boston, MA 02107 -

,

2. , Identification of the facility, or the basic component supplied for such facility, which contains a defect:

,

Shoreham Nuclear Power Station, Unit 1 General Electric Company (GE) 4 kV switchgear circuit breaker - Snap Rings

3. Identification of firm constructing facility or supplying basic component which contains a defect:

Basic Component supplied by GE

.

wa en 99 a 9

'

.

k-

_____- __ _-_ _ _ _

,

- *

-

,

. . .

< .

.VS 2 July 23, 1980

-

, ...

- *

~

4. Nature of the defect and the safety hazard which could be created by such defect: ,

.:

o-There exists a departure from the technical requirements 7~ ;

' of a procurement document in that breakers could have'

,

failed to operate as specified. .-

w- .

_,

The defective circuit breakers are basic components-in GE

__ --

7.Y metal-clad switchgear (4 kV) and the -switchgear has- been

-

s; '

delivered to a purchaser.

  • y
c. .

As a result of loose breaker main output cranks, other Y ~2 m ka in the breaker mechanism moved out of alignment and' N -

depacted the prop pin snap. ring. The effect of these -

^9 impacts deformed the snap ring sufficiently to allow it m

tio fall off the prop pin. This could result in the g[,-

failure of the breaker to operate properly.

_- The breakers are required under design basis events to 1 assure the capability to shut down the reactor and f

" maintain it in a safe shutdown condition. Degradation of such essential safety-related equipment represents a f

major reduction in the degree of protection provided to the public health and safety and results in a substantial

.1 safety hazard.

i

-

5. Date on which information of'such defect was obtained:

July 23,1980 i

6. In the case of a basic component which contains a defect, the number and location of all such components in use at, supplied for, or being supplied for facilities subject to the regulation:

Shoreham Nuclear Power Station 65-4 kV swithgear circuit breakers of which 29 are used in safety-related applicacion.

~

7. The corrective action which has been, is being, or will be taken; name of individual or organization responsible; and length of time taken to complete the action:

,

All 65 breakers at the Shoreham site were returned to GE u

for corrective work. Corrective action consisted. of

! complete disassembly of each breaker mechanism for inspection with replacement af parts as necessary.

,

GE factory engineering and Quality Assurance groups have

[_ been apprised of this problem to prevent. recurrence.

The identified corrective action has been completed.

_

L.

, .

.

M -

4. . .. _

.--__-_: _ . - - _ = - - - - - - - - - - - - - - - ~ ~"* ~ ~

.. - a-

  • z -

.

, ,

. .

,

-s ,

e JS ,_

3 July 23,1980

.

8. Advice' related to the defect th'at has been given to purchasers or licensees:

No other action apart from that specified under the previous section.

.. .

.

+;. . . .

,

Identificatica'of this defect and the~ filing of this report are results "

{ of a. review of-10CFR50.55(e) Reports and Licensee Event Reports filed by S&W clients since January 6,-1978. This review,' committed to in our .

'

letter to NRC of September 6, 1979, resulted from the NRC special -

-

inspection (,f May 1-4, 1979. ' NRC has been previously advised of this Problem by IILCO motification on November'.17,1978, in accordance with

._. If you require any further information, please contact S. B. Jacobs at 617-973-5264.

, ,

V iry truly yours[-

r

-

Y$$- P. A. Wild

~

~ Director of Engineering

.

. PAS:mra .

.