Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:Operating Report
MONTHYEARML22076A0182022-03-16016 March 2022 Annual Changes, Tests, and Experiments Report - Regulatory Commitment Evaluation Report ML22066A4842022-03-0909 March 2022 Review of the Spring 2021 Steam Generator Tube Inspection Report ML0623703502006-08-18018 August 2006 Owner'S Activity Report ML0209903272002-03-28028 March 2002 Cycle 18 Core Operating Limits Report ML19105A3031978-09-13013 September 1978 Submit Monthly Operating Report for the Month of August 1978 ML19095A3811978-09-13013 September 1978 Submit Operating Report for Month of August 1978 ML19105A3081978-01-0909 January 1978 Submit Monthly Operating Report for the Month of December 1977 ML19105A3091977-12-0808 December 1977 Submit Monthly Operating Report for the Month of November 1977 ML19105A3101977-11-10010 November 1977 Submit Monthly Operating Report for the Month of October 1977 ML19105A3111977-10-11011 October 1977 Submit Monthly Operating Report for the Month of September 1977 ML19105A3131977-08-0909 August 1977 Submit Monthly Operating Report for the Month of July 1977 ML19095A3761977-08-0909 August 1977 Submit Operating Information for Month of July 1977 ML19095A3771977-07-0808 July 1977 Submit Operating Information for Month of June 1977 ML19095A3781977-07-0808 July 1977 Submit Operating Information for Month of June 1977 ML19095A3791977-06-0808 June 1977 Submit Operating Information for Month of May 1977 ML19105A3151977-06-0808 June 1977 Submit Monthly Operating Report for the Month of May 1977 ML19095A3111977-05-0909 May 1977 Submit Operating Report for the Month of April 1977 ML19105A3161977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 ML19095A3121977-03-10010 March 1977 Submit Operating Report for the Month of February 1977 ML19105A3171977-03-10010 March 1977 Submit Monthly Operating Report for the Month of February 1977 ML19095A3141977-02-14014 February 1977 Response to Request, Attached, Revised Pages of Monthly Operating Statistics. as Surry Units Are Base Loaded, Reactor Reserve Shutdown Hours Should Be Zero Rather than That Previously Reported ML19095A3151977-02-11011 February 1977 Submit Operating Report for the Month of January 1977 ML19105A3181976-12-0909 December 1976 Submit Monthly Operating Report for the Month of November 1976 ML19095A3161976-12-0909 December 1976 Submit Operating Report for the Month of November 1976 ML19105A3211976-11-10010 November 1976 Submit Monthly Operating Report for the Month of October 1976 ML19095A3171976-11-10010 November 1976 Submit Operating Report for the Month of October 1976 ML19105A3241976-10-0808 October 1976 Submit Monthly Operating Report for the Month of September 1976 & Corrected Copy of Data for August 1976 ML19095A3181976-10-0808 October 1976 Submit Operating Report for the Month of August 1976 ML19105A3251976-09-13013 September 1976 Submit Monthly Operating Report for the Month of August 1976 on Units 1 & 2, & Corrected Copy of Data for March Through July 1976 on Unit 1 & April Through July 1976 on Unit 2 ML19095A3201976-09-13013 September 1976 Submit Operating Report for the Month of August 1976, & Corrected Copies of Data for Mach Through July 1976 on Unit 1 and April Through July 1976 on Unit 2 ML19095A3231976-08-0202 August 1976 Submit Operating Report for the Month of July, 1976 ML19105A3261976-08-0202 August 1976 Submit Monthly Operating Report for Surry 2 for the Month of July 1976 ML19095A3271976-06-0707 June 1976 Submit Operating Report for the Month of May 1976 & Corrected Copies for April 1976 ML19105A3271976-06-0707 June 1976 Submit Monthly Operating Report for the Month of May 1976 & Corrected Operating Report for the Month of April 1976 ML19095A3301976-05-12012 May 1976 Submit Operating Report for the Month of April 1976 ML19105A3281976-05-12012 May 1976 Submit Monthly Operating Report for Surry 2 for the Month of April 1976 ML19105A3291976-03-0808 