Part 21 Rept Re Defective Rochester Instrument PR-2035 Under Voltage Relays Exhibiting Tendency to Drift from Designated Setpoint &/Or Inability to Maintain Deadband Adjustment. Investigation Continuing.Final Rept by 851011
ML20132D414
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 09/25/1985
From: Engbrecht A
ROCHESTER INSTRUMENT SYSTEMS, INC.
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-85, REF-PT21-85-428-000 85-001, 85-1, PT21-85-428, PT21-85-428-000, NUDOCS 8509300166
Download: ML20132D414 (4)


Text

'

i September 25, 1985 r

Mr. James Taylor Nuclear Regulatory Commission Director of Inspection and Enforcement EW/357 Washington, DC 20555

Subject:

10CRF-21 Notification.on Rochester Instrument Systems - PR-2035 QA ID No.85-001 Centlemen:

Attached please find a report of defective Rochester Instrument Systems' PR-2035 in accordance with 10CFR-21 procedure.

Following our complete investigation we expect the final report to be issued by October 11, 1985.

Sincerely, ROCHESTER INSTRUMENT SYSTEMS, INC.

-1'e kV~

O.u) w A. Wayne Engbrecht Manager of Quality Assurance AWE /kak Attachment cc:

Mr. K. R. Naidu Nuclear Regulatory Commission EW/357 Washington, DC 20555 Mr. J. Carney Stone & Webster Corp.

P.O. Box 2325 Boston, MA 02107 8509300166 850925 PDR ADOCK 05000322 g

PDR

/IT

))] 255 North Union Street, Rochester. New Wrk 14605 U.S.A.

lf EnWend:

ROCHESTER INSTRUMENT SYSTEMS,INC.

l Mamm Road, Cre twd, s

E E E Telephone:1716 263-7700

  • Cable: RISROCNY + Telex: 978457 A member of The Marmon Group of comparves -

11 j

Mr. James Taylor

(

Page 2 l

September 25, 1985 i

t' J1 cc:

Mr. K. Shott Virginia Electric Power Corp.

l P.O. Box 26666 Richmond, VA 23261 I

{

Mr. S. Rogoff - RiS

~

Mr. C. Buchler - RiS Mr. D. Ilo11 ands - RiS i

Mr. D. Seward - RiS Mr. C. Tomlinson - R1S i

f Ms. D. Wood - RiS 1

p:

1 t

i

ATTACHMENT A ROCHESTER INSTRUMENT SYSTEMS, INC.

QA ID NO:

85-001 (60-0 5)

Page 1 of 2 REPORT OF DEFECTS AND NON-COMPLIANCE PER NRC 10CFR-21

'A.

Receipt of Information:

From:

Stone & Webs ter corn.

Phone No:

Unknown Address:

P.O. Box 2325 Date:

M y 6, 1985~

Boston, MA 02107 Plant:

Shoreham Nuclear Power Station Unit 1 - LILCO Reported by:

J. Carney

Title:

Project Engineer Project:

J. O. No. 11600.02 Reference No:

File Nos. 242.5, 242.41.1 Defect / Description of Problem: PR-20 35 Under Vol tage Relavs have exhibited a tendency to drift from the desinnated set point sand /or inability to maintain deadband adjustment.

(Published specifications on Deadband Adjustments =

Independent blind set from 0.5% to 10% of input range.)

Received by:

Ms. D. J. Wood - Contracts B.

Action Plan for Evaluation / Investigation: Scheduled by:

July 15, 1985 Date LILCO to return 3 PR-2035 units for RiS to conduct "As Found Condition" tests.

Units received at RIS September 3.

1985.

C.

Evaluation:

As Found tests showed minimum deadband was out of tolerance as follows: S /N 71232-2 0 1. 4VAC. S /N 71232-3 0 0. 7VAC. S /N 71232-6 0 0. 9VAC (sner. comonros to 0.6VAc).

Also rhn L.E.D.'s associated with relavs Kl Olich Trip) and K2 (Low Trip) exhibited a condition in which the L.E.D would not consistently track the relay action.

aA,e...-

.w

.w 4A44.

4 4 t6asa.h3

..-----+AA44%

.,&*w a _ A -4 w

A

.( 1. 42 A.a

,g-ai.

Page 2 of 2 j

- l D.

Notification.to NRC? Yes By Date:

9/25/85 4

Problem Not Generic - No Notification Required (Comment s ) :

l 4

E.

Probable Cause:

Under investiention - to be completed by October 4, 1985.

d i

F.

Re c ommenda t ion /Corre c t ive Ac t ion :

To follow.

Exnect final report to be i

1 j

4ssiind hv Octohor 11. 19R5.

G.

Scheduled Corrective Action Completion Date:

)

H.

Approvals:

. d. b/W 9f.1dffS 9

A 6

Manager of $A Datd Product Manager Date /

~

i S

L V.P. Engineering Date i

e I.

Follow Up/ Verification:

(

Verified by:

[

Title Date

\\

Approved by:

I-Date i

l J.

Customer Notification Required: Yes No 1

Completed by:

Name Title Date Send NRC Notifications to:

Mr. James Taylor s

l Nuclear Regulatory Commission Director of Inspection 6' Enforcement 1

EW/357 '

Washington, DC 20555 cc:

K. R. Naidu IE/VPB

_