Inspection/Activity Plan for 03/01/2005 - 09/30/2006
ML050610142
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/04/2005
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Young D
Florida Power Corp
Shared Package
ML050610125 List:
References
IR-05-001 Report 22
Download: ML050610142 (2)


Text

Page 1 of 2 Crystal River 02/28/2005 13:41:31 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1SSDPC - SSDPC PRE-INSPECTION VISIT 1 3 IP 7111121 Safety System Design and Performance Capability 03/28/2005 03/30/2005 Baseline Inspections PS2- EP - EP INSPECTION 1 3 IP 7111402 Alert and Notification System Testing 04/25/2005 04/29/2005 Baseline Inspections 3 IP 7111403 Emergency Response Organization Augmentation Testing 04/25/2005 04/29/2005 Baseline Inspections 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/25/2005 04/29/2005 Baseline Inspections 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/25/2005 04/29/2005 Baseline Inspections 3 IP 71151 Performance Indicator Verification 04/25/2005 04/29/2005 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 4 3 IP 7111121 Safety System Design and Performance Capability 04/25/2005 04/29/2005 Baseline Inspections 3 IP 7111121 Safety System Design and Performance Capability 05/09/2005 05/13/2005 Baseline Inspections MTN-MR - MR EFFECTIVENESS 1 3 IP 7111112B Maintenance Effectiveness 08/15/2005 08/19/2005 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 3 V23237 CRYSTAL RIVER/EXAMS AT POWER FACILITIES 08/15/2005 08/19/2005 Not Applicable OL EXAM - INITIAL EXAM 3 3 V23237 CRYSTAL RIVER/EXAMS AT POWER FACILITIES 09/12/2005 09/16/2005 Not Applicable PS1-RP - RP OCCUPATIONAL BASELINE - WEEK 1 3 3 IP 7112101 Access Control to Radiologically Significant Areas 10/31/2005 11/04/2005 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 10/31/2005 11/04/2005 Baseline Inspections 3 IP 7112202 Radioactive Material Processing and Transportation 10/31/2005 11/04/2005 Baseline Inspections 3 IP 71151 Performance Indicator Verification 10/31/2005 11/04/2005 Baseline Inspections MTN-ISI - INSERVICE INSPECTION 2 3 IP 7111108P Inservice Inspection Activities - PWR 11/07/2005 11/11/2005 Baseline Inspections MTNTI160 - 2515/160 U-3: PZR PENETRATION NOZZLES 1 3 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 11/07/2005 11/11/2005 Safety Issues MTNSGISI - STEAM GENERATOR ISI 2 3 IP 7111108P Inservice Inspection Activities - PWR 11/14/2005 11/18/2005 Baseline Inspections PS1-RP - RP OCCUPATIONAL BASELINE - WEEK 2 3 3 IP 7112101 Access Control to Radiologically Significant Areas 11/14/2005 11/18/2005 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 11/14/2005 11/18/2005 Baseline Inspections 3 IP 7112202 Radioactive Material Processing and Transportation 11/14/2005 11/18/2005 Baseline Inspections 3 IP 71151 Performance Indicator Verification 11/14/2005 11/18/2005 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59 4 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 12/05/2005 12/09/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Crystal River 02/28/2005 13:41:31 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-MODS - MODIFICATIONS/10CFR50.59 4 3 IP 7111117B Permanent Plant Modifications 12/05/2005 12/09/2005 Baseline Inspections MTN-HS - HEAT SINK 1 3 IP 7111107B Heat Sink Performance 01/09/2006 01/13/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 3 IP 7111111B Licensed Operator Requalification Program 01/30/2006 02/03/2006 Baseline Inspections PS2-EP - EP EXERCISE 3 3 IP 7111401 Exercise Evaluation 04/24/2006 04/28/2006 Baseline Inspections 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/24/2006 04/28/2006 Baseline Inspections 3 IP 71151 Performance Indicator Verification 04/24/2006 04/28/2006 Baseline Inspections DRP - PI&R 4 3 IP 71152B Identification and Resolution of Problems 06/05/2006 06/23/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.