March 1976 Submit Monthly Operating Report for Surry 2 for the Month of February 1976 ML19105B1161976-03-0202 March 1976 03/02/1976 Semiannual Operating Report for July 1 Through December 31, 1975, Volume I ML19098B4771975-12-11011 December 1975 Forwarding Two Missing Pages to Be Inserted in Semiannual Operating Report, SOR-6, Covering Period 1/1/1975 Through 6/30/1975 ML19105A3301975-11-14014 November 1975 Submit Monthly Operating Report for the Month of October 1975 & Corrected Operating Report for the Month of September 1975 ML19095A3381975-11-14014 November 1975 Submit Operating Report for the Month of October 1975 & Corrected Copy for Unit 2 for the Month of September 1975 ML19105A3311975-09-0808 September 1975 Submit Monthly Operating Report for the Month of August 1975 ML19095A3421975-09-0808 September 1975 Submit Operating Report for the Month of August 1975 ML19105B1151975-08-29029 August 1975 08/29/1975 Submit Semiannual Operating Report, SOR-6, Covering the Period January 1 Through June 30, 1975 ML19095A3441975-08-0808 August 1975 Submit Operating Report for the Month of July 1975 ML19105A3331975-07-0909 July 1975 Submit Monthly Operating Report for the Month of June 1975 ML19095A3461975-07-0909 July 1975 Submit Operating Report for the Month of June 1975 ML19095A3481975-06-12012 June 1975 Submit Operating Report for the Month of May 1975 ML19105A3351975-05-13013 May 1975 Response to Directive of 2/19/1974 Requiring Operating Information on a Monthly Basis, Submit Monthly Operating Report for the Month of April 1975 ML19095A7531975-05-13013 May 1975 Submit Monthly Operating Report for the Month of April 1975 2022-03-09
[Table view] Category:Monthly
MONTHYEARML19095A3811978-09-13013 September 1978 Submit Operating Report for Month of August 1978 ML19105A3031978-09-13013 September 1978 Submit Monthly Operating Report for the Month of August 1978 ML19105A3081978-01-0909 January 1978 Submit Monthly Operating Report for the Month of December 1977 ML19105A3091977-12-0808 December 1977 Submit Monthly Operating Report for the Month of November 1977 ML19105A3101977-11-10010 November 1977 Submit Monthly Operating Report for the Month of October 1977 ML19105A3111977-10-11011 October 1977 Submit Monthly Operating Report for the Month of September 1977 ML19095A3761977-08-0909 August 1977 Submit Operating Information for Month of July 1977 ML19105A3131977-08-0909 August 1977 Submit Monthly Operating Report for the Month of July 1977 ML19095A3771977-07-0808 July 1977 Submit Operating Information for Month of June 1977 ML19095A3781977-07-0808 July 1977 Submit Operating Information for Month of June 1977 ML19105A3151977-06-0808 June 1977 Submit Monthly Operating Report for the Month of May 1977 ML19095A3791977-06-0808 June 1977 Submit Operating Information for Month of May 1977 ML19095A3111977-05-0909 May 1977 Submit Operating Report for the Month of April 1977 ML19105A3161977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 ML19095A3121977-03-10010 March 1977 Submit Operating Report for the Month of February 1977 ML19105A3171977-03-10010 March 1977 Submit Monthly Operating Report for the Month of February 1977 ML19095A3141977-02-14014 February 1977 Response to Request, Attached, Revised Pages of Monthly Operating Statistics. as Surry Units Are Base Loaded, Reactor Reserve Shutdown Hours Should Be Zero Rather than That Previously Reported ML19095A3151977-02-11011 February 1977 Submit Operating Report for the Month of January 1977 ML19095A3161976-12-0909 December 1976 Submit Operating Report for the Month of November 1976 ML19105A3181976-12-0909 December 1976 Submit Monthly Operating Report for the Month of November 1976 ML19095A3171976-11-10010 November 1976 Submit Operating Report for the Month of October 1976 ML19105A3211976-11-10010 November 1976 Submit Monthly Operating Report for the Month of October 1976 ML19095A3181976-10-0808 October 1976 Submit