Letter Sequence Approval |
---|
EPID:L-2018-RNW-0002, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement
Results
Other: L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses, L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses, L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items, L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation, L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses, ML17360A054, ML18037A824, ML18037A828, ML18074A252, ML18086A705, ML18087A433, ML18183A445, ML18230B482, ML18232A576, ML18299A114, ML18299A116, ML18341A024, ML19032A536, ML19050A400, ML19162A072, ML19162A097, ML19162A117, ML19162A343, ML22073A122
|
MONTHYEARML19326C1141972-07-19019 July 1972 SLR Tech Specs from Authority File Project stage: Acceptance Review L-2018-004, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)2018-01-30030 January 2018 Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) Project stage: Request ML18037A8122018-01-30030 January 2018, 31 January 2018 Submittal of Subsequent License Renewal Application Project stage: Request ML18037A8292018-01-30030 January 2018 Enclosure 2 - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Project stage: Request ML18037A8282018-01-30030 January 2018 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary Project stage: Other ML18037A8242018-01-30030 January 2018 Submittal of Subsequent License Renewal Application Project stage: Other ML18113A1322018-01-31031 January 2018, 10 April 2018, 30 April 2018 Transmittal of Subsequent License Renewal Application Revision 1 Project stage: Request L-2018-039, License Renewal Application - Supplement 12018-02-0909 February 2018 License Renewal Application - Supplement 1 Project stage: Supplement ML18053A1372018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Supplement L-2018-053, Replacement Pages to Enclosure 3, SLRA Section 42018-02-16016 February 2018 Replacement Pages to Enclosure 3, SLRA Section 4 Project stage: Request ML18053A1232018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Request ML18038A6912018-04-0303 April 2018 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18113A1422018-04-10010 April 2018 Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) Project stage: Request ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application Project stage: Other ML18087A4332018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Other ML18087A4742018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Request ML17360A0542018-04-25025 April 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other ML18086A7052018-04-26026 April 2018 Plan for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18173A0872018-07-0505 July 2018 Plan for the Irradiated Concrete Technical Issue Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Acceptance Review ML18183A4452018-07-23023 July 2018 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18218A2002018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18218A1982018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 Project stage: Request ML18218A1992018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - E-mail Project stage: RAI ML18232A5462018-08-20020 August 2018 Safety RAIs - Set 2 - Draft Project stage: Draft RAI ML18232A5142018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 Project stage: RAI ML18232A5122018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 Project stage: Request ML18232A5132018-08-20020 August 2018 SLRA Safety RAIs - Set 2 - RAIs Project stage: RAI ML18232A5762018-08-21021 August 2018 Plan for On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses2018-09-14014 September 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses Project stage: Other ML18260A2432018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 5 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18260A2412018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application Set 5 Project stage: Request ML18260A2422018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 5 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI ML18259A0002018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 Project stage: RAI ML18243A0072018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 3 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI ML18243A0052018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application Set 3 Project stage: Request ML18243A0062018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 1 Project stage: RAI ML18262A0782018-09-26026 September 2018 09/10/2018 Summary of Meeting with FPL to Discuss the Potential Subsequent License Renewal Wear Issues of CRDM Thermal Sleeve Flanges at Turkey Point Based on Recent Operating Experience Project stage: Meeting ML18269A2102018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID L-2018-RNW-0002) - Enclosure Project stage: RAI ML18269A2082018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application Set 4 Project stage: Request ML18269A2092018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI