December 2004 Monthly Operating Report for Pilgrim Nuclear Power Station
ML050280253
Person / Time
Site: Pilgrim
Issue date: 01/10/2005
From: Ford B
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.05.001
Download: ML050280253 (2)


Text

Enteryv 72.1 0/

Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Palyouth, MA 02360 January 10, 2005 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293.

License No.: DPR-35 December Operating Data Report LETTER NUMBER: 2.05.001

Dear Sir or Madam:

In accordance with Technical Specification 5.6.4, the attached operating data report for Pilgrim Nuclear Power Station is provided for your Information and planning.

There are no commitments contained in this letter.

Should you have questions or comments concerning this report, please contact me at (508) 830-8403.

Sincerely, Bryan Ford - -

Manager, Ucensing MJG/dm

Attachment:

December Operating Data Report (1 page) cc: Samuel J. Collins Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 205001 E

- -;o OPERATING DATA REPORT DOCKET NO. 50-293 UNIT NAME Pilgrim I DATE January 04, 2005 COMPLETED BY Mary J. Gatslick TELEPHONE (508) 830.8373 REPORTING PERIOD: December2004

1. Design Electrical Rating 690.00
2. Maximum Dependable Capacity (MWe-Ne) 684.70 This Month yr-to-Date Cumulative
3. Number of Hours the Reactorwas Critical 744.00 8.738.58 198 893 48
4. Number of Hours Generator On-line 744.00 8,721.92 196,666.87
5. Reserve Shutdown Hours 0.00 0.00 0.00

.6... Net Electrical Energy Generated (MWHrs) -"511 ,570.49 -- 5.939.283.60 117,591,962.0 UNIT SHUTDOWNS Type Method of No D F: Forced Duration Shutting Cause & Corrective Action Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The period began and ended with the unit on line, operating at 100% power (2028 MWt). There were no power reductions during this reporling period.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TrIplScram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & LIcense Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1