Operating Report for the Month of August 1976 ML19105A3241976-10-0808 October 1976 Submit Monthly Operating Report for the Month of September 1976 & Corrected Copy of Data for August 1976 ML19095A3201976-09-13013 September 1976 Submit Operating Report for the Month of August 1976, & Corrected Copies of Data for Mach Through July 1976 on Unit 1 and April Through July 1976 on Unit 2 ML19105A3251976-09-13013 September 1976 Submit Monthly Operating Report for the Month of August 1976 on Units 1 & 2, & Corrected Copy of Data for March Through July 1976 on Unit 1 & April Through July 1976 on Unit 2 ML19095A3231976-08-0202 August 1976 Submit Operating Report for the Month of July, 1976 ML19105A3261976-08-0202 August 1976 Submit Monthly Operating Report for Surry 2 for the Month of July 1976 ML19095A3271976-06-0707 June 1976 Submit Operating Report for the Month of May 1976 & Corrected Copies for April 1976 ML19105A3271976-06-0707 June 1976 Submit Monthly Operating Report for the Month of May 1976 & Corrected Operating Report for the Month of April 1976 ML19095A3301976-05-12012 May 1976 Submit Operating Report for the Month of April 1976 ML19105A3281976-05-12012 May 1976 Submit Monthly Operating Report for Surry 2 for the Month of April 1976 ML19105A3291976-03-0808 March 1976 Submit Monthly Operating Report for Surry 2 for the Month of February 1976 ML19105A3301975-11-14014 November 1975 Submit Monthly Operating Report for the Month of October 1975 & Corrected Operating Report for the Month of September 1975 ML19095A3381975-11-14014 November 1975 Submit Operating Report for the Month of October 1975 & Corrected Copy for Unit 2 for the Month of September 1975 ML19105A3311975-09-0808 September 1975 Submit Monthly Operating Report for the Month of August 1975 ML19095A3421975-09-0808 September 1975 Submit Operating Report for the Month of August 1975 ML19095A3441975-08-0808 August 1975 Submit Operating Report for the Month of July 1975 ML19105A3331975-07-0909 July 1975 Submit Monthly Operating Report for the Month of June 1975 ML19095A3461975-07-0909 July 1975 Submit Operating Report for the Month of June 1975 ML19095A3481975-06-12012 June 1975 Submit Operating Report for the Month of May 1975 ML19095A7531975-05-13013 May 1975 Submit Monthly Operating Report for the Month of April 1975 ML19105A3351975-05-13013 May 1975 Response to Directive of 2/19/1974 Requiring Operating Information on a Monthly Basis, Submit Monthly Operating Report for the Month of April 1975 ML19105A3361975-04-0909 April 1975 Response to Directive of 2/19/1974 Requiring Operating Information on a Monthly Basis, Submit Monthly Operating Report for the Month of March 1975 ML19095A3491975-04-0909 April 1975 Submit Operating Report for the Month of March 1975 ML19105A3371975-03-13013 March 1975 Response to Directive of 2/19/1974 Requiring Operating Information on a Monthly Basis, Submit Monthly Operating Report for the Month of February 1975 ML19095A3501975-03-13013 March 1975 Submit Operating Report for the Month of February 1975 ML19105A3381975-02-14014 February 1975 Response to Directive of 2/19/1974 Requiring Operating Information on a Monthly Basis, Submit Monthly Operating Report for the Month of January 1975 ML19095A3521975-02-14014 February 1975 Submit Operating Report for the Month of January 1975 1978-09-13
[Table view] |
Text
.e VIRGINIA ELECTRIC .AND POWER COMP.ANY RIOHMOND, VIRGINIA 2 3 2 61 April 9, 1975 Office of Plans and Schedules Serial No. 465/0"21974 Division of Reactor Licensing PO&M/JTB:clw United States Nuclear Regulatory Connnission Washington, D. C. 20555 Docket Nos. 50-280 50~281 License Nos. DPR-32 DPR-37
Dear Sir:
Pursuant to Mr. L. Manning Muntzing's directive of February 19, 1974 requiring that certain operating information be forwarded to you on a monthly basis, the Virginia Electric and Power Company submits the information enclosed herewith for the month of March 1975.