ML18269A2282018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18269A2272018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Email Project stage: RAI L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation2018-10-0505 October 2018 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation Project stage: Other ML18299A1172018-10-12012 October 2018 Framatome Calculation No. 32-9280712, Rev. 002, Tp CRDM Lower Joint Environmentally Assisted Fatigue Dated October 12, 2018 (Non-Proprietary) Project stage: Request ML18230B4822018-10-15015 October 2018 Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal Project stage: Other ML18296A0242018-10-16016 October 2018 Set 3 Response to Request for Additional Information to Subsequent License Renewal Application Safety Review Project stage: Response to RAI L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses2018-10-17017 October 2018 Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses Project stage: Other L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items2018-10-17017 October 2018 Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items Project stage: Other ML18299A1142018-10-24024 October 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 4 Responses Project stage: Other 2018-04-10
[Table View] |
|
---|
Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24158A0072024-09-17017 September 2024 SLR License DPR-41 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses ML24158A0062024-09-17017 September 2024 SLR License DPR-31 ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML24036A0732024-02-12012 February 2024 – Correction of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23249A2412023-09-25025 September 2023 Regulatory Audit Summary for the Review of License Amendment Request to Revise the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23082A0402023-04-0505 April 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment Nos. 260 and 255 ML22028A0662022-05-24024 May 2022 Issuance of Amendment Nos. 296 and 289 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology (EPID L-2021-LLA-0070)- Non-Proprietary ML22098A0902022-04-13013 April 2022 Nextera/Fpl Non-Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (EPID L-2021-LRM-0007) (Slides) ML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) ML21279A0432021-10-15015 October 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 ML21119A3552021-05-26026 May 2021 Correction to Amendment Concerning Extension of Containment Leak Rate Testing Frequency Amendments ML21032A0202021-02-26026 February 2021 Issuance of Amendment Nos. 295 and 268 Concerning Extension of Containment Leak Rate Testing Frequency ML20198M4982021-01-27027 January 2021 Issuance of Amendment Nos. 294 and 267 Regarding Emergency Action Level Scheme Upgrade (EPID L-2019-LLA-0271) (L-2019-203) ML20237F3852020-10-20020 October 2020 Issuance of Amendment Nos. 293 and 286 Regarding Containment Atmospheric Radioactivity Ventilation Isolation and Leakage Detection System ML20104B5272020-04-16016 April 2020 Issuance of Exigent Amendment No. 291 Concerning the Deferral of Steam Generator Inspections ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML19266A5852019-12-17017 December 2019 Issuance of Amendment Nos. 289 and 283 Technical Specification Applicability to Equipment Shared Between Units and Exception to Technical Specification 4.0.4 ML19310D7782019-12-0404 December 2019 Florida Power & Light Company - Turkey Point Nuclear Generating Unit 4 Subsequent Renewed Facility Operating License ML19305C8792019-12-0404 December 2019 LTR - Issuance of Subsequent Renewed Facility Operating License Nos. DPR-31 and DPR-41 for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML19310D7772019-12-0404 December 2019 Florida Power & Light Company - Turkey Point Nuclear Generating Unit 3 Subsequent Renewed Facility Operating License ML19031C8912019-08-15015 August 2019 Issuance of Amendment Nos. 288 and 282 Regarding Revised Reactor Core Safety Limit to Reflect WCAP-17642-PA Revision 1 ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 L-2019-088, Subsequent License Renewal Application FPL Comments Regarding the NRC Biological Assessment2019-04-18018 April 2019 Subsequent License Renewal Application FPL Comments Regarding the NRC Biological Assessment ML19064A9032019-03-27027 March 2019 Issuance of Amendments Regarding Transition License Conditions for Reactor Coolant Pump Seals ML18354A6732019-03-18018 March 2019 Issuance of Amendments Regarding Technical Specifications Changes to Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement ML18270A4292018-12-0303 December 2018 Issuance of Amendments Nos. 284 and 278 Regarding Adoption of Risk-Informed Completion Times in Technical Specifications (CAC Nos. MF5455 and MF5456; EPID L-2014-LLA-0002) ML18255A3602018-11-14014 November 2018 Issuance of Amendments Regarding Technical Specifications Changes to Address Non-Conservative Actions for Containment and Control Room Ventilation Functions