Attachments cc: Mr. Norman C. Moseley, Director Region II
l .,
DOCKET NO. 50-280 UNIT Surry Unit No . 1 DATE 4-2-75 COMPLETED BY W. C. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH MARCH
~~~~~~~~~~-
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 1 793.9 17 809.6 2 804.8 18 809.6 3 802.3 19 804.6 4 804.4 20 806.9 5 803.8 21 806.7 6 794.2 22 801.4 7 19.8 23 778.8 8 0 24 803.8 9 0 25 808.0 10 0 26 806.9 11 0 27 804. 3 .
12 0 28 800.7 13 0 29 800.4 14 467.9 30 783.8 15 786.7 31 792.3 16 807.5 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the*net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly. *
\ ..
.. ".
'.
UNIT Surry Uni.t No. l DATE 4-2-75 COMPLETED BY w. c. Earl DOCKET N0._5_0_-_2_8_0_ _ _ __
OPERATING STATUS i.* REPORTING PERIOD: 0001 7 50301 THROUGH 2400 7 50331 HOURS IN REPORTING PERIOD: __7_4_4_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) 788
- 3.. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS CUMULATIVE REPORTING PERIOD YR TO DATE TO DATE S. HOURS REACTOR WAS CRITICAL. . . . . . . * . . . .
- 6. REACTOR RESER VE SHUTDOWN HOURS , . * . . . . 0 0 0
- 7. HOURS GENERA.TOR ON LINE.: . . . . . . . . * * . . . ~69.6 1,160.3 11,577.8
- 8. UNIT RESERVE SHUT_DOWN HOURS ... , . . . . . . . 0 0 0
. 9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . * . * * . . . . . ; *.**..* 1,363,940 2,694,210 242750,231
- 10. GROSS ELECTRICAL ENERGY
. -GENERA TED (MWH) . . . . . . . . * * * * . . . * * , ; .. 453,670 888,285 8,216,048
- 11. NET ELECTRICAL ENERGY GENERATED 431,941 844,438 727742791 '
(MWH) .......... *. . . . . . . . . . . ; .*.*.*..*
- 12. REACTOR AVAILABILITY FACTOR (1) . . . * * . * .
- 13. UNIT AVAILABILITY FACTOR (2) * . . * * * * . * * *
- 14. UNIT CAPACITY FACTOR (3) ....*..***.***. 73.7 4!.L2 fi2.5
- 15. UNIT FORCED OUTAGE RATE (4) . . . . . . . * * * * . 0 0.5 28.2
- 16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
- 17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - . . , . - - - - - - - -
- 18. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) REPORT THE FOLLOWING:
.DATE LAST DATE
. FORECAST . ACHIEVED INITiAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY .FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE (2) UNIT AVAILABILITY FACTOR -----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWe-NET) X liOURS IN REPORTING PERIOD .
FORCED OUT AGE HOURS (4) UNIT FORCED OUTAGE RATE _H_O_U_R_S_G-EN_E_R_A_T_O_R_O_N_L_IN_E_+_F_O-RC_E_D_*_o_U_T_A_G_E_H_O_U_R_S_XlOO
'
DOCKET NO. .50-280
..
UNIT SHUTDOWNS UNIT NAME Surry Unit No. 1 ~
i .
DATE 4-2-75 COMPLETED BY w. c. Earl REPORT MONTH __MAR_C_H_ _ __
TYPE METHOD OF F-FORCED .DURATION ~HUTTING DOWN NO. DATE S-SCHEDULED (HOURS) Rf:ASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS
- "*
B 1 Repair*of Turbine bearing.
(1) REASON (2) METHOD A--EQUIPMENT FAILURE (EXPLAIN)
- I-MANUAL B- MAINT. OR TEST 2-MANUAL I C--REFUELING SCRAM D-REGllLATORY RESTRICTION 3--AUTOMATIC E-OPERATOKTRAINING AND *SCRAM
' LICENSE EXAMINATION. .
. F-ADMINISTRATIVE G--OPERATIONAL ERROR (EXPLAIN)
H..,.OTl-IER (EXPLAIN)
,.
..
.. ',!
SUMMARY
' .
,,
UNIT Surry Unit No. 2 DATE 4-2-75 COMPLETED BY W. C. Earl AVERAGE DAILY UNIT POWER LEVEL MONTH MARCH.
....
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 1 777 .9 17 797.9 2 796.7 18 800.6 3 776.5 19 799.7 4 781.0 20 798.4 5 799.4 21 725.2 6 799.8 22 0 . I 7 788.9 23 0 8 787.1 24 522.1 9 795.0 . 25 797.1 10 768.7 26. 798.5 11 749.8 27 800.6 12 792.9 28 800.8 13 796.9 29 775.2 ~
14 795.2 30 793.1 15 731.8 31 791. 7 16 797.1 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt. . .
These figures will be used to plot a graph for each reporting month: Note that by using maximum dependable capacity for the* net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaiy.
ft !
' .
UNIT Surry Unit No. 2 DATE 4-2-75 COMPLETED BY W* C
- Earl DOCKET No._5_0_-_2_8_1_____
OPERATING STATUS
- l. REPORTINGPERioD: 0001 750301 THROUGH 2400 750331 HOURS IN REPORTING PERioD: _ _7;_4"'-4"'--------------------------
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2441 MAX. DEPENDABLE CAPACITY (MWe-NET) _,7'-'8:...:8:..--_
- 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _ _ _ _ _ _ __
- 4. REASONS FOR RESTRICTioN (IF ANY):
THIS CUMULATIVE REPORTING PERIOD YR TO DATE . TODATE S. HOURS REACTOR WAS CRITICAL * . . . . . * . . . . . . 719.4 22038.6 10,547.6
- 6. REACTOR RESERVE SHUTDOWN HOURS **.**.* 0 0 304.3
- 7. HOURS GENERATOR ON LINE . . . . . . . . . * . . * *
- 8. UNIT RESERVE SHUTDOWN HOURS .*...*.**** 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) . * . . . . . . . * . ~ . . . * . * . .
- 1,634 ,413 425452059 22,769,848
- 10. GROSS ELECTRICAL ENERGY GENERA TED (MWH) . * . . . . . . . . . * . * * . * * * .** 540,860 l 2494z345 725162812
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) . . . . . * * . . . * . . . * . . * . . * * * . * . . * .
514,153 1,418,809 7, 1182108
- 12. REACTOR AVAILABILITY FACTOR(l) * . . . * * . . . 96.7 94.4 62.8
- 13. UNIT AVAILABILITY FACTOR (2) . . . * . * * . . . . . 92.8 21.2 61.Z
- 14. UNIT CAPACITY FACTOR (3) . * . . . . . * * * . * . **. 87.7 83.4 "53.8
- 15. UNIT FORCED OUTAGE RATE (4) . * . . . . * * * . . . 0 5.6 25.4
- 16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
Refueling scheduled April 17, 1975; approximately six weeks
- 17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S T A R T U P : - - - - - - - - - - - -
- 18. UNITS IN TEST STATUS (PRioR .TO COMMERCIAL OPE RA TioN) REPORT THE FOLLOWING:
DATE LAST DATE FORECAST ACHIEVED -;;
INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (1) REACTOR AVAILABILITY FACTOR
. HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE (2). UNIT AVAILABILITY FACTOR.* _H_O_U_R_S-IN_R_E-PO_R_T_l_N_G_P_E_R-IO-D--X lOO NET ELECTRICAL POWER GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDA_BLE CAPACITY (MWe-NET) X HOURS IN REPORTING PERIOD FORCED OUTAGE HOURS
. (4) UNIT FORCED OUTAGE RATE --------------------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS
- DOCKETNO. _5_:0_-~28~1;____ _ _ ;
UNIT SHUTDOWNS UNIT NAME Surry Unit No.* 2 ,_
DATE 4-2-75 COMPLETED BY W. C. Earl REPORT MONTH _ _:MAR==C=H_ _ __
TYPE METHOD OF F-FORCED DURATION $HUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS 75-5 032175 s 53.7 A & B 3 Received Rx trip due to a malfunction in
- the turbine EHC Control System during thi scheduied shutdown to do maintenance on secondary system *
. .
(1) REASON (2) METHOD A -EQUIPMENT FAILURE (EXPLAIN) I-MANUAL ll MAINT. OR TEST 2-MANUAL
'. C- RErUELING SCRAM D-REGllLATORY RESTRICTION 3-AUTOMATiC E-OPERA TOR TRAINING AND SCRAM LICENSE EXAMINATION F-AOMINISTRATIVE G--OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
..
SUMMARY