ML18019A0782018-03-19019 March 2018 Issuance of Amendments Regarding the Elimination of Certain Technical Specification Reporting Requirements (CAC Nos. MF9601 and MF9602; EPID L-2017-LLA-0213) ML18018A5592018-02-20020 February 2018 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations (CAC Nos. MF9903 and MF9904; EPID L-2017-LLA-0254) ML17228A5632017-10-26026 October 2017 Issuance of Amendments Regarding Technical Specifications for High-Range Noble Gas Effluent Monitors ML17209A3192017-09-28028 September 2017 Issuance of Amendments Regarding Technical Specifications for Auxiliary Feedwater Actuation ML17172A1152017-08-0303 August 2017 Turkey Point Nuclear Plant Generating Unit Nos. 3 and 4 - Issuance of Amendments Regarding Technical Specifications for Control Room Emergency Ventilation System (CAC Nos. MF8221 and MF8222) ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17004A2922017-02-0909 February 2017 Issuance of Amendments Regarding Technical Specifications for Snubbers ML16120A4732016-06-20020 June 2016 Issuance of Amendments Regarding Technical Specifications for Moderator Temperature Coefficient Measurements ML16004A0192016-04-26026 April 2016 Issuance of Amendments Regarding Technical Specification Figure for the Boric Acid Tank Minimum Volume ML16040A3732016-03-29029 March 2016 Issuance of Amendments Regarding Technical Specifications for Communications and the Manipulator Crane ML16008B0722016-02-25025 February 2016 Issuance of Amendments Regarding Technical Specifications for Facility Staff Qualifications for Licensed Operators ML15294A4432015-11-0909 November 2015 Issuance of Amendments Regarding Emergency Core Cooling System Technical Specifications ML15233A3792015-09-28028 September 2015 Issuance of Amendments Regarding Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15205A1742015-08-14014 August 2015 Issuance of Amendments Regarding Removal of Reactor Coolant System Chemistry Requirements from the Technical Specifications and Relocation of Requirements in Licensee-Controlled Documents ML15181A1792015-07-27027 July 2015 Issuance of Amendments Regarding Adoption of Technical Specification Task Force Traveler 523 (TSTF-523), Revision 2 ML13329A0922014-06-13013 June 2014 Issuance of Amendments Regarding Operating License Conditions and Technical Specifications ML13329A1392014-02-21021 February 2014 Issuance of Amendments Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material ML13207A0952013-09-10010 September 2013 Issuance of Amendment No. 258 Regarding a One-Time Extension of Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d ML13059A2242013-04-0202 April 2013 Issuance of Amendments Regarding the Recirculation Ph Control System and Sodium Tetraborate Basket Loading ML12339A1122012-12-17017 December 2012 Issuance of Amendments Regarding Revision of Cyber Security 2024-09-17
[Table view] |
Text
December 4, 2019 Mr. Mano Nazar President, Nuclear Division and Chief Nuclear Officer Florida Power and Light Company 700 Universe Blvd Mail Stop EX/JB Juno Beach, FL 33408
SUBJECT:
ISSUANCE OF SUBSEQUENT RENEWED FACILITY OPERATING LICENSE NOS. DPR-31 AND DPR-41 FOR TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 (EPID L-2018-RNW-0002)
Dear Mr. Nazar:
The U.S. Nuclear Regulatory Commission (NRC) has issued Subsequent Renewed Facility Operating License Nos. DPR-31 and DPR-41 to Florida Power & Light Company (FPL), for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The NRC issued the subsequent renewed facility operating licenses upon completion of the NRC staffs review of your application dated January 30, 2018, as supplemented by letters submitted to the NRC through April 10, 2018.
Subsequent Renewed Facility Operating License Nos. DPR-31 and DPR-41 for Units 3 and 4 expire at midnight on July 19, 2052, and April 10, 2053, respectively. As you are aware, all adjudicatory matters before the Atomic Safety and Licensing Board (Board) regarding the Turkey Point subsequent license renewal application have been resolved with the Boards issuance of its decision in LBP-19-8, and adjudicatory proceedings before the Board have terminated. While appeals of the Boards decisions are currently pending before the Commission, the NRC staff has determined that issuance of the subsequent renewed licenses prior to Commission action on those appeals would not foreclose or prejudice any action by the Commission and the subsequent renewed licenses may therefore be issued. to this letter contains Subsequent Renewed Facility Operating License No. DPR-31 for Turkey Point Unit 3. contains Subsequent Renewed Facility Operating License No. DPR-41 for Turkey Point Unit 4. contains the following appendices related to Turkey Point Units 3 and 4:
- Appendix A, Technical Specifications
- Appendix B, Environmental Protection Plan contains the Record of Decision for Turkey Point. is a draft copy of the related Federal Register notice of issuance of the subsequent renewed licenses as sent to the Office of the Federal Register for publication.
M. Nazar The technical basis for issuing the subsequent renewed facility operating licenses for Turkey Point is set forth in the NRC staffs Safety Evaluation Report Related to the Subsequent License Renewal of Turkey Point Generating Units 3 and 4, dated July 22, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19191A057). The results of the NRC staffs environmental review related to the issuance of the subsequent renewed licenses are summarized in the record of decision, which is provided as Enclosure 4 to this letter, and are provided in detail in NUREG-1437, Supplement 5, Second Renewal, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal, Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report, dated October 2019 (ADAMS Accession No. ML19290H346).
No technical changes were made to the Technical Specifications as a result of this subsequent license renewal.
A new section, Section 2.1, Endangered Species Act, was added to Appendix B, Environmental Plan. Section 2.1 discusses the Biological Opinion issued by the Fish and Wildlife Service (FWS) that includes an Incidental Take Statement pertaining to the American crocodile (Crocodylus acutus) and eastern indigo snake (Drymarchon couperi). The Biological Opinion includes a Reasonable and Prudent Measure that the FWS determined to be necessary and appropriate to reduce take and to minimize the direct and indirect effects on listed species.
The Terms and Conditions that implement the Reasonable and Prudent Measure are nondiscretionary. The currently applicable Biological Opinion concludes that continued operation of Turkey Point Nuclear Generating Unit Nos. 3 and 4, as a result of the subsequent license renewal, is not likely to jeopardize the continued existence of the listed species or to adversely affect the designated critical habitat of those species. FPL is required to adhere to the requirements of the Incidental Take Statement in the Biological Opinion. Future changes to the Biological Opinion, including the Incidental Take Statement, Reasonable and Prudent Measures, and Terms and Conditions contained therein, must be preceded by consultation between the NRC, as the authorizing agency, and the FWS.
If you have any questions regarding this matter, please feel free to contact me by phone at 301-415-6223 or by e-mail at David.Drucker@nrc.gov.
Sincerely,
/RA/
David Drucker, Senior Project Manager License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosures:
As stated cc: Listserv
ML19305C878 (Package),
ML19305C879(Letter),
ML19310D777 (Unit 3 Subsequent Renewed License),
ML19310D778 (Unit 4 Subsequent Renewed License),
ML19326C114 (Appendix A - Technical Specifications),
ML19308B570 (Appendix B - Environmental Protection Plan),
ML19309F859 (Record of Decision),
ML19305C880 (Federal Register Notice),
- concurrence via e-mail OFFICE PM:DNRL:NLRP LA:DNRL:NLRP Tech Editor PM:DORL:LPL2-2 BC:DORL:LPL2-2 NAME WBurton YEdmonds SSchwarz MBarillas UShoop DATE 11/4/2019 11/4/2019 11/4/2019 11/08/2019 11/15/2019 OFFICE BC:NMSS:ELRB BC:DNRL:NLRP* OGC (NLO) D:DNRL D:NRR NAME RElliott EOesterle STurk ABradford HNieh DATE 11/15/2019 11/4/2019 12/4/2019 12/4/2019 12/4/2019 OFFICE PM:DNRL:NLRP NAME DDrucker DATE 12/4/2019
Enclosure 1 Turkey Point Unit 3 Subsequent Renewed Facility Operating License ADAMS Accession No. ML19310D777
Enclosure 2 Turkey Point Unit 4 Subsequent Renewed Facility Operating License ADAMS Accession No. ML19310D778
Enclosure 3 Turkey Point 3 and 4 Appendix A, Technical Specifications, ADAMS Accession No. ML19326C114 The Technical Specifications did not change as a result of the subsequent license renewal of the Turkey Point Nuclear Generating Unit Nos. 3 and 4 and are not included here.
Appendix B, Environmental Protection Plan ADAMS Accession No. ML19308B570 The Environmental Protection Plan was revised as a result of the subsequent license renewal of the Turkey Point Nuclear Generating Unit Nos. 3 and 4.
Enclosure 4 Turkey Point 3 and 4 Record of Decision for Turkey Point ADAMS Accession No. ML19309F859
Enclosure 5 Turkey Point 3 and 4 Copy of the Draft Federal Register Notice of Subsequent Renewed Facility Operating Licenses ADAMS Accession No. ML19305C880